36C24518B0232-0001005.pdf
PDF 149 KB Posted
- Attached to
- Replace OR and ICU Roofs (VA-18-00087961) Federal contract opportunity
- Solicitation number
- 36C24518B0232
About this file
36C24518B0232 0001 540-18-025S - VA Clarksburg Re Roof --Sheet - 2 of 2.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24518C0163-000.docx | DOCX document | |
| 36C24518B0232-0004000.docx | DOCX document | |
| 36C24518B0232-0003000.docx | DOCX document | |
| 36C24518B0232-0002001.pdf | ||
| 36C24518B0232-0002000.docx | DOCX document | |
| 36C24518B0232-0002004.pdf | ||
| 36C24518B0232-0002002.pdf | ||
| 36C24518B0232-0002003.pdf | ||
| 36C24518B0232-0001010.pdf | ||
| 36C24518B0232-0001002.pdf | ||
| 36C24518B0232-0001011.pdf | ||
| 36C24518B0232-0001007.pdf | ||
| 36C24518B0232-0001008.pdf | ||
| 36C24518B0232-0001009.pdf | ||
| 36C24518B0232-0001004.pdf | ||
| 36C24518B0232-0001000.docx | DOCX document | |
| 36C24518B0232-0001006.pdf | ||
| 36C24518B0232-0001001.pdf | ||
| 36C24518B0232-0001003.pdf | ||
| 36C24518B0232-004.zip | ZIP file | |
| 36C24518B0232-002.pdf | ||
| 36C24518B0232-003.zip | ZIP file | |
| 36C24518B0232-001.docx | DOCX document | |
| 36C24518B0232-005.docx | DOCX document | |
| 36C24518B0232-000.docx | DOCX document |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
72' - 0" 96' - 0 1/2"
/4
1/ 4"
68' - 8 1/4" 124' - 0"
Roof 3R0201
Roof 2R0202
²11²13²15²16²17²18²19²20²21²22
²E
²F
²J
²L
²M
²N
²O
EXIST. GOOSE NECK VENT
EXIST. 30" ROOF PADS
ABANDONED
COOLING
TOWER
EXIST.
30"
ROOF
PADS
EXIST. VENT AND
BIOHAZARD BOX
EJ EJ
45' - 6"
30' - 6"
EXIST.
LOUVERS ON
WALL FACE
EXIST. I-EF-23
EXIST. I-EF-111E
EXIST. I-EF-2F-126
EXIST. I-EF-IF-28
EXIST.
F-4
EXIST. F-2
EXIST. F-4
EXIST. F-3
EXIST. BIOHAZARD
EXIST. HAZARD EXHAUST FAN
EXIST. LAB
EXHAUST
HOODS
2F-140
EXIST. LAB
EXHAUST
HOODS
2F-161
EXIST. LAB
EXHAUST
HOODS
2F-154
EXIST.LAB
EXHAUST
HOODS
2F-154
EXIST. COMPRESSOR UNIT
14" STONE CAP ON 6" PARAPET
EXIST. 4" WIDE CURB. 2 "
TALL. AND GRAVEL STOP
AT 3 1/2"
5 5
SLOPE.
MATCH
EXISTING.
5 5 5
EQUIPMENT/PIPE CURB
GOOSENECK VENT
EXHAUST VENT
ROOF DRAIN
PLUMBING VENT
ROOF DRAWING SYMBOLS
ITEMS ABOVE ROOF DECK
ITEMS ON ROOF DECK
LIGHTNING PROTECTION
SCUPPER/OVERFLOW DRAIN
SUPPLY/RETURN DUCTS
EPDM ROOF PAVERS
NO WORK ON THIS ROOF
GUARDRAIL
LADDER W/ CAGE AND
CROSSOVER PLATFORM
LADDER W/ CAGE AND
CROSSOVER PLATFORM
(NO CAGE)
WINDOW CLEANING
ANCHORAGE POINT
LOCATION
ALTERNATE: SEE GI100 AND
SPECIFICATIONS FOR MORE
INFO.
SPRINKLER SYSTEM; DRY PIPE
SPECIFIC PLAN NOTES
1. CUT OUT & REMOVE EXISTING ROOF
SYSTEM WITH WET/FAILED INSULATION.
PROVIDE NEW INSULATION, COVER
BOARD AND EPDM MEMBRANE.
MAINTAIN EXISTING ROOF SLOPE. TIE
INTO EXISTING EPDM ROOF
MEMBRANE PER MANUFACTURE'S
RECOMMENDATIONS. PROVIDE NEW
FLASHING AT WALLS, ROOF TOP UNITS,
AND ROOF PENETRATIONS AS
REQUIRED. PROVIDE NEW METAL
COPING IN WHOLE LENGTHS.
2. CUT OUT & REMOVE EXISTING ROOF
SYSTEM TO DECK. INSTALL NEW
INSULATION, 4" THICK FOR 20 R-VALUE
MIN. GREATER THICKNESS AS REQUIRED
FOR 1/8" SLOPE. THICKER/GREATER AS
REQUIRED FOR SLOPE. INSTALL
COVERBOARD AND EPDM MEMBRANE.
PROVIDE NEW FLASHING AT WALLS,
ROOF TOP UNITS AND ROOF
PENETRATIONS AS REQUIRED.
3. REMOVE EXISTING WALKWAY PADS AS
REQUIRED FOR NEW CONSTRUCTION.
UPON COMPLETION OF ROOF
RESTORATION, INSTALL NEW WALKWAY
PADS IN SAME LOCATION. MATCH
EXISTING.
4. EXISTING LADDER. MODIFY LOOSE END
LENGTH TO BE NO LESS THAN 8" ABOVE
EPDM.
5. CLEAN ROOF DRAIN AND PIPE. VIDEO
STORM FOR CLEAR OBSTRUCTIONS
UNTIL STORM DRAINS LATERAL BELOW
GRADE.
6. REMOVE ROOF DRAIN AND REPLACE
WITH NEW ROOF DRAIN OF EQUAL SIZE
7. EXISTING LIGHTNING PROTECTION.
REMOVE FOR WORK. REINSTALL.
8. NOT USED
9. NOT USED
10. REMOVE, REFLASH, AND REPLACE
STONE CAP.
11. PROVIDE NEW WALK PADS, TYPICAL.
MATCH EXISTING
12. PROVIDE NEW ROOF SCUPPER OPENING
THROUGH EXISTING MASONRY PARAPET
AND PROVIDE SCUPPER PER DETAIL
16/AS500.
13. ROUTE DOWNSPOUT HORIZONTALLY
TO THIS LOCATION WITH 1/4" PER FOOT
SLOPE, MINIMUM. TURN DOWN AND
DISCHARGE ON ROOF BELOW. PROVIDE
WALL BRACKETS 5'-0" O.C. MAX.
14. GENERAL CONTRACTOR TO
COORDINATE WITH COR BEFORE
PERFORMING ANY AND ALL WORK IN
THE VICINITY OF DESIGNATED EXIST.
BIO-HAZARDOUS AND LAB EXHAUST
VENTS.
NOTE: NOT ALL SPECIFIC PLAN NOTES
APPEAR ON EVERY SHEET. THIS LIST
INCLUDES ALL SPECIFIC PLAN NOTES FOR THE
ENTIRE PROJECT.
P:\13.1065 - VA Clarksburg - IDIQ\Task 003 - Roof Repairs\2. Drawings\2-3_Archived\BID Documents\AutoCAD\13-1065-003-VAClarksburgReRoof-100_aogrzewalla-VAHorizBlack-764419.jpg
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
LOUIS A. JOHNSON VAMC
CLINICAL ADDITION
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number 540-18-025S
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
BID DOCUMENTS
LEVEL 3 ROOF PLANS
05-07-2018
REPLACEMENT OF
OPERATING ROOMS AND
ICU ROOFS
SCALE: 1/64" = 1'-0"
LEVEL 3 KEY PLAN
SCALE: 1/8" = 1'-0"1LEVEL 3 ENLARGED ROOF PLAN TRUE
N
| Model |
| Layout1 |
File details come from the government source that posted it.