36C24419Q1040-017.pdf
PDF 691 KB Posted
- Solicitation number
- 36C24419Q1040
About this file
This combined synopsis/solicitation from the Department of Veterans Affairs seeks firestop barrier inspection services at the Veterans Affairs Medical Center in Lebanon, Pennsylvania. The solicitation number is 36C24419Q1040, with an original response date of August 28, 2019. The NAICS code is 238310 and the procurement is set aside as a total SDVOSB. The statement of work in Attachment 1 provides additional details on the required services. Offerors must follow the quote submission instructions in Attachment 3 and provide pricing using the line item in Attachment 4. The service contract act wage determination number 2015-4231 applies. This is a new requirement not replacing any existing contract.
36C24419Q1040 B34 _ B35.pdf
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP UP
DN DN
85 SF
Bedroom S106C
86 SF
Bedroom S106B
88 SF
Double S106
54 SF
Toilet S106A
86 SF
Bedroom S104C
85 SF
Bedroom S104B
88 SF
Double S104
54 SF
Toilet S104A
180 SF
Single S102
68 SF
ADA Toilet S102A
180 SF
Single S100
68 SF
ADA Toilet S100A
124 SF
Vestibule S001
49 SF
HAC /
Storage
S005
111 SF
Office/Meeting S004
65 SF
Storage S003
315 SF
SARRTP
Desk S002
86 SF
Bedroom S110C
85 SF
Bedroom S110B
88 SF
Double S110
54 SF
Toilet S110A
85 SF
Bedroom S114B
86 SF
Bedroom S114C
88 SF
Double S114
54 SF
Toilet S114A
86 SF
Bedroom S116C
85 SF
Bedroom S116B
88 SF
Double S116
54 SF
Toilet S116A
192 SF
Single S118
54 SF
Toilet S118A
612 SF
Corridor S007
85 SF
Bedroom S115B
86 SF
Bedroom S115C
88 SF
Double S115
54 SF
Toilet S115A
86 SF
Bedroom S113B
85 SF
Bedroom S113C
88 SF
Double S113
54 SF
Toilet S113A
181 SF
Single
S111 69 SF
ADA Toilet S111A
114 SF
Mechanical S009
78 SF
Laundry S008
85 SF
Bedroom S105C
86 SF
Bedroom S105B
88 SF
Double S105
54 SF
Toilet S105A
86 SF
Bedroom S107C
85 SF
Bedroom S107B
88 SF
Double
S107 54 SF
Toilet S107A
191 SF
Single S109
53 SF
Toilet S109A
685 SF
Corridor S006
55 SF
Toilet S112A
159 SF
Single S112
32 SF
Elec. Clos.
S007A
63 SF
Elec. Clos.
S008B
141 SF
Single S103
140 SF
Single S101
53 SF
Toilet S103A
53 SF
Toilet S101A
18 SF
Stor.
S008A
18 SF
Stor.
S008C
93 SF
Corridor S029
Group/Living Room
S030
Group Room S132
Toilet S131
E X
IS
T
D
IS
T A
N C
E
4'
-3
EXIST DISTANCE = 90'-0"EXIST DISTANCE = 56'-2"
TEC
TEC
TEC
T E
C
TEC
FEC
FEC
F E
C
68 SF
Vestibule C019
83 SF
Vestibule C001
1119 SF
Dining Social Space
C018
196 SF
Kitchen/Dish C022
332 SF
Gameroom / Lounge
C014
233 SF
Private Family Room
C028
175 SF
Vestibule C005
41 SF
Storage C020
42 SF
Toilet C026
91 SF
Office/Reception C010
233 SF
Private Family Room
C012
446 SF
Mechanical C013
109 SF
Rec.
Therapy Office
C016
45 SF
Toilet C027
320 SF
Gallery/Reception
C002 175 SF
Vestibule C006
110 SF
Rec.
Therapy Office
C01559 SF
Electric C025
178 SF
Servery C021
71 SF
Walk-In Refrigerator
C023 36 SF
HAC
C024
320 SF
Gallery/Reception C002
157 SF
Computer Room
C011
44 SF
Elev Eqmt C017
58 SF
Elevator
CE010
227 SF
Corridor
C003187 SF
Corridor C004
EXIST DISTANCE = 50'-3"
EXIST DISTANCE = 49'-2"
TEC
TEC
T E
C
T E
C
T E
C
T E
C
FEC
F E
C
FEC
PA Office & Consult.
C030
Waiting C031
F E
F E
CS137
C101 C102 C103 C105
C106 C107 C109
CS138
C122 C123
C118 C117
C121
C120
C133 C132 C124A C130 C129 C128
C127C126C125
C124
C111
C112
C115C116 C113C114
C110C100
C108C104
S008
90 SF
Counselor C102
90 SF
Counselor C103
90 SF
Counselor C104
161 SF
Staff Lounge C105
90 SF
Counselor C106
90 SF
Counselor C107
90 SF
Office C108
155 SF
Office C110
155 SF
Office C100
73 SF
Work Room C119
38 SF
IT
C120
59 SF
Electric C121
42 SF
Men's C122
119 SF
Counselor C133
92 SF
Lockers C132
213 SF
Large Conference
C124
99 SF
Counselor C130
99 SF
Psych C129
99 SF
Psych C128
80 SF
Copy/Storage C125
117 SF
Small Conference
C126
99 SF
Counselor C127
132 SF
Business Office
C118
131 SF
RN Office C117
148 SF
Social Worker
C116
124 SF
Social Worker
C115
119 SF
Social Worker
C114
131 SF
Social Worker
C113
34 SF
HAC
C112
78 SF
Office C111
631 SF
Corridor C140
58 SF
Elevator
CE100
45 SF
Women's C123
90 SF
Assistant's Office
C101
90 SF
Assistant's Office
C109
147 SF
Stair 1
CS137
147 SF
Stair 2
CS138
148 SF
Waiting Area C143
183 SF
Corridor C141
325 SF
Corridor C142
87 SF
Corridor C144
EXIST DISTANCE = 56'-3"
EXIST DISTANCE = 99'-1"
T E
C
F E
C
T E
C
F E
C
F E
C
Life Safety Plan Legend
FE
FACP
SD
F
F
Standard Bracket-Mounted Fire Extinguisher
Fire Alarm Control Panel
Smoke Detector
Pull Station
Strobe
Emergency Lighting
Path of Egress
New Exit Sign
Width Provided
Egress Capacity
36"
Smoke Rated Partition
1 HR Partition
2 HR Partition
FEC
Fire Extinguisher Cabinet
TEC Tactile Exit Sign
NOTE: SEE MEP DRAWINGS FOR
COMPLETE ELECTRICAL AND FIRE
PROTECTION INFORMATION
NEW FIRE EXTINGUISHERS TO BE
FURNISHED AND INSTALLED BY G.C.
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
MEP & Civil Engineers Buchart Horn 445 W Philadelphia St York, PA 17401 717.852.1400
Fire Protection Engineers
GTA
94 Boston Hill Plymouth, PA 18651-3225 570.779.7843
Structural Engineers QproQ Engineering, Inc.
187 N. Main ST Wilkes-Barre PA 18792 570.823.9935
THESE RECORD DOCUMENTS HAVE BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS. THE DESIGN PROFESSIONAL HAS
NOT VERIFIED THE ACCURACY AND/OR COMPLETENESS OF THIS
INFORMATION AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR
OMISSIONS WHICH MAY BE INCORPORATED HEREIN AS A RESULT.
Expand Behavioral Health
Clinic Services
7/15/2011
A0-100
595-901
AuthorChecker
Space Summary &
Lifesafety Plan - SARRTP &
Central Building
1/8" = 1'-0"1 Area Plan - SARRTP
1/8" = 1'-0"2 Area Plan - Central Building 1st Floor
1/8" = 1'-0"3 Area Plan - Central Building 2nd Floor
ROOM AREA SCHEDULE - SARRTP
Number Name Area
S106C Bedroom 85 SF
S107 Double 88 SF
S107A Toilet 54 SF
S107B Bedroom 85 SF
S107C Bedroom 86 SF
S109 Single 191 SF
S109A Toilet 53 SF
S110 Double 88 SF
S110A Toilet 54 SF
S110B Bedroom 85 SF
S110C Bedroom 86 SF
S111 Single 181 SF
S111A ADA Toilet 69 SF
S112 Single 159 SF
S112A Toilet 55 SF
S113 Double 88 SF
S113A Toilet 54 SF
S113B Bedroom 86 SF
S113C Bedroom 85 SF
S114 Double 88 SF
S114A Toilet 54 SF
S114B Bedroom 85 SF
S114C Bedroom 86 SF
S115 Double 88 SF
S115A Toilet 54 SF
S115B Bedroom 85 SF
S115C Bedroom 86 SF
S116 Double 88 SF
S116A Toilet 54 SF
S116B Bedroom 85 SF
S116C Bedroom 86 SF
S118 Single 192 SF
S118A Toilet 54 SF
S131 Toilet 85 SF
S132 Group Room 198 SF
7873 SF
ROOM AREA SCHEDULE - SARRTP
Number Name Area
SARRTP
T.O. First Floor
S001 Vestibule 124 SF
S002 SARRTP Desk 315 SF
S003 Storage 65 SF
S004 Office/Meeting 111 SF
S005 HAC / Storage 49 SF
S006 Corridor 685 SF
S007 Corridor 612 SF
S007A Elec. Clos. 32 SF
S008 Laundry 78 SF
S008A Stor. 18 SF
S008B Elec. Clos. 63 SF
S008C Stor. 18 SF
S009 Mechanical 114 SF
S029 Corridor 93 SF
S030 Group/Living Room 558 SF
S100 Single 180 SF
S100A ADA Toilet 68 SF
S101 Single 140 SF
S101A Toilet 53 SF
S102 Single 180 SF
S102A ADA Toilet 68 SF
S103 Single 141 SF
S103A Toilet 53 SF
S104 Double 88 SF
S104A Toilet 54 SF
S104B Bedroom 85 SF
S104C Bedroom 86 SF
S105 Double 88 SF
S105A Toilet 54 SF
S105B Bedroom 86 SF
S105C Bedroom 85 SF
S106 Double 88 SF
S106A Toilet 54 SF
S106B Bedroom 86 SF
ROOM AREA SCHEDULE - Central Building
Number Name Area
Pipe Trench
C32 Room 503 SF
C33 Pipe Trench 0 SF
C34 Pipe Trench 502 SF
C35 Elevator Pit 58 SF
1063 SF
T.O. First Floor
C001 Vestibule 83 SF
C002 Gallery/Reception 320 SF
C003 Corridor 227 SF
C004 Corridor 187 SF
C005 Vestibule 175 SF
C006 Vestibule 175 SF
C010 Office/Reception 91 SF
C011 Computer Room 157 SF
C012 Private Family Room 233 SF
C013 Mechanical 446 SF
C014 Gameroom / Lounge 332 SF
C015 Rec. Therapy Office 110 SF
C016 Rec. Therapy Office 109 SF
C017 Elev Eqmt 44 SF
C018 Dining Social Space 1119 SF
C019 Vestibule 68 SF
C020 Storage 41 SF
C021 Servery 178 SF
C022 Kitchen/Dish 196 SF
C023 Walk-In Refrigerator 71 SF
C024 HAC 36 SF
C025 Electric 59 SF
C026 Toilet 42 SF
C027 Toilet 45 SF
C028 Private Family Room 233 SF
C029 Corridor 127 SF
C030 PA Office & Consult. 152 SF
C031 Waiting 39 SF
CE010 Elevator 58 SF
5152 SF
T. O. Second Floor
C100 Office 155 SF
C101 Assistant's Office 90 SF
C102 Counselor 90 SF
C103 Counselor 90 SF
C104 Counselor 90 SF
C105 Staff Lounge 161 SF
C106 Counselor 90 SF
C107 Counselor 90 SF
C108 Office 90 SF
C109 Assistant's Office 90 SF
C110 Office 155 SF
C111 Office 78 SF
C112 HAC 34 SF
C113 Social Worker 131 SF
C114 Social Worker 119 SF
C115 Social Worker 124 SF
C116 Social Worker 148 SF
C117 RN Office 131 SF
C118 Business Office 132 SF
C119 Work Room 73 SF
C120 IT 38 SF
C121 Electric 59 SF
C122 Men's 42 SF
C123 Women's 45 SF
C124 Large Conference 213 SF
C125 Copy/Storage 80 SF
C126 Small Conference 117 SF
C127 Counselor 99 SF
C128 Psych 99 SF
C129 Psych 99 SF
C130 Counselor 99 SF
C132 Lockers 92 SF
C133 Counselor 119 SF
C140 Corridor 631 SF
C141 Corridor 183 SF
C142 Corridor 325 SF
C143 Waiting Area 148 SF
C144 Corridor 87 SF
CE100 Elevator 58 SF
CS137 Stair 1 147 SF
CS138 Stair 2 147 SF
5086 SF
PROGRAM NET SF
CENTRAL BUILDING (1st Floor) 5151 sf CENTRAL BUILDING (2nd Floor) 5947 sf SARRTP 8262 sf
Total 19360 sf
PRTTP (Temporary Alternate) 6105 sf
Revision Schedule
Number Description Date
34 & 35AS BUILT
| Sheets |
| A0-000 - Abbreviations, Symbols and Notes |
| A0-001 - Partition Types and Schedules |
| A0-100 - Space Summary & Lifesafety Plan - SARRTP & Central Building |
| A0-101 - Space Summary & Lifesaftey Plan - PRRTP |
| A1-100 - Facility Plans - SARRTP |
| A1-100a - Corridor and Utility Layout Plan - SARRTP |
| A1-101 - Facility Plans - Central Building |
| A1-101a - Corridor and Utility Layout Plan - Central Building |
| A1-102 - Facility Plans - PRRTP |
| A1-102a - Corridor and Utility Layout Plan - PRRTP |
| A1-103 - Walkway and Springhouse Plans, Elevations and Sections |
| A1-110 - Attic Plan - SARRTP & Central Buildings |
| A1-112 - Attic Plan - PRRTP |
| A1-200 - Roof Plan - SARRTP & PRRTP |
| A1-201 - Roof Plan - Central Building |
| A2-100 - Enlarged Resident Unit Plans |
| A3-100 - Building Elevations - SARRTP |
| A3-101 - Building Elevations - Central Building |
| A3-102 - Building Elevations - PRRTP |
| A4-100 - Building Sections - Central Building |
| A4-200 - Building Sections - SARRTP Wing |
| A5-100 - Wall Sections and Details |
| A5-101 - Wall Sections and Details |
| A5-102 - Wall Sections and Details |
| A5-103 - Pipe Trench Plans and Details |
| A5-200 - Pavillion Details |
| A6-100 - Stair / Elevator Plans, Sections, Details |
| A7-100 - Enlarged Plans and Interior Elevations |
| A7-101 - Enlarged Plans and Interior Elevations |
| A7-201 - Casework Details |
| A8-100 - Door Schedule, Elevations and Details |
| A8-101 - Window Schedule, Elevations and Details |
| A9-100 - Reflected Ceiling Plans - SARRTP |
| A9-101 - Reflected Ceiling Plans - Central Building |
| A9-102 - Reflected Ceiling Plans - PRRTP |
| A9-200 - Room Finish Schedule and Details |
| G0-000 - Cover Sheet |
| G0-001 - Drawing List |
File details come from the government source that posted it. Updated .