Locks - J and A MRI Chiller CO Executed 041723.pdf
PDF 267 KB Posted
- Attached to
- Y1DZ--595-23-4-5482-0014 | NRM| 595-23-113, Construct UPS for MRI Chiller D/B (VA-23-00045591) Federal contract opportunity
- Solicitation number
- 36C24423R0076
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24423R0076_3.docx | DOCX document | |
| Phase I EXHIBIT A - Project Example.docx | DOCX document | |
| 2018 VA Electrical Specs.pdf | ||
| 36C24423R0076 - New UPS for MRI Chiller Leb Final.pdf | ||
| Security Systems - J and A CO Executed 041823.pdf | ||
| HVAC Controls - J and A MRI Chiller CO Executed 041723.pdf | ||
| SOW - 595-23-113 Construct UPS for MRI Chiller.pdf | ||
| Fire Alarm - J and A MRI Chiller CO Executed 041723.pdf | ||
| WD PA20230093 R0 04072023.pdf | ||
| 013526 Lebanon Safety Requirements Spec 20221012.pdf | ||
| 010000 Lebanon General Requirements Spec.pdf | ||
| 36C24423R0076_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Part 806.3 Other Than Full and Open Competition (OFOC) Attachment 7: Request for Sole Source Justification Format >SAT
Rev: 13 Effective Date: 02/01/22 Page 1 of 3
DEPARTMENT OF VETERANS AFFAIRS
Justification and Approval (J&A) For
Other Than Full and Open Competition (>SAT)
Acquisition Plan Action ID: 36C244-23-AP-2100
1. Contracting Activity: Department of Veterans Affairs, VISN 4, Lebanon VAMC, Facilities
Service is requesting this J & A approval from the NCO4 Construction Team - West
2. Nature and/or Description of the Action Being Processed: This is a Justification and Approval for Other Than Full and Open Competition, Brand Name Only, for BEST access systems and locks, which are a small portion of the construction materials for construction project 595-23-113 Construct UPS for MRI Chiller, a new requirement to award a firm fixed price contract.
3. Description of Supplies/Services Required to Meet the Agency’s Needs: Locks, cores, cylinders and other associated access control hardware to create a complete and usable BEST great grand master lock and key system. BEST locks seamlessly integrate with our existing facility wide BEST great grand master access control system, as per Specificaiton Section 08 71 00 and related drawings. The total estimated value of the BEST locks access system is $2,000.00.
4. Statutory Authority Permitting Other than Full and Open Competition:
(X) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1;
( ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by FAR 6.302-2;
( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3;
( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by FAR 6.302-4 ( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by FAR 6.302-5;
( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6;
( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7;
5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition
Requires the Use of the Authority Cited Above (applicability of authority): Although there are other manufacturers of access controls that can meet the same general performance standards as the BEST locks, they are not compatible with the BEST locks system. The BEST locks system is exclusively used at this facility. Use of additional manufacturers would result in the requirement to purchase and store additional spare inventory, have additional service contracts, and additional training for our locksmiths. Accordingly, BEST locks is the
Effective Date: 02/01/22 Page 2 of 3 only firm capable of providing the supplies and services described in Section 3 above without the Veteran’s Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition..
6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: A Notice of Intent to Sole Source Access Controls BEST Locks will be posted on SAM.GOV with the solicitation. Offerors will be able to obtain BEST Locks components from various distributors and sources available in the open market
7. Determination by the CO that the Anticipated Cost to the Government will be Fair and
Reasonable: Edward EST fire alarm components are widely available for purchase.
Therefore, the Contracting Officer reasonably expects competitive proposals from multiple SDVOSB and/or VOSB contractors. Proposals will be compared with the independent government cost estimate to verify that the proposed contract price is fair and reasonable.
8. Description of the Market Research Conducted and the Results, or a Statement of the
Reasons Market Research Was Not Conducted: As described in Section 6 above, market research, in accordance with FAR Part 10, was conducted by synopsis of the proposed acquisition, advising industry of the pending acquisition and soliciting inquiries from interested parties.
9. Any Other Facts Supporting the Use of Other than Full and Open Competition: Quick access through locked doors is essential for our police and code teams in the event of an emergency. Installing non-compatible locks will increase the number and variety of keys that must be carried and tried in various locks, slowing down emergency responses, reduing patient, staff and visitor safety. No other manufacturer makes a system that is guaranteed, as a whole, to be compatible with our installed BEST locks sytem.
10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: See paragraph 6, above.
11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required: If, in the future, there is a requirement to replace the access controls for the entire facility, then we will consider all manufacturers of access controls with the appropriate performance specifications.
Effective Date: 02/01/22 Page 3 of 3
12. Requirements Certification: I certify that the requirement outlined in this justification is a
Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.
David C. Scharf Date Assistant Chief Engineer Lebanon VAMC
13. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:
a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.
Stephanie Luniewski Date Contracting Officer NCO4 West Construction Team https://dvagov.sharepoint.com/sites/VHAProcurement/VHAPM/VHAPM_Part_806.3.aspx
| 2023-04-17T14:59:00-0400 | |
| STEPHANIE LUNIEWSKI |
| 2023-04-18T12:32:12-0400 | |
| DAVID SCHARF |
File details come from the government source that posted it. Updated .