This amendment to a federal contract solicitation and the related opportunity describe requirements for replacing underground storage tanks at a Department of Veterans Affairs medical center. The scope of work includes removing and replacing four underground fuel oil storage tanks, associated piping, mechanical and electrical equipment, monitoring systems, concrete, and utilities. The magnitude of the project is estimated between $1,000,000 to $5,000,000. The period of performance is approximately 272 calendar days after notice to proceed. The solicitation is a 100% service-disabled veteran small business set-aside. A pre-proposal site visit will be held within two weeks of solicitation issuance at the location specified. Questions should be directed to the contracting officer at the medical center by the date listed while referencing the synopsis and project number.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24421B0011 0003.docx | DOCX document | |
| S02 SafetyHealthDuringConstruction 18S-15-346.pdf | ||
| S-02 2021 Fuel Reports -Tanks 1 -4.pdf | ||
| 36C24421B0011 0002.docx | DOCX document | |
| S02 Existing Leak Detect Monit Alarm Sys Plan.pdf | ||
| S02 PROJECT SITE PHOTOGRAPH 1.pdf | ||
| S02 Price Sheet with Bid Deduct.docx | DOCX document | |
| S04 UST Sign-in.pdf | ||
| 36C24421B0011 0001.docx | DOCX document | |
| P09 DWGs.pdf | ||
| 36C24421B0011.docx | DOCX document | |
| P09 Replace USTs Specs.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project #693-20-109 Replace Underground Storage Tanks AMENDMENT No. 3 MODIFICATIONS, ADDITIONS & CLARIFICATIONS TO THE CONTRACT SOLICITATION DOCUMENTS:
1. General Items:
· Buildings to the east and south of the tank locations are typical building foundation walls and floor slabs, no basements.
· “PROJECT SITE PHOTOGRAPHS” were provided for reference only.
2. Specifications Section 02 65 00, Page 5, Paragraph 3.4.A.3: The “2021 Fuel Reports – Wilkes Barre VA Medical Center – Tanks 1 through 4” were provided as supplemental information for this specification requirement.
3. Drawing E-101, SHEET KEY NOTE 1: Revise Note 1 to read: CONTRACTOR IS TO FIELD VERIFY THE EXISTING TANK LEAK DETECTION, ALARM AND MONITORING SYSTEM IS IN WORKING ORDER PRIOR TO START OF WORK. THE EXISTING SYSTEM MONITORS THE FOUR EXISTING UST’s BEING REPLACED BY THIS WORK AND ONE EXISTING ABOVE GROUND STORAGE TANK THAT REMAINS IN PLACE. IF FOUND TO BE NOT WORKING CONTACT COR ON HOW TO PROCEED. PROVIDE A COMPLETELY NEW LEAK DETECTION, ALARM AND MONITORING SYSTEM TO REPLACE THE EXISTING SYSTEM. DURING CONSTRUCTION OF PHASE 1 THE UST’s BEING REPLACED UNDER PHASE 2 AND THE EXISTING AST WILL BE IN USE AND MUST BE PROVIDED WITH A LEAK DETECTION, ALARM AND MONITORING SYSTEM. EXISTING CONDUITS WITHIN THE BOILER PLANT BUILDING MAY BE REUSED TO THE MOST EXTEND PRACTICAL BY THE CONTRACTOR FOR NEW WIRING ASSOCIATED WITH THE SYSTEM. ALL EXTERIOR CONDUITS SHALL BE NEW.
4. Supplemental Information for Leak Detection, Alarm and Monitoring System work: Drawing pdf titled “EXISTING LEAK DETECTION, MONITORING AND ALARM SYSTEM PLAN” was provided as supplemental information for clarification of this portion of the work. All panels, components, sensors, alarms, switches, remote alarms, wiring, etc. associated with the existing Veeder-Root TLS-350 system shall be replaced in it’s entirety with new equipment. The basis of design for the new replacement system shall be the Veeder-Root TLS-450PLUS system. The existing sensors and wiring from the existing 1500-gallon AST shall be reconnected and made operational with the new system. Existing conduits at the interior of the boiler plant building already in place as described on the attached drawing pdf can be reused to the most extent practical by the contractor.
5. The following Bid Deducts were added to the Solicitation:
Bid Deduct No. 1:
1. Specifications Section 02 65 00, Page 5, Paragraph 3.4.A.3: Provide a credit for the fuel removed to the Wilkes-Barre VAMC. Contractor is to assume a total volume of No. 2 fuel oil to be removed is 100,000 gallons.
Bid Deduct No. 2:
2. Drawing CS501, Section 2/CS501: In lieu of reinforced concrete ballasted pads for each new UST provide two (2) reinforced concrete deadman anchors for each new UST. The length of each deadman anchor shall match the length of each new UST.