36C24419R0020-001.pdf

PDF 238 KB Posted

Attached to
Construct New Community Living Center CLC A/E Project 595-601 Federal contract opportunity
Solicitation number
36C24419R0020
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419R0020 SOW Attachment I - PCRA.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Community Living Center CLC A/E Project 595-601, newest first.
File Type Posted
36C24419R0020-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-construction Risk Assessment Lebanon VA Medical Center

Location of Construction: Project Start Date:

Contracting Officer Technical Representative: Estimated Duration:

Contractor Performing Work: Permit Expiration Date:

Contractor’s Supervisor: Telephone:

Description of project/work activity:

Construction Activities - The following projects do not require completion of the Pre-construction risk assessment form:

Repair medical gas outlet.

Air balance readings.

Check air-conditioning.

Replace light bulb.

Check or replace electric outlet.

Paint and wallpaper in business offices and non-patient areas.

Paint in patient room if closed for painting and less than 3 sq.ft. of wall needs patched. Filter for room unit changed after painting.

Installation of soap dispenser/needle box/paper towel holder in patient room.

Repair of window blind.

Ceiling tile replacement for areas less than 10 2 X 2 tiles, if not in business offices and non-patient areas.

Minimum repair of nurse call system/TV/Bed/Telephone.

Ceiling tile replacement for area less than 5 2 X 2 tiles in a patient area if patient is out of the immediate area and clean up can be accomplished before patient returns.

Unstop sink/commode with no water on floor.

Unstop commode when water on floor requires maintenance to have Housekeeping clean area immediately.

Intermediate jobs that create a moderate amount of dust inside room and is made negative by use of HEPA-equipped unit with minimum 10 ACH, and all air discharged outside, HEPA unit must run 2 hours after completion of job and Housekeeping must clean room before unit is removed from room. All work and use of HEPA unit must be documented and copy forward to Infection Control and Safety.

NOTE: all duct vents to be sealed off during work!

Y N NA Environment

Will there be noise generated that will impact a department adjacent to, above, or below the construction area?

If so, these departments must be notified.

How are you going to keep the noise level below 60 dBA?

Will there be strong odors generated that will impact a department adjacent to, above, or below the construction area?

How are you going to ensure that the odor does not migrate to the adjacent occupancies?

Will there be vibration generated that will impact a department adjacent to, above, or below the construction area?

If so, these departments must be notified each time this type of work will be performed.

How are you going to ensure that the vibrations do not impact work activities of the adjacent occupancies?

Will the COTR ensure that Emergency Procedures in place and posted on each job for accidental events that could greatly impact Patient Care or Life Safety to the facility? Included in these procedures are such things as:

Emergency telephone numbers of key departments.

A plan that describes where main valves, switches, and controls are for the area in case of an emergency.

A plan for unexpected outages.

Are any of the following environmental hazards present?

Will hazardous chemicals be used on this project? Contractor will be required to keep a paper copy of all pertinent

Material Safety Data Sheets on site.

Is asbestos or lead abatement required on this job? If so, notify Safety and Maintenance at the activation.

Will there be hot work done on this project? If there are, then a hot work permit must be posted on the job site. All hot work must have a fire watch assigned to each area while the hot work is being performed.

Will there be a Confined Space Entry required on this project? If so, the Lebanon VAMC confined space entry program must be followed.

Utilities - Planned Outages

Will any of the following systems be out of service at any time during the project?

Fire alarm (if out for more than 4 hours, Interim Life Safety Measures must be implemented.)

Sprinkler (If out for more than 4 hours, Interim Life Safety Measures must be implemented.)

Electrical

Domestic water

Oxygen

Medical Gas

Steam

Sewage

HVAC

Develop of list of shutoff valves that may need to be closed immediately in the event that a utility pipe is broken. Show or describe location of the valve and areas disrupted by the closure. Share list with contractor and shop foremen.

Insert in the list here:

Interim Life Safety Measures (ILSMs) Objective: To protect occupants during periods when Life Safety Code is not met or during periods of construction.

Will there be any work that will require activation of the Interim Life Safety Measures during this project? If so, insert pertinent information into the Interim Life Safety Measure form on the share and advise the Safety Officer.

Some things that will cause ILSM’s to be implemented are but not limited to:

Any construction that impacts an EXIT or stairs, Any construction that impacts major breaches in a fire or smoke wall, Taking the main fire protection system out of service (sprinkler), Taking the main fire alarm system out of service, Taking the ‘area” fire or fire alarm systems out of service for more than 4 hours within a 24-hour period.

Can the need for an ILSM be eliminated or mitigated by design or phasing?

Infection Control Risk Assessments (ICRAs) Objective: To protect occupants from infectious conditions during periods of construction.

The Lebanon VAMC is considered a low risk facility for the transmission of Tuberculosis. However contract employees working in an area where there is known TB, or those working on local exhaust ventilation (or within 25 feet of a labeled biohazard exhaust vent), airborne isolation room, ED, OR or patient treatment room will be required to provide proof of TB testing in accordance with VHA Directive 2011-036..

Will there be any work that will require activation of the Infection Control Risk Assessment during this project? If so, consult with Infection Control Practitioner for implementing an ICRA.

ICRA Form

Class 4 needed, filtering needed for B101 HVAC

Can the need for an ICRA be eliminated or mitigated by design or phasing?

Additional Safety Concerns

Will construction affect exit routes from occupied areas adjacent to construction site?

Will project affect traffic patterns in area? If yes, explain plan. Phasing will be used to maintain traffic flow. West side exit of B101 will relocate and eventually traffic from Bldg 1 south entrance will go through Bldg 101 to get to Bldg 1 elevator lobby

The following must be completed prior to any construction activities.

Separation wall must be constructed prior to project beginning.

Fire protection systems must remain intact.

Provide extra fire extinguishers in work areas.

Maintain exit lights in work area.

Maintain negative air in construction area (24/7) through duration of project.

There cannot be any return air from within the construction area to the rest of the building.

Redirect exiting not to go through construction area.

Put signs on doors into construction area “Construction Area Do Not Enter”.

Maintain daily logs and keep a current Hot Work Permit.

Place sticky mats at doors exiting construction area.

All debris removal must be by covered cart.

Maintain clean and orderly work area on a daily basis.

How will this project affect the departments above, below and adjacent to this project?

Flooding Mitigation

Are there any active wet piping systems within the construction area? If so, develop a list of shutoff valves noting exact location of valve and who is authorized to close them and share list with those authorized to shutoff valves.

Security Issues Objective: To ensure the construction work site is kept secure to prevent patients and employees from entering these areas at all times of the day.

Are there any security vulnerabilities? How they will addressed? The construction work will penetrate the exterior walls of the building

Will any keys be issued to the contractor gain access to their workspace(s) and how will the space be secured?

Are there any areas of contractor’s work site(s) not requiring to be secured 24/7? If so, where?

Are construction cores required? If so, where?

Are there any security phasing issues?

Any chance of a construction worker being locked in a space without means of emergency exiting?

File details come from the government source that posted it.