Questions and Answers.pdf

PDF 224 KB Posted

Attached to
H146--Water System Testing and Maintenance | Drinking Water Coatesville VAMC
Solicitation number
36C24423Q1106
Issued by

About this file

This document contains questions and answers regarding solicitation number 36C24423Q1106 for water system testing and maintenance services at the Coatesville Veterans Affairs Medical Center. The contractor will be required to acknowledge needs for water sampling within two hours of notification, perform sampling and testing according to the statement of work, and maintain PA Class A-D water operator certification for all employees and laboratories used throughout the contract period. The opportunity is available from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4.

View the file

Other files

File Type Posted
RFQ 36C24423Q1106.pdf PDF
Sampling PADEP 2023.pdf PDF
WD 2015-5791 COATESVILLE REV 23 DATED 6-30-23.pdf PDF
36C24423Q1106_1.docx DOCX document
1061-1 D 2021-02-16.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers – Solicitation Notice 36C24423Q1106

1. Reference the requirement: "The contractor shall respond within 2 hours of being notified that the facility needs a water sample taken to confirm the presence of coliform bacteria due to an unexpected event such as a water main break."

o Question: Could you ascertain whether "respond" means being on site within 2 hours or just acknowledge that a need has arisen?

o Answer: Contractor shall acknowledge a need has risen.

2. "e). A statement certifying that all employees and laboratories used will, maintain a PA Class A-D water operator certification throughout the life of the contract to maintain a PA Class A-D water operator certification". Reference Section (D) Operator Certification.

o Question: Is this a requirement for testing and sampling?

o Answer: Contractor will perform sampling and testing according to the SOW (Section 2 sampling and testing).

File details come from the government source that posted it. Updated .