This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Department of Veterans Affairs. The amendment (Solicitation Number 36C24425R0061) is for a Temporary Boiler Stub-Outs project at the Coatesville, PA VA facility, with the solicitation receipt date extended to July 17, 2025, at 10:00 EDT. The project involves installing block valves, temporary boiler connections, steam header replacement, electrical and control systems, and site work.

The contract includes two Contract Line Item Numbers (CLINs): CLIN 0001 is the base bid for comprehensive boiler and infrastructure modifications, and CLIN 0002 is a deduct alternate for additional temporary boiler operation months. The government reserves the right to award the base CLIN or include the deduct alternate. The project scope includes installing connection points for boiler feed water and condensate return, electrical power and controls, cameras for monitoring, a temporary control room trailer, driveway repairs, protective bollards, and commissioning of the temporary boiler through April 15, 2026, in compliance with VA and code requirements.

View the file

Other files

File Type Posted
M-601.pdf PDF
M-102.pdf PDF
010000 _11-2021 _General Requirements R1.pdf PDF
36C24425R0061 0004.docx DOCX document
36C24425R0061 0003.docx DOCX document
Temp Boiler sign in.pdf PDF
36C24425R0061 0002.docx DOCX document
2024-12-10 Bid Documents - Drawings.pdf PDF
2024-12-10 Bid Documents - Specifications-Volume II.pdf PDF
36C24425R0061 0001.docx DOCX document
2024-12-10 Bid Documents - Specifications-Volume I.pdf PDF
36C24425R0061.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-02-2025 542-23-105 00244 Department of Veterans Affairs Network Contracting Office 4

CVAMC

1400 Blackhorse Hill Road Coatesville

PA

19320 00244 Department of Veterans Affairs Network Contracting Office 4

CVAMC

1400 Blackhorse Hill Road Coatesville

PA

19320 To all Offerors/Bidders

36C24425R0061 05-15-2025

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-17-2025 10:00 EDT X Project No. 542-23-105 Temporary Boiler Stub-Outs Solicitation 36C24425R0061 is being amended as follows:

** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-17-2025 10:00 EDT

Extending POP for temporary boiler commissioning through April 15, 2026.

Adding bid deduct for temporary boiler commissioning.

Changes to General Requirements SECTION 01 00 00.

Changes to drawings M-102 and M-601.

See attachments for more information.

COST/PRICE BID SCHEDULE

The Government intends to award base Contract Line Item Number (CLIN) CLIN 0001; however, it reserves the right to award the base CLIN 0001, and one Alternative Bid Deduct CLIN 0002.

CLIN 0001. BASE PRICE: Scope of Work description.

Project 542-23-105, ITEM I, General Construction: Work includes installation of block valves to isolate the in-plant boiler supply from the temporary boiler supply, and any other isolation deemed necessary for safety with future construction activities occurring during operation of the plant. Work includes a temporary control room trailer. Work includes driveway repairs and removeable protective bollards, and associated site work.

ITEM II, General Electric: Work includes all connection points for boiler feed water and condensate return, electrical power and controls. Work includes cameras for monitoring the temporary boiler and all associated monitors and wiring.

ITEM III, General Plumbing: Work includes replacement of the steam header in the boiler plant. Work includes hooking up a temporary boiler for commissioning purposes, and commissioning, to ensure that it is fully integrated into the existing plant through April 15, 2026.

All work must be in accordance with VA and code requirements.

LUMP SUM BASE BID: $ ____________

Write Bid Amount in Words **NOTE** Indicate the price for deduct alternates.

CLIN 0002. DEDUCT ALTERNATE #1: All work described in the Base Bid except deduct:

Temporary Boiler: Deduct additional months of temporary boiler operation. Provide a per month bid price for the continued operation of the temporary boilers after the completion of the stub-out and boiler plant work. Disassembly of all temporary fencing and components will still be required upon removal of the temporary boilers. Any incidental costs or miscellaneous rental costs required to keep the temporary boilers operational during this period shall also be included in the per month bid price. The government reserves the right to decline this deduct or to accept this deduct for any number of months or partial months required by the government once the temporary boilers have been placed into service by the contractor.

LUMP SUM DEDUCT ALTERNATE #1: $______________________________________

See attached document: 010000 _11-2021 _General Requirements R1.

See attached document: M-102.

See attached document: M-601.

End of Document