Z2DA--542-23-105 | Temporary Boiler Stub-outs | NCO 4 Construction East (VA-25-00031452)
Solicitation number
36C24425R0061
Issued by

About this file

This document is a Request for Proposal (RFP) for the Coatesville Veterans Affairs Medical Center's Temporary Boiler Stub-outs Project (Project #542-23-105, Solicitation #36C24425R0061). The project involves professional construction services to install temporary boiler infrastructure, including stub-outs, piping connections, block valves, steam header replacement, temporary control room trailer, cameras, monitoring systems, and site work. The VA will use a "Best Value" tradeoff source selection approach, with Technical Capability and Past Performance being equally weighted and significantly more important than Price.

Proposals are due by July 3, 2025, at 10:00 EDT and must be submitted electronically to the Contract Specialist. Offerors must provide a technical proposal (not exceeding 25 pages) covering Proposed Team and Construction Approach, and a past performance section highlighting 3-5 relevant construction projects. The evaluation will include assessing the contractor's organizational structure, experience, construction methodology, and previous project performance. The government intends to award a firm-fixed-price contract to the most responsive and responsible offeror offering the best overall value, with the option to make an award without discussions.

View the file

Other files

File Type Posted
M-102.pdf PDF
010000 _11-2021 _General Requirements R1.pdf PDF
36C24425R0061 0005.docx DOCX document
M-601.pdf PDF
36C24425R0061 0003.docx DOCX document
Temp Boiler sign in.pdf PDF
36C24425R0061 0002.docx DOCX document
36C24425R0061 0001.docx DOCX document
2024-12-10 Bid Documents - Drawings.pdf PDF
2024-12-10 Bid Documents - Specifications-Volume II.pdf PDF
2024-12-10 Bid Documents - Specifications-Volume I.pdf PDF
36C24425R0061.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-17-2025 542-23-105 00244 Department of Veterans Affairs Network Contracting Office 4

CVAMC

1400 Blackhorse Hill Road Coatesville

PA

19320 00244 Department of Veterans Affairs Network Contracting Office 4

CVAMC

1400 Blackhorse Hill Road Coatesville

PA

19320 To all Offerors/Bidders

36C24425R0061 05-15-2025

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-03-2025 10:00 EDT X Project No. 542-23-105 Temporary Boiler Stub-Outs Solicitation 36C24425R0061 is being amended as follows:

Adding evaluation criteria and requirements for submission of Request for Proposal.

COATESVILLE VETERANS AFFAIRS MEDICAL CENTER

1400 Blackhorse Hill Road Coatesville. PA 19320

Temporary Boiler Stub-outs Project #: 542-23-105 Solicitation # 36C24425R0061

Evaluation Criteria

PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA

1. Overview

1.1 The intent of this solicitation is to select one contractor to provide professional construction services per the Statement of Work (SOW), drawings, and specifications for Temporary Boiler Stub-outs, Project #: 542-23-105.

1.2 The Government intends to use the “Best Value” tradeoff process source selection approach in accordance with FAR 15.101-1. Award will be made to the responsive responsible offeror whose offer is in conformance with this solicitation, results in the best value to the Government, price plus other factors considered. The Contracting Officer will award a firm fixed price contract to the responsive responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

2. Submittal of offers

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals, so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's experience, technical approach, and management capabilities to successfully complete the project. Proposals should follow in the order of sequence set forth in the Request for Proposal (RFP). Information provided out of sequence may not be evaluated and may result in the offeror's disqualification from award. Requirements stated in this RFP are minimums. Innovative, creative or cost-saving proposals that meet or exceed the requirements should be clearly noted and justified in the proposal.

2.2 Offerors must comply with the detailed instructions for the format and content of the proposal; proposals that do not comply with the detailed instructions for the format and content of the proposal may be considered non-responsive and may render the Offeror ineligible for award.

2.3 All proposal materials shall be submitted with a table of contents and divided sections. The sections should parallel the submission requirements identified below.

Volume I: Sections 1 & 2 Volume I: Sections 1 & 2 shall be submitted via email to the Contracting Officer. This submission must be typed. Packages that are handwritten will not be evaluated. Failure to place the required submission information under the appropriate section (factor or sub factor) and format may result in a lower rating if the evaluators cannot readily find the appropriate information.

Volume II: Section 3 Volume II: Section 3 shall be submitted via email to the Contracting Officer.

2.4 All proposals shall be submitted to:

Vanessa Chmielewski Contract Specialist E-Mail Address: vanessa.chmielewski@va.gov

3. Proposal Evaluation Process

3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Department of Veterans Affairs will evaluate the proposals. SSEB may also include Architect and Engineering firm non-voting members. The identities of the SSEB personnel are confidential, and any attempt by the offerors to contact these individuals is prohibited. The evaluation will be based on the content of the proposal and any subsequent discussions, if necessary, as well as information obtained from other sources, e.g. past performance information. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence in that technical and past performance proposals are reviewed and rated without knowledge of the price offered. During deliberation, the number and identities of offerors are not revealed to anyone who is not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and award will be made to the responsive responsible offeror whose offer in conformance with this solicitation, results in the best value to the Government, price and other factors considered.

3.2 The evaluation process essentially consists of three parts: Technical, Past Performance and Price Evaluation.

3.2.1 Technical and Past Performance Evaluation: Proposals will be evaluated against the Evaluation Factors and Criteria identified in Par. 4.1 and Pars. 5.1.1, 5.1.2, 5.2.1, and 5.2.2.

3.2.3 Price Evaluation: The CO will evaluate price proposals independent of the technical/past performance evaluation. The SSEB will not have access to price information until completion of the technical/past performance evaluation.

NOTE: Price/Technical Trade-off Analysis: After all above evaluations are complete, the SSEB will compare the relative advantages and disadvantages of technical proposals and weigh against the prices. SOW identifies project scope. The SSEB will then consider all factors to select the proposal offering with the best value to the Government.

4. Evaluation Factors

4.1 Proposals will be evaluated in accordance with the Evaluation Factors identified below. Technical Capability and Past Performance are equal and when combined are significantly more important than Price. Subfactors are of equal importance.

Evaluation Factor 1 – Technical Capability (Volume 1 – Reference 5.1 below) Evaluation Factor 2 – Past Performance (Volume 1 – Reference 5.2 below) Evaluation Factor 3 – Price (Volume 2 – Reference 6.1 below)

4.2 As demonstrated in their proposals, Offerors shall be evaluated in terms of the Offeror’s ability to meet or exceed the project’s requirements as identified in the SOW, and those proposals demonstrating an ability to exceed specified requirements may be rated higher in those areas than proposals demonstrating only the ability to meet requirements. Offerors are reminded to include their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government intends to make award to a responsible Offeror submitting a conforming proposal without discussions, if deemed to be in the best interest of the Government.

5. Volume I – Technical Proposal

5.1 Section 1 – Technical Capability

5.1.1 Submission Requirements

Provide a clear, concise narrative not to exceed 25 pages (front and back side use of a single page will count as 2 pages). Company advertising literature shall not be included. The narrative shall address two subfactors, which are of equal importance: Proposed Team and Construction Approach. The contractor is advised to note in each of these subfactors any elements or aspects exceeding the RFP requirements or betterments provided, including an explanation of how each element or aspect improves upon the basic requirements and how it would benefit the VA.

A. Proposed Team

1) Provide a diagram or organization chart showing the prime contractor and subcontractors that will be tasked with the following major functional categories.

a. Site Civil Construction (e.g., Heavy equipment operations, which includes, but not limited to, earthwork and/or soil & erosion controls)

b. Scheduling and Phasing Work (i.e., Continuity of operations)

c. Safety

d. Demolition – Disposal and Recycling

e. Hazardous Materials

f. Installation of pipe stub-outs required to operate two (2) temporary boilers including pipe fitting and welding operations.

g. Installation and testing of temporary trailer mounted boilers and trailer control room. (including removal of temporary boilers when project is completed)

h. Security including all PSRDM (Physical Security and Resiliency Design Manual revised May 1, 2024) requirements.

i. Underground Utility Coordination

j. Commissioning

2) Provide prime contactor’s project manager and site foreman’s resume. The document should be written to show the construction experience / qualifications with respect to the major functional categories identified in 5.1.1.A above.

3) Provide resume for the functional lead(s) for the major functional categories identified in 5.1.1.A above.

B. Construction Approach

1) Provide a narrative identifying the construction approach anticipated including phasing to maintain continuity of operations. Address the major functional categories identified above (5.1.1.A). The purpose of the narrative is to show the contractor’s ability to plan through the work and successfully complete the project.

2) Identify potential pitfalls and unintended negative impacts associated with the work, and provide a plan to avoid such outcomes.

3) Identify critical path elements of the project and identify measures to maintain schedule.

4) Identify the means of maintaining quality control of the work.

5.1.2 Evaluation Criteria

A. Proposed Team

The organizational chart must provide all of the specified information, and resumes must be provided as indicated. Missing information will be considered as a deficiency for the category. Demonstration of a strong team with extensive relevant experience will be considered a benefit. An intuitive organizational chart which effectively communicates the roles of each member and which organization serves as the lead for each of the major functional categories will also be considered as a benefit.

B. Construction Approach

All of the indicated elements must be addressed. Missing information will be considered as a deficiency for the category. A well organized and well thought out plan which is project specific will be considered a benefit. Well-articulated potential pitfalls and preventative measures to avoid them will be considered a benefit. A well-established quality control program will be considered a benefit. A well-articulated plan that is not backed by an experienced proposed team covering the major functional categories casts doubt about the contactor’s ability to execute the plan.

5.2 Section 2 – Past Performance

5.2.1 Submission Requirements

The VA request at least three (3) but no more than five (5) construction projects that best illustrate the contractor’s prime and subcontractor teams’ qualifications. The document should be written to show the teams’ construction experience with respect to the major functional categories listed in 5.1.1.A.1).

1) Provide a project description. At a minimum, the description should include scope, size and cost of the project and can include photographs.

2) Show the participation of key personnel (identified previously with resume) in the listed projects. The offeror can also include the subcontractors by company name. Including subcontractors may be beneficial to show the experience of the company in addition to the key personnel.

3) The Government may also use other tools including but not limited to CPARS/PPIRS to gather documentation on past performance.

4) Include customer’s point of contact (name, title, and phone number).

5.2.2 Evaluation Criteria

The SSEB will evaluate the degree of successful completion of the recent and relevant past performance identified in the proposal. Documentation of satisfactory performance of projects similar in size, scope, and dollar value will be considered to have met the minimum requirements of the RFP. Conversely, offers which do not achieve satisfactory performance of projects similar in size, scope and dollar value will not be considered to have met the minimum requirements of the RFP. Projects that are not determined similar in size, scope and dollar value may not be considered. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction as to quality, schedule, cost, and management. Past performance will be evaluated in accordance with FAR 15.305(a)(2). Evaluations may include past performance information regarding predecessor companies or subcontractors that will perform major or critical aspects of the requirement. Offerors without a record of relevant past performance or for whom information on past performance is not available may not be evaluated favorably or unfavorably on past performance and shall receive a neutral rating for Past Performance. Offerors may provide information on problems encountered on the identified contracts and the corrective action taken, if desired.

6.0 Volume II – Price Information

6.1 Section 3: Price

6.1.1 Submission Requirements

A. The offeror shall complete and submit Standard Form 1442.

B. Proposal Price Schedule of Values with a breakdown identifying at a minimum each of the following areas:

1) General Conditions.

2) New temporary piping and support systems (including dismantlement and storage when project is completed)

3) Temporary boiler rental costs.

4) Temporary control room trailer costs.

5) Excavation, earthworks, and associated removals.

6) PSRDM requirements (including, fencing, cameras, and lighting systems)

7) Underground utility locating

8) Commissioning

6.1.2 Evaluation Criteria

The price will be evaluated by the Contracting Officer and may also include Architect and Engineer firm representative review for reasonableness.

End of Document