36C24419Q0318-001.pdf

PDF 752 KB Posted

Attached to
UPS PM Services PGH Base + 4 Option Years
Solicitation number
36C24419Q0318
Issued by

About this file

36C24419Q0318 S02. 36C24419Q0318.pdf

View the file

Other files

File Type Posted
-16711.docx DOCX document
36C24419Q0318-0001001.pdf PDF
36C24419Q0318-0001000.docx DOCX document
36C24419Q0318-002.pdf PDF
36C24419Q0318-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. DUNS: DUNS+4:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 54

646-19-3-5079-0049

36C24419Q0318 04-01-2019

Shea Matthews 412-822-3765 04-10-2019

4PM EST

00244 Department of Veterans Affairs Network Contracting Office 4

X 100

X

238210

$15 Million

N/A

VA Pittsburgh Healthcare System

University Dr. C Pittsburgh PA 15240

00244

Network Contracting Office 4

Austin Payment Center

PO Box 149971 Austin TX 78714-9971

(877) 353-9791 (512) 460-5429

See CONTINUATION Page

See Statement of Work and Schedule Files

UPS systems are from APC, Duracell, Eaton Powerware, MK Battery, Yuasa Battery Co., CSB Battery CO., Universal Battery, MGE, Enersys, Portalac Battery, C&D Technologies, and Minuteman

KVA varies between 1 and 375 Battery count per unit varies between 1 and 120

See CONTINUATION Page

X X

Gregg Wizar Contract Officer

36C24419Q0310

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

B.3 DELIVERY SCHEDULE

B.4 STATEMENT OF WORK

B.5 ISSO/PO COMMENTS

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT

2018)

C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (OCT 2018)

C.3 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

C.5 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 – INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS. (DEVIATION

2018-O0018)

E.2 INSTRUCTIONS TO OFFERORS

E.3 EVALUATION CRITERIA

E.4 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL

ITEMS (OCT 2018)

E.5 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED

SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C244

Department of Veterans Affairs

Network Contracting Office 4

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other []

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

Austin Payment Center

PO Box 149971

Austin TX 78714-9971

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVIC

ES

QUANTIT

Y

UNI

T UNIT PRICE AMOUNT

1.00 YR ______________ ________________

UPS Maintenance Base Year

Contract Period: Base POP Begin: 05-01-2019 POP End: 04-30-2020

UPS Maintenance Option Year 1

Contract Period: Option 1 POP Begin: 05-01-2020 POP End: 04-30-2021

UPS Maintenance Option Year 2

Contract Period: Option 2 POP Begin: 05-01-2021 POP End: 04-30-2022

1.00 YR ______________

UPS Maintenance Option Year 3 Contract Period: Option 3 POP Begin: 05-01-2022 POP End: 04-30-2023

4001 1.00 YR ______________

UPS Maintenance Option Year 4 Contract Period: Option 4 POP Begin: 05-01-2023 POP End: 04-30-2024

GRAND TOTAL ________________

B.3 DELIVERY SCHEDULE

ITEM NUMBER QUANTITY

DELIVERY

DATE

VA Pittsburgh Healthcare System 1.00 POP End: 4/30/20

VA Pittsburgh Healthcare System 1.00 POP End: 4/30/21

VA Pittsburgh Healthcare System 1.00 POP End: 4/30/22

VA Pittsburgh Healthcare System 1.00 POP End: 4/30/23

4001 VA Pittsburgh Healthcare System 1.00 POP End: 4/30/24

B.4 STATEMENT OF WORK

1. Scope of Work

The Contractor shall furnish all parts, materials, labor and transportation necessary to provide semi-annual Uninterruptable Power Supply (UPS) preventive maintenance services in accordance with the Terms, Conditions and Specifications of the contract. The contract shall be for one (1) year from date of award with four (4) one-year option years. The contractor shall provide all manpower, travel, tools, equipment, and supplies to perform trouble shooting and minor repairs. Minor repairs totaling $200 are included to cover all four sites per semi-annual visit. Batteries are excluded and shall be supplied by the VA.

2. Requirements

The VA Pittsburgh Healthcare System (VAPHS) has a requirement for all labor, travel, tools, equipment, supplies and parts up to $200 (excluding batteries) to perform a semi-annual preventive maintenance services by a trained technician to inspect and service Uninterruptable Power Supply (UPS) systems at four VAPHS locations in the Pittsburgh area.

Service on all UPS systems equates to 1 job, performed two times each year. Payments to the Contractor shall be made only after complete service reports are delivered for all sites and the work has been verified has having been performed and is accepted by the Contracting Officer’s Representative (COR).

Any required repairs in excess of $200.00 will be covered under separate purchase orders. The Contractor shall not conduct any repairs in excess of $200.00 on this contract. The cost for any repair work conducted in excess of $200.00, without VAPHS approval shall be the responsibility of the Contractor.

All UPS services shall be completed in accordance with the manufacturer’s recommendations and shall include, but are not limited to:

a. A complete visual inspection of units including sub-assemblies, wiring harnesses, contacts, cables and major components (swab contacts if necessary)

b. Cleaning out of dust or debris from entire unit

c. Re-torqueing of all high-current carrying terminals and breakers

d. Recording of all voltage and current meter readings on the control cabinet

e. Calibrating of all unit electronics to system specifications

f. Measuring and recording of all low-voltage power supply levels

g. Measuring and recording phase-to-phase input voltage and current levels

h. Checking the calibration of all power monitoring features and adjusting as needed

i. Replacing all air filters

j. Reviewing system performance with VAPHS designee to address any questions, problems and recommendations and to schedule any repairs.

Complete inspection of UPS batteries including:

a. General appearance and cleanliness of immediate area (clean exposed surfaces if necessary)

b. Measure overall battery system voltage on float

c. Inspect each battery for cracks or leakage of electrolyte

d. Inspect all intercell connections and cabling for cleanliness and evidence of corrosion

e. Measure the float voltage of each battery and the total battery terminal voltage

f. Measure and record the ambient temperature

g. Record impedance across the battery string

h. Record impedance of individual batteries

i. Perform mini-load test on any battery found questionable during inspection

j. Perform thermal-scan intercell connections for excessive heat

k. Re-torque all battery connections to manufacturer’s specifications

l. Record battery date codes and unit installation date information where available

3. Emergency Services

The Contractor shall provide all manpower, travel, tools, equipment, and supplies to perform trouble shooting and minor repairs. Parts under $200.00 are included. Batteries are excluded and shall be supplied by the VA.

The Contractor shall provide 24-hour, 7-days a week emergency service and a toll-free phone number for technical assistance.

The Contractor shall provide on-site response time for routine service calls of 8 hours or less; emergency calls shall have a 4-hr on-site response time.

4. General Requirements

The Contractor shall properly dispose all debris and trash generated while performing services, and shall clean their work area of dust and debris.

The Contractor shall deliver service reports to each campuses’ designated representative, and shall ensure that the reports include a record of all preventative maintenance actions taken; including a description of all testing and inspection activities, all repairs made and any parts that were replaced.

Payments will be made in arrears of services being performed. The Contractor’s invoices shall include the correct VA purchase order number.

A complete list of UPS unit is included in this SOW.

7 of the UPS units are 3 phase.

UPS Locations:

University Drive Campus, University Dr. C, Pittsburgh, PA 15240

UD Campus

Unit Name Manufacturer Serial # Batt Qty

Coverage PM Frequency

UPS 10 APC NS0650008531 16 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 10 BAT 1 Duracell 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 12 APC NS0649005336 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 12 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 14 APC NS0649005444 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 14 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 15 APC NS0649005446 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 15 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 16 APC NS0649005443 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 16 BAT 1 Duracell 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 17 APC NS0649005354 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 17 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 18 APC NS0649005307 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 18 - BATT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 19 APC NS0649005339 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 19 - BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 2 APC JS0651012949 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 2 - BATT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 2 - BATT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 22 APC NS0649005379 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 22 - BATT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 24 APC NS0649005306 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 24 - BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 26 APC NS0649005458 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 26 Batt 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 27 APC QS1042330081 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 27 - BATT 1 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 27 - BATT 2 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 30 APC IS1207003902 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 30 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 30 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 APC IS1207003946 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 - UPS 1 APC IS1207003906 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 - BAT 3 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 32 APC IS1207003957 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 32 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 32 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 33 APC QS1042330050 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 33 - BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 33 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 34 APC QS1041130402 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 34 - BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 34 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 35 APC JS1036010718 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 35 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 35 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 36 APC JS1034002007 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 36 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 36 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 37 APC QS1042330053 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 37 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 37 - BATT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 38 APC QS1042330055 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 38 - BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 38 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 39 APC JS1036010699 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 39 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 39 - BATT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 4 APC JS0651012951 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 4 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 4 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 41 APC QS1042330056 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 41 - BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 41 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 42 APC QS1042330052 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 42 - BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 42 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 43 APC JS1047002173 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 43 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 43 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 44 APC JS1047002187 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 44 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 44 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 45 APC JS1047002243 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 45 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 45 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 47 APC JS1047002160 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 47 - BATT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 47 - BATT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 48 APC JS1047002177 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 48 - BATT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 48 - BATT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 49 APC JS1047012224 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 49 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 49 - BATT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 50 APC YS0432822088 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 50 APC JS1047012225 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 50 - BATT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 50 - BATT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 50 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 50 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 51 APC JS1047002263 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 51 - BATT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 51 - BATT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 52 APC JS1047012265 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 52 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 52 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 53 APC JS1207003940 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 53 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 53 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 54 APC JS1207003941 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 54 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 54 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 56 APC JS0946022006 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 56 - BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 56 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 57 APC NS0648016325 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 57 - BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 58 APC AS1129141629 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 58 BAT 1 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 58 BAT 2 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 59 APC QS1132330201 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 59 - BAT 1 EnerSys 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 59 - BAT 2 EnerSys 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 6 APC JS0651012948 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 6 BAT 1 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 6 BAT 2 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 60 APC JS0803011536 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 60 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 60 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 61 APC JS1008046575 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 61 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 61 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 62 APC IS1207003911 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 62 - BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 62 - BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 63 APC IS1207003900 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 63 - BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 63 - BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 64 APC NQ6050008535 16 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 64 - BAT 1 Duracell 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 65 APC NQ0648016327 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 65 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 66 APC IS1207003971 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 66 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 66 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 67 APC IS1207003964 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 67 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 67 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 68 MGE E05-12434 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 68 BAT 1 C&D

Technologies 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 68 BAT 2 C&D

Technologies 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 69 Eaton Powerware

EG305CBC02 40 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 69 BAT 1 Eaton Powerware 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 70 Eaton Powerware

EF331CBB04 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 70 BAT 1 Eaton Powerware 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 71 APC IS1207003972 4 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 71 BAT 1 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 71 BAT 2 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 71 BAT 3 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 71 BAT 4 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 72 APC IS1207003965 4 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 72 BAT 1 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 72 BAT 2 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 72 BAT 3 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 72 BAT 4 CSB 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 8 Eaton Powerware

EY134CAA01 40 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 8 - BATT 1 Eaton Powerware 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 9 APC NS0649005370 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 9 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS A FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS B FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS C FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS D FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS E FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS F FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS G FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS H FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS I Minuteman FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

H.J. Heinz Campus, 1010 Delafield Rd. Pittsburgh, PA 15216

HZ Campus

Unit Name Manufacturer Serial # Batt Qty

Coverage PM Frequency

UPS 1 APC JS0650009588 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 1 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 1 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 12 APC NS0650008532 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 12 - BATT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 13 APC QS1132330202 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 13 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 13 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 14 APC NS0650008581 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 14 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 18 APC NS0650008586 16 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 18 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 2 APC JS0649025608 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 2 - BATT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 2 - BATT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 21 APC NS0648016208 16 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 21 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 26 APC NS0648016210 16 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 26 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 28 APC JS0803009494 4 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 28 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 28 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 29 APC JS0803009518 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 29 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 29 BAT 2 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 30 APC JS0803011530 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 30 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 30 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 APC JS0803009605 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 31 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 32 APC QS1042330060 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 32 - BATT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 32 - BATT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 33 APC JS0803009484 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 33 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 33 BAT 2 EnerSys 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 34 APC JS1052005134 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 34 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 34 BAT 2 CSB 8 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 35 APC JS1052005195 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 35 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 35 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 36 APC JS1052005186 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 36 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 36 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 37 APC JS1052005146 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 37 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 37 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 38 APC JS1052005139 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 38 BAT 1 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 38 BAT 2 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 39 APC JS10520005154 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 39 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 39 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 4 APC JS0649025605 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 4 - BATT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 4 - BATT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 40 APC JS10520005128 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 40 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 40 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 41 APC QS1042330046 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 41 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 41 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 42 Eaton Powerware

EY411ZXX01 120 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 42 BAT 1 CSB 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 42 BAT 2 CSB 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 42 BAT 3 CSB 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 43 Eaton Powerware

EY411ZXX05 3 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 43 BAT 1 CSB 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 43 BAT 2 CSB HR 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 43 BAT 3 CSB 40 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 45 MGE 1PPK21001 72 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 45 BAT 1 C&D

Technologies

J09-10627 36 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 46 APC JS0832016139 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 46 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 46 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 47 APC JS0832016197 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 47 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 47 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 48 APC JS0832016228 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 48 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 48 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 51 APC QS1042330041 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 51 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 51 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 53 APC JS1052005157 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 53 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 53 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 54 APC NS0650008537 16 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 54 BAT 1 MK Battery 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 57 APC QS1132330103 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 57 BAT 1 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 57 BAT 2 Duracell 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 58 APC JS0649025614 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 58 BAT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 58 BAT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 59 APC JS0649023964 1 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 59 Bat 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 6 APC JS0650009583 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 6 - BATT 1 MK Battery 8 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 60 APC AS0748230176 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 60 Bat 1 Duracell 2 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 62 Minuteman DE02110900241 3 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 62 BAT 1 CSB 3 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 7 APC JS0650009587 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 7 - BATT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 7 - BATT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 9 APC JS0635004195 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 9 - BATT 1 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 9 - BATT 2 MK Battery 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

Bakery Square, 6450 Penn Ave., Pittsburgh, PA 15206

(BSQ), Bakery Square

Unit Name Manufacturer Serial # Batt Qty

Coverage PM Frequency

UPS 1 APC QS0936230287 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 1 - BATT 1 16 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 2 APC QS0936230285 8 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

Delmonte Building, 375 North Shore Dr., Pittsburgh, PA 15212

Delmonte Building

Unit Name Manufacturer Serial # Batt Qty

Coverage PM Frequency

UPS 1 APC JS0803011529 2 FS/P/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 1 BAT 1 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

UPS 1 BAT 2 CSB 4 PM/4hr 1 Major 5x8 / 1 Minor 5x8

VHA Directive 1192 requires all health care personnel (HCP) to participate in the seasonal influenza prevention program and outlines the key implementation steps. Health care personnel is defined in VHA Directive 1192 as all VA licensed and unlicensed, clinical and administrative, paid and unpaid, full- and part-time employees, intermittent employees, fee basis employees, VA contractors, students, researchers, volunteers, and trainees who work in VHA locations. HCP covered by the policy are expected to receive annual influenza vaccination. Those HCP unable or unwilling to be vaccinated are required to wear a face mask throughout the influenza season. Masks are available at entrances throughout the medical center.

It is the responsibility of the contractor to ensure that all contract staff are compliant with the requirements outlined in VHA Directive 1192. The contractor shall maintain the following documentation:

- Documentation of vaccination, e.g., signed record of immunization from a health care provider or pharmacy, or a copy of medical records documenting the vaccination.

- Completed Health Care Personnel Influenza Vaccination Form (Attachment B of VHA Directive 1192) if unwilling or unable to receive the vaccine.

The contractor is required to submit annual certification to the Contracting Officer’s Representative (COR) that all contract staff performing services at VA facilities are in compliance with VHA Directive 1192.

Tuberculosis Screening- VHA Directive 2011-036, Safety and Health During Construction. Contractor must certify annually to the COR(s) that all Contractor employees working at VAPHS facilities have a documented screening for latent Tuberculosis within the last 12 months. If screening for latent

Tuberculosis is positive, clearance from a physician is required prior to working at VAPHS. Contractor employees that fail to meet this requirement will not be permitted to work at VAPHS facilities and may be asked to leave VAPHS property without notice until the requirement is met.

B.5 ISSO/PO COMMENTS

ISSO/PO Comments:

The COR is responsible for ensuring that all Contractors comply with physical security policies. A compliant ID badge must be worn by Contractors at all times while on VA premises.

Contractor may not have access to the VA network or any VA sensitive information under this contract.

Contractor must be escorted at all times by authorized VA personnel when performing work in sensitive IT areas including the Data Center and IT telecom closets.

All Contractors must receive Privacy training annually using one of the following methods:

• Complete “VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or Use to VA Sensitive Information” training by using VA’s TMS system (https://www.tms.va.gov/SecureAuth35/). Contractors may use the TMS Managed Self Enrollment method to complete the training in TMS. The COR must ensure that all contractors are validated in the PIH domain.

• Complete the hard copy version of “VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or Use to VA Sensitive Information”. Signed training documents must be submitted to the COR.

Training must be completed prior to the performance of the contract and annually thereafter. Proof of training completion must be verified and tracked by the COR.

B.6 WAGE DETERMINATIONS

WD 15-4235 (Rev.-9) was first posted on www.wdol.gov on 01/01/2019

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-4235 Daniel W. Simms Division of | Revision No.: 9 Director Wage Determinations| Date Of Revision: 12/26/2018 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: Pennsylvania

Area: Pennsylvania Counties of Allegheny, Armstrong, Beaver, Butler, Fayette, Washington, Westmoreland **Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE

FOOTNOTE RATE

23000 - Mechanics And Maintenance And Repair Occupations

23160 - Electrician, Maintenance 29.33 23181 - Electronics Technician Maintenance I 25.05 23182 - Electronics Technician Maintenance II 26.39 23183 - Electronics Technician Maintenance III 27.63

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

ITEMS (OCT 2018)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by

EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts;

18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti- Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause)

C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO

IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS

(OCT 2018)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115–91).

(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(4) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(5) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108- 78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).

[] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L.