SA Equipment List 2026.xls

XLS spreadsheet 72 KB Posted

Attached to
R425--FY 27 Service (Base+4) | NYH Energy Control Procedures/LOTO Services | 630
Solicitation number
36C24227Q0091
Issued by

About this file

This is an equipment list in spreadsheet format supporting a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside solicitation for Lockout Tagout (LOTO)/Energy Control Procedures (ECP) implementation and software/maintenance services. The solicitation (36C24227Q0091) is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 and covers three New York Harbor VA Healthcare System facilities: Manhattan VA Medical Center, Brooklyn VA Medical Center, and St. Albans VA Medical Center. The procurement is for one base year plus four option years, with NAICS code 541330 (Engineering Services) and a small business size standard of $25.5 million. The FSC/PSC code is R425. This is a Request for Quote (RFQ) issued under FAR subpart 12.202 procedures for commercial products and services.

The equipment list file itself appears to be a supporting document that would detail specific equipment or materials required for the LOTO/ECP services across the three VA facilities. Contractors must reference this list in conjunction with the Statement of Work and pricing worksheet when submitting quotations. The solicitation follows the Revolutionary FAR Overhaul (RFO) format and incorporates provisions through Federal Acquisition Circular 2026-01. Interested vendors should note the opportunity for a site visit on Monday, November (date not fully provided in excerpt), and should coordinate pricing submissions with the detailed requirements specified in the attached SOW and pricing worksheet.

View the file

Other files

File Type Posted
SCA WD 2015-4187.pdf PDF
Manhattan Equipment Inventory.xlsx XLSX spreadsheet
BK Equipment 10-15-26.xlsx XLSX spreadsheet
Limitations on Subcontracting.pdf PDF
Final SOW.docx DOCX document
36C24227Q0091.pdf PDF
36C24227Q0091 Pricing Worksheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical Equipment

Generators
MakeModelSerial No.LocationCapacity
CaterpillarD150-10CAT00C71VL7C00430Building 89150 KW
CaterpillarD150-10CAT00C71AL7C00428Building 167- B, C, D150 KW
CaterpillarD150-10CAT00C71LL7C00429Building 168- E, F1, F2150 KW
CaterpillarD200-2CAT00C71CETG00540Building 88-1200 KW
CaterpillarD500CAT00C15KNAP01599Building 88-2500 KW
CaterpillarC27GDN00219Building 174- Laundry750 KW
CaterpillarD30-2CAT0DG30ANBW00138Building 60- Police30 KW
CaterpillarC15CAT000C9NGP00992Building 64-UL300 KW
CaterpillarC32G2Z02009Building 64-LL1000 KW
CaterpillarG300LG6GXJ04856B176- Pump Station300 KW
Electrical Equipment
DesignationLocation
ATS- ASCO 7000 SeriesBuilding 89
ATS- S/N: EME 259969-3Building 89
ELS 259969-1Building 89
ECR 259968-3Building 89
Transformer Westinghouse 1Building 89
Transformer Westinghouse 2
GE SwitchBoardBuilding 89
FEEDER 2 AND 4Building 89
FEEDER 1 S/N: N239743TGUABuilding 89
FEEDER 2 S/N: N239744TGUABuilding 89
Distribution Board 1
Distribution Board 2
ATS- ASCO 7000 SeriesBuilding 85/86/87
ATS S/N: EME 259968-2Building 85/86/87
ELS 259970-1Building 85/86/87
ECR259969-4Building 85/86/87
Transformer Westinghouse- S/N: 450500A012-5163ABuilding 85/86/87
Distribution Board- 87
ATS- ASCO 7000 SeriesBuilding 88
ATS- S/N: 259971Building 88
ATS- S/N: 262866Building 88
Transformer WestinghouseBuilding 88
GENERAL ELECTRICBuilding 88
TRANSFORMER A1 B3Building 88
S/N: N239759TGUABuilding 88
Distribution Board 3
Distribution Board 4
ATS- ASCO 7000 SeriesBuilding 91/92/93
ATS- ELS 259970-2Building 91/92/93
ATS- ECR 259969-2Building 91/92/93
ATS- EME 259968-1Building 91/92/93
Transformer Westinghouse- S/N: 420500A013-5163B-RBuilding 91/92/93
Transformer Culter-HammerBuilding 91/92/93
S/N: V46D28T12H-FPBuilding 91/92/93
S/N: V46D4TH22H-FPBuilding 91/92/93
Switchboard Distribution -91Building 91/92/93
ATS Square D- 93738A-11Building 176
CUTLER HAMMERBuilding 176
S/N: PFB-0230Building 176
I.T.E POWER TRANSFORMERBuilding 176
S/N: EIA 218Building 176
ATS- GE ZENITH ZTGBuilding 60
ATS- ASCO 7000 SeriesBuilding 64
ATS S/N: 259967-002Building 64
ATS S/N: 259967-001Building 64
Switchboard Distribution 1Building 64
Switchboard Distribution 2Building 64
Transformer 1Building 64
Transformer 2Building 64
ATS-ASCO 7000 SeriesBuilding 173
Switchboard Distribution -173Building 173
Transformer 750kvaBuilding 173
Fire Pump Panel- Eaton FT90AL1USBBuilding 89- B18
Fire Pump Panel- Eaton FT9050AL1USBBuilding 89- B18
Fire Pump Baldor series- C1602190102Building 89- B18
Fire Pump Motor- FPM2542/T 2/4Building 89- B18
Primary Substation 4160VBuilding 169
Main Breaker 1Building 169
Main Breaker 2Building 169
Tie BreakerBuilding 169

Boiler Plant

Facility #Facility Name / DescriptionEquipment LocationArea/Equipment ServedEquip TagEquipment TypeManufacturerModel NumberSerial Number
64Boiler PlantBoiler PlantAll BuildingsBoiler 1Water Tube BoilerVictoryDT-2-33 SP15806-1
64Boiler PlantBoiler PlantAll BuildingsBoiler 2Water Tube BoilerVictoryDT-2-33 SP15806-2
64Boiler PlantBoiler PlantAll BuildingsBoiler 3Water Tube BoilerVictoryDT-2-33 SP15806-3
64Boiler PlantBoiler PlantBoiler Plant64-P-1FW PumpGrundfosCR 15-7A-F-A-E-HQQE
64Boiler PlantBoiler PlantBoiler Plant64-P-2FW PumpGrundfosCR 15-7A-F-A-E-HQQE
64Boiler PlantBoiler PlantBoiler Plant64-P-3FW PumpGrundfosCR 15-7A-F-A-E-HQQE
64Boiler PlantBoiler PlantBoiler Plant64-P-4Condensate Transfer PumpGrundfosCR 32-2-2-A-G-A-E-HQQE
64Boiler PlantBoiler PlantBoiler Plant64-P5Condensate Transfer PumpGrundfosCR 32-2-2-A-G-A-E-HQQE
64Boiler PlantBoiler PlantBoiler Plant64-P-6Fuel oil PumpIndustrial Fuel Systems3D187Y25357
64Boiler PlantBoiler PlantBoiler Plant64-P-7Fuel oil PumpIndustrial Fuel Systems3D187Y25357
64Boiler PlantBoiler PlantBoiler PlantH-1Dearator TankSuperior BoilerMSTC050T165-13521070095
64Boiler PlantBoiler PlantBoiler PlantT-1Condensate TankSuperior BoilerMS S1600D21070096
64Boiler PlantBoiler PlantBoiler PlantAir Compressor 1
64Boiler PlantBoiler PlantBoiler PlantAir Compressor 2

AC Shop part 1

St AlbansUnit LocationMakeModel NumberSerial Number
6th Floor Chilled Water Pumps 1 and 2ArmstrongNS-5425496
Commissary Chiller Pump 1Armstrong3X2X13 4030
Commissary Chiller Pump 2Armstrong3X2X13 4030
Commissary Chiller Pump 3Armstrong3X2X13 4030
2nd Floor Mechanical Room Chilled Water Pumps (2) for Chiller 2Weinman
2nd Floor Mechanical Room Chilled Water Pumps (2) for Chiller 2Weinman
ChapelCarrier38AKs016---500---1595F42797
Telephone room - BasementLayton - LarkinPFG-588643591-1
Audiology 3rd floor roofAaaonCC-B-017-3-A-2201202-CHCD04001
Audiology 3rd floor roofTemtrolITF-I-DHRELLT009775-001-00
Laundry HV1Yorkcs490f0af y-HV-184-803423-b-h-1
Outpatient EastTranecsaa025Uac00K12B13661
Outpatient WestTranecsaa014uac00k12b13871
Commissary Offices Basement AHU-1 Central AHUYork94-1022520ap150fsfc hu-1(Barely legible)
Chapel AHUYorkebv128-ajso48198
AHU-7McquayMSL141DH35Aocc10-04
Directors room AHUYorkap80fsfc12x12cfdm-008367
Dir conference roomsYorkHICE150A25ANF0m049411
RTU-3 Package UnitTranetsc036e47ba1ed0000132-110741L
Laundry Offices RTU-4TraneTSC092E4rCA11G0C1a1b20101110610174L
Laundry AC-2 Condensing UnitTraneTTA150e400AA11045YspYA
Ground floor outsideTranessHLF40E6D45E7BD10c11A00414
AHU-7 ChillerTraneMSL1410H35A0CC10-04
Medical Admin Office RTU-2 PackageTraneTSC036E3RE…110610114L
Retherm Split SystemYorkFs-VC-RFCanm21993D
Retherm CondensingYorkHB180C00A2AAA1ASNFLM060177
Clean Area Process Equipment HV-2Yorkcs490f0af y-HV-284-803423-b-h-2
Clean Area Process Equipment HV-3Yorkcs490f0af y-HV-384-803423-b-h-3
Clean Area Process Equipment HV-4Yorkcs490f0af y-hv-483-803423-c-h-3
Chapel Central ACYorkEBV128-AJso48198
Commissary Kitchen AHU-2 Central AHUYORKap400fsaf113013262
HV-2 Central AHUYorkCS490FOAV Y-HV-284-803424-B-H-2
Soiled Laundry Area Bldg. 173 HV-1 CentralYorkcs490f0af y-e-284-803423-e-h-5
Dining Room SCAC-1 Split SystemSCAC-1
Dining Room Pub SCAC-2 Split SystemSCAC-2
Sterile Processing Central AHUXetexXHR-30G-48-BP-CW2195G20672
Ward C1 Bldg. 85CARRIER CONDENSER38APD0275JA161242018Q62236
Ward C1 Bldg 85CARRIER AHU39MN08WL4802646XXE
Test Kitchen Split SystemFriedrichMw09y3jadel00526mw09y3j
Canteen AHUTraneCSAA025uaLooh21k05787A
25 Ton Carrier ChillerCarrier39MN61D02337N12ACS1515A-42562
Trane Volunteer services - Around back ground levelTranetsc120e3rgbdyg0ciaib28101-d110610211l
Canteen ChillerTraneRAUJC60EBE13ABDF0201#C21KO7419
RooftopMcQuayRPS060DSSFBOU101101244 00
RooftopMcQuayRPS060DSSFBOU101101235 00
Left of entry PITLaytonLEDG-0332021110-003B
Dom 2nd floor roofTraneCGAM 070A 2c02 AXDX AIAX XAIC 1A4Xu11c21487
TraneCgam130a2c02AKD2AIAIAIAxXAIA!A4XXAXXXAIA3XIDXXXCXVU11c21490
Concrete slab near deliveriesTraneCGAM 070A 2c02 AXDX AIAX XAIC 1A4XU11C21488
Concrete slab near deliveriesTraneCGAM 070A 2c02 AXDX AIAX XAIC 1A4XU11C21489
SPD ChillerYorkYCAL0028EE17XEASFWM63106

AC Shop part 2

Facility #Facility Name / DescriptionEquipment LocationArea/Equipment ServedEquip TagEquipment TypeManufacturerModel Number
85Intermediate Care - Wards C and DBldg 85 RoofBldg 85EF-1 (Bldg 85 Toilet Exhaust)Exhaust FanDayton4YY10
85Intermediate Care - Wards C and DGrounds OutsideBldg 85 C1 DayroomAHU-2Packaged AHUCarrierCarrier 39MN
85Intermediate Care - Wards C and DGrounds OutsideBldg 85 C1 WardAHU-1Packaged AHUCarrierCarrier 39MN
86Intermediate Care - Wards C and DOutside Bldg 86Adult Day Health CareACU-3Packaged AHUTrane IntellipakSSHLF40E6D45E7BD1011ABC0FG00000RT0M8600
86Intermediate Care - Wards C and DBldg 86 RoofBldg 86EF-2 (Bldg 86 Toilet Exhaust)Exhaust FanGreenheckGB-260-20
86Intermediate Care - Wards C and DBldg 86 Basement Mechanical RoomBldg 86 Floors 2,3 (abandoned)AHU-1Central AHUMcQuayMSL-222CH
86Intermediate Care - Wards C and DBldg 86 Basement Mechanical RoomBldg 85 - 86DHW HX-1, DHW HX-2Heat ExchangerFloRite-
86Intermediate Care - Wards C and DBasement MER - Bldg 88Bldg 85 -86-DHW Pump--
87Nursing Care – Ward BBldg 87 Roof2nd & 3rd Floors, EastAHU B1Central AHUMcQuayRPS060DSS
87Nursing Care – Ward BBldg 87 Roof2nd & 3rd Floors, WestAHU B2Central AHUMcQuayRPS060DSS
87Nursing Care – Ward BGround Floor Mechanical RoomChapelChapel ACUCentral AHUYorkEBV182-A
87Nursing Care – Ward BBasement Mechanical RoomBasement SPDSPD AHUCentral AHUXeteXXHR-30G-48-BP-CW-HS-HM
87Nursing Care – Ward BOutside - Ground LevelChapel AHUChapel ACCUCondensing UnitCarrier38AKS016---500--
87Nursing Care – Ward BOutside - Ground LevelBasement SPD AHUSPD ChillerChillerYorkYCALOO28EE17XEA SDTX AXXRLXXXX 44XX1XXXX XXXSXXX XXX 1XXXXXN BXAXED
87Nursing Care – Ward BRoom B4Bldg 87DHW HX-1, DHW HX-2Heat ExchangerFloRite-
87Nursing Care – Ward BRoom B4Bldg 87-DHW Pump--
88Food Commissary-Dietetics / Domiciliary S2nd Floor Small Mech Room near DomicilliaryCommissary Kitchen - BasementAHU-2Central AHUYorkAP400FSAFII30
88Food Commissary-Dietetics / Domiciliary S2nd Floor Mechanical RoomCommissary Offices BasementAHU-1
(Commissary Offices AHU)Central AHUSnyderGeneral McQuayLSL164DH
88Food Commissary-Dietetics / Domiciliary S2nd Floor Small Mech Room near DomicilliaryDiet KitchenHV-1Central AHU-no plate visible
88Food Commissary-Dietetics / Domiciliary S2nd Floor Mechanical RoomAuditoriumAHU-2
(Auditorium AHU)Central AHUSnyderGeneralLSL150DH
88Food Commissary-Dietetics / Domiciliary SRoofMedical Administration OfficeRTU-2Packaged RTUTraneTSC036E3REA16G0C1A1B20301
88Food Commissary-Dietetics / Domiciliary SPenthouse Mechanical RoomOutpatient Clinic EastOutpatient East AHUCentral AHUMcQuayMMM-214CH
88Food Commissary-Dietetics / Domiciliary SPenthouse Mechanical RoomOutpatient Clinic WestOutpatient West AHUCentral AHUMcQuayMMM222CH
88Food Commissary-Dietetics / Domiciliary S2nd & 3rd Floor CeilingsDomiciliary RoomsFCUsFan Coil Units--
88Food Commissary-Dietetics / Domiciliary SRoofKitchen Make-up AirKMU-1Make-up air unit-no plate visible
88Food Commissary-Dietetics / Domiciliary SRoofKitchen Make-up AirKMU-2Make-up air unit-no plate visible
88Food Commissary-Dietetics / Domiciliary SBasement Mech RoomRetherm KitchenRetherm ACSplit-System ACYork-
88Food Commissary-Dietetics / Domiciliary SOutside Ground LevelRetherm ACRetherm Condensing UnitCondensing UnitYorkHB180C00A2AAA1A
88Food Commissary-Dietetics / Domiciliary S2nd Floor Roof SouthDomiciliaryChiller 6ChillerTraneCGAM 070A 2C02 AXD2 A1A1 A1AX XA1C 1A4X XAXX XA1A 3X1D XXXL XX
88Food Commissary-Dietetics / Domiciliary S2nd Floor - Domicillary ClosetChiller 6CHWP-1CHW Pump--
88Food Commissary-Dietetics / Domiciliary SRoofDomiciliary Offices 1st FloorRTU-3Packaged RTUTraneTSC120E3RGB0YG0C1A1B20101
88Food Commissary-Dietetics / Domiciliary STest KitchenTest KitchenTest Kitchen ACSplit-System AC-no plate visible
88Food Commissary-Dietetics / Domiciliary SOutside - Ground LevelVolunteer ServiceRTU-1Condensing UnitTraneTSC120E3RGB0YG0C1A1B20101
88Food Commissary-Dietetics / Domiciliary SOutside - Ground LevelAHU-1 Tray Line; AHU-2 KitchenChiller 4ChillerTraneCGAM 070A 2C02 AXD2 A1A1 A1AX XA1C 1A4X XAXX XA1A 3X1D XXXL XX
88Food Commissary-Dietetics / Domiciliary SOutside - Ground LevelAHU-1 Tray Line; AHU-2 KitchenChiller 5ChillerTraneCGAM 070A 2C02 AXD2 A1A1 A1AX XA1C 1A4X XAXX XA1A 3X1D XXXL XX
88Food Commissary-Dietetics / Domiciliary SMain Mechanical RoomChillers 4 & 5CHWP-1CHW PumpArmstrong3X2X13 4030
88Food Commissary-Dietetics / Domiciliary SMain Mechanical RoomChillers 4 & 5CHWP-2CHW PumpArmstrong3X2X13 4030
88Food Commissary-Dietetics / Domiciliary SMain Mechanical RoomChillers 4 & 5CHWP-3CHW PumpArmstrong3X2X13 4030
88Food Commissary-Dietetics / Domiciliary S2nd Floor RoofAHU-1: Com AHU and AHU-2: AuditoriumChiller 3ChillerTraneCGAM 100A 2C02 AXD2 A1A1 A1AX XA2C 1A4X XAXX XA1A 3X1D XXXL XS
88Food Commissary-Dietetics / Domiciliary S2nd Floor Mechanical RoomChiller 3CHWP-1 & -2CHW PumpWeinman-
88Food Commissary-Dietetics / Domiciliary SOutside - Ground LevelOutpatient Clinic AHUsChiller 2ChillerCarrier30GT-060---500KA
88Food Commissary-Dietetics / Domiciliary SMain Mechanical RoomBldg 88DHW HX-1, DHW HX-2Heat ExchangerArmstrong665
88Food Commissary-Dietetics / Domiciliary SMain Mechanical RoomBldg 88DHW Pumps-1 & -2DHW PumpGoulds Pumps, ITTNPE 1 1/4 X 1 1/2 - 6
88Food Commissary-Dietetics / Domiciliary S2nd Floor Mechanical RoomChiller 2 - Outpatient ClinicCHWP-1 & -2CHW Pump--
88Food Commissary-Dietetics / Domiciliary SBuilding PerimeterBldg 88Steam RadiatorsSteam Radiator--
89Administration Building & Nursing CarePenthouse Mechanical Room - 6th Floor4th & 5th FloorsAHU-7Central AHUTranePSCA048UAAAO
89Administration Building & Nursing CareRoofAHU-7Chiller 1ChillerTraneCGAM 130A 2C02 AXD2 A1A1 A1AX XA1A 1A4X XAXX XA1A 3X1D XXXL XXXX
89Administration Building & Nursing CarePenthouse Mechanical Room - 6th FloorChiller 1CHWP-1 & -2CHW PumpArmstrong4X3X11.5 4030
89Administration Building & Nursing CareBasement Mechanical Room A-20Food Tray lineAHU-1Central AHUYorkAP150FSFC(…unreadable)
89Administration Building & Nursing CareCeiling - Laundry StorageLinenHV-2Central AHUYorkCoil Model DA0100630.00x048G01HD035S000DH01L CS01BM2.0007.00ANA99SR
89Administration Building & Nursing Care2nd Floor Mechanical RoomDining RoomSCAC-1Split-System ACYorkH2CA360A24B
89Administration Building & Nursing Care2nd Floor Ladies room Mech RoomDining Room PubSCAC-2Split-System AC--
89Administration Building & Nursing CareBasement Mechanical RoomCanteenCanteen Condnesing UnitCondensing UnitTraneRAUJC60EBE13
89Administration Building & Nursing CareOutside - Ground LevelCanteen AHUCanteen ChillerChillerCarrier30GT-020---510
89Administration Building & Nursing CareOutside - Ground LevelSterile Processing - BasementSterile Processing AHUPackaged AHUCarrier50HJ-007---521--
89Administration Building & Nursing CareAC: Inside; ACCU: Outside - Ground LevelPID Room - 1st FloorPID ACUSplit-System ACRheem ACCU-
89Administration Building & Nursing CareAC: Inside; ACCU: Outside - Ground LevelPharmacy East - 1st FloorPharmacy East ACSplit-System ACCarrier38AR-007-501
89Administration Building & Nursing CareAC: Inside; ACCU: Outside - Ground LevelPharmacy West - 1st FloorPharmacy West ACSplit-System ACCarrier38AK-007-501
89Administration Building & Nursing CareOutside - Ground LevelTelephone RoomTelephone Room ACSplit-System ACLaytonLARKIN PFG5
89Administration Building & Nursing CareOutside - Ground LevelTelephone RoomTelephone room BackupSplit-System ACInter-City ProductsAD060HD
89Administration Building & Nursing CareBasement Mechanical RoomBldg 89DHW HX-1, DHW HX-2Storage Tank - Heat Exchanger--
89Administration Building & Nursing CareBasement Mechanical RoomBldg 89DHW Pumps-1 & -2DHW Pump--
89Administration Building & Nursing Care3rd Floor Mechanical Room RoofBuilding 89 RehabilitationACCU-1Condensing UnitTempmasterYJT20C00A4BAE4
89Administration Building & Nursing Care3rd Floor Mechanical RoomBuilding 89 RehabilitationAHU-1Central AHUTitusIAH42X66
89Administration Building & Nursing Care3rd floor Mechancial RoofBuilding 89 AudiologyACCUCondensing UnitAaonCCB0173A2BAB00A0
89Administration Building & Nursing Care3rd floor Mechancial RoofBuilding 89 AudiologyAHUCentral AHUTemtrolITF-DHII
173Consolidated LaundryMezzanine Mechanical RoomSoiled Laundry AreaHV-1Central AHUYorkCS490FOAF Y-HV-1
173Consolidated LaundryMezzanine Mechanical RoomClean Area Process EquipmentHV-2Central AHUYorkCS490FOAV Y-HV-2
173Consolidated LaundryMezzanine Mechanical RoomClean Area Process EquipmentHV-3Central AHUYorkCS490FOAF Y-HV-2
173Consolidated LaundryMezzanine Mechanical RoomClean Area Process EquipmentHV-4Central AHUYorkCS490FOAF Y-HV-4
173Consolidated LaundryRoofOfficesRTU-4Packaged RTUTraneTSC092E4RCA11G0C1A1B20101
173Consolidated LaundryMezzanine Mechanical RoomMechanics Shop & Break RoomAC-2Central AHUYorkCS113FOAF
173Consolidated LaundryRoofAC-2AC-2 ACCUCondensing UnitTraneTTA150E400AA
173Consolidated LaundryLow RoofSoiled AreaE-1AExhaust FanEnergenics140
173Consolidated LaundryLow RoofSoiled AreaE-2AExhaust FanDayton36Y66G
173Consolidated LaundryHigh RoofClean AreaE-1Exhaust Fan--
173Consolidated LaundryHigh RoofClean AreaE-2Exhaust FanYorkCS490FOAF Y-E-2
173Consolidated LaundryHigh RoofClean AreaE-3Exhaust Fan--
173Consolidated LaundryLow RoofLocker RoomsE-6Exhaust Fan--
173Consolidated LaundryLow RoofLaundry Equipment RoomE-7Exhaust Fan--
173Consolidated LaundryEquipment RoomEquipment RoomE-8Exhaust Fan--
173Consolidated LaundryClerestoryMechanics Shop & Break RoomE-10Exhaust Fan--
173Consolidated LaundryHigh RoofTunnelE-AExhaust Fan--
173Consolidated LaundryHigh RoofTunnelE-BExhaust Fan--
173Consolidated LaundryHigh RoofTunnelE-CExhaust Fan--
173Consolidated LaundryUtility Mechanical RoomLaundryE-1 Central ExhaustExhaust FanYorkCS113FOAF Y-AC-2
173Consolidated LaundryMechanical RoomLaundryDHW HX-1, DHW HX-2Storage Tank - Heat Exchangerunreadable
173Consolidated LaundryMechanical RoomLaundryDHW Pumps-1, -2, & -3DHW PumpMarathonunreadable

Plumbing Shop

Units
Bldg87 Storm Drain Ejector Pump
4th Floor Hot Water Pump
85-86 Main Water Shutoff
87-89 Main Water Valve
A Wing Steam Valve
B WIng Steam Valve
Bldg 85-86 Sewer Ejector Pump
Bldg. 85-86 Condensate Pump
Bldg. 85-86 Hot Water Circulating Pumps
Bldg. 85-86 Medical Air Disconnect
Bldg. 87 Condensate Pump
Bldg. 87 Storm Drain Ejector Pump
Bldg. 88 NFS Condensate Pumps Disconnect
Bldg. 89 Chiller Circulating Pumps Disconnect
Bldg. 89 Hot Water Circulating Pump
Bldg. 89 Main Steam Valve
Bldg. 89 Medical Air Compressor-Vacuum Disconnect
Bldg. 89 Sewer Ejector Pumps
Bldg. 91 Sewer Ejector Pump
Bldg. 91 Storm Drain Ejector Pumps
Bldg. 93 Condensate Pump Disconnect
Bldg. 93 Sewer Ejector Pump
Canteen Sewer Ejector Pump
C-D Steam Valve
E Wing Steam Valve
F WIng Steam Valve
Jockey Pump Disconnect
Storm Drain Ejector Pumps Building 91
Bldg. 89 Circulating Pumps
Bldg. 88 Sewer Ejector-Storm Drain Pumps

File details come from the government source that posted it. Updated .