S02_-_Exhibit_5_-_QASP.pdf
PDF 163 KB Posted
- Solicitation number
- 36C24419Q0198
About this file
36C24419Q0198 S02 - Exhibit 5 - QASP.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419Q0198-0004001.xlsx | XLSX spreadsheet | |
| 36C24419Q0198-0004000.docx | DOCX document | |
| 36C24419Q0198-0003000.docx | DOCX document | |
| 36C24419Q0198-0002000.docx | DOCX document | |
| 36C24419Q0198-0001000.docx | DOCX document | |
| S02_-_Exhibit_4___Medical_Center_and_VCC_History.pdf | ||
| 36C24419Q0198.docx | DOCX document | |
| S02_-_Exhibit_2_-_Price_Cost_Schedule.xlsx | XLSX spreadsheet | |
| S02_-_Exhibit_6___Wage_Determinations.pdf | ||
| S02_-_Exhibit_1_-_Statement_of_Objectives.pdf | ||
| S02_-_Exhibit_7_-_Records_Management_Language.pdf | ||
| S02_-_Exhibit_3_-_Additional_VAPHS_Requirements.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 5 - QASP
REGULATED MEDICAL WASTE SERVICE
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
For: VISN04 Medical Centers and VCC’s as specified in the SOW
Contract Number: Provided Upon Award
Contract Description: Regulated Medical Waste Services
Contractor’s name: Provided Upon Award
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor.
Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Stephanie French Organization or Agency: Department of Veterans Affairs, NCO 4
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Additionally, an Alternate COR (ACOR) may be appointed.
a. Assigned COR: Provided Upon Award
b. Assigned ACOR: Provided Upon Award
c. Other Key Government Personnel - <Upon award, Government will enter name, if applicable. This may include Performance Monitors, Clinical Quality experts, etc. who may act on behalf of the COR to monitor performance.>
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager: Provided Upon Award
b. Other Contractor Personnel: Provided Upon Award
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
Required Service
Performance Standard
Method of Surveillance
CPAR Rating Comments
Contractor transports waste in a safe manner
Zero violations of local, state, county or federal laws pertaining to OSHA, EPA and DOT regulations
Direct observation, progress/status meetings, periodic inspection, and validated user/customer complaints.
Deficiencies noted in annual performance evaluations, and notes made in
CPARS.
Contractor provides all applicable materials for packaging waste
No more than two
(2) instances where sites run out of materials to include red or yellow bags, cardboard boxes, Direct observation, progress/status meetings, and periodic inspection.
Deficiencies noted in annual performance evaluations, and notes made in
CPARS.
generator labels and tape
If Contractor decides to switch brand of reusable sharps containers, Contractor repairs damage caused by removal of existing containers and/or brackets and restores the mounting surfaces to their original condition
No more than one instance where the damage was not repaired or the mounting surface was not restored to the original condition
Direct observation Deficiencies noted in annual performance evaluations, and notes made in
CPARS.
Contractor furnishes a copy of the shipping manifest to the FCOR or his/her identified representative prior to removal of RMW from the facility.
No more than one
(1) instance where the Contractor does not provide a copy of the shipping manifest to the FCOR or his/her identified representative prior to removal of RMW from the facility.
Direct observation, progress/status meetings, and periodic inspection.
Deficiencies noted in annual performance evaluations, and notes made in
CPARS.
Contractor provides the destruction documents to FCOR along with the Medical Center’s monthly invoice.
No more than two
(2) instances where the destruction documents are not provided to the FCOR along with the Medical Center’s monthly invoice.
Direct observation, progress/status meetings, and periodic inspection.
Deficiencies noted in annual performance evaluations, and notes made in
CPARS.
Contractor provides annual on-site training to include topics as defined in the SOW, to participating facility employees
Zero instances where annual training is not provided and certificate of completion returned to COR
Direct Observation and progress/status meetings.
Deficiencies noted in annual performance evaluations, and more than 30 days after training
Contractor provides Medical Center and VCC specific RMW disposal/collection history for the prior month to FCOR and CO by the end of each month
No more than two
(2) instances where RMW disposal/collection history for the prior month was provided later than the end of the month
Direct Observation and progress/status meetings.
Deficiencies noted in annual performance evaluations, and
5. INCENTIVES
The Government shall use past performance as an incentive. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
The Government facilities may at any time inspect and verify that the accuracy of the work compares to that indicated on the invoice. Any deviation will be deducted from the invoice price
The COR shall use the surveillance methods listed below in the administration of this
QASP.
a. DIRECT OBSERVATION: 100% surveillance/Inspection
b. PERIODIC INSPECTION: Inspections will be scheduled Daily, Weekly, Monthly, Quarterly, annually and unscheduled, as needed.
c. VALIDATED USER/CUSTOMER COMPLAINTS: Complaints are investigated and validated.
d. PROGESS/STATUS MEETINGS: Annually
7. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE:
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE:
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the Contracting Officer (CO) determines formal written communication is required, a Contract Discrepancy Report (CDR) shall be prepared and presented to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the Contracting Officer. The Contracting Officer shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement:
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings:
The COR shall meet with the contractor ANNUALLY to assess performance and shall provide a written assessment. The written assessment will be placed in the COR file and a copy provided to the Contracting Officer.
Signature – Contractor Program Manager (contractor)
Signature – Contracting Officer’s Representative (COR)
File details come from the government source that posted it.