S02 EXHIBIT B - Calculation of Self-Performed Work 36C24420R0086.docx

DOCX document 41 KB Posted

Attached to
Y1FZ--Upgrade Access to Building 5 - Design Build
Solicitation number
36C24422R0181
Issued by

About this file

This document provides details for a federal design-build contract opportunity to upgrade access to Building 5 at the Butler Veteran Administration Medical Center. The project scope includes providing all labor, materials, tools, equipment, and design-build services to design and construct upgrades in accordance with VA guidelines and specifications. The contract will be awarded on a best value basis to a Service-Disabled Veteran Owned Small Business as a firm-fixed price contract for $250,000 to $500,000 with a 240 calendar day period of performance. Questions regarding the solicitation are due by September 8, 2022, with responses posted to SAM.gov where the full solicitation will also be made available. Offerors must be registered in SAM and verified through the VA's Center for Veterans Enterprise by the Phase I proposal due date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK

EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO Request For Proposal 36C24420R0086

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %