36C24518R0207_0003.docx

DOCX document 37 KB Posted

Attached to
Shuttle Transportation Services for VAMHCS
Solicitation number
36C24518R0207
Issued by

About this file

36C24518R0207 0003 36C24518R0207 0003.docx

View the file

Other files

File Type Posted
36C24519C0074-000.docx DOCX document
36C24518R0207_0002.docx DOCX document
36C24518R0207-0001002.docx DOCX document
36C24518R0207-003.pdf PDF
36C24518R0207-005.pdf PDF
36C24518R0207-007.pdf PDF
36C24518R0207-004.pdf PDF
36C24518R0207-006.pdf PDF
36C24518R0207-002.pdf PDF
36C24518R0207-008.pdf PDF
36C24518R0207-001.docx DOCX document
36C24518R0207-000.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) None Department of Veterans Affairs Network Contracting Office 5

Department of Veterans Affairs Network Contracting Office 5

To all Offerors/Bidders

36C24518R0207 01-17-2019

X X X

11:00 AM EST, 1-18-2019

See CONTINUATION Page The purpose of this amendment is to inform offerors of the revision to solicitation section B.2, Price Schedule. The Base Period was reduced from 12 months to 7 months due to limited FY19 funding. A 5-month option period was added on the tail end of the contract so that the contract term will still total 5 years, inclusive of all options. See the Continu ation Pages for the revised Price Schedule.

The solicitation closing date is extended to 11:00 AM EST, 1-18-2019.

CONTINUATION PAGE

B.2 PRICE/COST SCHEDULE

ITEM NUMBER
DESCRIPTION OF SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
7.00
MO
__________________
__________________

Metro Shuttle Contract Period: Base POP Begin: 03-01-2019 POP End: 09-30-2019

7.00
MO
__________________
__________________

Marc Shuttle

7.00
MO
__________________
__________________

Metro West Parking Shuttle

7.00
MO
__________________
__________________

Lexington Market Metro Subwaylink Shuttle Contract Period: Base

7.00
MO
__________________
__________________

Annex/Arena Shuttle

7.00
MO
__________________
__________________

Annex Shuttle

7.00
MO
__________________
__________________

Washington DC Shuttle

7.00
MO
__________________
__________________

Glen Burnie Shuttle

7.00
MO
__________________
__________________

Perry Point Shuttle

7.00
MO
__________________
__________________

Loch Raven Shuttle

7.00
MO
__________________
__________________

Cambridge Shuttle

7.00
MO
__________________
__________________

East Baltimore Shuttle

7.00
MO
__________________
__________________

Cambridge/Eastern Shore Door-to-Door Shuttle Contract Period: Base

12.00
MO
__________________
__________________

Metro Shuttle Contract Period: Option 1 POP Begin: 10-01-2019 POP End: 09-30-2020

12.00
MO
__________________
__________________

Marc Shuttle

12.00
MO
__________________
__________________

Metro West Parking Shuttle

12.00
MO
__________________
__________________

Lexington Market Metro

Contract Period: Option 1

12.00
MO
__________________
__________________

Annex/Arena Shuttle

12.00
MO
__________________
__________________

Annex Shuttle

12.00
MO
__________________
__________________

Washington DC Shuttle

12.00
MO
__________________
__________________

Glen Burnie Shuttle

12.00
MO
__________________
__________________

Perry Point Shuttle

12.00
MO
__________________
__________________

Loch Raven Shuttle

12.00
MO
__________________
__________________

Cambridge Shuttle

12.00
MO
__________________
__________________

East Baltimore Shuttle

12.00
MO
__________________
__________________

Cambridge/Eastern Shore

Contract Period: Option 1

12.00
MO
__________________
__________________

Metro Shuttle Contract Period: Option 2 POP Begin: 10-01-2020 POP End: 09-30-2021

12.00
MO
__________________
__________________

Marc Shuttle

12.00
MO
__________________
__________________

Metro West Parking Shuttle

12.00
MO
__________________
__________________

Lexington Market Metro

Contract Period: Option 2

12.00
MO
__________________
__________________

Annex/Arena Shuttle

12.00
MO
__________________
__________________

Annex Shuttle

12.00
MO
__________________
__________________

Washington DC Shuttle

12.00
MO
__________________
__________________

Glen Burnie Shuttle

12.00
MO
__________________
__________________

Perry Point Shuttle

12.00
MO
__________________
__________________

Loch Raven Shuttle

12.00
MO
__________________
__________________

Cambridge Shuttle

12.00
MO
__________________
__________________

East Baltimore Shuttle

12.00
MO
__________________
__________________

Cambridge/Eastern Shore

Contract Period: Option 2

12.00
MO
__________________
__________________

Metro Shuttle Contract Period: Option 3 POP Begin: 10-01-2021 POP End: 09-30-2022

12.00
MO
__________________
__________________

Marc Shuttle

12.00
MO
__________________
__________________

Metro West Parking Shuttle

12.00
MO
__________________
__________________

Lexington Market Metro

Contract Period: Option 3

12.00
MO
__________________
__________________

Annex/Arena Shuttle

POP End: 09-30-202

12.00
MO
__________________
__________________

Annex Shuttle

12.00
MO
__________________
__________________

Washington DC Shuttle

12.00
MO
__________________
__________________

Glen Burnie Shuttle

12.00
MO
__________________
__________________

Perry Point Shuttle

12.00
MO
__________________
__________________

Loch Raven Shuttle

12.00
MO
__________________
__________________

Cambridge Shuttle

12.00
MO
__________________
__________________

East Baltimore Shuttle

12.00
MO
__________________
__________________

Cambridge/Eastern Shore

Contract Period: Option 3

12.00
MO
__________________
__________________

Metro Shuttle Contract Period: Option 4 POP Begin: 10-01-2022 POP End: 09-30-2023

12.00
MO
__________________
__________________

Marc Shuttle

12.00
MO
__________________
__________________

Metro West Parking Shuttle

12.00
MO
__________________
__________________

Lexington Market Metro

Contract Period: Option 4

12.00
MO
__________________
__________________

Annex/Arena Shuttle

12.00
MO
__________________
__________________

Annex Shuttle

12.00
MO
__________________
__________________

Washington DC Shuttle

12.00
MO
__________________
__________________

Glen Burnie Shuttle

12.00
MO
__________________
__________________

Perry Point Shuttle

12.00
MO
__________________
__________________

Loch Raven Shuttle

12.00
MO
__________________
__________________

Cambridge Shuttle

12.00
MO
__________________
__________________

East Baltimore Shuttle

12.00
MO
__________________
__________________

Cambridge/Eastern Shore

Contract Period: Option 4

5.00
MO
__________________
__________________

Metro Shuttle Contract Period: Option 5 POP Begin: 10-01-2023 POP End: 02-29-2024

5.00
MO
__________________
__________________

Marc Shuttle

5.00
MO
__________________
__________________

Metro West Parking Shuttle

5.00
MO
__________________
__________________

Lexington Market Metro

Contract Period: Option 5

5.00
MO
__________________
__________________

Annex/Arena Shuttle

5.00
MO
__________________
__________________

Annex Shuttle

5.00
MO
__________________
__________________

Washington DC Shuttle

5.00
MO
__________________
__________________

Glen Burnie Shuttle

5.00
MO
__________________
__________________

Perry Point Shuttle

5.00
MO
__________________
__________________

Loch Raven Shuttle

5.00
MO
__________________
__________________

Cambridge Shuttle

5.00
MO
__________________
__________________

East Baltimore Shuttle

5.00
MO
__________________
__________________

Cambridge/Eastern Shore

Contract Period: Option 5

GRAND TOTAL
__________________

File details come from the government source that posted it.