S10.xls

XLS spreadsheet 49 KB Posted

Attached to
Y1DA--STATION-CONST TBD OIG RENOVATION
Solicitation number
36C24227Q0135
Issued by

About this file

This is a Sources Sought Notice for a construction project at the Margaret Cochran Corbin VA Campus in New York. The Department of Veterans Affairs is conducting market research to identify qualified construction contractors for Project No. 630SI3167B14, which involves flooring replacement, cove base replacement, and wall painting at 423 E 23rd St, New York, NY 10010. The estimated magnitude of construction ranges between $100,000 and $250,000, and no expansion of the existing building footprint is anticipated. This requirement will be procured under FAR Part 36 as a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with the applicable NAICS code 236220 (Commercial and Institutional Building Construction) and a small business size standard of $45 million.

All interested SDVOSB firms must be registered in SAM.gov and verified in the SBA Veteran Small Business Certification (VetCert) database at the time of response to be considered for award. The anticipated award date for the construction contract is on or before February 12, 2027. This announcement is not a request for proposal, and the government will not pay nor reimburse any costs associated with responding to this market research notice. Prospective contractors must comply with VAAR 852.219-10 and VAAR 852.219-11 regarding Service-Disabled Veteran-Owned Small Business set-aside requirements.

View the file

Other files

File Type Posted
SOW.docx DOCX document
36C24227Q0135.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Column2Column1
ProjectVA OIG Space Flooring, Cove Base Replacement, and Wall Painting
LocationManhattan, New York VA
Prepared Date
BasisSOW quantities; contractor shall field verify all dimensions
Cost SummaryAmountBasis / Formula
General Conditions$0.00Cost Detail by category
Demolition$0.00Cost Detail by category
Flooring$0.00Cost Detail by category
Cove Base$0.00Cost Detail by category
Painting$0.00Cost Detail by category
Closeout$0.00Cost Detail by category
Direct Construction Cost$0.00Sum of all direct work
Bonds / Insurance (2.0%)$0.00Direct Cost x 2.0%
Contractor Overhead & Profit (10.0%)$0.00(Direct + Bonds/Insurance) x 10.0%
Escalation / Procurement Risk (3.0%)$0.00(Direct + Bonds + O&P) x 3.0%
Contingency / Rounding to Approved TotalBalancing amount to establish final total
GRAND TOTAL$0.00Target total requested by VA
Key QuantitiesQtyUnit
Flooring Replacement2,241.49SF
Cove Base Replacement666.90LF
Total Wall Paint Area5,585.00SF
Shoji White SW 70424,587.00SF
Benjamin Moore Slate Blue 1648998.00SF

Cost Detail

WBSCategoryRequirement / Work TaskDetailed BasisQtyUnitMaterial/Equipment Unit CostLabor HoursLabor RateMaterial/Equipment CostLabor CostSubtotal
01.01General ConditionsMobilization, field verification, preconstructionSite verification, logistics, safety plan, submittals1.00LS$0.00
01.02General ConditionsProject management & superintendentScheduling, coordination, QA/QC oversight1.00LS$0.00
01.03General ConditionsSite protection, containment, daily cleanupDust protection, occupant protection, safe access/egress1.00LS$0.00
02.01DemolitionRemove existing flooringRemove existing flooring in included OIG spaces - 2,241.49 SF2,241.49SF$0.00
02.02DemolitionRemove existing cove baseRemove existing 4-inch cove base - 666.9 LF666.90LF$0.00
02.03DemolitionSurface prep, debris handling and disposalHauling, disposal, substrate cleanup, minor scrape/grind1.00LS$0.00
03.01FlooringFurnish LVT flooringInterface Textured Wood Grains - Level Set A00416 Antique Dark Oak2,241.49SF$0.00
03.02FlooringInstall LVT flooringAdhesive, layout, cutting, installation, transitions and terminations2,241.49SF$0.00
04.01Cove BaseFurnish 4-inch cove baseRoppe Pinnacle 194 Burnt Umber - 666.9 LF666.90LF$0.00
04.02Cove BaseInstall 4-inch cove baseAdhesive, corners, clean lines, secure installation666.90LF$0.00
05.01PaintingPaint standard Shoji White wallsSherwin-Williams Shoji White SW 7042 semi-gloss - 4,587 SF4,587.00SF$0.00
05.02PaintingPaint Slate Blue accent wallsBenjamin Moore 1648 Slate Blue semi-gloss - 998 SF998.00SF$0.00
05.03PaintingWall prep, primer, patching and touch-upWall patching, primer where required, minor surface repairs - 5,585 SF5,585.00SF$0.00
06.01CloseoutFinal cleaning, punch list, warranty, O&MFinal cleanup, deficiency correction, care/maintenance and warranty package1.00LS$0.00
DIRECT CONSTRUCTION COST$0.00$0.00$0.00

Labor Rates

Trade / RoleEstimated Market Labor RateUnitUsed In EstimateNotes
Project Manager$/HRGeneral conditionsManhattan commercial construction coordination
Superintendent / Foreman$/HRMobilization / field oversightField supervision, site access, safety
Flooring Installer$/HRLVT installationCommercial LVT installation labor
Commercial Painter$/HRWall painting and prepPainting, patching, primer and finish coats
Construction Laborer$/HRDemolition / disposalFlooring/cove base removal, debris handling
Closeout / Punchlist Labor$/HRFinal cleanup and deficienciesFinish correction and turnover support

Equipment Basis

Material / AllowanceBasisQtyUnitUnit CostExtended Cost
LVT flooringInterface Textured Wood Grains - Level Set A00416 Antique Dark Oak2,241.49SF$0.00
LVT install materials/allowanceAdhesives, minor transitions and consumables2,241.49SF$0.00
Roppe cove baseRoppe Pinnacle 194 Burnt Umber, 4-inch high666.90LF$0.00
Cove base adhesive/consumablesIncluded as unit allowance666.90LF$0.00
Shoji White paint materialSherwin-Williams Shoji White SW 7042 semi-gloss4,587.00SF$0.00
Slate Blue paint materialBenjamin Moore 1648 Slate Blue semi-gloss998.00SF$0.00
Primer/patching materialPrimer, spackle, sandpaper, sundries5,585.00SF$0.00

File details come from the government source that posted it. Updated .