EXHIBIT C - Calculation of Self-Performed Work.docx
DOCX document 38 KB Posted
- Solicitation number
- 36C24421R0013
About this file
This document provides details for a two-phase design-build solicitation for renovation of the third floor for oncology and telehealth at the Erie Veterans Affairs Medical Center in Erie, Pennsylvania. The solicitation will seek a prime contractor to partner with an architecture/engineering firm to complete designs and construction for the project, including all labor, materials, tools, equipment, and design-build services. The project is anticipated to be between $500,000 and $1,000,000 and must be completed within 180 calendar days of the notice to proceed. Only service-disabled veteran-owned small businesses will be allowed to participate in Phase I and will be evaluated to determine which offerors will be selected for Phase II. The solicitation is scheduled for release on or around December 28, 2020 and will be set aside and conducted in accordance with Federal Acquisition Regulation Parts 36.3 and 15.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 36C24421R0013 - 2-2-2021.docx | DOCX document | |
| EXHIBIT A - Past Performance Relevancy Questionnaire.docx | DOCX document | |
| EXHIBIT E - Past Performance Questionnaire 36C24421R0013.docx | DOCX document | |
| EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx | DOCX document | |
| EXHIBIT B - Subcontractor Information and Consent Form.docx | DOCX document | |
| ICRA FORM.docx | DOCX document | |
| P07-General Decision Number- PA20210088 01-22-2021.docx | DOCX document | |
| 36C24421R0013_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO Request For Proposal 36C24421R0013
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self-performed) $ __________________
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($) ________________________
B.4 Remainder is “Total amount of work to be performed under the Contract” =
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %