This amendment to a solicitation provides additional details for an opportunity to install exterior card readers at the Coatesville VA Medical Center. The scope of work involves installing card readers at building entrances across the medical center campus. Interested offerors must RSVP for an optional site visit by May 19th and submit offers by the extended deadline of May 31st. The amendment addresses questions from potential bidders to clarify specifics of the project, such as the type of building materials, existing security and network equipment, and service providers for related systems. Additional questions cover needs such as conduit, penetrations between areas, and availability of power outlets.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24423Q0819 0001_1.docx | DOCX document | |
| 36C24423Q0819.pdf | ||
| P03.J_A.apprvd.pdf | ||
| 36C24423Q0819_1.docx | DOCX document | |
| 36C24423Q0819 LineItems.xlsx | XLSX spreadsheet | |
| Scanexteriorcardreaderdrwgs_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 05-18-2023
542-23-3-4483-0019
None
00244
Department of Veterans Affairs Network Contracting Office 4
1601 Kirkwood Highway Wilmington DE 19805
00244
Department of Veterans Affairs Network Contracting Office 4
1601 Kirkwood Highway Wilmington DE 19805
To all Offerors/Bidders
36C24423Q0819
05-18-2023
X
X X
05-31-2023 4:00pm EST
The purpose of this amendment is to:
1. Provide answers to submitted questions.
2. Include a site visit as requested in Q&A. The site visit is scheduled for Monday 05-22-2023 at 9:00AM EST.
Interested parties must RSVP with contracting by 05-19-2023 4:00PM EST via email to the CS at Hanna.Karmazyn@va.gov
3. Extend the RFQ deadline to 05-31-2023 4:00PM EST to provide additional time to bidders post site visit.
All other RFQ terms and conditions remain the same.
Ronald Kline Contracting Officer
Q&A
1. Will a site visit be conducted for solicitation 36C24423Q0819? A site visit will be offered Monday, May 22nd 9 AM. Interested parties must RSVP with contracting by Friday 5/19 4:00PM EST. This will be the only site visit offered and is the last offering for Q&A for this requirement.
2. Could you assist with providing the dongle ID for the current Lenel system? 145506
3. What version is the current Lenel software? OnGuard 7.4.457
4. How many firewalls will we need to be penetrated to accomplish this project? Assume average of 3 per door on basement floors, 4 per door for 1st floor doors, 5 per door for 2nd floor doors, 6 per door for 3rd floor doors. It is all going to depend on the location of the door in relation to the IT closet. You will need one from the door into the hallway, one smoke barrier wall if not two, and one into the IT closet. Then you’ll need ones through floors if they are above the IT closet level. But you can reduce number of penetrations by doing one larger one into the IT closet that all cabling runs through. You can also reutilize existing sleeves if there is room, but that would all be determined at the time of installation as availability is constantly changing. I cannot give an exact availability of existing penetrations at this time.
5. How much conduit estimated to be needed? This is all going to depend on how the contractor installs the card readers and their comfort level of drilling through brick/block. We want the wiring secured inside the wall as much as possible. I would estimate at least 5 feet per door and then additional sleeves for each IT closet to run cabling through one penetration instead of multiple.
6. In what areas will conduit be needed? Any area where the cabling is not able to be hidden inside the wall or door frame. Also recommend having a sleeve for the cabling to go into the IT closet to reduce number of penetrations.
7. Are there areas with hard ceilings where cable will be installed? If so, in which areas?
Yes, Bldg 59 1st floor but there are access panels that can be utilized. Stairwells have hard ceilings but we are anticipating you running the cable from the stairwell into the hallway which is drop ceiling.
8. What is the structure around each of these doors? Ex., drywall, block, etc.. All exterior doors are going to be brick. All interior doors assume block.
9. Are any of the door frames filled with concrete? Assume all are filled with concrete.
10. Are there areas that have IRCA requirements? If so, what areas are those and levels?
I’m assuming the contractor meant ICRA. There will be a pre-construction risk assessment form filled out and approved by our safety department before the start of the project. From past experience, no ICRA barriers were needed. The contractor just had to clean up the dust they created before moving on to the next area.
11. If there are areas where we would need to provide additional utilities for (i.e., electrical outlets) can a list of those areas be provided? The SOW asks that if there are additional utilities needed, the contractor is to provide a listing of additional utilities to Coatesville VAMC that need to be installed at the start of the project for approval. Additional utilities are all going to depend on your proposed installation plan, whether you will be hard wiring the panels or utilizing outlets. The contractor will need to determine what is needed utilities wise.
12. Who is the current automatic door company servicing the facility and what is their contact info? Stanley Access Technologies
Timothy Carey Service Manager/ASTEA Internal Support STANLEY Access Technologies 17-C Marlen Dr, Trenton, NJ, 08691 O 609-890-0877 ex 6 | Direct 609-689-5471| M 609-943-8558 | Toll Free: 800-631-5314 Timothy.Carey@sbdinc.com|
Ian Aparicio Service Dispatcher STANLEY Access Technologies 17-C Marlen Dr, Trenton, NJ, 08691 M 954-419-8928 | Ian.Aparicio@sbdinc.com|
13. Is the current Lenel system connected to the fire alarm system? Only in Bldg 2 and
4. All other buildings are not currently connected to the fire alarm system
14. Who is your current fire alarm service company? ADT
15. What type of fire alarm system is currently installed? Fireworks
16. The documentation states that “The contractor shall then run cat 6 cabling from the 4 port, POE switch to an open port on the existing switches in each IT closet”. What is/are the model(s) of the current facility switches and will there be ports available on these switches? IFS brand ES xx model. Depending on closet the size is different anywhere from 8 to 48 port. Yes, one port is available on each existing switch.
17. Would you be able to provide the system/dongle id number to the existing Lenel onguard system at the medical center? 145506
End of Document mailto:Timothy.Carey@sbdinc.com%7C mailto:Ian.Aparicio@sbdinc.com%7C
| 2023-05-18T15:08:28-0400 | |
| RONALD J. KLINE 152627 |
File details come from the government source that posted it. Updated .