36C24419Q1040-006.pdf

PDF 261 KB Posted

Attached to
Fire Stop Barrier Inspection Services Lebanon VAMC
Solicitation number
36C24419Q1040
Issued by

About this file

This combined synopsis/solicitation from the Department of Veterans Affairs seeks firestop barrier inspection services for the Veterans Affairs Medical Center in Lebanon, Pennsylvania. The solicitation includes a statement of work detailing the required services to be provided. Interested parties must submit quotes by August 28, 2019 responding to instructions in Attachment 3. The contract will utilize Service Contract Act wage determinations and has an estimated period of performance through the end of the calendar year. The solicitation is set aside for qualified service-disabled veteran-owned small businesses. The NAICS code for this procurement is 238310.

36C24419Q1040 B36 02.pdf

View the file

Other files

File Type Posted
-18051.docx DOCX document
36C24419Q1040-0002002.rtf RTF text file
36C24419Q1040-0002001.docx DOCX document
36C24419Q1040-0002000.docx DOCX document
36C24419Q1040-0001000.docx DOCX document
36C24419Q1040-0001001.pdf PDF
36C24419Q1040-007.pdf PDF
36C24419Q1040-021.pdf PDF
36C24419Q1040-014.pdf PDF
36C24419Q1040-020.pdf PDF
36C24419Q1040-006.pdf PDF
36C24419Q1040-002.pdf PDF
36C24419Q1040-013.pdf PDF
36C24419Q1040-004.xlsx XLSX spreadsheet
36C24419Q1040-009.pdf PDF
36C24419Q1040-010.pdf PDF
36C24419Q1040-018.pdf PDF
36C24419Q1040-017.pdf PDF
36C24419Q1040-019.pdf PDF
36C24419Q1040-003.docx DOCX document
36C24419Q1040-011.pdf PDF
36C24419Q1040-012.pdf PDF
36C24419Q1040-000.docx DOCX document
36C24419Q1040-015.pdf PDF
36C24419Q1040-001.rtf RTF text file
36C24419Q1040-008.pdf PDF
36C24419Q1040-016.pdf PDF
36C24419Q1040-005.docx DOCX document
36C24419Q1040-019.pdf PDF
36C24419Q1040-008.pdf PDF
36C24419Q1040-002.pdf PDF
36C24419Q1040-000.docx DOCX document
36C24419Q1040-009.pdf PDF
36C24419Q1040-003.docx DOCX document
36C24419Q1040-001.rtf RTF text file
36C24419Q1040-016.pdf PDF
36C24419Q1040-005.docx DOCX document
36C24419Q1040-013.pdf PDF
36C24419Q1040-017.pdf PDF
36C24419Q1040-007.pdf PDF
36C24419Q1040-020.pdf PDF
36C24419Q1040-012.pdf PDF
36C24419Q1040-021.pdf PDF
36C24419Q1040-014.pdf PDF
36C24419Q1040-010.pdf PDF
36C24419Q1040-004.xlsx XLSX spreadsheet
36C24419Q1040-015.pdf PDF
36C24419Q1040-018.pdf PDF
36C24419Q1040-011.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

49 SF

HAC /

Storage

P004

558 SF

Group/Living Room

P005

96 SF

Office/Meeting P003

72 SF

Storage

P002 315 SF

PRRTP Desk P006

124 SF

Vestibule P001

428 SF

Corridor P008

180 SF

Single P100

68 SF

ADA Toilet P100A

54 SF

Toilet P102A

88 SF

Double P102

85 SF

Bedroom P102C

86 SF

Bedroom P102B

86 SF

Bedroom P104B

85 SF

Bedroom P104C

88 SF

Double P104

54 SF

Toilet P104A

86 SF

Bedroom P103C

85 SF

Bedroom P103B

88 SF

Double

P10354 SF

Toilet P103A

68 SF

ADA Toilet P101A

179 SF

Single

P101182 SF

Single P110

68 SF

ADA Toilet P110A

78 SF

Laundry P007

118 SF

Mechanical P009

88 SF

Double P113

85 SF

Bedroom P113B

86 SF

Bedroom P113C

54 SF

Toilet P113A

86 SF

Bedroom P115B

85 SF

Bedroom P115C

88 SF

Double P115

54 SF

Toilet P115A

86 SF

Bedroom P112C

85 SF

Bedroom P112B

85 SF

Bedroom P114B

86 SF

Bedroom P114C

54 SF

Toilet P112A

54 SF

Toilet P114A

88 SF

Double P114

88 SF

Double P112

501 SF

Corridor P010

151 SF

Single P111

37 SF

Elec. Clos.

P008

56 SF

Toilet P111A

98 SF

Corridor P011

Toilet P134

EXIST DISTANCE = 31'-6"

E X

IS

T

D

IS

T A

N C

E

9'

-1 0"

TEC

TEC

TEC

TEC

F E

C

FEC

FEC

Life Safety Plan Legend

FE

FACP

SD

F

F

Standard Bracket-Mounted Fire Extinguisher

Fire Alarm Control Panel

Smoke Detector

Pull Station

Strobe

Emergency Lighting

Path of Egress

New Exit Sign

Width Provided

Egress Capacity

36"

Smoke Rated Partition

1 HR Partition

2 HR Partition

FEC

Fire Extinguisher Cabinet

TEC Tactile Exit Sign

NOTE: SEE MEP DRAWINGS FOR

COMPLETE ELECTRICAL AND FIRE

PROTECTION INFORMATION

NEW FIRE EXTINGUISHERS TO BE

FURNISHED AND INSTALLED BY G.C.

PROJECT

NORTH

KEY PLAN

TRUE

NORTH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities

Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

MEP & Civil Engineers Buchart Horn 445 W Philadelphia St York, PA 17401 717.852.1400

Fire Protection Engineers

GTA

94 Boston Hill Plymouth, PA 18651-3225 570.779.7843

Structural Engineers QproQ Engineering, Inc.

187 N. Main ST Wilkes-Barre PA 18792 570.823.9935

THESE RECORD DOCUMENTS HAVE BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS. THE DESIGN PROFESSIONAL HAS

NOT VERIFIED THE ACCURACY AND/OR COMPLETENESS OF THIS

INFORMATION AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR

OMISSIONS WHICH MAY BE INCORPORATED HEREIN AS A RESULT.

Expand Behavioral Health

Clinic Services

7/15/2011

A0-101

595-901

AuthorChecker

Space Summary &

Lifesaftey Plan - PRRTP

1/8" = 1'-0"1 Area Plan - PRRTP

ROOM AREA SCHEDULE - Central Building

Number Name Area

Pipe Trench

C32 Room 503 SF

C33 Pipe Trench 0 SF

C34 Pipe Trench 502 SF

C35 Elevator Pit 58 SF

1063 SF

T.O. First Floor

C001 Vestibule 83 SF

C002 Gallery/Reception 320 SF

C003 Corridor 227 SF

C004 Corridor 187 SF

C005 Vestibule 175 SF

C006 Vestibule 175 SF

C010 Office/Reception 91 SF

C011 Computer Room 157 SF

C012 Private Family Room 233 SF

C013 Mechanical 446 SF

C014 Gameroom / Lounge 332 SF

C015 Rec. Therapy Office 110 SF

C016 Rec. Therapy Office 109 SF

C017 Elev Eqmt 44 SF

C018 Dining Social Space 1119 SF

C019 Vestibule 68 SF

C020 Storage 41 SF

C021 Servery 178 SF

C022 Kitchen/Dish 196 SF

C023 Walk-In Refrigerator 71 SF

C024 HAC 36 SF

C025 Electric 59 SF

C026 Toilet 42 SF

C027 Toilet 45 SF

C028 Private Family Room 233 SF

C029 Corridor 127 SF

C030 PA Office & Consult. 152 SF

C031 Waiting 39 SF

CE010 Elevator 58 SF

5152 SF

T. O. Second Floor

C100 Office 155 SF

C101 Assistant's Office 90 SF

C102 Counselor 90 SF

C103 Counselor 90 SF

C104 Counselor 90 SF

C105 Staff Lounge 161 SF

C106 Counselor 90 SF

C107 Counselor 90 SF

C108 Office 90 SF

C109 Assistant's Office 90 SF

C110 Office 155 SF

C111 Office 78 SF

C112 HAC 34 SF

C113 Social Worker 131 SF

C114 Social Worker 119 SF

C115 Social Worker 124 SF

C116 Social Worker 148 SF

C117 RN Office 131 SF

C118 Business Office 132 SF

C119 Work Room 73 SF

C120 IT 38 SF

C121 Electric 59 SF

C122 Men's 42 SF

C123 Women's 45 SF

C124 Large Conference 213 SF

C125 Copy/Storage 80 SF

C126 Small Conference 117 SF

C127 Counselor 99 SF

C128 Psych 99 SF

C129 Psych 99 SF

C130 Counselor 99 SF

C132 Lockers 92 SF

C133 Counselor 119 SF

C140 Corridor 631 SF

C141 Corridor 183 SF

C142 Corridor 325 SF

C143 Waiting Area 148 SF

C144 Corridor 87 SF

CE100 Elevator 58 SF

CS137 Stair 1 147 SF

CS138 Stair 2 147 SF

5086 SF

PROGRAM NET SF

CENTRAL BUILDING (1st Floor) 5151 sf CENTRAL BUILDING (2nd Floor) 5947 sf SARRTP 8262 sf

Total 19360 sf

PRTTP (Temporary Alternate) 6105 sf

NOT IN CONTRACT -THIS

FACILITY WING PROVIDED

FOR INFORMATIONAL

PURPOSES ONLY

Revision Schedule

Number Description Date

36AS BUILT

Sheets
A0-000 - Abbreviations, Symbols and Notes
A0-001 - Partition Types and Schedules
A0-100 - Space Summary & Lifesafety Plan - SARRTP & Central Building
A0-101 - Space Summary & Lifesaftey Plan - PRRTP
A1-100 - Facility Plans - SARRTP
A1-100a - Corridor and Utility Layout Plan - SARRTP
A1-101 - Facility Plans - Central Building
A1-101a - Corridor and Utility Layout Plan - Central Building
A1-102 - Facility Plans - PRRTP
A1-102a - Corridor and Utility Layout Plan - PRRTP
A1-103 - Walkway and Springhouse Plans, Elevations and Sections
A1-110 - Attic Plan - SARRTP & Central Buildings
A1-112 - Attic Plan - PRRTP
A1-200 - Roof Plan - SARRTP & PRRTP
A1-201 - Roof Plan - Central Building
A2-100 - Enlarged Resident Unit Plans
A3-100 - Building Elevations - SARRTP
A3-101 - Building Elevations - Central Building
A3-102 - Building Elevations - PRRTP
A4-100 - Building Sections - Central Building
A4-200 - Building Sections - SARRTP Wing
A5-100 - Wall Sections and Details
A5-101 - Wall Sections and Details
A5-102 - Wall Sections and Details
A5-103 - Pipe Trench Plans and Details
A5-200 - Pavillion Details
A6-100 - Stair / Elevator Plans, Sections, Details
A7-100 - Enlarged Plans and Interior Elevations
A7-101 - Enlarged Plans and Interior Elevations
A7-201 - Casework Details
A8-100 - Door Schedule, Elevations and Details
A8-101 - Window Schedule, Elevations and Details
A9-100 - Reflected Ceiling Plans - SARRTP
A9-101 - Reflected Ceiling Plans - Central Building
A9-102 - Reflected Ceiling Plans - PRRTP
A9-200 - Room Finish Schedule and Details
G0-000 - Cover Sheet
G0-001 - Drawing List

File details come from the government source that posted it. Updated .