36C24518R0243-003.docx
DOCX document 35 KB Posted
- Solicitation number
- 36C24518R0243
About this file
36C24518R0243 attachment 2.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24518C0179-000.docx | DOCX document | |
| 36C24518R0243-0002000.docx | DOCX document | |
| 36C24518R0243-0002001.pdf | ||
| 36C24518R0243-0001003.docx | DOCX document | |
| 36C24518R0243-002.docx | DOCX document | |
| 36C24518R0243-001.docx | DOCX document | |
| 36C24518R0243-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2: QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):
| Monthly | Quarterly | As needed | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (Check): | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
Contract Discrepancy Report (Attachment 3)
Contract No.
Report No. for this Discrepancy:
Contractor/Manager’s Name:
From: (Name of Project Officer)
Dates
Prepared:
Returned by Contractor:
Action Complete:
Discrepancy or Problem:
Signature of Contracting Officer:
To: (Contracting Officer)
From: (Contractor)
Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)
Signature of Contractor Representative:
Date:
Government Evaluation:
Government Actions:
Close Out
| Name |
| Title |
| Signature |
| Date |
Contractor Notified
Project Officer
Contracting Officer
File details come from the government source that posted it.