36C24419Q1010-001.pdf
PDF 413 KB Posted
- Attached to
- VISN 04 ACCREDITATION READINESS REVIEWS
- Solicitation number
- 36C24419Q1010
About this file
36C24419Q1010 36C24419Q1010 VISN 04 ACCREDITATION.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419Q1010-002.docx | DOCX document | |
| 36C24419Q1010-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS
General Information Document Type: Combined Synopsis/Solicitation Solicitation Number: 36C24419Q1010 Posted Date: August, 9, 2019 Original Response Date: August 19, 2019 Current Response Date: August 19, 2019 Product or Service Code: R410 Set Aside: Small Business NAICS Code: 541611, Administrative Management and General Management
Consulting Services
Contracting Office Address The Department of Veterans Affairs Network Contracting Office 4 100 S. Independence Mall West Philadelphia, PA 19106
SECTION 1: DESCRIPTION
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued. The Government reserves the right to make no award from this solicitation.
This solicitation is a request for quotations (RFQ). The government anticipates awarding a firm-fixed price purchase order resulting from this solicitation. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-101.
The associated North American Industrial Classification System (NAICS) code for this procurement is 541611, Administrative Management and General Management Consulting Services, with a small business size standard of $15.0 Million. This solicitation is a 100% set-aside for Small Businesses.
The Department of Veterans Affairs, Network Contracting Office 4, 100 S. Independence Mall West, Philadelphia, PA, is soliciting quotations from Small Businesses to provide all labor, expertise, supervision and all other resources required to conduct, at all VISN 4 medical centers:
1) Clinical/administrative ARR, hereinafter referred to as CLINICAL ARR, for The Joint Commission survey in the Hospital, Ambulatory, Behavioral Health, Home Care Programs, and the LTCI review in CLC, and 2) Environment of Care, Emergency Management and Life Safety ARR hereinafter referred to as SAFETY ARR. Respondents to this solicitation must fully demonstrate their capability by supplying detailed quote information along with any other documents necessary to support the requirements below.
All interested companies shall provide quotation(s) for the following:
SECTION 2: STATEMENT OF WORK
A. General Information
A.1 Title of Project VISN 4 Accreditation Readiness Review
A.2 Scope of Work The contractor shall provide all labor, expertise, supervision and all other resources required to conduct, at all VISN 4 medical centers: 1) Clinical/administrative ARR, hereinafter referred to as CLINICAL ARR, for The Joint Commission survey in the Hospital, Ambulatory, Behavioral Health, Home Care Programs, and the LTCI review in CLC, and 2) Environment of Care, Emergency Management and Life Safety ARR hereinafter referred to as SAFETY ARR.
A.3 Acronyms The acronyms listed below may be used in place of full text throughout this document:
ARR Accreditation Readiness Review(s) BAA Business Associate Agreement CAMH Comprehensive Accreditation Manual for Hospitals CAM Capital Assets Manager CLC Community Living Centers CLIN Contract Line Item Number COR Contracting Officer Representative EC Environment of Care EM Emergency Management F-tags Federal Tags FCOR Facility Contracting Officer Representative FMOR Facility Management Office Representative IDIQ Indefinite Delivery-Indefinite Quantity LS Life Safety LTCI Long Term Care Institute PHI Protected Health Information POC Point of Contact PWS Performance Work Statement
QMO Quality Management Office or Officer SAFER Survey Analysis for Evaluating Risk SOC Statement of Conditions SOHM Safety and Occupational Health Manager TTJC The Joint Commission
TO Task Order VISN Veterans Integrated Services Network
VCC Veteran Community Clinics
VHA Veteran’s Health Administration
A.4 Background The TJC and CLC accreditation visits are unannounced and may occur over a wide timeframe. To ensure compliance with the TJC standard and the State Operations Manual, VISN 4 requires both CLINICAL ARR and SAFETY ARR at all VISN 4 medical centers.
The CLINICAL ARR shall focus on the National Patient Safety Goals, challenging standards, frequently cited requirements for improvement, survey process, human resource readiness, and system and individual tracer methodology. The CLC consultation will be based on transformation of the culture of care and will be based on F-tags for determination of severity and scope.
The SAFETY ARR shall assess each VISN 4 facility’s current state of compliance with the identified TJC standards under the EC, EM, and LS chapters of the applicable and most current TJC CAMH. The assessment is to identify deficient program areas and make recommendations towards abatement, control, and compliance.
All costs, including travel costs and materials furnished to the facilities/VISN 4, must be incorporated into each CLIN in the Price Schedule located in Section 4 of this solicitation.
A.5 Type of Contract Commercial Firm Fixed Price IDIQ contract with a minimum amount of $100,000.00 and a maximum amount of $3,000,000.00.
A.6 Performance Period 10/01/2019-9/30/2024
A.7 Place of Performance
The Contractor shall furnish services at the following locations:
VISN 4 Medical Center Locations
Facility Main Phone Street City State ZIP
Altoona 877-626-2500 2907 Pleasant Valley Blvd. Altoona PA 16602
Butler 800-362-8262 353 North Duffy Road Butler PA 16001
Coatesville 800-290-6172 1400 Black Horse Hill Road Coatesville PA 19320
Erie 800-274-8387 135 East 38th Street Erie PA 16504
Lebanon 800-409-8771 1700 South Lincoln Avenue Lebanon PA 17042
Philadelphia 800-949-1001 3900 Woodland Avenue Philadelphia PA 19104
Pittsburgh 866-482-7488 HJ Heinz Campus:
1010 Delafield Road Pittsburgh PA 15215
866-482-7488 University Drive Campus:
University Dr. Pittsburgh PA 15240
Wilkes Barre 877-928-2621 1111 East End Boulevard Wilkes Barre PA 18711
Wilmington 800-461-8262 1601 Kirkwood Highway Wilmington DE 19805
Note: The Pittsburgh facility has two campuses covered by one “umbrella” program. The onsite SAFETY ARR assessment will be conducted at the University Drive campus.
A.8 Facility Information
Facility Hospital
Square Footage Hospital Authorized Beds
CLC
Square Footage
CLC
Authorized
Beds
Altoona 285,208 SF 11
CLC 5 - 12,946 SF
CLC 6 - 12,948 SF
Butler
*Note – Butler is ambulatory
HCC 246,612 GSF Dom has 5 buildings Bldg. 21:
11,955 GSF Bldg. 22: 5,372 GSF Bldg. 23: 6,590 GSF Bldg. 24: 6,590 GSF Bldg.
25: 5,276 GSF TR house:
8,405 GSF
No inpatient beds in HCC
Dom 56
TR 10
52,280 GSF 60 beds
Coatesville
90,465 SF (does not include Primary Care and Behavioral health clinic space, but does include DOMs and inpatient MH unit)
28 62,693 SF 90
Erie
261,779 SF: Includes all occupancies and mechanical spaces)
6,877 SF: New Domiciliary with planned opening in February/March 2019
8 Dom Beds planned
Existing CLC:
26, 035 SF
New Freestanding CLC with planned opening in July -August 2019: 24,000
SF
Existing CLC:
New CLC: 22 Beds Phase I
Lebanon
Facility 830,000 SF
VCC’s 73,092 SF
Total 903,092 SF
Med Surg: 27
BH: 22
DOM/TR: 63
26,265 SF
Authorized: 136
Operating: 76
Philadelphia 300,000 SF 143 99,999 SF 120
A.8 Facility Information Continued
Facility Hospital
Square Footage Hospital Authorized Beds
CLC
Square Footage
CLC
Authorized
Beds
Pittsburgh – H.J. Heinz 108,700 SF 0 198,555 SF 225
Pittsburgh – University Dr
600,000 SF 224
Wilkes Barre 251,188 SF clinical space 61 46,500 SF clinical space 95
Wilmington 122,953 SF 60 33,812 SF 60
VISN 4 and Facility Contacts – CLINICAL
Facility Position Name Email Telephone
VISN04 Quality Manager Moira Hughes Moira.Hughes@va.gov 412-822-3291
VISN04
Accreditation Manager/Coordinator Roxanne Degnan Roxanne.Degnan@va.gov 570-899-7950
VISN04
Quality Management Admin Officer
Danielle Ott Danielle.Ott@va.gov 412-822-3291
Altoona Quality Manager Gina Homan Gina.Homan@va.gov 814-943-8164 x 7321
Altoona Accreditation Coordinator Deborah Zeiders Deborah.Zeiders@va.gov 814-943-8164 x 7135
Butler Quality Manager Kimberly Ripper Kimberly.Ripper@va.gov 878-271-6476
Butler Accreditation Coordinator Heather Truitt Heather.Truitt@va.gov 878-271-6487
Coatesville Quality Manager Laura Harrington Laura.Harrington@va.gov 610-384-7711 x 3826
Coatesville Accreditation Coordinator Emily Herling Emily.Herling@va.gov 610-384-7711 x 3890
Erie Quality Manager Tracey Schoen tracey.schoen@va.gov
Erie Accreditation Coordinator Pamela Sedney pamela.sedney@va.gov 814-860-2230
Lebanon Quality Manager Laine Hellein Laine.Hellein@va.gov 717-272-6621 x 4407
Lebanon Accreditation Coordinator Dawn Thomas Dawn.Thomas2@va.gov 717-272-6621 x 4118 mailto:Moira.Hughes@va.gov mailto:Roxanne.Degnan@va.gov mailto:Danielle.Ott@va.gov mailto:Gina.Homan@va.gov mailto:Deborah.Zeiders@va.gov mailto:Kimberly.Ripper@va.gov mailto:Heather.Truitt@va.gov mailto:Laura.Harrington@va.gov mailto:Emily.Herling@va.gov mailto:tracey.schoen@va.gov mailto:pamela.sedney@va.gov mailto:Laine.Hellein@va.gov mailto:Dawn.Thomas2@va.gov
Philadelphia Quality Manager Virginia Davis Virginia.Davis4@va.gov 215-823-5800 x 6273
Philadelphia Accreditation Coordinator Teresa DeBoard Teresa.DeBoard@va.gov 215-823-5800 x 5314
Pittsburgh Quality Manager Anita Steinmiller Anita.Steinmiller@va.gov 412-360-1858
Pittsburgh Accreditation Coordinator Kelly Liartis Kelly.Liartis@va.gov 412-360-1751
Wilkes Barre Quality Manager Toni Germaintudgay Toni.Germaintudgay@va.gov 570-824-3521 x 7974
Wilkes Barre Accreditation Coordinator Kathleen Mrozinski Kathleen.Mrozinski@va.gov 570-824-3521 x 7754
Wilmington Quality Manager Abiodun Raimi Abiodun.Raimi@va.gov 302-994-2511 x 4796
Wilmington Accreditation Coordinator Dennis P. Tauchus Dennis.Tauchus@va.gov 302-994-2511 x 4120
A.10 VISN 4 and Facility Contacts – SAFETY
Facility Position Name Email Telephone
VISN04 Safety and Occupational Health Manager
Scott Kager Scott.kager@va.gov 814-969-2158
VISN04 Capital Asset Manager Joseph Delanko Joseph.delanko@va.gov 814-860-4970
Altoona Facility Management Office Representative Jerry Wilson
Jerry.wilson5@va.gov
814-943-8164 x8347
Butler Facility Management Office Representative Daniel Michalek Daniel.michalek@va.gov 724-285-2467
Coatesville Facility Management Office Representative
Richard Crumley Richard.crumley@va.gov 610-384-7711
Erie Facility Management Office Representative
Sean Henry Sean.henry@va.gov 814-860-2090
Lebanon Facility Management Office Representative
Thaddeus, Kocuba Thaddeus.kocuba2@va.gov 717-272-6621 x4740
Philadelphia Facility Management Office Representative
William England William.england@va.gov 215-823-4251
Pittsburgh Facility Management Office Representative Susan McCaffrey Susan.mccaffrey@va.gov 412-360-6138
Wilkes Barre Facility Management Office Representative Mirarchi, Orlando Orlando.mararchijr@va.gov 570-824-3521 x4169
Wilmington Facility Management Office Representative Jacob Spruance Jacob.spruance@va.gov 302-994-2511 x4013
B. Description of Work
B.1 Specifications/Requirements – CLINICAL ARR
a. At each of the VISN 4 Medical Centers (reference A.7 for locations), the Contractor shall provide all labor, expertise, supervision and all other resources required to conduct CLINICAL ARR for TJC survey in the Hospital, Ambulatory, Behavioral Health, and Home Care Programs and the CLC review using the State Operations Manual F-tags. The following table exhibits the required number of visits/days/consults annually per facility:
mailto:Virginia.Davis4@va.gov mailto:Teresa.DeBoard@va.gov mailto:Anita.Steinmiller@va.gov mailto:Kelly.Liartis@va.gov mailto:Toni.Germaintudgay@va.gov mailto:Kathleen.Mrozinski@va.gov mailto:Abiodun.Raimi@va.gov mailto:Dennis.Tauchus@va.gov mailto:Scott.kager@va.gov mailto:Joseph.delanko@va.gov mailto:Jerry.wilson5@va.gov mailto:Sean.henry@va.gov mailto:Thaddeus.kocuba2@va.gov mailto:William.england@va.gov mailto:Susan.mccaffrey@va.gov mailto:Orlando.mararchijr@va.gov mailto:Jacob.spruance@va.gov
Facility 2-Day Visit with 2 Consultants 5-Day Visit with 2 Consultants
Altoona 1 -
Butler 2* -
Coatesville 2* -
Erie 1 -
Lebanon 2* -
Philadelphia 2* -
Pittsburgh - 1
Wilkes-Barre 2* -
Wilmington 2* -
*These shall be separate visits.
b. CLC consultation shall cover the State Operations Manual including but not limited to: 1) compliance issues with residents’ rights and quality of life requirements, 2) the accuracy of residents’ comprehensive assessments and the adequacy of care plans based on these assessments, 3) the quality of care and services furnished, as measured by indicators of medical, nursing, rehabilitative care and drug therapy, dietary and nutrition services, activities and social participation, sanitation and infection control, and 4) the effectiveness of the physical environment to empower residents, accommodate resident needs, and maintain resident safety, including whether requested room variances meet health, safety, and quality of life needs for the affected residents.
c. Dates of the reviews shall be coordinated with and approved by the Quality Manager and Accreditation Coordinator at each facility in consultation with the VISN 4 Accreditation Manager. The review schedule will be definitized in the applicable TO. The Contractor will need to be flexible with regard to any schedule changes. The Contractor will be able to accommodate schedule changes requested 30 days prior to agreed upon schedule set in the TO. If the Joint Commission, Long Term Care Institute, or the Office of Inspector General teams arrive during the same week the contractor is there for the readiness review, the facility shall have the option to stop the contractor visit and reschedule the visit for another date approved by the facility and contractor for that fiscal year.
d. The CLINICAL ARR will be coordinated with the quality management and/or accreditation staff at each facility. Each accreditation readiness review may include, but not be limited to, an opening conference, training, tracer activities, a Leadership conference, an exit briefing and/or a standards-based verbal or written report.
e. The consultants shall address Hospital, CLC, Behavioral Health, Home Care, and applicable Ambulatory Care Standards and the programs under which these standards are surveyed.
f. The CLINICAL ARR must be provided and priced as indicated in the Price Schedule located in Section 4 of this solicitation.
B.2 Specifications/Requirements – SAFETY ARR
a. At each of the VISN 4 medical centers (reference A.7 for locations), the Contractor shall provide all labor, expertise, supervision and all other resources required to conduct SAFETY ARR for TJC survey by assessing compliance with the Joint Commission EC, EM, and LS standards and elements of performance. Contractor will review written policies and documentation, interview staff, and physically survey each facility in the gathering of information and completion of the assessment. The assessment is to identify deficient program areas and make recommendations toward abatement, control and compliance. NOTE: The assessment of the LS standards excludes the generation of the SOC, which include Basic Building Information, Life Safety Assessment, Plan for Improvement, and drawings indicating features of fire protection. However, the Contractor must verify the organization has implemented a process to effectively manage the SOC.
b. Prior to an assessment, the Contractor shall forward a pre-assessment questionnaire to the applicable FMOR, identified in Section A.10, to determine 1) the scope of services provided by the facility and 2) the applicable TJC manuals required to perform the assessment (Ambulatory, Behavioral Health, Home Care, Hospital, Laboratory, and/or Nursing Care Center). The Contractor shall include a list of required documents, policies, reports, etcetera, for the facility to provide the Contractor prior to the on-site portion of the assessment.
c. The Contractor shall review all documents requested from the facility, refer to Section B.2b, as well as any other relevant documents provided by the facility for applicable TJC standards compliance. During the on-site assessment, the Contractor may request additional documents to provide relevant and useful information.
d. The Contractor shall begin the on-site portion of the assessment with an interview meeting to include the assessment team, FMOR and other facility representatives. The meeting will include: 1) a review of the questionnaire required in Section B.2b to clarify any uncertainties, 2) assessment strategy development to ensure the it is conducted efficiently with minimal disruption to facility operations, and 3) a question and answer session to address the facility’s inquiries and concerns.
e. The Contractor shall immediately provide a verbal report to the FMOR, VISN 4 SOHM and/or VISN 4 CAM of any situation or condition that presents an immediate threat to health or safety. The Contractor shall submit a written report regarding the unsafe situation or condition within three (3) days of the verbal notification to the FMOR, VISN 4 SOHM and VISN 4 CAM.
f. Each onsite assessment will be three (3) consecutive days.
g. The Contractor shall coordinate dates of the reviews with and receive prior approval from the FMOR at each facility in consultation with the VISN 4 CAM and SOHM. The review schedule will be definitized in the applicable TO and, if required by FMOR, be accomplished within three (3) months of TO award date. The Contractor will need to be flexible with regard to any schedule changes. The Contractor shall be able to accommodate schedule changes requested 30 days prior to agreed upon schedule set in the TO.
If the Joint Commission, Long Term Care Institute, or the Office of Inspector General teams arrive during the same week the contractor is there for the readiness review, the facility shall have the option to stop the contractor visit and reschedule the visit for another date approved by the facility and contractor for that fiscal year.
h. At the end of each onsite assessment, the Contractor shall hold a preliminary closeout meeting with appropriate VAMC representatives identified by the FMOR for each site. The meeting shall include at least the following:
1. A summary of preliminary findings
2. A synopsis of individual program compliance status, noting significant issue areas
3. A list of deficiencies that may result in significant findings by the TJC
4. Steps the facility may take to address the deficiencies
5. A clear report for gaining as well as maintaining compliance
i. The Contractor shall prepare for and participate in monthly conference calls/webinars with the VISN 4 CAM and facility leadership. The conference call requirements are as follows:
• Calls shall be a minimum of one hour.
• Contractor shall provide applicable educational and supportive materials.
• Contractor shall coordinate the call schedule with the VISN 4 CAM.
• Each call shall consist of a discussion of current TJC survey trends, frequently cited EC, EM and LS standards, “hot” topics, proposed or revised standards, and key reminders for survey readiness.
• Calls shall be educational and pertinent hand-out material provided via e-mail.
• Contractor shall provide to the CAM a written report of each call including: topics, attendance, material, and answers to questions posed during the call.
j. The Contractor shall respond to telephone and e-mail requests for interpretations and means of accomplishing the standards’ intent for a period of one year following an assessment’s final report at no additional charge to the Government. The response may take any form acceptable to the applicable facility; a follow-up e-mail will document an answer was provided. Questions received from individuals not included on the Facility and VISN point of contacts list in Section A.10 must be vetted by the applicable facility FMOR prior to answer submission.
k. The SAFETY ARR must be provided and priced as indicated in the Price Schedule located in Section 4 of this solicitation.
C. Key Personnel Requirements
C.1 Contractor personnel performing the CLINICAL ARR shall possess the appropriate qualifications and experience for conducting the TJC compliance assessments as follows:
• Each clinical ARR consulting team shall have an administrative and clinical person for review.
• The clinical and administrative person shall have credentials like those of a TTJC surveyor.
• Prior experience serving as TTJC surveyors and/or credentials for conducting surveys.
• Demonstrate experience and knowledge of the unique challenges faced by VA Medical Centers.
• Experience conducting assessments within the VHA is required.
• Consultant expertise in Hospital, Community Living Centers, Behavioral Health, Home Care, Life Safety and Ambulatory Care is required.
• Consultants may not be employed by the TJC in any capacity.
C.2 Contractor personnel performing the SAFETY ARR shall possess the appropriate qualifications and credentials for conducting TJC compliance assessments as follows:
• A minimum of five (5) years’ experience (within the last 7 years) as a TJC compliance consultant.
• Experience conducting assessments within the VHA is required.
• Possess a minimum of ten (10) years knowledge of healthcare engineering.
• Demonstrate an understanding of the intent of the EC, EM, and LS chapters of the
TJC standards under the Ambulatory, Behavioral Health, Home Care, Hospital, Laboratory, and Nursing Care Center manuals.
• Consultants shall not be employed by the TJC in any capacity.
• Contractor must include with proposal each consultant’s qualifications and experience history.
C.3 Certain skilled experienced professional and/or technical personnel are essential for successful contractor accomplishment of the work to be performed under this contract. These are defined as "Key Personnel" and are those persons whose resumes were submitted for evaluation of the proposal.
(A) The contractor agrees that such personnel shall not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) hereof.
(B) If one or more of the key personnel for whatever reason becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding thirty (30) work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the Contracting Officer and shall, subject to the concurrence of the Contracting Officer or his authorized representative, promptly replace such personnel with personnel of at least substantially equal ability and qualifications.
(C) All requests for approval of substitutions hereunder must be in writing and provide a detailed explanation of the circumstances necessitating the proposed substitutions. They must contain a complete resume for the proposed substitute, and any other information requested by the Contracting Officer or needed by him to approve or disapprove the proposed substitution. The Contracting Officer or his authorized representative will evaluate such requests and promptly notify the contractor of his approval or disapproval thereof in writing.
D. Deliverables
D.1 CLINICAL ARR
a. The Contractor shall provide a detailed, standards-based verbal and/or written exit report at the completion of each site visit. The report format will reference and use the SAFER methodology to include the matrix. The report shall cite the specific standards assessed as opportunities for improvement.
The written and/or verbal report format is at the discretion of the facility leadership. Satisfactory report completion is based upon government acceptance.
b. At each review completion, the consultants will provide a written report to the associated facility and VISN Accreditation Manager within 5 working days of the visit.
c. If there are any significant findings the vendor must immediately notify the VISN 4 QMO, VISN 4 Accreditation Manager and at least one member of the facility’s executive board (Director, Associate Director, Associate Director of Patient Care Services, Chief of Staff). Refer to the table in Section A.7 for the facilities’ main telephone numbers. Following the immediate notification, the vendor must conduct a VISN 4 conference call with VISN 4 QMO, VISN 4 Accreditation Manager and Facility leadership within two hours of the significant findings’ discovery.
d. The exit report schedule must be coordinated with and approved by each facility’s Quality Manager or Accreditation Coordinator.
e. The Contractor shall provide telephone or email responses to questions regarding TJC standards or F-tags throughout the term of the applicable TO.
D.2 SAFETY ARR
a. The Contractor shall provide a pre-assessment questionnaire, refer to B.2b for details.
b. The Contractor shall provide a written report regarding any unsafe condition within three (3) days of the verbal notification, refer to B.2e for details.
c. The Contractor shall provide a preliminary closeout presentation and report, refer to B.2h for details.
d. The Contractor shall provide a separate written report for each facility encompassing and assessing the EC, EM, and LS Standards for the applicable accredited programs (Ambulatory, Behavioral Health, Home Care, Hospital, Laboratory, and Nursing Care Center). The report shall include the probable TJC standard score and the suggested means of achieving satisfactory compliance when a Standard or EP is scored partial or insufficient compliance. The Contractor shall submit the report to the FMOR, VAMC Director, VISN 4 CAM, and the COR.
The draft written report shall be:
• Submitted as a draft and include individual standard compliance status with recommended corrections
• Submitted within ten (10) business days after each site visit/exit interview
• Submitted electronically in Microsoft Word to the VISN 4 CAM, COR, and FMOR
The final written report shall:
• Incorporate all comments and be submitted within ten (10) business days of receiving VAMC comments
• Be submitted as an electronic Microsoft Word version as well as four (4) hard copies to the VISN 4 CAM (1 copy), COR (1 copy), and FMOR (2 copies)
Submission of the safety reports shall be according to the following schedule:
Facility Site Assessment Draft Report VAMC Review Final Report
VISN 4
Medical Center
TBD – Per individual TO and coordination with
FMOR
10 business days from Exit Interview
10 business days from receipt of Draft Report
10 business days from receipt of VAMC Comments
The report shall include the following:
1. Executive Summary
2. Methods, scope and procedures used for conducting the survey
3. Identification of specific program deficiencies with associated reference to applicable standards
4. Each finding should be clearly linked to a Standard and appropriate Element of
Performance and include the reference
5. Recommended actions for abatement to achieve compliance
E. Contractor Responsibilities
a. Consultants shall use the most recent edition of TJC Standards published in the CAMH: The Official Handbook and other appropriate standards for Nursing and Rehabilitation Centers such as the State Operations Manual, F-tag, Ambulatory Care, Home Care, Behavioral Health Ambulatory, Behavioral Health, Hospital, Laboratory, and/or Nursing Care Center. TJC standards can be found at www.jointcommission.org and the State Operations Manual can be found at https://www.health.pa.gov.
http://www.jointcommission.org/ https://www.health.pa.gov/
b. The Contractor shall coordinate the ARRs with the requisite Government points of contact as stipulated in the requirements Section B.
c. The Contractor shall refer questions from persons not included on the Government approved listing to the COR.
d. Subsequent consultant substitution must be approved by the VISN 4 SOHM and the applicable facility’s FMOR. Consultant substitution costs will be borne by the Contractor.
F. Government Responsibilities
a. Each facility will supply the consultants with accurate information describing the scope of services provided. The facility will provide access to those staff members who would normally be involved in a Joint Commission Survey and LTCI visit to allow adequate assessment of standards compliance.
b. The facility will designate representative(s) to participate will have knowledge of the physical plant and campus and its operations.
c. Provide the Contractor with the assigned and approved VAMC POCs. Questions by persons not included on the provided listing shall be referred
d. Review the Draft Reports within the specified timeframe. And provide any additional documentation that may not have been made available during the onsite assessment to substantiate comments.
e. The Government IT security requirements for certification and accreditation (authorization) (C&A) of the contractor system do not apply and a Security Accreditation Package is not required since the no contractor-owned IT devices in support of these services will connect to a VA internal trusted network.
G. Performance Standards
Contract Performance and Evaluation Criteria and Standards In accordance with FAR Subpart 42.1503.
I. Technical (Quality of Product or Service)
Quality Report in accordance with contract terms and conditions. Provide accurate and current responses tailored to the individual needs of the requestor and to agency requirements.
Ratings
Exceptional: Deliverables received are always well-researched, complete and technically accurate. The Contractor frequently exceeds technical expectations. Rework is not required. Other deliverables typically exceed all Contract requirements.
Very Good: Deliverables received are well-researched, complete and technically accurate. Other deliverables meet all Contract requirements.
Satisfactory: Deliverables received are well-researched, complete and technically accurate. No more than one
(1) revision is needed to accept the item. Other deliverables meet all Contract requirements.
Marginal: Deliverables are occasionally not well-researched and contain some technical inaccuracies. Rework is occasionally required.
Unsatisfactory: Deliverables are typically not well-researched and contain many technical inaccuracies. Rework is frequently required.
II. Schedule / Timeliness
Schedule / Timeliness Provide timely notification on items requiring government action and timely response to inquiries.
Ratings Exceptional: Contractor routinely delivers ahead of deadlines, schedules, and responds immediately to Government requests.
Very Good: Contractor routinely meets deadlines and schedules and occasionally delivers early and responds immediately to Government requests.
Satisfactory: Contractor routinely meets deadlines, schedules, and quickly responds to Government requests.
Marginal: Contractor occasionally misses deadlines, schedules or is slow to respond or occasionally non-responsive to Government requests.
Unsatisfactory: Contractor frequently misses deadlines or is slow to respond / non-responsive to Government requests.
III. Management / Business Relations
Communication Timely and effective communication to the Government in accordance with contract terms and conditions.
Ratings
Exceptional: Contractor takes proactive approach such that communications are almost always clear, effective and timely.
Very Good: Contractor routinely communicates with Government in an effective and timely manner and is frequently proactive in managing communications.
Satisfactory: Contractor routinely communicates with Government in an effective and timely manner and communicates emergent issues in accordance with contract terms and conditions.
Marginal: Contractor occasionally fails to communicate with Government in an effective and timely manner.
Unsatisfactory: Contractor fails to communicate with Government in an effective and timely manner.
III. Management / Business Relations continued
Responsiveness Responsive to Government requests and concerns.
Ratings
Exceptional: Contractor’s management takes proactive approach in dealing with Government representatives and anticipates concerns.
Very Good: Contractor’s management is responsive to requests and concerns and is occasionally proactive in anticipating concerns.
Satisfactory: Contractor’s management is responsive to Government requests and concerns.
Marginal: Contractor’s management is occasionally unresponsive to Government requests and concerns.
Unsatisfactory: Contractor’s management is unresponsive to Government requests and concerns.
Problem Resolution Resolve problems quickly requiring little to no Government mitigation.
Ratings
Exceptional: Problems are nonexistent, or the Contractor takes corrective action without Government involvement.
Very Good: Problems occur infrequently and are generally resolved quickly with minimal Government involvement.
Satisfactory: Problems are resolved quickly with minimal Government involvement.
Marginal: Problems are generally resolved but take unusual Government effort to resolve or take an excessive amount of time to resolve.
Unsatisfactory: Problems are unresolved, repetitive, or take excessive Government effort to resolve.
IV. Other - Staffing
Qualifications Personnel shall have the knowledge, experience and certifications needed to meet contract requirements. The Contractor shall maintain adequate staffing levels to ensure performance and delivery requirements are met.
Ratings
Exceptional: Contractor provides highly qualified personnel. There are no lapses in coverage. New and/or substitute resumes are submitted in accordance with contract requirements. Personnel work/deliver products that are fully consistent with resume qualifications.
Very Good: Contractor provides a mix of qualified and highly qualified personnel. Lapses in coverage are rare and are successfully managed by the contractor with little or no impact on timeliness or quality. New and/or substitute resumes are submitted in association with contract requirements. Personnel work/deliver products that are fully consistent with resume qualifications.
Satisfactory: Contractor provides qualified personnel. Lapses in coverage occur occasionally and are successfully managed by the contractor to minimize impact on timeliness or quality. New and/or substitute resume are submitted in association with contract requirements. Personnel work/deliver products that are fully consistent with resume qualifications.
Marginal: Contractor provides marginally qualified personnel. Lapses in coverage occur more than occasionally.
Unsatisfactory: Contractor provides marginally qualified or unqualified personnel. Lapses in coverage occur regularly.
V. Other - Customer Satisfaction
Customer Satisfaction Meets Government’s expectations based on contract requirements with no customer complaints.
Ratings
Exceptional: Exceeds customer expectations.
Very Good: Routinely meets or occasionally exceeds customer expectations.
Satisfactory: Meets customer expectations.
Marginal: Contractor occasionally fails to meet customer expectations.
Unsatisfactory: Fails to meet customer expectations.
H. SECURITY REQUIREMENTS
The Contractor will review VA Handbook 6500.6 (see attached). In reference to Appendices B and C, this contract does not require software to be installed on a VA computer.
The Information System Security Officer has determined that paragraphs 5 (f, g) of VA Handbook 6500.6, Appendix C be included in the contract. The aforementioned paragraphs are incorporated below.
I. INFORMATION SYSTEM HOSTING, OPERATION, MAINTENANCE, OR USE
VA prohibits the installation and use of personally-owned or contractor/subcontractor owned equipment or software on VA’s network. If non-VA owned equipment must be used to fulfill the requirements of a contract, it must be stated in the service agreement, SOW or contract. All of the security controls required for government furnished equipment (GFE) must be utilized in approved other equipment (OE) and must be funded by the owner of the equipment. All remote systems must be equipped with, and use, a VA-approved antivirus (AV) software and a personal (host-based or enclave based) firewall that is configured with a VA approved configuration. Software must be kept current, including all critical updates and patches. Owners of approved OE are responsible for providing and maintaining the anti-viral software and the firewall on the non-VA owned OE.
All electronic storage media used on non-VA leased or non-VA owned IT equipment that is used to store, process, or access VA information must be handled in adherence with VA Handbook 6500.1, Electronic Media Sanitization upon: (i) completion or termination of the contract or (ii) disposal or return of the IT equipment by the contractor/subcontractor or any person acting on behalf of the contractor/subcontractor, whichever is earlier. Media (hard drives, optical disks, CDs, back-up tapes, etc.) used by the contractors/subcontractors that contain VA information must be returned to the VA for sanitization or destruction or the contractor/subcontractor must self-certify that the media has been disposed of per
6500.1 requirements. This must be completed within 30 days of termination of the contract.
Additionally, the contractor, their personnel, and their subcontractors shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in this contract.
The Contractor will also complete the attached Contractor Security Control Assessment, within 30 days of the contract approval and periodically as requested by the Government to ensure that appropriate security controls are being implemented.
J. PRIVACY REQUIREMENTS
The Privacy Officer has determined paragraphs 1, 2 (a, b, e), 3 (a, b, c, d, e, f, g, h, j, k), 6 (a, b, c, d), 7 (a, b, c, d), 8 and 9 (a, b, c) of VA Handbook 6500.6, Appendix C be included in the contract. The aforementioned paragraphs are incorporated below.
1. General
Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
2. Access to VA Information and VA Information Systems
a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.
b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.
e. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor’s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.
3. VA Information Custodial Language
a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).
b. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor’s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with VA’s sanitization requirements. VA reserves the right to conduct on-site inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements.
c. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.
d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract.
e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.
f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.
g. If a VHA contract is terminated for cause, the associated BAA must also be terminated and appropriate actions taken in accordance with VHA Handbook 1600.01, Business Associate Agreements. Absent an agreement to use or disclose protected health information, there is no business associate relationship.
h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose
VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or (ii) with VA’s prior written approval. The contractor/subcontractor must refer all requests for, demands for production of, or inquiries about, VA information and information systems to the VA contracting officer for response.
k. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the above mentioned information, that contractor/subcontractor shall immediately refer such court orders or other requests to the VA contracting officer for response.
6. Security Incident Investigation
a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COTR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.
b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.
c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.
d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
7. Liquidated Damages for Data Breach
a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.
b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.
c. Each risk analysis shall address all relevant information concerning the data breach, including the following:
(1) Nature of the event (loss, theft, unauthorized access);
(2) Description of the event, including:
(a) date of occurrence;
(b) data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code;
(3) Number of individuals affected or potentially affected;
(4) Names of individuals or groups affected or potentially affected;
(5) Ease of logical data access to the lost, stolen or improperly accessed data in light of the degree of protection for the data, e.g., unencrypted, plain text;
(6) Amount of time the data has been out of VA control;
(7) The likelihood that the sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons);
(8) Known misuses of data containing sensitive personal information, if any;
(9) Assessment of the potential harm to the affected individuals;
(10) Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate; and
(11) Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised.
d. Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $50.00 per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following:
(1) Notification;
(2) One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports;
(3)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.