36C24425Q0529 Solicitation Document.docx
DOCX document 125 KB Posted
- Solicitation number
- 36C24425Q0529
About this file
This document is a Request for Quote (RFQ) for Boiler Preventative Maintenance Services at the VA Pittsburgh Healthcare System. The solicitation (36C24425Q0529) is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 811310 with a business size standard of $12.5 million. The five-year Indefinite Delivery Indefinite Quantity (IDIQ) contract will cover preventative maintenance and inspection services for boiler systems at two campus locations, including three water-tube boilers at the University Drive Campus and four fire tube boilers at the H.J. Heinz Campus.
Key service requirements include annual and semi-annual activities such as internal and external boiler system inspections, tuning of combustion control systems, deaerator tank inspections, boiler and plant safety device testing, and calibration of operating systems. The contractor will be responsible for detailed inspections, reporting, and potential repairs, with specific requirements including following national inspection codes, safety standards, and VA directives. Pricing will be on a fixed-price basis with additional hourly rates for potential extra repairs. The period of performance is from May 14, 2025, to May 13, 2030, with task orders issued as needed. Quoters must be registered in the System for Award Management (SAM) and submit responses via email by the specified deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions 05-08-2025.docx | DOCX document | |
| SOW Rev4 Boiler PM PITT 05-08-2025.docx | DOCX document | |
| 36C24425Q0529 0003.docx | DOCX document | |
| 36C24425Q0529 0002 Question Extension.docx | DOCX document | |
| 36C24425Q0529 0001_1 Amendment Document.docx | DOCX document | |
| Attachment B Boiler Safety Device Testing Manual - 5th Edition_December 2018_Final.pdf | ||
| 36C24425Q0529.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment A VHA Dir 1810 - Boiler and Boiler Plant Operations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24425Q0529 Table of Contents
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 PRICE/COST SCHEDULE | 4 |
| ITEM INFORMATION | 4 |
| B.3 STATEMENT OF WORK | 7 |
| SECTION C - CONTRACT CLAUSES | 20 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023) | 20 |
| C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 25 |
| C.3 52.216-18 ORDERING (AUG 2020) | 26 |
| C.4 52.216-19 ORDER LIMITATIONS (OCT 1995) | 27 |
| C.5 52.216-22 INDEFINITE QUANTITY (OCT 1995) | 27 |
| C.6 SUPPLEMENTAL INSURANCE REQUIREMENTS | 28 |
| C.7 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 28 |
| C.8 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 28 |
| C.9 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 31 |
| C.10 VAAR 852.222-71, Compliance with Executive Order 13899. (DEVIATION) (APR 2025) | 33 |
| C.11 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 34 |
| C.12 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 35 |
| C.13 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) [(DEVIATION FEB 2025)] | 35 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 44 |
| SECTION E - SOLICITATION PROVISIONS | 45 |
| E.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023) | 45 |
| E.2 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023) | 45 |
| ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 49 |
| E.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 50 |
| E.4 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 51 |
| E.5 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 53 |
| E.6 52.216-1 TYPE OF CONTRACT (APR 1984) | 55 |
| E.7 52.233-2 SERVICE OF PROTEST (SEP 2006) | 55 |
| E.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 55 |
| E.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 56 |
| E.10 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 56 |
| E.11 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024)[(DEVIATION FEB 2025)] | 58 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: To be determined at award
b. GOVERNMENT: Contracting Officer 36C244 Department of Veterans Affairs Network Contracting Office 4 Services 2 3900 Woodland Avenue Philadelphia PA 19104
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Within 30 days of completion of each task order. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
All invoices shall be submitted to Tungsten at:
https://authentication.tungsten-network.com/login ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5.00 |
| JB |
| __________________ |
| __________________ |
Annual internal and external boiler system inspections IAW Section 4 of the Statement of Work
Services performed between June - August
POP Begin: 05-14-2025 POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
| 10.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual tuning of the boiler combustion control systems IAW Section 5 of the Statement of Work
Services performed in May and November
POP Begin: 05-14-2025 POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
| 5.00 |
| JB |
| __________________ |
| __________________ |
Annual Deaerator (DA) tank inspections performed with tanks in bypass mode.
Services performed between June - August
POP Begin: 05-14-2025 POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
| 10.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual boiler and plant safety device training performed during hot operating boiler conditions IAW section 8 of the Statement of Work.
Services performed in June and August
POP Begin: 05-14-2025 POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
| 5.00 |
| JB |
| __________________ |
| __________________ |
Annual calibration of operating systems services IAW Section 9 of the Statement of Work.
POP Begin: 05-14-2025 POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
| JB |
| NSP |
| NSP |
Additional Boiler System Repairs in accordance with the Statement of Work. Additional repairs will be authorized by individual task orders at the listed hourly rates plus parts. This CLIN is an estimate for the given ordering period, actual usage will vary.
POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
0006AA
| 160.00 |
| HR |
| __________________ |
| __________________ |
Standard Service Rate for Additional Repairs in accordance with Section 10 of the Statement of Work. Standard Service Rate does not include any parts. Quantities are estimated.
POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
0006AB
| 160.00 |
| HR |
| __________________ |
| __________________ |
Emergency Service Rate for Additional Repairs in accordance with Section 11 of the Statement of Work. Emergency Service Rate does not include any parts. Quantities are estimated.
POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
0006AC
| NSP |
| NSP |
Parts for Additional Boiler System Repairs in accordance with the Statement of Work. Parts do not include any service or labor.
POP End: 05-13-2030 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
| GRAND TOTAL |
| __________________ |
B.3 STATEMENT OF WORK
VA Pittsburgh Healthcare System Boiler Preventative Maintenance Services Statement of Work
1. Purpose
1.1. The VA Pittsburgh Healthcare System (VAPHS) has a requirement for all labor, equipment, parts, maintenance, and travel to provide Boiler Preventative Maintenance Services.
1.2. Requirements include boiler systems inspection, calibration, and tuning services at two campus locations in the Pittsburgh area. The Contractor will maintain and provide a record of all service activities performed. The Contractor shall perform repairs of boiler equipment on an as needed basis.
2. Locations and Equipment Description
2.1. VAPHS Main Hospital, University Drive Campus
University Drive C, Pittsburgh, PA 15240
2.1.1. Three (3) Tampella Water-Tube Boilers with Faber burners.
2.1.1.1. Boilers (B1, B2) rated for 25,00lbs/hr.
2.1.1.2. Boiler (B3) rated for 15,000lbs/hr.
2.1.2. Primary fuel is natural gas with #2 fuel oil as the secondary source.
2.1.3. Fireye Nexus PPC6000 Combustion Control System; parallel position combustion control with oxygen trim and VFD control of combustion air blower.
2.1.4. Each burner is set up with four fuel profiles; Gas with VFD, Gas with VFD by-pass, oil with VFD and oil with VFD by-pass.
2.2. VAPHS, H.J. Heinz Campus, Community Living Center, Ambulatory Care Center 1010 Delafield Road, Pittsburgh, PA 15216
2.2.1. Four (4) Johnston Boilers, Fire Tube, PTFA400-4LG150S.
2.2.1.1. Boilers (B1, B2, B3, B4) each rated at 12,000lbs/hr.
2.2.2. Primary fuel is natural gas with #2 fuel oil as the secondary source.
2.2.3. Fireye Nexus PPC6000 Combustion Control System; parallel position combustion control with oxygen trim and VFD control of combustion air blower.
2.2.4. Each burner is set up with four fuel profiles: gas with VFD, gas with VFD by-pass, oil with VFD and oil with VFD by-pass.
3. General Requirements
3.1. The Contractor shall be responsible for maintaining the boiler inspection service schedule and coordinating with the VAPHS Program Manager (PM) no later than 15 days prior to a required service.
3.2. The Contractor shall perform the following services at both facilities in accordance with the requirements listed in this Statement of Work (SOW):
3.2.1. Internal and external boiler system inspections – performed on cold, laid-up boilers, annually from June – August. (See Section 4)
3.2.2. Tuning of boiler combustion control systems – performed on hot, operating boilers, semi-annually in May and November. (See Section 5)
3.2.3. Deaerator (DA) tank Inspections – services performed with DA tank in bypass mode, annually from June – August. (See Section 7)
3.2.4. Boiler and plant safety device testing – performed during hot, operating boiler condition, semi-annually from June – August. (See Section 8)
3.2.5. Calibration services (operating systems) – performed immediately prior to combustion tuning, annually in October. Includes semi-annual calibration of certain equipment. (See Section 9)
3.3. The Contractor shall follow the policy guidelines listed here:
3.3.1. Current issue of the National Board Inspection Code, Part RB, In service Inspection of Pressure-Retaining Items Code
3.3.2. American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Sections VI and VII, as applicable.
3.3.3. VHA Directive 1810, Boiler and Boiler Plant Operations (Most Recent Version)
3.3.3.1. See Attachment A
3.3.4. National Fire Protection Association (NFPA) 85, Boiler and Combustion Systems Hazard Code, latest edt.
3.3.5. National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace
3.3.6. VHA Boiler Plant Safety Device Testing Manual, (Most Recent Edition).
3.3.6.1. See Attachment B
3.4. Inspections shall be scheduled and performed during periods when the Program Manager determines that the boilers can be brought off-line, and when the VAPHS Utility Supervisor or his/her designate is available to monitor the inspections.
3.5. To maintain adequate steam service, typically only one boiler at University Drive and two at Heinz campus is available at a time for servicing and inspection, therefore multiple site visits will be required to get all the boiler inspections completed.
3.6. Services shall require the Contractor to perform confined space inspections of the boilers and feed water deaerators. The Contractor must submit to the Program Manager, a confined space safety plan, including confined space certificates of training for those Contractor employees performing the inspections.
3.7. VAPHS shall comply with any other reasonable Contractor preparation requirement provided the request is submitted in writing to the Program Manager at least two weeks prior to the scheduled inspection date.
3.8. A schedule confirmation for inspection visits for the year shall be submitted to the Program Manager, or his designate, within 30 days of award of the contract. VAPHS reserves the right to alter the schedule as needed to maintain N+1 boiler redundancy.
4. Internal and External Boiler Inspections
4.1. The Contractor shall perform the following boiler services:
4.1.1. Review the boilers’ history, to include:
4.1.1.1. ASME stamping
4.1.1.2. Burner control and interlock test reports
4.1.1.3. Current operational state and overall general condition
4.1.1.4. Date of last inspection
4.1.1.5. Latest inspection certificate
4.1.1.6. National Board registration
4.1.1.7. Repair and modification log
4.1.1.8. Water testing reports
4.1.2. Inspect all boiler components, systems, sub-systems and related parts and equipment for cleanliness, proper installation and operation, code compliance and defects. A separate report will be prepared for each boiler.
4.1.3. Any safety related deficiencies discovered during any inspection or related service activity shall be reported to the Program Manager, or his designate, immediately.
4.1.4. Defects include; but are not limited to, improper pressure, leaks, cracks, bulges, blisters, grooving, pitting, sagging, abnormal stress, improper alignment, obstructions, corrosion, wasting, warping, broken or missing parts, improper seating, scaling or flame impingement of the following boiler systems and components:
4.1.4.1. Bottom blow-off collection
4.1.4.2. Drains
4.1.4.3. Drum surfaces
4.1.4.4. External parts and surfaces
4.1.4.5. Feed water admission
4.1.4.6. Foundations
4.1.4.7. Gas side baffles
4.1.4.8. Gaskets and seals
4.1.4.9. Internal surfaces
4.1.4.10. Locking seals
4.1.4.11. Low water cutouts – mechanical and electrical (disassembled)
4.1.4.12. Manways and hand holes
4.1.4.13. Nozzles
4.1.4.14. Nuts and bolts
4.1.4.15. Operation of high-steam pressure cutouts (on hot boiler by raising steam pressure)
4.1.4.16. Piping and pipe connections
4.1.4.17. Refractory, burner throat, expansion joint and bull ring
4.1.4.18. Safety valves
4.1.4.19. Seating surfaces
4.1.4.20. Soot blowers
4.1.4.21. Stays and stayed plates
4.1.4.22. Steam separating internals
4.1.4.23. Tubes and tube ends
4.1.4.24. Valves
4.1.4.25. Vents
4.1.4.26. Water level gage glass
4.1.5. The Contractor shall recommend to the Program Manager, or his designate, the use of non-destructive tests when inspection findings indicate the need for such tests to identify any conditions that could potentially impact safe boiler operating conditions.
4.1.6. Any required re-inspections shall be conducted after corrective actions have been taken. The cost for re-inspections will be paid for under separate purchase agreements.
4.2. Contractor is responsible to provide all confined space retrieval equipment and contractor certified/trained attendant for all confined space entries.
4.3. Prior to each site visit, VAPHS shall prepare the boilers for inspection as follows:
4.3.1. Cool boiler to near ambient temperature
4.3.2. Open all manways, hand holes and furnace access doors
4.3.3. Remove loose materials (waterside and fireside)
4.3.4. Place electrical, steam and water lock-out/tag-out
4.3.5. Isolate connection piping
4.3.6. Provide illumination
4.3.7. Perform surface preparation
4.3.8. Repair cracked or damaged refractory
5. Tuning of Boiler Combustion Control Systems
5.1. The Contractor shall perform parallel position combustion system tuning services on all boilers, for each fuel profile, and provide a record of operating profiles to VAPHS as follows:
5.1.1. Record “as found” readings at each Fireye Nexus profile point.
5.1.2. Perform any necessary combustion system calibrations.
5.1.3. Complete Nexus auto oxygen trim procedure for each profile point. Adjust oxygen levels and flow values as needed, and verify trim function is working properly.
5.1.4. Check operation of the VFD and download each profile.
5.1.5. Download all combustion profiles.
5.1.6. Set oxygen alarm settings low and high to cause boiler shutdown before reaching a level of 50 PPM.
5.1.7. Ensure high fire and turn down settings meet manufacture requirement of minimum 7 to 1 at 3.5% oxygen.
5.1.8. Ensure boilers pass PRV tests. (both PRV valves must lift under normal operating conditions)
5.1.9. All boilers must be able to lift both Safety Valves after tuning.
5.1.10. Update Nexus touchscreen with the latest software version.
5.1.11. Calibrate the combination oxygen/temperature probe, replace its filter and document the service.
5.1.12. Calibrate the AARELL-SCADA (Supervisory Control and Data Acquisition) system, and verify calibration with flow meters.
5.1.13. Provide any parts, test instruments, flash drives or storage discs to VAPHS.
5.2. The Contractor shall record, at a minimum, the following data at all points on the combustion curve on a VAPHS designated MS Excel spreadsheet. The readings must include:
5.2.1. Outside air temperature
5.2.2. Oil
5.2.3. Sle
5.2.4. FGR
5.2.5. O2 NOx
5.2.6. O2 Anl
5.2.7. CO
5.2.8. Nox
5.2.9. Efficiency
5.2.10. Stack temperature
5.2.11. Oil supply
5.2.12. Oil pump
5.2.13. Oil return
5.3. If a tuning procedure cannot be completed due to system or component malfunction, the report shall include the recommended repair actions needed, and a repair cost estimate.
5.4. The University Drive boilers B1 and B2 must be able to produce 25,000 lbs./hr. with all fuel sources after tuning. Boiler B3 must be able to produce 15,000 lbs./hr.
5.5. The H.J. Heinz campus boilers B1, B2, B3 and B4 must be able to produce 12,000 lbs./hr. with all fuel sources after tuning.
6. Reports
6.1. Boiler System and Component Reports – Inspections/Calibrations
6.1.1. The Contractor shall provide a record of all inspections, test findings and recommendations utilizing National Forms NB-6, NB-7, or other VAPHS approved forms.
6.1.2. Any safety related deficiencies discovered during any inspection or related service activity shall be reported to the Program Manager, or his designate, immediately.
6.1.3. Reports shall contain the following information on all boiler systems and components:
6.1.3.1. General condition and a pass or fail grade.
6.1.3.2. Corrective action recommendations for all deficiencies.
6.1.3.3. Sketches and/or photographs as needed or requested to illustrate deficient systems or components requiring service or repair.
6.1.3.4. All test data, including any calculations used.
6.1.3.5. Non-destructive test results, including sketches, where applicable or as requested.
6.1.4. All boiler inspection, testing and calibration activities shall be documented and provided to VAPHS in both hard copy and digital formats.
6.1.5. Hard copy documentation shall be maintained in 3-ring binders with spine labeling that includes year of performance and campus location.
6.1.6. Documentation shall include:
6.1.6.1. A table of contents in MS Excel or PDF format
6.1.6.2. MS Excel spreadsheet listing each task by completion date and next due date
6.1.6.3. A copy of the current contract
6.1.6.4. Copies of any required manufacturer’s representative certifications
6.1.6.5. Copies of all employee certifications
6.1.6.6. Contractor’s health and safety plan, including confined space certificates
6.1.6.7. Test and inspection template forms
6.1.6.8. History of all test and inspection forms organized by boiler number
6.2. Combustion Tuning Records Requirements
6.2.1. The Contractor shall provide a tuning report for each boiler in MS Excel, Word or PDF format for both “as found” and “post tuning” results for each fuel source, at all 12 fuel curve points.
6.2.2. Each report shall contain the following test result information:
6.2.2.1. Boiler number
6.2.2.2. Fuel source used (natural gas or fuel oil)
6.2.2.3. Ambient air temperature in Fahrenheit
6.2.2.4. Firing rate profile point
6.2.2.5. Nexus oxygen percentage, ambient temperature and stack temperature at each profile point
6.2.2.6. Nexus comparison of percentage of oxygen at each profile point
6.2.2.7. Carbon monoxide PPM at each profile point (must be under 50 PPM)
6.2.2.8. Percentage of carbon dioxide at each profile point
6.2.2.9. Fuel and steam flow at each profile point, for all four fuel profiles
6.2.2.10. Oxygen alarms for all fuel profiles
6.2.2.11. Rate of gas supply to burner, in PSI
6.2.2.12. Rate of gas out of burner regulator, in PSI
6.2.2.13. Gas pressure at burner manifold inches of water
6.2.2.14. Wind box pressure
6.2.2.15. Combustion efficiency
6.2.2.16. PRV operation
6.2.2.17. Calibration record for steam, feed water, gas and oil flow meters
7. Deaerator (DA) Tank Inspections
7.1. The Contractor shall review the feed water deaerator history to include:
7.1.1. Date of last inspection
7.1.2. Current inspection certificate
7.1.3. ASME stamping
7.1.4. National Board registration number
7.1.5. Construction materials used
7.1.6. Extent of post-weld treatment
7.1.7. History of repairs and modifications
7.1.8. Overall condition
7.2. The Contractor shall inspect all deaerator systems to include:
7.2.1. External parts, accessories and piping for cleanliness, leakage, proper operation and code compliance
7.2.2. Proper operation of pressure gages and thermometers
7.2.3. Non-condensable gas vent line is open and has the proper orifice installed
7.2.4. Support structure integrity and thermal expansion allowance capability
7.2.5. Safety valve installation, pressure capacity and settings
7.3. The Contractor shall perform pressure operation tests to confirm proper operation at set pressures to verify that the deaerator can withstand pressure prior to testing the valves in-situ.
8. Boiler and Safety Device Training
8.1. The Contractor shall perform boiler plant safety device testing semi-annually at each campus location. Testing will include all boiler plant auxiliary equipment. Safety device testing will be performed in accordance with Attachment B, Boiler Safety Device Testing Manual - 5th Edition_December 2018_Final or the most recent edition.
9. Equipment Calibration
9.1. The Contractor shall calibrate the following chart recorders, and steam, water and fuel-oil flow meters and submit the calibration records to the Program Manager or his designate:
9.1.1. University Dr. Campus:
9.1.1.1. Qty 5 – Steam flow meters: ABB Vortex Master, model FSV430
9.1.1.2. Qty 3 – Natural gas boiler flow meters: ABB Vortex Master
9.1.1.3. Qty 3 – Feed water: ABB Process Master, model FEP300
9.1.1.4. Qty 3 – Fuel oil: Aqua Metro Contoil Fuel Oil, model DN 15-50
9.1.1.5. Provide Services to Plant Master and SCADA System to include software updates.
9.1.2. H.J. Heinz Campus:
9.1.2.1. Qty 5 – Steam: Rosemount M# 1151DP4J12B1D1
9.1.2.2. Qty 5 – Chart Recorders: Hayes Republic Model # D-02100-B0
9.2. The Contractor shall also calibrate the following VAPHS equipment annually and semi-annually as indicated:
9.2.1. Qty 2 - Bacharach PCA3 265 Combustion Analyzer (Annually)
9.2.2. Qty 4 - Ashcroft 30 PSI and Ashcroft 300 PSI digital pressure gauges. (Annually)
9.2.3. Qty 2 Drager X-am 2500 Portable Gas Detection Monitor. (Semi-Annually)
9.2.4. Heinz Campus Sensalert 0611-057, 1209-092 CO and Combustion Monitoring System with 4 CO and 4 Combustion sensors. (Semi-Annually).
9.2.5. University Drive Sensidyne 0606-003, 0911-171 CO and Combustion Monitoring Systems with 4 CO and 4 Combustion sensors. (Semi-Annually).
9.2.6. Heinz Campus Qty 1 Haloguard III 1-D2C2-3+ALS(4) Refrigerant Monitoring System test and calibrate (Semi-Annually).
9.2.7. University Drive Qty 2 Haloguard IR 1741-113+ALS(4), 1741-113+ALS(4) Refrigerant Monitoring System test and calibrate (Semi-Annually)
10. Equipment Evaluation and Repairs
10.1. The Contractor shall be capable of providing evaluation and repairs to equipment deficiencies identified during inspections, testing, calibration, tuning, or through equipment failure. Repairs are defined as unscheduled work to repair or modify a boiler and/or ancillary equipment, or to correct recurring system and/or equipment malfunction(s).
10.2. Equipment Evaluation: The Contractor shall provide a service technician for diagnostics and troubleshooting of any boiler or ancillary equipment issues on an “as needed” basis. This evaluation and resulting estimate shall be provided at no additional cost to the Government.
10.2.1. Upon discovery of any equipment deficiencies or malfunctions which require repairs not covered elsewhere in this contract, the Contractor shall provide a service technician for diagnostics and troubleshooting so an estimate for repairs can be provided. Scheduling for this evaluation shall be coordinated with and approved by the Program Manager. This evaluation shall be at no additional cost to the government.
10.2.2. Following the equipment evaluation, the Contractor shall provide a detailed estimate to the Program Manager and Contract Officer for review. The estimate must include a breakdown of all parts, labor (adhering to established service rate), and a schedule for completion of services.
10.3. Repairs:
10.3.1. A separate line item will be included to establish a service rate for standard (non-emergency) repairs. The Contract Officer will review the Contractor provided estimate from the equipment evaluation to confirm adherence with the established hourly rate. The Contract Officer will evaluate the parts portion of the estimate separately before determining whether to proceed with any repairs. The Government reserves the right to obtain these services from other vendors.
10.3.2. Prior to engaging in any service or repair under this section the contractor shall obtain written approval from the Contracting Officer in the form of a Task Order. A separate task order will be issued for any repairs covered under this section. Any work performed without Contract Officer authorization shall not be approved for payment and considered an Unauthorized Commitment.
10.3.3. Upon completion of any repairs, the Contractor must conduct complete re-testing, inspection, calibration, tuning and/or otherwise as appropriate and document the repair and reinspection on a post-service report provided to the Program Manager.
11. Emergency Evaluation and Repairs
11.1. The Contractor shall be capable of providing emergency evaluation and repairs to equipment deficiencies identified during inspections, testing, calibration, tuning, or through equipment failure.
11.2. Emergency Evaluation: The Contractor shall provide a service technician for diagnostics and troubleshooting of any boiler or ancillary equipment issues determined to be an emergency by the Program Manager on an “as needed basis”.
11.2.1. The purpose of the emergency evaluation is to identify the parts and labor needed for any repairs required to restore normal boiler function as soon as possible. The contractor shall provide a detailed estimate including a breakdown of all parts, labor (adhering to established service rate), and a schedule for completion of services. The Contractor shall provide the emergency response and estimate at no additional cost to the Government.
11.2.2. The Contractor shall provide the emergency evaluation within four hours of request. The Contractor must be capable of providing the emergency evaluation during all hours (24-hour availability), on weekends, and on holidays.
11.3. Emergency Repairs: The Contractor shall provide emergency repair services on an “as needed” basis. Following the emergency evaluation and receipt of the contractor provided estimate for emergency repairs, the Contract Officer will determine whether to proceed. The Government reserves the right to obtain these services from other vendors.
11.3.1. A separate line item will be included to establish a service rate for emergency repairs. The Contract Officer will review the Contractor provided estimate from the emergency evaluation to confirm adherence with the established hourly rate. The Contract Officer will evaluate the parts portion of the estimate separately before determining whether to proceed with any repairs.
11.3.2. Prior to engaging in any service or repair under this section the contractor shall obtain written approval from the Contracting Officer in the form of a Task Order. A separate task order will be issued for any repairs covered under this section. Any work performed without Contract Officer authorization shall not be approved for payment and considered an Unauthorized Commitment.
11.3.3. Upon completion of any repairs, the Contractor must conduct complete re-testing, inspection, calibration, tuning and/or otherwise as appropriate and document the repair and reinspection on a post-service report provided to the Program Manager.
12. Contractor Qualifications
12.1. Non-destructive testing:
12.1.1. Contractor’s inspectors shall hold a commission from the National Board of Boiler and Pressure Vessel Inspectors.
12.1.2. Contractor’s employees shall have passed any required Pennsylvania sanctioned boiler inspection examinations.
12.1.3. Contractor has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code.
12.1.4. Contractor has a representative serving as a member of the ASME Conference Committee.
12.1.5. Contractor is underwritten by an insurer licensed and qualified by the state of Pennsylvania to write boiler or pressure vessel insurance policies.
12.1.6. Contractor’s boiler inspectors shall hold a Level II, American Society for Non-Destructive Testing (ASNT) certification.
12.2. Combustion tuning:
12.2.1. The Contractor’s tuning technicians shall be factory authorized and trained by the equipment manufacturer.
12.2.2. Certificates of training for the Fireye, Nexus PPC6000 Combustion Control System, Fireye, Burner LogiX Integrated Burner Management Controls, and Fireye 550 and 650 must be provided.
12.2.3. Technicians shall possess a minimum of five years’ experience with parallel position combustion control systems and fire tube boilers.
12.3. Equipment Calibration:
12.3.1. Licensure for Bradley & Rockwell Allen software services.
13. Site Specific Requirements
13.1. The Contractor gaining award of this Contract shall provide the name, address, telephone number, and email address of authorized Contractor representative(s) who have the binding authority to act on behalf of the Contractor on administrative and/or performance matters pertaining to this Contract. The Contractor shall maintain this list and submit any changes thereof to the Program Manager as changes occur.
13.2. Contractor’s Responsibilities and Insurance Requirements: The Contractor shall obtain all necessary licenses and/or permits required to perform this work. The Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this Contract. They shall be responsible for any injury to himself, his employees, or others, as well as for any damage to personal or public property that occurs during the performance of this Contract that is caused by their employees’ fault or negligence.
13.3. Safety Requirements: To protect the lives and health of occupants of the buildings, the Contractor in the performance of this Contract shall take such safety precautions as the Contract Officer or Pittsburgh Program Manager may determine to be reasonably necessary. The Contract Officer or Program Manager will notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his representative shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contract Officer may issue an order, stopping all or any part of the work, and hold the Contractor in default. Noncompliance may result in Contract termination.
13.4. Identification: A compliant ID badge must be always worn by Contractors while on VA premises.
13.5. Interference with Normal Functions: The Contractor’s personnel are required to interrupt their work at any time so as not to interfere with the normal functioning of the medical facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and emergency and/or service carts. These interruptions should only be occasional. Any interruptions considered to be excessive should be brought to the attention of the Contract Officer.
13.6. Disposal of Hazardous Waste: The Contractor shall not dispose of any hazardous materials at any location on the medical facility premises except as specified by the Contract Officer.
13.7. HIPAA Compliance: Contractor must adhere to the provisions of Public Law 104-91, Health Insurance Portability and Accountability Act (HIPAA) of 1966 and the National Standards to Protect the Privacy and Security of Protected Health Information (PHI).
14. Contract Type and Task Orders
14.1. The resulting contract will be a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract with fixed price task orders authorizing the requested services as needed. The IDIQ will be established for a five-year period. Task orders may vary in size and will only be issued and awarded by a Contract Officer.
14.2. Task order pricing shall be determined by using the line items and rates established in this IDIQ contract.
14.3. Task Order Process
14.3.1. The Pittsburgh VA Medical Center will identify a need for services and request an order under this contract.
14.3.2. The Contract Officer will compare the requested line items, quantities, and pricing to the IDIQ contract, all pricing shall be determined directly from the IDIQ contract less any applicable discounts.
14.3.3. The Contract Officer will create the task order and issue the order by written notification to the Contractor.
14.3.3.1. Only a Contract Officer is authorized to approve services. No payment will be made for services performed without Contract Officer approval. Any unauthorized services performed will be considered an unauthorized commitment.
14.3.4. To facilitate closeout of individual orders placed under this IDIQ, the contractor shall submit final invoices within 30 days of completion of any order.
14.4. Services under $2,500.00 may be purchased using the Government Purchase Card as an alternate to Contract Officer issued task orders.
15. VHA Health Directives – Influenza and Tuberculosis
VHA Directive 1192 requires all health care personnel (HCP) to participate in the seasonal influenza prevention program and outlines the key implementation steps. Health care personnel is defined in VHA Directive 1192 as all VA licensed and unlicensed, clinical and administrative, paid and unpaid, full- and part-time employees, intermittent employees, fee basis employees, VA contractors, students, researchers, volunteers, and trainees who work in VHA locations. HCP covered by the policy are expected to receive annual influenza vaccination. Those HCP unable or unwilling to be vaccinated are required to wear a face mask throughout the influenza season. Masks are available at entrances throughout the medical center.
It is the responsibility of the contractor to ensure that all contract staff is compliant with the requirements outlined in VHA Directive 1192. The contractor shall maintain the following documentation:
Documentation of vaccination, e.g., signed record of immunization from a health care provider or pharmacy, or a copy of medical records documenting the vaccination.
Completed Health Care Personnel Influenza Vaccination Form (Attachment B of VHA Directive 1192) if unwilling or unable to receive the vaccine.
The contractor is required to submit annual certification to the Program Manager that all contract staff performing services at VA facilities are in compliance with VHA Directive 1192.
See HEALTH CARE PERSONNEL INFLUENZA VACCINATION FORM below.
Tuberculosis Screening- VHA Directive 2011-036, Safety and Health During Construction. Contractor must certify annually to the Program Manager that all Contractor employees working at VAPHS facilities have a documented screening for latent Tuberculosis within the last 12 months. If screening for latent Tuberculosis is positive, clearance from a physician is required prior to working at VAPHS. Contractor employees that fail to meet this requirement will not be permitted to work at VAPHS facilities and may be asked to leave VAPHS property without notice until the requirement is met.
HEALTH CARE PERSONNEL INFLUENZA VACCINATION FORM
I received the seasonal influenza vaccine this flu season (required documentation is attached.)
I decline to receive seasonal influenza vaccine at this time for the following reason:
Select the single answer that best fits your reason:
I do not like needles.
I have a philosophical or religious reason for not receiving the vaccine.
I have an allergy to the vaccine or one of its components.
I am concerned about the side effects/safety of the vaccine.
I have never had the flu and don’t think I will this season.
I have another reason. (Please explain)
I acknowledge that VHA policy requires health care personnel to receive the influenza vaccine every year. I understand that if I decline to receive the vaccine and/or to provide proof of vaccination by November 30 or within two weeks of beginning employment if after November 30, I must wear a face mask according to requirements and guidelines within the Directive 1192, Seasonal Influenza Prevention Program.
I have read and fully understand the information on this form and have been given the opportunity to have my questions answered.
Signature: ______________________________ Date: ___________
Name (print): _____________________________ Last 4 SS# _______
Contractor Name: ____________________
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n)…
This is the start of the file's text. The full file is on GovTribe.