Additional Information Fire Extinguisher Inspections Approximately.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
H312--Fire Extinguisher Inspection Amendment 0003 Federal contract opportunity
Solicitation number
36C24426Q0159
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This is a fire extinguisher inspection tracking spreadsheet and amendment to a solicitation for fire extinguisher inspection and testing services issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The spreadsheet provides a comprehensive monthly inspection reference document detailing the locations, quantities, and types of 263 fire extinguishers across multiple buildings and facilities. The inventory includes various extinguisher types: 110 units of 10 lb ABC, 5 units of 10 lb CO2, 11 units of 15 lb CO2, 102 units of 5 lb ABC, 20 units of 5 lb CO2, 5 units of 2.5 gallon water mist, 4 units of 2.5 gallon pressurized water, 3 units of Type K, 3 units of 5 lb Halotron, and additional specialty units distributed across Buildings 1, 2, 3, 5, 11, 17, 35, 42, CLCs (Care Living Centers), vehicles, parking garages, and outdoor locations. Extinguishers are located in various high-risk areas including kitchens, mechanical rooms, electrical closets, laboratories, operating rooms, stairwells, and emergency exits.

The solicitation amendment (36C24426Q0159) updates the clause list, separates line items, adds additional attachments, and extends the quote due date to February 20, 2026, at 3:00 PM EST. The tracking document references NFPA 10 (2018 edition) standards and indicates hydrostatic testing requirements, with inspection dates ranging from 2014 to 2021 and due dates extending through 2027. The document serves as the baseline inventory for the inspection and maintenance contract, enabling the contractor to understand the full scope of fire extinguisher inspection, testing, and maintenance services required across the entire Veterans Affairs facility network.

View the file

Other files for this federal contract opportunity

Other files attached to H312--Fire Extinguisher Inspection Amendment 0003, newest first.
File Type Posted
Contract Opportunities 36C24426Q0159 0003_1.docx DOCX document
36C24426Q0159 0002 Fire Extinguisher Inspections Wilkes Barre.pdf PDF
36C24426Q0159 0001 Wilkes Barre Fire Extinguisher Inspections.pdf PDF
852.219-75 MUST SIGN AND RETURN WITH PROPOSAL.pdf PDF
SCA WD 2015-4239.txt TXT text file
36C24426Q0159.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LC-MonthlyInspTrack-New01.0 (2)

#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

111GNew Warehouse Receiving Area10 lb ABC
211GNew Warehouse Large Supply Room10 lb ABC
311GNew Warehouse Corridor (Across from Restroom)10 lb ABC
411GNew Warehouse Connecting Corridor10 lb ABC
511GNew Warehouse Connecting Corridor10 lb ABC
611GInside double doors after mailroom in Hose Cabinet10 lb CO2
711GInside double doors after mailroom in Hose Cabinet10 lb ABC
811GBiomed Shop Corridor; Outside EG-3415 lb CO2
911GBiomed Shop Corridor; Outside EG-3410 lb ABC
1011GShop Corridor Hose cabinet, next to BG4;right of Boiler&Pump room doors10 lb ABC
1111GShop Corridor Hose cabinet, next to BG4;right of Boiler&Pump room doors5 lb CO2
1211GPump/Compressor Room, inside rm BG4;Outside of Plumbing Shop5 lb CO2
1311GPlumbing Shop; 1st doors on left5 lb ABC
1411GPlumbing Shop Cart 15 lb ABC
1511GPlumbing Shop Cart 25 lb ABC
1611GPlumbing Shop Cart 32.5 lb ABC
1711GPlumbing Shop Cart 42.5 lb ABC
1811GBoiler Control Rm; outside brick wall10 lb ABC
1911GBoiler Control Rm; in boiler room-far right corner10 lb ABC
2011GBoiler Rm Hose Cabinet;in boiler room-front left corner10 lb ABC
2111GWelding Shop; across from Maint Shop-on front side of table5 lb CO2
2211GPaint Shop Corridor; next to G915 lb CO2
2311GPaint Shop Corridor; next to G910 lb ABC
2411GShop Area Center;Electric Shop sign above door-next to G-1H15 lb CO2
2511GCarpenter Shop; Far right shop-next to exit door10 lb ABC
2611GPaint Storage Room; Thru storage shelves & turn right-next to G-1B10 lb ABC
2711GMezzanine Level;upstairs on left-next to Exit Door10 lb ABC
281GInside Mail Room EG-445 lb CO2
3111GLaundry5 lb ABC
3211GLaundry5 lb ABC
3311GTrash Compactor Corridor5 lb ABC
3417GWarehouse-side of steel beam10 lb ABC
3517GWarehouse-Center steel beam10 lb ABC
3617GWarehouse-next to Supervisor's Office5 lb ABC
3717GWarehouse-Next to garage doors10 lb ABC
3817GNew Kitchen Construction-outside sterile supply room10lb ABC
391GPrimary Supply Room CB-60A10 lb ABC
401GEMS Bulk Storage (CB-23)5 lb ABC
411GStair 2 East between CB 20A & CB 2010 lb ABC
431GInside of med surge10lb ABC
441GAnsul System HoodAuto Extinguish Sys
451GNew Kitchen Office area-CG-3910 lb ABC
461GKitchen Receiving Corrider next to Freezers10 lb ABC
471GKitchen adjacent to Fryer/Cooker and below Ansul tanksAmerex K-Type
481GKitchen adjacent to Cart Cooler (Added 8/22/22) on column10 lb ABC
491GKitchen Dishwasher Area (Added 3/3/22) on column10 lb ABC
501GCB-09 Vault Room15 lb CO2
511GCB-09 Vault Room15 lb CO2
521GCenter Hose Cabinet, Stair 310 lb ABC
531GPharmacy, Bulk storage10lb ABC
541GPharmacy, back door inside15 lb CO2
551GPharmacy, side door inside10 lb ABC
561GPharmacy, inside customer serving window.5 lb ABC
571GStair 4 Hose Cabinet10 lb ABC
581GNorth Canteen Serving LineType K
591GNorth Canteen Kitchen AreaType K
601GNear Police Office (across from water fountain)5 lb ABC
611GCommand Center5 lb ABC
621GER Switch Gear Room/Electrical Room; AG-20/AG-18; 522 Key5 lb C02
631GER Next to CG-2910 lb ABC
641GER Next to CG-17A10 lb ABC
651GER Across from Stair1 (enter from Silver Elev side)10 lb ABC
661GNew ER section, Waiting room next to water fountain10lb ABC
671GNew ER section, Between Exam rooms 1 & 210lb ABC
68GGenerator Bldg. near ER entrance (Master Key)10 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

111Stair 2 East Hose Cabinet, next to C1-35A10 lb ABC
211East MHC C1-50A10 lb ABC
311C1-22;Telephone Room;(522 Key-left out of silver elev)5 lb CO2
411Stair 3 Center Hose Cabinet10 lb ABC
511Green Elevator Lobby, North5 lb ABC
611Stair 4 North Hose Cabinet10 lb ABC
711Dental Lab-N1-108 (In N1-109)10 lb ABC
811Dental Clinic (across N1-112 & next to N1-134)5 lb ABC
911Dental Clinic (across N1-124 & next to N1-133)5 lb ABC
1011Clinic Counter (behind counter)10 lb ABC
1111Clinic A1-61 Stair 610 lb ABC
1211Clinic across from A1-4310 lb ABC
1311First Floor;Across from A1-02-in hallway-orange elev)10 lb ABC
1411Stair 1 West Hose5 lb ABC
1511Chapel Hose Cabinet5 lb ABC
1611Chapel Smoke Shack5 lb ABC
1711Computer Room IT has to let you in5 lb CO2
1811Computer Room IT has to let you in5 lb CO2
1911Computer Room C1-20 IT has to let you in5 lb Halotron
2011ALPHA Room IT has to let you in5 lb Halotron
2111Ammunition Room (C1-24) (Police inspects & sends email)10lb ABC
2211Ammunition Room (C1-27) (Police inspects & sends email)10lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

2312Stair 2 East-Hose Cabinet10 lb ABC
2412East Adjacent Room C2-33E5 lb ABC
2512Nuclear Medicine (MRI) Corridor5 lb CO2
2612Nuclear Medicine (MRI) Corridor2.5 Gal Water mist
2712PET/CT Control Room-211, inside Rm 212 (ck in use)5 lb ABC
2812Nuclear Medicine (MRI)-Rm2195 lb CO2
ERROR:#REF!12C2-07- Wheelchair / Bed Repair Room (use Master Key)10 lb ABC
ERROR:#REF!12Stair 1 West Hose Cabinet10 lb ABC
ERROR:#REF!12Stair 3 Center Hose Cabinet10 lb ABC
ERROR:#REF!12Stair 4 North Hose Cabinet10 lb ABC
ERROR:#REF!12NCA (in room A2-59A)5 lb ABC
ERROR:#REF!12NCA Ext near Stairway 6-near A2-535 lb ABC
ERROR:#REF!12NCA Waiting Room, next to water fountain & nurse station10 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

113Stair 2 East Hose Cabinet10 lb ABC
213Stair 3 Center Hose Cabinet10 lb ABC
313North Phlebotomy Lab (N3-78, inside blood draw on left)5 lb ABC
413Hallway (in hall past Blood draw immed after make left -N3-94)10 lb ABC
513West - A3-45 break room inside10 lb ABC
613West - A3-45 break room outside10 lb ABC
713Bldg1, West - A3-55 Histology (two; 1-inside & 1-outside of room)10 lb ABC
813North Stair 4, Hose Cabinet10 lb ABC
913North New Lab, center room post-enter by door on left,always open10 lb ABC
1013North, New-Lab N3-98, microbiology (N3-98 is written on tag)10 lb ABC
1113North, New-Lab N3-100, molecular lab10 lb ABC
1213West - between C3-62 & C3-635 lb ABC
1313West - between C3-10 & C3-11 (South/East hallway)5 lb ABC
1413West - C3-69 (next to C3-69 / Across from Stair 1)5 lb ABC
1513West - A3-03 (near orange elevator mechanical room) 522 key10 lb CO2
1613West (across from A3-06 & next to A3-05)10 lb ABC
1713Center (2nd A3-03 room-past A3-36-down A3-35 corridor) 522 key10 lb CO2
1813West-A3-21 Eye Clinic(locked-MSA behind counter gave 065044 key)5 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

114OR next to A4-4210 lb ABC
214OR B;on left wall after double doors;Gown up/have them bring to you5 lb CO2
314MICU/SICU; behind Desk Area 15 lb CO2
414MICU/SICU; behind Desk Area 12.5 Gal Water mist
514MICU/SICU; behind Desk Area 25 lb CO2
614MICU/SICU; behind Desk Area 22.5 Gal Water mist
714West SPU C4-16, near clerk desk on wall10 lb ABC
814West SPU Stair 110 lb ABC
914West SPU, near bed 610 lb ABC
1014West SPU between C4-03 & C4-04; Corridor to CLC10 lb ABC
1114West C4-07; Corridor to CLC10 lb ABC
1214West SPU Waiting Room5 lb ABC
1314Stair 2 East Hose Cabinet-near C4-3410 lb ABC
1414Stair 3 Center Hose Cabinet10 lb ABC
1514Surgical Recovery Rm (PACU)-N4-865 lb CO2
1614Stair 4 North Hose Cabinet-SPS10 lb ABC
1714SPS (Clean);N4-97(in N4-94 on right);Gown up/have them bring to you5 lb ABC
1814SPS (Dirty);N4-101(in N4-105 on right);Gown up/have them bring to you5 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

115Stair 2 East Hose Cabinet5 lb ABC
315Stair 3 Center Hose Cabinet5 lb ABC
415Center Mech Room C5-75 (125186 Key)10 lb CO2
215Stair 1 West Hose Cabinet5 lb ABC
515A/C Shop Hose CabinetPW 2.5 Gal
615A/C Shop Center Col15 lb CO2
715A/C Shop Machine Room15 lb CO2
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

116Stair 1 West Hose Cabinet10 lb ABC
216C6-67E Elevator Mech Room in C6-67F (681522)5 lb ABC
316Across from C6-565 lb ABC
416Silver Elevator Lobby, next to C6-785 lb ABC
516Corridor C6-255 lb ABC
616Corridor to Library; between C6-27 & C6-285 lb ABC
716East Corridor, Stair 25 lb ABC
816North -Stairwell #4 Above AC shop10 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

117Stair 2 East Cabinet10 lb ABC
217Stair 1 West Hose Cabinet5 lb ABC
317Stair 3 Center Hose Cabinet, Silver Elev.10 lb ABC
417Research Workroom;A7-69-off orange elev;locked;MikeSurdy/NancyTomko let in5 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

118Stair 2 East Hose Cabinet10 lb ABC
218C8-50 ADL Kitchen (090 Housekeeper Key)5 lb ABC
318Stair 3 Center Hose Cabinet, Silver Elev.10 lb ABC
418West Corridor between C8-81 & C8-825 lb ABC
518West Audiology between C8-61 & C8-62 (South/East)5 lb ABC
618Stair 1 West Hose Cabinet10 lb ABC
718West Sleep Lab between C8-03 & C8-045 lb ABC
818West Orange Elevator Lobby5 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

119Stair 2 East Hose Cabinet5 lb ABC
219East Nurses Station, C9-16-5 lb ABC
319Stair 3, Center Hose Cabinet, Silver Elevators10 lb ABC
419Stair 1 West Hose Cabinet (Nurse's Station has Key)5 lb ABC
519West Nurse's Station5 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1110Stair 2 East Hose Cabinet10 lb ABC
2110Stair 3 Center Hose Cabinet5 lb ABC
3110Stair 1 West Hose Cabinet5 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1111Stair 2 East Hose Cabinet C11-245 lb ABC
2111Stair 2 East Electrical Closet-Across C11-25 (in stairwell)5 lb ABC
3111Stair 3 Center Hose Cabinet, Silver Elev.5 lb ABC
4111Stair 1 West Hose Cabinet, C11-0310 lb ABC
5111Stair 5 C11-6D, Orange Elevator Mech Room
(Orange stairwell on 10 go up one flight)(Master or Roof key)10 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1112West Penthouse, stair #1 (Master or Roof Key)5 lb CO2
2112Stair 3 Center Hose Cabinet; Stair Gate-Key 125186;top of 2nd stair5 lb ABC
3112Center Penthouse; (681522 Key)5 lb CO2
4112Service Elevators (7 & 8) - Machine Room; (681522 Key)5 lb ABC
5112East Penthouse, stair #2 (Master or Roof Key)5 lb CO2
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1113Stair 3, Machine Room (Key 522)5 lb CO2
2113Stair 3, Silver Elevators 1-4 Mech Room, 13th Floor(681522 Key)10 lb ABC
3113Stair 3, Center Communication Room 13-000 on right (125186 Key) by a/c unit5 lb ABC
CLC
#BLDGFLOOR1 CLC
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

11CLCAdjacent to Stairway;next to locker room 1-118 by Stair 1-left of outside entrance5 lb ABC
21CLCAdjacent to Elevators Right off the elevators-next to C1-35 lb ABC
31CLCElevator Machine Room C1-103; inside C1-3 double doors; (125816 key)5 lb ABC
41CLCGenerator Bldg. near 1CLC5 lb ABC
#BLDGFLOOR2 CLC
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

12CLCRoom 2-114, inside right of sink5 lb ABC
22CLCRoom 2-114, Kitchen Hood6lb K class
32CLCacross from room 2-11410 lb ABC
42CLCAdjacent room between 2-118 & 2-11910 lb ABC
52CLCAcross from room 2-106, next to water fountain & ice machine5 lb ABC
62CLCWest Nurse's Station; between Dementa Unit door & Nurse's Station5 lb ABC
72CLCAcross from room 2-148 (sally port)10 lb ABC
82CLCAdjacent room 2-12610 lb ABC
92CLCbetween room 2-135 & 2-13610 lb ABC
102CLCStair 3, corridor, near room 2-132 (sally port)10 lb ABC
112CLCAdjacent room 2-133, back canteen hallway, near stairway #310 lb ABC
122CLCStair 1 Adjacent room 2-1015 lb ABC
2CLCAnsul System
#BLDGFLOOR3 CLC (start left off Gold Elevators & right of Nurse's Station)
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

13CLCAdjacent room 3-101, between 3-101 & Stair110 lb ABC
23CLCAdjacent room 3-12710 lb ABC
33CLCAdjacent room 3-13710 lb ABC
43CLCHospice Kitchen/ Family Room, 3-1355 lb ABC
53CLCAdjacent room 3-13310 lb ABC
63CLCCross Corridor10 lb ABC
73CLCAcross from room 3-114 (in front of cross corridor doors)10 lb ABC
83CLCAdjacent room between 3-119 & 3-12010 lb ABC
93CLCAdjacent room 3-106, next to water fountain5 lb ABC
103CLCAdjacent room 3-147, outside main dining room10 lb ABC
#BLDGFLOOR4 CLC
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

14CLCAdjacent to Room 4-107 (left)5 lb ABC
24CLCAcross from Room 4-107-main hemodialysis doors5 lb ABC
34CLCGold Elevator Lobby5 lb ABC
44CLCAdjacent to Room 4-1345 lb ABC
54CLCInside Room 4-132, Cath recovery room5 lb ABC
64CLCAcross from Room 4-12510 lb ABC
74CLCAdjacent to Room 4-119, office outside wall5 lb ABC
84CLCBetween Room 4-118 & 4-120 (hemodialysis back side of room)5 lb ABC
94CLCBetween Room 4-140 & 4-144 (across from Cath Lab Procedure Room)5 lb CO2
104CLCBetween Room 4-139 & 4-1415 lb ABC
114CLCAdjacent to Room 4-1645 lb ABC
124CLCCross Corridor5 lb ABC
#BLDGFLOORBLDG 35
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1351Corridor5 lb ABC
2351Corridor5 lb ABC
3351Corridor5 lb ABC
4351Corridor5 lb ABC
#BLDGFLOORBLDG 42
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1421Corridor5 lb ABC
2421Corridor5 lb ABC
3421Corridor5 lb ABC
4421Corridor5 lb ABC
5Pump HouseFire Pump Building10 lb ABC
6PavilionOutside Pavilion Key in Bill's office for lock (Removed for the winter)10 lb ABC
7PavilionOutside Pavilion Key in Bill's office for lock (Removed for the winter)10lb K-type
#BLDGFLOORBLDG 2
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

121Kitchen5 lb ABC
2222nd Floor5 lb ABC
32BBasement10 lb ABC
#BLDGFLOORBLDG 3
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

131BLDG 310 lb ABC
231BLDG 310 lb ABC
3322nd floor, top of stairs, left side10 lb ABC
#BLDGFLOORBLDG 5
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

151First Floor10 lb ABC
252Second Floor10 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1OutsideCase 580-Back loader2.5 lb ABC
2OutsideShed 1-In fenced/gated area behind Pole Barn10 lb ABC
3OutsideBig Vac-leaf sucker/blower2.5 lb ABC
4OutsidePump House-Stone building behind Pole Barn10 lb ABC
5OutsidePole Barn10 lb ABC
6OutsidePole Barn10 lb ABC
7OutsidePole Barn(outside)10 lb ABC
8OutsideNew Pole Barn10 lb ABC
9OutsideNew Pole Barn10 lb ABC
10OutsideNew Pole Barn(outside)10 lb ABC
11OutsideChipper (Orange in color)5 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

1VehiclePolice Vehicle 0544K (Police inspects & sends email)10 lb ABC
2VehiclePolice Vehicle 2552L (Police inspects & sends email)5 lb ABC
4BusFMS Bus VA215765 lb ABC
#BLDGFLOOR
LOCATION OF FIRE EXTINGUISHER:TYPE OF FIRE

EXTINGUISHER

45Parking Garage-Elavator machine roomCO2-
45Parking Garage-Electrical Room basementCO2
45Parking Garage-Elevator machine roomABC-5lb
45Parking Garage-Colum South SideABC-10lb
45Parking Garage-Elevator LobbyABC-10lb
Parking Garage-Elevator LobbyABC-10lb
Parking Garage-Elevator LobbyABC-10lb

2024 Monthly Fire Extinguisher Inspections

Reference: NFPA 10 (2018 edition), EC 02.03.05 EP 15 (monthly); EP 16 (annual)

Spares

HYDRO/TYPE OF
MAINT.FIRE EXTINGUISHER
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare

Vehicles

HYDRO/TYPE OFDATE
LOCATION OF FIRE EXTINGUISHER:MAINT.FIRE EXTINGUISHERINSP.
Police Vehicle 0544K2015
Police Vehicle 2552L2016
FMS Bus VA227322017
FMS Bus VA215762016
DUV VA 226402018

Hydrostatic Test Dates

LOCATION OF FIRE EXTINGUISHER:TYPE EXTINGUISHERINSP DATEDATE DUELOCATION OF FIRE EXTINGUISHER:TYPE EXTINGUISHERINSP DATEDATE DUE
Bldg 11, Basement, Shop Corridor Hose cabinetCO2 10 lb20162021Bldg. 11, Basement, EB-31 Men's Locker Room10 lb ABC20142020
Bldg 1, Fifth Floor, Center Mech RoomCO2 10 lb20162021Bldg. 11, Basement, Boiler Rm Hose Cabinet10 lb ABC20152021
Bldg 1, Third Floor, West - A3-03CO2 10 lb20162021Bldg. 1, Basement, Primary Supply Room CB-6410 lb ABC20152021
Bldg 1, Third Floor, West - A3-03CO2 10 lb20162021Bldg. 1, Basement, Center Hose Cabinet, Stair 310 lb ABC20152021
SpareCO2 10 lb20162021Bldg. 11, Basement, Outside mailroom double doors in Hose Cabinet10 lb CO220162021
Bldg 11, Basement, Paint Shop CorridorCO2 15 lb20162021Bldg. 1, Fifth Floor, Center Mech Room C5-7510 lb CO220162021
Bldg 11, Basement, Welding ShopCO2 5 lb20162021Bldg. 1, Third Floor, West - A3-03, near blue elevator mechanical room10 lb CO220162021
Bldg 11, Basement, Pump/Compressor RoomCO2 5 lb20162021Bldg. 1, Third Floor, Center - A3-03 between A3-36-down hallway old lab10 lb CO220162021
Bldg 1, Basement, Mail RoomCO2 5 lb20162021Bldg. 11, Basement, Paint Shop Corr+B9idor15 lb CO220162021
Bldg 1, First Floor, Computer RoomCO2 5 lb20162021Bldg. 1, Second Floor, Nuclear Medicine (MRI) Corridor2.5 Gal Water mist20162021
Bldg 1, First Floor, Computer RoomCO2 5 lb20162021Bldg. 1, First Floor, Dental Clinic, across N1-1125 lb ABC20152021
Bldg 1, First Floor, C1-22 TelephoneCO2 5 lb20162021Bldg. 1, Third Floor, West - between C3-62 & C3-635 lb ABC20152021
Bldg 1, Fourth Floor, MICU/SICUCO2 5 lb20162021Bldg. 1, Third Floor, West - between C3-10 & C3-115 lb ABC20152021
Bldg 1, Twelfth Floor, West PenthouseCO2 5 lb20162021Generator Bldg. near 1CLC5 lb ABC20152021
SpareCO2 5 lb201620213CLC, Hospice Kitchen/ Family Room, 3-1355 lb ABC20152021
Bldg 1, First Floor, Computer Room C1-20Halotron 5 lb20162021Police Vehicle 2552L5 lb ABC20152021
Bldg 1, First Floor, ALPHA RoomHalotron 5 lb20162021Bldg. 1, First Floor, C1-22 Telephone5 lb CO220162021
Bldg 1, Fifth Floor, A/C Shop Hose CabinetPW 2.5 Gal20162021Bldg. 1, Fourth Floor, Surgical Recovery Rm (PACU)-N4-865 lb CO220162021
Bldg 1, Second Floor, Nuclear Medicine (MRI) CorridorWatermist 2.5 Gal20162021Bldg. 1, Fourth Floor, MICU/SICU5 lb CO220162021
Bldg 11, Basement, Paint Shop CorridorABC 10 lb20162022Bldg. 1, Twelfth Floor, West Penthouse, stair #15 lb CO220162021
Bldg 1, Basement, Center Hose CabinetABC 10 lb20162022Bldg. 1, First Floor, Computer Room C1-205 lb Halotron20162021
Bldg 1, Basement, ER Next to CG-29ABC 10 lb20162022Bldg. 1, First Floor, ALPHA Room5 lb Halotron20162021
Bldg 1, Basement, ER Next to CG-17AABC 10 lb20162022Bldg. 11, Basement, Paint Shop Corridor10 lb ABC20162022
Bldg 1, Basement, ER Across from Stair1ABC 10 lb20162022Bldg. 1, Basement, ER Next to CG-2910 lb ABC20162022
Generator Bldg near ER entranceABC 10 lb20162022Bldg. 1, Basement, ER Next to CG-17A10 lb ABC20162022
Bldg 1, First Floor, Dental LabABC 10 lb20162022Bldg. 1, Basement, ER Across from Stair110 lb ABC20162022
Bldg 1, Tenth Floor, Stair 2 East Hose CabinetABC 10 lb20162022Bldg. 1, First Floor, Dental Lab-N1-10810 lb ABC20162022
Bldg 1, Eleventh Floor, Stair 1 West Hose CabinetABC 10 lb20162022Bldg. 1, Sixth Floor, North -Stairwell #4 Above AC shop10 lb ABC20162022
2CLC, Adjacent room 2-148ABC 10 lb20162022Bldg. 1, Ninth Floor, Center Hose Cabinet, Silver Elevators10 lb ABC20162022
Outside PavillionABC 10 lb20162022Bldg. 1, Tenth Floor, Stair 2 East Hose Cabinet10 lb ABC20162022
Shed 1ABC 10 lb20162022Bldg. 1, Eleventh Floor, Stair 1 West Hose Cabinet, C11-0310 lb ABC20162022
SpareABC 10 lb201620222CLC, Across from room 2-148 (sally port)10 lb ABC20162022
SpareABC 10 lb20162022Outside Pavilion Key in Bill's office for lock10 lb ABC20162022
Bldg 1, Fourth Floor, Stair 4 North Hose CabinetABC 10 lb20162022Shed 1-In fenced/gated area behind Pole Barn10 lb ABC20162022
Bldg 1, Fourth Floor, OR A4-42ABC 10 lb20162022New Pole Barn10 lb ABC20162022
Bldg 11, Basement, Plumbing Shop CartABC 5 lb20162022Bldg. 1, Fourth Floor, Stair 4 North Hose Cabinet-SPS10 lb ABC20162022
Bldg 11, Basement, LaundryABC 5 lb20162022Bldg. 1, Fourth Floor, OR next to A4-4210 lb ABC20162022
Bldg 11, Basement, LaundryABC 5 lb20162022Bldg. 11, Basement, Shop Area Center15 lb CO220172022
Bldg 11, Basement, Trash Compactor CorridorABC 5 lb20162022Bldg. 11, Basement, Biomed Shop Corridor15 lb CO220172022
Bldg 1, Basement, Near Police OfficeABC 5 lb20162022Bldg. 1, Fourth Floor, MICU/SICU2.5 Gal Water mist20172022
Bldg 1, Basement, Command CenterABC 5 lb20162022Bldg. 11, Basement, Laundry5 lb ABC20162022
Bldg 1, First Floor, Stair 2 East Hose CabinetABC 5 lb20162022Bldg. 11, Basement, Laundry5 lb ABC20162022
Bldg 1, First Floor, Chapel Hose CabinetABC 5 lb20162022Bldg. 11, Basement, Trash Compactor Corridor5 lb ABC20162022
Bldg 1, Second Floor, C2-43ABC 5 lb20162022Bldg. 1, Basement, Near Police Office5 lb ABC20162022
Bldg 1, Second Floor, C2-14 CanteenABC 5 lb20162022Bldg. 1, Basement, Command Center5 lb ABC20162022
Bldg 1, Second Floor, NCA Ext near Stairway 6ABC 5 lb20162022Bldg. 1, First Floor, Stair 2 East Hose Cabinet, next to C1-35A5 lb ABC20162022
Bldg 1, Second Floor, NCA A2-59ABC 5 lb20162022Bldg. 1, First Floor, Chapel Smoke Shack5 lb ABC20162022
Bldg 1, Third Floor, North Phlebotomy Lab (N3-78)ABC 5 lb20162022Bldg. 1, First Floor, Chapel Hose Cabinet5 lb ABC20162022
Bldg 1, Third Floor, West - C3-69ABC 5 lb20162022Bldg. 1, Second Floor, C2-435 lb ABC20162022
Bldg 1, Third Floor, West Stair 6ABC 5 lb20162022Bldg. 1, Second Floor, C2-14 Canteen, near front entrance5 lb ABC20162022
Bldg 1, Third Floor, West - Lab AreaABC 5 lb20162022Bldg. 1, Second Floor, NCA Ext near Stairway 6-near A2-535 lb ABC20162022
Bldg 1, Third Floor, West - Lab AreaABC 5 lb20162022Bldg. 1, Second Floor, NCA A2-59A5 lb ABC20162022
Bldg 1, Third Floor, West - A3-20 Eye ClinicABC 5 lb20162022Bldg. 1, Third Floor, North Phlebotomy Lab (N3-78)5 lb ABC20162022
Bldg 1, Fifth Floor, Stair 2 East Hose CabinetABC 5 lb20162022Bldg. 1, Third Floor, West - C3-69, next to C3-69 / Across from Stair.15 lb ABC20162022
Bldg 1, Fifth Floor, Stair 3 Center Hose CabinetABC 5 lb20162022Bldg. 1, Third Floor, West - A3-21 Eye Clinic5 lb ABC20162022
Bldg 1, Sixth Floor, Corridor C6-33ABC 5 lb20162022Bldg. 1, Fifth Floor, Stair 2 East Hose Cabinet5 lb ABC20162022
Bldg 1, Eight Floor, C8-50 ADL KitchenABC 5 lb20162022Bldg. 1, Fifth Floor, Stair 3 Center Hose Cabinet5 lb ABC20162022
Bldg 1, Ninth Floor, Stair 2 East Hose CabinetABC 5 lb20162022Bldg. 1, Sixth Floor, Corridor between C6-27 & C6-285 lb ABC20162022
Bldg 1, Ninth Floor, West Nurse's StationABC 5 lb20162022Bldg. 1, Eight Floor, C8-50 ADL Kitchen5 lb ABC20162022
Bldg 1, Tenth Floor, Stair 3 Center Hose CabinetABC 5 lb20162022Bldg. 1, Ninth Floor, Stair 2 East Hose Cabinet5 lb ABC20162022
Bldg 1, Tenth Floor, Stair 1 West Hose CabinetABC 5 lb20162022Bldg. 1, Ninth Floor, West Nurse's Station5 lb ABC20162022
Bldg 1, Eleventh Floor, Stair 2 East Hose CabinetABC 5 lb20162022Bldg. 1, Tenth Floor, Stair 3 Center Hose Cabinet5 lb ABC20162022
Bldg 1, Eleventh Floor, Stair 2 East Electrical ClosetABC 5 lb20162022Bldg. 1, Tenth Floor, Stair 1 West Hose Cabinet5 lb ABC20162022
Bldg 1, Eleventh Floor, Stair 3 Center Hose CabinetABC 5 lb20162022Bldg. 1, Eleventh Floor, Stair 2 East Hose Cabinet C11-245 lb ABC20162022
4CLC, Adjacent to Room 4-139ABC 5 lb20162022Bldg. 1, Eleventh Floor, Stair 2 East Electrical Closet-Across C11-255 lb ABC20162022
4CLC, Adjacent to Room 4-164ABC 5 lb20162022Bldg. 1, Eleventh Floor, Stair 3 Center Hose Cabinet, Silver Elev.5 lb ABC20162022
4CLC, Cross CorridorABC 5 lb201620224CLC, Between Room 4-139 & 4-1415 lb ABC20162022
BLDG 35, CorridorABC 5 lb201620224CLC, Adjacent to Room 4-1645 lb ABC20162022
BLDG 35, CorridorABC 5 lb201620224CLC, Cross Corridor5 lb ABC20162022
BLDG 35, CorridorABC 5 lb20162022BLDG 35, Corridor5 lb ABC20162022
BLDG 42ABC 5 lb20162022BLDG 35, Corridor5 lb ABC20162022
BLDG 42ABC 5 lb20162022BLDG 35, Corridor5 lb ABC20162022
BLDG 42ABC 5 lb20162022BLDG 425 lb ABC20162022
Police Vehicle 2552LABC 5 lb20162022BLDG 425 lb ABC20162022
FMS Bus VA21576ABC 5 lb20162022BLDG 425 lb ABC20162022
Bldg 1, Fourth Floor, SPD (Clean)ABC 5 lb20162022FMS Bus VA215765 lb ABC20162022
Bldg 1, Fourth Floor, West SPU Waiting RoomABC 5 lb20162022Bldg. 1, Fourth Floor, SPS (Clean) N4-975 lb ABC20162022
Bldg 1, Basement, EMS Bulk Storage (CB-23)ABC 5 lb20162022Bldg. 1, Fourth Floor, West SPU Waiting Room5 lb ABC20162022
Bldg 11, Basement, Shop AreaCO2 15 lb20172022Bldg. 1, Basement, EMS Bulk Storage (CB-23)5 lb ABC20162022
Bldg 11, Basement, Biomed Shop CorridorCO2 15 lb20172022Bldg. 1, Basement, ER Switch Gear Room/Electrical Room5 lb C0220172022
SparePW 2.5 Gal20172022Bldg. 11, Basement, Paint Storage Room, (near back wall)10 lb ABC20172023
SparePW 2.5 Gal20172022Bldg. 11, Basement, Mezzanine Level10 lb ABC20172023
Bldg 1, Basement, CB-78 KitchenType K20172022Bldg. 1, Basement, Pharmacy, side door inside10 lb ABC20172023
SpareType K20172022Bldg. 1, Basement, Stair 4 Hose Cabinet10 lb ABC20172023
Bldg 1, Fourth Floor, MICU/SICUWatermist 2.5 Gal20172022Bldg. 1, First Floor, Stair 3 Center Hose Cabinet10 lb ABC20172023
SpareWatermist 2.5 Gal (MRI)20172022Bldg. 1, Second Floor, Stair 4 North Hose Cabinet10 lb ABC20172023
Bldg 11, Basement, Paint Storage RoomABC 10 lb20172023Bldg. 1, Third Floor, North New Lab, center of room post10 lb ABC20172023
Bldg 11, Basement, Mezzanine LevelABC 10 lb20172023Bldg. 1, Third Floor, North Stair 4, Hose Cabinet10 lb ABC20172023
Bldg 11, Basement, EMS Equipment RoomABC 10 lb20172023Bldg. 1, Sixth Floor, Stair 1 West Hose Cabinet10 lb ABC20172023
Bldg 1, Basement, PharmacyABC 10 lb20172023Bldg. 1, Seventh Floor, Stair 3 Center Hose Cabinet, Silver Elev.10 lb ABC20172023
Bldg 1, Basement, Stair 4 Hose CabinetABC 10 lb20172023Bldg. 1, Eight Floor, Stair 1 West Hose Cabinet10 lb ABC20172023
Bldg 1, First Floor, Stair 3 Center Hose CabinetABC 10 lb20172023Bldg. 1, Eight Floor, Stair 3 Center Hose Cabinet, Silver Elev.10 lb ABC20172023
Bldg 1, Second Floor, Stair 4 North Hose CabinetABC 10 lb201720233CLC, Adjacent room 3-101, between 3-101 & Stair110 lb ABC20172023
Bldg 1, Third Floor, North New LabABC 10 lb201720233CLC, Adjacent room 3-147, outside main dining room10 lb ABC20172023
Bldg 1, Third Floor, North Stair 4ABC 10 lb201720234CLC, Across from Room 4-12510 lb ABC20172023
Bldg 1, Sixth Floor, Stair 1 West Hose CabinetABC 10 lb20172023BLDG 310 lb ABC20172023
Bldg 1, Seventh Floor, Stair 3 Center Hose CabinetABC 10 lb20172023BLDG 5 First Floor10 lb ABC20172023
Bldg 1, Eight Floor, Stair 1 West Hose CabinetABC 10 lb20172023Pole Barn10 lb ABC20172023
Bldg 1, Eight Floor, Stair 3 Center Hose CabinetABC 10 lb20172023Pole Barn10 lb ABC20172023
3CLC, Adjacent room 3-101ABC 10 lb20172023New Pole Barn10 lb ABC20172023
4CLC, Adjacent to Room 4-119ABC 10 lb20172023Bldg. 1, Fourth Floor, West SPU, near bed 610 lb ABC20172023
4CLC, Across from Room 4-125ABC 10 lb20172023Bldg. 1, Fourth Floor, West SPU Stair 110 lb ABC20172023
4CLC, Across from Room 4-144ABC 10 lb20172023Bldg. 1, Fourth Floor, West SPU C4-16, near clerk desk on wall10 lb ABC20172023
BLDG 3ABC 10 lb20172023Bldg. 1, Fourth Floor, West SPU between C4-03 & C4-0410 lb ABC20172023
BLDG 5 First FloorABC 10 lb20172023Bldg. 1, Fourth Floor, West C4-0710 lb ABC20172023
BLDG 5 Second FloorABC 10 lb20172023Bldg. 1, First Floor, Ammunition Room (C1-24)10lb ABC20172023
Pole BarnABC 10 lb20172023Bldg. 1, Fifth Floor, A/C Shop Center Col15 lb CO220182023
Pole BarnABC 10 lb20172023Case 580-Back loader2.5 lb ABC20172023
SpareABC 10 lb20172023Big Vac-leaf sucker/blower2.5 lb ABC20172023
Bldg 1, Fourth Floor, West SPUABC 10 lb20172023Bldg. 17, Basement, Warehouse-next to Dave's Office5 lb ABC20172023
Bldg 1, Fourth Floor, West SPU Stair 1ABC 10 lb20172023Bldg. 1, First Floor, Stair 1 West Hose5 lb ABC20172023
Bldg 1, Fourth Floor, West SPU C4-16ABC 10 lb20172023Bldg. 1, Second Floor, PET/CT Control Room-211, inside Rm 2125 lb ABC20172023
Bldg 1, Fourth Floor, West SPU C4-04ABC 10 lb20172023Bldg. 1, Ninth Floor, East Nurses Station, C9-16-5 lb ABC20172023
Bldg 1, Fourth Floor, West C4-07ABC 10 lb20172023Bldg. 1, Twelfth Floor, Service Elevators (7 & 8) - Machine Room5 lb ABC20172023
Bldg 1, First Floor, Ammunition Room (C1-24)ABC 10 lb20172023Bldg. 1, Thirteenth Floor, Stair 3, Center Communication Room 13th Floor5 lb ABC20172023
Case 580ABC 2.5 lb201720231CLC, Adjacent to Elevators Right off the elevators-next to C1-35 lb ABC20172023
Big VacABC 2.5 lb201720234CLC, Adjacent to Room 4-1075 lb ABC20172023
Bldg 17, Basement, WarehouseABC 5 lb201720234CLC, Across from Room 4-107-main hemodialysis doors5 lb ABC20172023
Bldg 1, Basement, PharmacyABC 5 lb201720234CLC, Gold Elevator Lobby5 lb ABC20172023
Bldg 1, Second Floor, PET/CT Control RoomABC 5 lb201720234CLC, Adjacent to Room 4-1345 lb ABC20172023
Bldg 1, Ninth Floor, East Nurses StationABC 5 lb201720234CLC, Inside Room 4-132, Cath recovery room5 lb ABC20172023
Bldg 1, Twelfth Floor, Service Elevator Machine RoomABC 5 lb201720234CLC, Between Room 4-118 & 4-120 (hemodialysis)5 lb ABC20172023
Bldg 1, Twelfth Floor, Center Comunication RoomABC 5 lb201720234CLC, Adjacent to Room 4-119, office outside wall5 lb ABC20172023
1CLC, Adjacent to ElevatorsABC 5 lb20172023BLDG 35, Corridor5 lb ABC20172023
4CLC, Adjacent to Room 4-107ABC 5 lb20172023Bldg. 1, Fourth Floor, SPS (Dirty) N4-1015 lb ABC20172023
4CLC, Across from Room 4-107ABC 5 lb20172023Bldg. 1, Second Floor, Nuclear Medicine (MRI) Corridor5 lb CO220182023
4CLC, Elevator LobbyABC 5 lb20172023Bldg. 1, Second Floor, Nuclear Medicine (MRI)-Rm2195 lb CO220182023
4CLC, Adjacent to Room 4-134ABC 5 lb20172023Bldg. 1, Twelfth Floor, Center Penthouse5 lb CO220182023
4CLC, Room 4-132ABC 5 lb20172023Bldg. 1, Basement, CB-78 KitchenType K20182023
4CLC, Adjacent to Room 4-118ABC 5 lb20172023Bldg. 1, Basement, North Entrance Smoke Shack2.5 lb ABC20182024
BLDG 35, CorridorABC 5 lb20172023Bldg. 11, Basement, Boiler Control Rm, outside wall10 lb ABC20182024
FMS Bus VA22732ABC 5 lb20172023Bldg. 11, Basement, Boiler Control Rm, far right corner of boiler room.10 lb ABC20182024
SpareABC 5 lb20172023Bldg. 1, Basement, Kitchen Receive Corridor10 lb ABC20182024
Bldg 1, Basement, ER Switch Gear RoomCO2 5 lb20172023Bldg. 1, First Floor, East MHC C1-50A10 lb ABC20182024
Bldg 1, Second Floor, Nuclear Medicine (MRI) CorridorCO2 5 lb20182023Bldg. 1, First Floor, Stair 4 North Hose Cabinet10 lb ABC20182024
Bldg 1, Second Floor, Nuclear Medicine (MRI)CO2 5 lb20182023Bldg. 1, First Floor, Clinic A1-61 Stair 610 lb ABC20182024
SpareWatermist 2.5 Gal (MRI)20182023Bldg. 1, First Floor, Clinic across from A1-4310 lb ABC20182024
Bldg 11, Basement, Boiler Control RmABC 10 lb20182024Bldg. 1, First Floor, Clinic Counter10 lb ABC20182024
Bldg 1, Basement, Kitchen Receive CorridorABC 10 lb20182024Bldg. 1, Second Floor, Stair 1 West Hose Cabinet10 lb ABC20182024
Bldg 1, Basement, Kitchen Office CorridorABC 10 lb20182024Bldg. 1, Second Floor, Stair 3 Center Hose Cabinet10 lb ABC20182024
Bldg 1, First Floor, East MHC C1-50AABC 10 lb20182024Bldg. 1, Third Floor, Stair 2 East Hose Cabinet10 lb ABC20182024
Bldg 1, First Floor, Stair 4 North Hose CabinetABC 10 lb20182024Bldg. 1, Third Floor, West, A3-06, next to A3-0510 lb ABC20182024
Bldg 1, First Floor, Clinic A1-61 Stair 6ABC 10 lb20182024Bldg. 1, Third Floor, West - A3-45 break room inside10 lb ABC20182024
Bldg 1, First Floor, Clinic A1-43ABC 10 lb20182024Bldg. 1, Third Floor, West - A3-45 break room outside10 lb ABC20182024
Bldg 1, First Floor, Clinic CounterABC 10 lb20182024Bldg1, Third Floor, West-A3-55 Histology10 lb ABC20182024
Bldg 1, Second Floor, Stair 1 West Hose CabinetABC 10 lb20182024Bldg. 1, Third Floor, North, New-Lab N3-98, microbiology10 lb ABC20182024
Bldg 1, Second Floor, Stair 3 Center Hose CabinetABC 10 lb20182024Bldg. 1, Third Floor, North, New-Lab N3-100, molecular lab10 lb ABC20182024
Bldg 1, Second Floor, NCA Waiting RoomABC 10 lb20182024Bldg. 1, Eight Floor, Stair 2 East Hose Cabinet10 lb ABC20182024
Bldg 1, Third Floor, Stair 2 East Hose CabinetABC 10 lb20182024Bldg. 1, Eleventh Floor, Stair 5 C11-6D, Elevator Mech Room Blue elevators10 lb ABC20182024
Bldg 1, Third Floor, Stair 3 Center Hose CabinetABC 10 lb201820242CLC, across from room 2-11410 lb ABC20182024
Bldg 1, Third Floor, West Near A3-06ABC 10 lb201820242CLC, Adjacent room between 2-118 & 2-11910 lb ABC20182024
Bldg 1, Eight Floor, Stair 2 East Hose CabinetABC 10 lb201820242CLC, Adjacent room 2-12610 lb ABC20182024
Bldg 1, Ninth Floor, Center Hose CabinetABC 10 lb201820242CLC, between room 2-135 & 2-13610 lb ABC20182024
2CLC, Adjacent room 2-114ABC 10 lb201820242CLC, Stair 3, corridor, near room 2-132 (sally port)10 lb ABC20182024
2CLC, Adjacent room 2-118ABC 10 lb201820242CLC, Adjacent room 2-133, back canteen hallway, near stairway #310 lb ABC20182024
2CLC, Adjacent room 2-126ABC 10 lb201820243CLC, Adjacent room 3-12710 lb ABC20182024
2CLC, Adjacent room 2-136ABC 10 lb201820243CLC, Adjacent room 3-13710 lb ABC20182024
2CLC, Adjacent room 2-132ABC 10 lb201820243CLC, Adjacent room 3-13310 lb ABC20182024
2CLC, Adjacent room 2-133ABC 10 lb201820243CLC, Cross Corridor10 lb ABC20182024
3CLC, Adjacent room 3-127ABC 10 lb201820243CLC, Across from room 3-114 (in front of cross corridor doors)10 lb ABC20182024
3CLC, Adjacent room 3-137ABC 10 lb201820243CLC, Adjacent room between 3-119 & 3-12010 lb ABC20182024
3CLC, Adjacent room 3-133ABC 10 lb20182024Fire Pump Building10 lb ABC20182024
3CLC, CorridorABC 10 lb20182024Outside Pavilion Key in Bill's office for lock10 lb ABC20182024
3CLC, Across from room 3-112ABC 10 lb20182024BLDG 3, 2nd floor, top of stairs, left side.10 lb ABC20182024
3CLC, Adjacent room 3-120ABC 10 lb20182024BLDG 5 Second Floor10 lb ABC20182024
3CLC, Adjacent room 3-106ABC 10 lb20182024Bldg. 1, Thirteenth Floor, Stair 3, Silver Elevator Mech Room, 13th Floor10 lb ABC20182024
3CLC, Adjacent room 3-147ABC 10 lb20182024BLDG 17 Basement, New Kitchen Construction-outside sterile supply room10lb ABC20182024
Fire Pump BuildingABC 10 lb20182024Bldg. 1, Basement New ER section, Waiting room next to water fountain10lb ABC20182024
Outside PavillionABC 10 lb20182024Bldg. 1, Basement New ER section, Between Exam rooms 1 & 210lb ABC20182024
Bldg 1, First Floor, Ammunition Room (C1-27)ABC 10 lb20182024Bldg. 1, First Floor, Ammunition Room (C1-27)10lb ABC20182024
SpareABC 2.5 lb20182024Bldg. 1, Basement, CB-09 Vault Room15 lb CO220192024
Bldg 11, Basement, Plumbing ShopABC 5 lb20182024Bldg. 1, Fourth Floor, MICU/SICU2.5 Gal Water mist20182024
Bldg 1, Fifth Floor, Stair 1 West Hose CabinetABC 5 lb20182024Bldg. 11, Basement, Plumbing Shop5 lb ABC20182024
Bldg 1, Seventh Floor, Research WorkroomABC 5 lb20182024Bldg. 1, First Floor, East Stair 2 Smoke Shack5 lb ABC20182024
Bldg 1, Ninth Floor, Stair 1 West Hose CabinetABC 5 lb20182024Bldg. 1, Sixth Floor, C6-67E Elevator Mech Room5 lb ABC20182024
1CLC, Smoke Shack adjacent to entranceABC 5 lb20182024Bldg. 1, Sixth Floor, Across from C6-565 lb ABC20182024
2CLC, Room 2-114ABC 5 lb20182024Bldg. 1, Seventh Floor, Research Workroom5 lb ABC20182024
2CLC, Adjacent room 2-106ABC 5 lb20182024Bldg. 1, Ninth Floor, Stair 1 West Hose Cabinet5 lb ABC20182024
2CLC, Stair 1 Adjacent room 2-101ABC 5 lb201820242CLC, Room 2-114, inside left of sink5 lb ABC20182024
2CLC, West Nurse's StationABC 5 lb201820242CLC, Across from room 2-106, next to water fountain & ice machine5 lb ABC20182024
BLDG 42ABC 5 lb201820242CLC, Stair 1 Adjacent room 2-1015 lb ABC20182024
Police Vehicle 0544KABC 5 lb201820242CLC, West Nurse's Station5 lb ABC20182024
SpareABC 5 lb201820243CLC, Adjacent room 3-106, next to water fountain5 lb ABC20182024
SpareABC 5 lb20182024BLDG 425 lb ABC20182024
SpareABC 5 lb20182024Police Vehicle 0544K5 lb ABC20182024
SpareABC 5 lb20182024Bldg. 1, Basement, Inside Mail Room5 lb CO220192024
SpareABC 5 lb20182024Bldg. 1, Thirteenth Floor, Stair 1, Machine Room5 lb CO220192024
SpareCO2 15 lb201920244CLC, Between Room 4-140 & 4-1445 lb CO220192024
Bldg 1, Twelfth Floor, Machine RoomCO2 5 lb20192024Bldg. 17, Basement, Warehouse-Center steel beam10 lb ABC20192025
Bldg 17, Basement, WarehouseABC 10 lb20192025Bldg. 1, Basement, New Kitchen Office area-CG-3910 lb ABC20192025
Bldg 1, Second Floor, C2-07ABC 10 lb20192025Bldg. 1, Second Floor, C2-07-Across from Union Office10 lb ABC20192025
BLDG 2 (Basement)ABC 10 lb20192025Bldg. 1, Third Floor, Hallway, near Blood draw on the wall10 lb ABC20192025
Bldg 1, First Floor, Stair West HoseABC 5 lb20192025Bldg. 1, Seventh Floor, Stair 2 East Cabinet10 lb ABC20192025
Bldg 1, First Floor, Green Elevator LobbyABC 5 lb20192025BLDG 2 (Basement)10 lb ABC20192025
Bldg 1, Second Floor, East Adjacent Room C2-33EABC 5 lb20192025DUV VA2264011 lb halotron ABC20192025
Bldg 1, Eight Floor, West Corridor C8-81ABC 5 lb20192025Bldg. 1, Basement, CB-09 Vault Room15 lb CO220202025
Bldg 1, Eight Floor, West Audiology C8-61ABC 5 lb20192025Bldg. 1, Basement, Pharmacy, back door inside15 lb CO220202025
Bldg 1, Eight Floor, West Sleep Lab C8-03ABC 5 lb20192025Bldg. 1, Fifth Floor, A/C Shop Machine Room15 lb CO220202025
Bldg 1, Eight Floor, West Elevator LobbyABC 5 lb20192025Bldg. 1, Basement, Pharmacy, inside customer serving window.5 lb ABC20192025
Bldg 1, Twelfth Floor, Stair 3 Center Hose CabinetABC 5 lb20192025Bldg. 1, First Floor, Green Elevator Lobby, North5 lb ABC20192025
1CLC, Adjacent to StairwayABC 5 lb20192025Bldg. 1, Second Floor, East Adjacent Room C2-33E5 lb ABC20192025
3CLC, Hospice Kitchen/ Family RoomABC 5 lb20192025Bldg. 1, Eight Floor, West Corridor between C8-81 & C8-825 lb ABC20192025
BLDG 2 (Kitchen)ABC 5 lb20192025Bldg. 1, Eight Floor, West Audiology between C8-61 & C8-625 lb ABC20192025
BLDG 2 (2nd Floor)ABC 5 lb20192025Bldg. 1, Eight Floor, West Sleep Lab between C8-03 & C8-045 lb ABC20192025
Bldg 1, Basement, CB-09 Vault RoomCO2 15 lb20202025Bldg. 1, Eight Floor, West Blue Elevator Lobby5 lb ABC20192025
Bldg 1, Basement, CB-09 Vault RoomCO2 15 lb20202025Bldg. 1, Twelfth Floor, Stair 3 Center Hose Cabinet5 lb ABC20192025
Bldg 1, Basement, PharmacyCO2 15 lb202020251CLC, Adjacent to Stairway, next to locker room 1-1185 lb ABC20192025
Bldg 1, Fifth Floor, A/C Shop Center ColCO2 15 lb20202025BLDG 2 (Kitchen)5 lb ABC20192025
Bldg 1, Fifth Floor, A/C Shop Machine RoomCO2 15 lb20202025BLDG 2 (2nd Floor)5 lb ABC20192025
Bldg 1, Fifth Floor, North Motor RoomCO2 15 lb20202025Chipper (Orange in color)5 lb ABC20192025
Bldg 11, Basement, Shop Corridor Hose cabinetCO2 5 lb20202025DUV VA226405 lb ABC20192025
Bldg 1, Fourth Floor, Surgical Recovery Rm (PACU)CO2 5 lb20202025Bldg. 11, Basement, Welding Shop5 lb CO220202025
Bldg 1, Fourth Floor, MICU/SICUCO2 5 lb20202025Bldg. 11, Basement, Pump/Compressor Room, inside rm BB45 lb CO220202025
Bldg 1, Twelfth Floor, East PenthouseCO2 5 lb20202025Bldg. 11, Basement, Shop Corridor Hose cabinet, next to BB45 lb CO220202025
Bldg 1, Twelfth Floor, Center PenthouseCO2 5 lb20202025Bldg. 1, First Floor, Computer Room5 lb CO220202025
SpareCO2 5 lb20202025Bldg. 1, First Floor, Computer Room5 lb CO220202025
SpareType K20202025Bldg. 1, Fourth Floor, MICU/SICU5 lb CO220202025
Bldg 1, Fourth Floor, MICU/SICUWatermist 2.5 Gal20202025Bldg. 1, Twelfth Floor, East Penthouse, stair #25 lb CO220202025
Bldg 11, Basement, Carpenter ShopABC 10 lb20202026Bldg. 1, Fourth Floor, OR B, on left wall through double doors,5 lb CO220202025
Bldg 11, Basement, Shop Corridor Hose cabinetABC 10 lb20202026Bldg. 1, Fifth Floor, A/C Shop Hose CabinetPW 2.5 Gal20192025
Bldg 11, Basement, Biomed Shop CorridorABC 10 lb20202026Bldg. 11, Basement, Carpenter Shop10 lb ABC20202026
Bldg 11, Basement, EB-31 Men's Locker RoomABC 10 lb20202026Bldg. 11, Basement, Shop Corridor Hose cabinet, next to BB410 lb ABC20202026
Bldg 11, Basement, Shop Corridor Hose CabinetABC 10 lb20202026Bldg. 11, Basement, Outside mailroom double doors in Hose Cabinet10 lb ABC20202026
Bldg 17, Basement, WarehouseABC 10 lb20202026Bldg. 11, Basement, Biomed Shop Corridor10 lb ABC20202026
Bldg 17, Basement, WarehouseABC 10 lb20202026Bldg. 11, Basement, EMS Equipment Room, across from EB-4110 lb ABC20202026
Bldg 1, First Floor, Clinic A1-02ABC 10 lb20202026Bldg. 17, Basement, Warehouse-side of steel beam10 lb ABC20202026
Bldg 1, Second Floor, Stair 2 EastABC 10 lb20202026Bldg. 17, Basement, Warehouse-Next to garage doors10 lb ABC20202026
Bldg 1, Second Floor, C2-14 CanteenABC 10 lb20202026Bldg. 1, Basement, Stair 2 East between CB 20A & CB 2010 lb ABC20202026
Bldg 1, Third Floor, North ICRA Barrier Near N3-113ABC 10 lb20202026Generator Bldg. near ER entrance10 lb ABC20202026
Bldg 1, Seventh Floor, Stair 2 East CabinetABC 10 lb20202026Bldg. 1, First Floor, Clinic A1-0210 lb ABC20202026
BLDG 3ABC 10 lb20202026Bldg. 1, Second Floor, Stair 2 East-Hose Cabinet10 lb ABC20202026
Pump HouseABC 10 lb20202026Bldg. 1, Second Floor, C2-14 Canteen, near back room (2-14D)10 lb ABC20202026
Bldg 1, Fourth Floor, Stair 2 East Hose CabinetABC 10 lb20202026Bldg. 1, Second Floor, NCA Waiting Room, next to water fountain & nurse station10 lb ABC20202026
Bldg 1, Fourth Floor, Stair 3 CenterABC 10 lb20202026Bldg. 1, Third Floor, Stair 3 Center Hose Cabinet10 lb ABC20202026
Bldg 1 Basement, Main Kitchen Hose CabinetABC 10 lb20202026BLDG 310 lb ABC20202026
Bldg 1, Basement, Stair 2 East Hose CabinetABC 5 lb20202026Pump House-Stone building behind Pole Barn10 lb ABC20202026
Bldg 1, First Floor, Dental ClinicABC 5 lb20202026Police DECON vehicle G710782L10 lb ABC20202026
Bldg 1, Sixth Floor, Across from C6-56ABC 5 lb20202026Bldg. 1, Fourth Floor, Stair 2 East Hose Cabinet-near C4-3410 lb ABC20202026
Bldg 1, Sixth Floor, Silver Elevator LobbyABC 5 lb20202026Bldg. 1, Fourth Floor, Stair 3 Center Hose Cabinet10 lb ABC20202026
Bldg 1, Sixth Floor, Corridor C6-25ABC 5 lb20202026Bldg. 1 Basement, Main Kitchen Hose Cabinet10lb ABC20202026
Bldg 1, Sixth Floor, East Corridor, Stair 2ABC 5 lb20202026Bldg. 1, First Floor, Dental Clinic, across N1-1245 lb ABC20202026
Bldg 1, Seventh Floor, Stair 1 West Hose CabinetABC 5 lb20202026Bldg. 1, Fifth Floor, Stair 1 West Hose Cabinet5 lb ABC20202026
1CLC, Elevator Machine RoomABC 5 lb20202026Bldg. 1, Sixth Floor, Silver Elevator Lobby, next to C6-785 lb ABC20202026
Bldg 1, Fourth Floor, SPD (Dirty)ABC 5 lb20202026Bldg. 1, Sixth Floor, Corridor C6-255 lb ABC20202026
Bldg 1, Basement, Primary Supply Room CB-92ABC 10 lb20212027Bldg. 1, Sixth Floor, East Corridor, Stair 25 lb ABC20202026
Bldg 11, Basement, Boiler Rm Hose CabinetABC 5 lb20212027Bldg. 1, Seventh Floor, Stair 1 West Hose Cabinet5 lb ABC20202026
Bldg 1, First Floor, Dental ClinicABC 5 lb202120271CLC, Elevator Machine Room C1-1035 lb ABC20202026
Bldg 1, Third Floor, West - C3-63ABC 5 lb202120272CLC, Room 2-114, Kitchen Hood6lb K class20202026
Bldg 1, Third Floor, West - C3-11ABC 5 lb20212027Bldg. 11, Basement, Plumbing Shop Cart x25 lb ABC2019/20ERROR:#VALUE!
Generator Bldg near 1CLCABC 5 lb20212027Bldg. 1, Basement, CB-78 KitchenAuto Extinguish Sys
SpareABC 5 lb20212027
Bldg 1, Fourth Floor, OR BCO2 5 lb

Quantity by Type

Extinguisher TypeTotal
10 lb ABC110
10 lb CO25
15 lb CO211
2.5 Gal Watermist5
2.5 lb ABC3
5 lb ABC102
5 lb CO220
5 lb Halotron
PW 2.5 Gal4
Type K3

Total 263