About this file

This is Amendment P0002 to solicitation 36C24426B0009 for a Four East Shower Refurbish project at the Wilmington Veterans Affairs Medical Center in Delaware. The amendment was issued April 15, 2026, and extends the proposal deadline to May 27, 2026, at 1:00 PM EST.

The amendment provides responses to ten submitted Requests for Information (RFI), establishes Infection Control Risk Assessment (ICRA) requirements, provides facility drawings, supplies a site visit sign-in sheet, and incorporates FAR clause 52.222-90 addressing DEI discrimination by federal contractors. Key RFI answers clarify that shower bases are approximately 42" x 42", no known hazardous materials are present per industrial hygienist assessment, contractors must remove and finish drain covers properly, contractors must remove and reinstall fixtures as needed for workspace access, structural repairs will be handled via contract modification, hard-barrier enclosure specifications should reference the ICRA form, negative air exhaust placement should reference the ICRA form, no on-site storage is provided for equipment and materials, no off-hours work is anticipated as the unit operates continuously, and technical drawings are available. The amendment specifies that all other terms and conditions of the original solicitation remain unchanged. The Department of Veterans Affairs Network Contracting Office 4 administers this requirement.

View the file

Other files

File Type Posted
drawings for 4th floor.pdf PDF
36C24426B0009 0002_1.docx DOCX document
SIGN IN SHEET FOR SHOWER REFURBISH.pdf PDF
ICRA formfor fourth floor shower refurbish.pdf PDF
36C24426B0009 0001.pdf PDF
36C24426B0009 0001_1.docx DOCX document
36C24426B0009_2.docx DOCX document
36C24426B0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 5

0002 05-13-2026

None

00244

Department of Veterans Affairs Network Contracting Office 4 Wilmington VAMC 1601 Kirkwood Highway Wilmington DE 19805

00244

Department of Veterans Affairs Network Contracting Office 4 Wilmington VAMC 1601 Kirkwood Highway Wilmington DE 19805

To all Offerors/Bidders

36C24426B0009

04-15-2026

X

X X

X 1

The purpose of this amendment is to:

1) Provide answers to submitted RFI's. No additional questions will be accepted.

2) Provide the ICRA requirements.

3) Provide drawings.

4) Provide the site visit sign in sheet. No additional site visits will be conducted.

5) Add FAR clause 52.222-90 Addressing DEI Discrimination by Federal Contractors

All other terms and conditions remain the same. Proposals remain due 05-27-2026 1:00PM EST.

Cheryl Roberts Contracting Officer

36C24426B0009 Four East Shower Refurbish Amendment P0002

Submitted Questions & Corresponding Answers

Answers shown in red text

1. Square Footage: What are the approximate dimensions or square footage of each of the

13 shower bases? Roughly 42” x42”

2. Hazardous Materials: Do the existing shower bases or previous coatings contain any known hazardous materials (e.g., asbestos or lead) that would require specialized abatement protocols? As per the industrial hygienist no known hazardous material is on shower bases.

3. Drain Covers and Plumbing: Is the contractor responsible for removing, replacing, or treating the shower drains/drain covers, or do we simply prep and coat up to the existing drain edges? Yes, remove and finish properly.

4. Fixtures: Will the contractor be required to remove and reinstall any bathroom fixtures (e.g., grab bars, shower doors, or curtains) to properly abrade and coat the bases, or should all adjacent fixtures simply be protected in place? Remove what is needed in workspace and reinstall once completed in that room.

5. Out-of-Scope Repairs: The Statement of Work mentions documenting "water intrusion" during the Pre-Work Inspection. If significant structural rot or severe water damage is found beneath a base, will that repair be handled via a separate contract modification, or is there a baseline allowance we should include in our bid? Contract modification.

6. Hard-Barrier Enclosures: The scope requires "dust-tight, hard-barrier enclosures". Given the typical space constraints of patient bathrooms, are reusable rigid polycarbonate barrier systems (e.g., STARC systems or similar) acceptable, or is the VA expecting traditional temporary drywall/stud framing? Refer to ICRA form.

7. Negative Air Exhaust: Where should the negative air machines be exhausted? Can they be exhausted directly to the outside via a window, tied into the building's existing exhaust, or must they be scrubbed through the HEPA filters and recirculated directly into the unit corridor? Refer to ICRA form.

8. Staging and Storage: Will there be a secure area on the 4 East unit or elsewhere on campus to store our negative air machines, ICRA carts, and coating materials overnight, or must all equipment be completely removed from the unit at the end of each shift?

No storage area provided.

9. Off-Hours Work: The solicitation notes that normal work hours are 7:00 AM to 4:30 PM, but off-hours work may be required. Based on the specific clinical/patient operations of the 4 East unit, should bidders anticipate a significant portion of this work being pushed to 2nd shifts, 3rd shifts, or weekends? No, this unit is active at all times.

10. Can drawings be provided? Yes, see separate attachment.

52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION APR 2026)

(a) Definitions. As used in this clause—

Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations;

or similar opportunities that are sponsored or established by the contractor or subcontractor.

Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.

(b) In connection with the performance of work under this contract, the Contractor agrees as follows:

(1) The Contractor will not engage in any racially discriminatory DEI activities;

(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;

(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;

(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and

(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.

(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).

(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.

(End of clause)

See attached document: drawings for 4th floor.

See attached document: ICRA formfor fourth floor shower refurbish.

See attached document: SIGN IN SHEET FOR SHOWER REFURBISH.

End of Document