Specifications-Final.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24227B0009
About this file
This is a Project Specifications document for a Fire Alarm System Replacement and Upgrade at VA Montrose Medical Center (VA Project No. 620-22-110). The contract requires replacement and upgrade of fire alarm systems across 28 existing buildings plus two new buildings (CLC and 7B) at the medical center campus. The scope includes installing new Honeywell Notifier fully addressable, non-proprietary fire alarm systems with Fire Alarm Control Panels (FACPs) in each building, establishing the Fire Department (Building 19) as the primary master station and Building 20 (Boiler Plant) as a secondary master station, connecting all systems via existing fiber optic loop infrastructure, and providing manual voice communication capabilities with fire alarm graphics at both master locations. The contractor must reuse existing wiring and conduit where feasible and comply with NFPA 72, the VA Fire Protection Design Manual, and all applicable project specifications and drawings.
The bid must be itemized by building with separate line items for the base bid (complete fire alarm system upgrade for all buildings) and three alternates: Alternate 1 removes CLC building work; Alternate 2 removes both CLC and Building 7B work; and Alternate 3 relocates the Building 24 FACP installation to a different room. The contract includes a 5-year repair and maintenance agreement covering parts and labor, factory-trained manufacturer representatives providing two full days of on-site training for up to ten Fire Department and Electrical personnel, and delivery of all O&M manuals, as-built drawings, and test documentation. The phasing plan spans 76 work weeks across 532 calendar days with work divided into 27 phases prioritizing critical facilities (Fire Department and Boiler Plant) first, followed by healthcare buildings and remaining support facilities. All work must be performed by licensed and factory-authorized fire alarm installation contractors or registered apprentices in compliance with OSHA requirements, VA security procedures, infection control measures, and strict fire safety protocols including hot work permits and smoke barrier penetration permits.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
GENERAL CONSTRUCTION
100% CONSTRUCTION DOCUMENTS
VA MONTROSE MEDICAL
CENTER
FIRE ALARM SYSTEM
REPLACEMENT AND UPGRADE
VA PROJECT NO. 620-22-110
Professional Seal Fellenzer Engineering, LLP
22 Mulberry Street
Middletown, NY 10940
(845) 343-1481
FE Project No. 22-377 July 21, 2026
VA MONTROSE
FIRE ALARM SYSTEM REPLACEMENT AND UPGRADE
VA PROJECT #620-22-110
06-01-24
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 00 Construction Documentation 09-23
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24
01 33 23 Shop Drawings, Product Data, and Samples 11-23
01 33 50 Computer Aided Design Coordination Drawings 06-23
01 35 26 Safety Requirements for Major Projects 05-24
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE – NOT USED
DIVISION 04 – MASONRY – NOT USED
DIVISION 05 – METALS – NOT USED
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES – NOT USED
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 – OPENINGS – NOT USED
00 01 10-2
DIVISION 09 – FINISHES
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES – NOT USED
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS – NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-21
DIVISION 14– CONVEYING EQUIPMENT – NOT USED
DIVISION 21- FIRE SUPPRESSION – NOT USED
DIVISION 22 – PLUMBING – NOT USED
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC) – NOT USED
DIVISION 25 – INTEGRATED AUTOMATION – NOT USED
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 28 16 Circuit Breakers 11-22
DIVISION 27 – COMMUNICATIONS – NOT USED
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
00 01 10-3
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK – NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS – NOT USED
DIVISION 33 – UTILITIES – NOT USED
DIVISION 34 – TRANSPORTATION – NOT USED
DIVISION 48 – Electrical Power Generation – NOT USED
00 01 10-4
THIS PAGE INTENTIONALLY LEFT BLANK
05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
THE DRAWINGS LISTED BELOW ACCOMPANYING THIS SPECIFICATION FORM A PART OF THE CONTRACT.
SHEET NO. DRAWING NO. DRAWING TITLE
GENERAL INFORMATION:
1 GI-001 TITLE SHEET
2 GI-002 INDEX TO DRAWINGS
3 GI-003 PHASING PLAN
4 GI-004 ICRA DOCUMENTS
5 FA-001 FIRE ALARM: SYMBOLS, NOTES & ABBREVIATIONS
6 FA-700 FIRE ALARM: DETAILS
7 FA-701 FIRE ALARM: WIRING DIAGRAMS
8 FA-800 FIRE ALARM- SCHEDULES & DIAGRAMS
9 FA-FO-01 SITE PLAN: FIBER OPTIC NETWORK REPAIR
10 1-FAD-101 BUILDING 1: FIRE ALARM- BASEMENT & GROUND FLOOR
DEMOLITION PLANS
11 1-FAD-102 BUILDING 1: FIRE ALARM- FIRST FLOOR DEMOLITION PLAN
12 1-FAD-103 BUILDING 1: FIRE ALARM- SECOND FLOOR DEMOLITION PLAN
13 1-FAD-104 BUILDING 1: FIRE ALARM- THIRD FLOOR DEMOLITION PLAN
14 1-FAD-105 BUILDING 1: FIRE ALARM- ATTIC FLOOR DEMOLITION PLAN
15 1-FA-101 BUILDING 1: FIRE ALARM- BASEMENT & GROUND FLOOR
CONSTRUCTION PLANS
16 1-FA-102 BUILDING 1: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLAN
17 1-FA-103 BUILDING 1: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLAN
18 1-FA-104 BUILDING 1: FIRE ALARM- THIRD FLOOR CONSTRUCTION PLAN
19 1-FA-105 BUILDING 1: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLAN
20 1-FA-601 BUILDING 1: FIRE ALARM- RISER DIAGRAM
21 2-FAD-101 BUILDING 2 & 2B: FIRE ALARM- BASEMENT & GROUND
DEMOLITION PLANS
22 2-FA-101 BUILDING 2 & 2B: FIRE ALARM- BASEMENT & GROUND
CONSTRUCTION PLANS
23 3-FAD-101 BUILDING 3: FIRE ALARM- GROUND FLOOR DEMOLITION PLAN
24 3-FAD-102 BUILDING 3: FIRE ALARM- FIRST FLOOR DEMOLITION PLAN
25 3-FAD-103 BUILDING 3: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
26 3-FAD-104 BUILDING 3: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
27 3-FA-101 BUILDING 3: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLAN
00 01 15 - 2
28 3-FA-102 BUILDING 3: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLAN
29 3-FA-103 BUILDING 3: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
30 3-FA-104 BUILDING 3: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
31 3-FA-601 BUILDING 3: FIRE ALARM- RISER DIAGRAM
32 4-FAD-101 BUILDING 4: FIRE ALARM- GROUND FLOOR DEMOLITION PLANS
33 4-FAD-102 BUILDING 4: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
34 4-FAD-103 BUILDING 4: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
35 4-FAD-104 BUILDING 4: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
36 4-FA-101 BUILDING 4: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
37 4-FA-102 BUILDING 4: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
38 4-FA-103 BUILDING 4: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
39 4-FA-104 BUILDING 4: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
40 4-FA-601 BUILDING 4: FIRE ALARM- RISER DIAGRAM
41 5-FAD-101 BUILDING 5: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLANS
42 5-FAD-102 BUILDING 5: FIRE ALARM- GROUND FLOOR DEMOLITION PLANS
43 5-FAD-103 BUILDING 5: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
44 5-FAD-104 BUILDING 5: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
45 5-FA-101 BUILDING 5: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLANS
46 5-FA-102 BUILDING 5: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
47 5-FA-103 BUILDING 5: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
48 5-FA-104 BUILDING 5: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
49 5-FA-601 BUILDING 5: FIRE ALARM- RISER DIAGRAM
50 6-FAD-101 BUILDING 6: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLANS
51 6-FAD-102 BUILDING 6: FIRE ALARM- GROUND FLOOR DEMOLITION PLANS
52 6-FAD-103 BUILDING 6: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
53 6-FAD-104 BUILDING 6: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
54 6-FAD-105 BUILDING 6: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
55 6-FA-101 BUILDING 6: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLANS
56 6-FA-102 BUILDING 6: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
57 6-FA-103 BUILDING 6: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
58 6-FA-104 BUILDING 6: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
59 6-FA-105 BUILDING 6: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
60 6-FA-601 BUILDING 6: FIRE ALARM- RISER DIAGRAM
00 01 15 - 3
61 7-FAD-101 BUILDING 7: FIRE ALARM- GROUND FLOOR DEMOLITION PLANS
62 7-FAD-102 BUILDING 7: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
63 7-FAD-103 BUILDING 7: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
64 7-FAD-104 BUILDING 7: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
65 7-FA-101 BUILDING 7: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
66 7-FA-102 BUILDING 7: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
67 7-FA-103 BUILDING 7: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
68 7-FA-104 BUILDING 7: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
69 7-FA-601 BUILDING 7: FIRE ALARM- RISER DIAGRAM
70 7B-FAD-101 BUILDING 7B: FIRE ALARM-FIRST FLOOR DEMOLITION PLAN
71 7B-FA-101 BUILDING 7B: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLAN
& RISER DIAGRAM
72 12-FAD-101 BUILDING 12: FIRE ALARM- GROUND FLOOR DEMOLITION
PLANS
73 12-FAD-102 BUILDING 12: FIRE ALARM – FIRST FLOOR DEMOLITION PLANS
74 12-FAD-103 BUILDING 12: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
75 12-FAD-104 BUILDING 12: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
76 12-FA-101 BUILDING 12: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
77 12-FA-102 BUILDING 12: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
78 12-FA-103 BUILDING 12: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
79 12-FA-104 BUILDING 12: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
80 12-FA-601 BUILDING 12: FIRE ALARM- RISER DIAGRAM
81 13-FAD-101 BUILDING 13: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLANS
82 13-FAD-102 BUILDING 13: FIRE ALARM- GROUND FLOOR DEMOLITION
PLANS
83 13-FAD-103 BUILDING 13: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
84 13-FAD-104 BUILDING 13: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
85 13-FAD-105 BUILDING 13: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
86 13-FA-101 BUILDING 13: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLANS
87 13-FA-102 BUILDING 13: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
88 13-FA-103 BUILDING 13: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
89 13-FA-104 BUILDING 13: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
90 13-FA-105 BUILDING 13: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
91 13-FA-601 BUILDING 13: FIRE ALARM- RISER DIAGRAM
00 01 15 - 4
92 14-FAD-101 BUILDING 14: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLANS
93 14-FAD-102 BUILDING 14: FIRE ALARM- GROUND FLOOR DEMOLITION
PLANS
94 14-FAD-103 BUILDING 14: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
95 14-FAD-104 BUILDING 14: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
96 14-FAD-105 BUILDING 14: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
97 14-FA-101 BUILDING 14: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLANS
98 14-FA-102 BUILDING 14: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
99 14-FA-103 BUILDING 14: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
100 14-FA-104 BUILDING 14: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
101 14-FA-105 BUILDING 14: FIRE ALARM- ATTIC FLOOR CONSTRUCTION
PLANS
102 14-FA-601 BUILDING 14: FIRE ALARM- RISER DIAGRAM
103 15-FAD-101 BUILDING 15: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLANS
104 15-FAD-102 BUILDING 15: FIRE ALARM- GROUND FLOOR DEMOLITION
PLANS
105 15-FAD-103 BUILDING 15: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
106 15-FAD-104 BUILDING 15: FIRE ALARM- SECOND FLOOR DEMOLITION PLANS
107 15-FAD-105 BUILDING 15: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
108 15-FA-101 BUILDING 15: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLANS
109 15-FA-102 BUILDING 15: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
110 15-FA-103 BUILDING 15: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
111 15-FA-104 BUILDING 15: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLANS
112 15-FA-105 BUILDING 15: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
113 15-FA-601 BUILDING 15: FIRE ALARM- RISER DIAGRAM
114 16-FAD-101 BUILDING 16: FIRE ALARM- GROUND FLOOR SOUTH
DEMOLITION PLANS
115 16-FAD-102 BUILDING 16: FIRE ALARM- GROUND FLOOR NORTH
DEMOLITION PLANS
116 16-FA-101 BUILDING 16: FIRE ALARM- GROUND FLOOR SOUTH
CONSTRUCTION PLANS
117 16-FA-102 BUILDING 16: FIRE ALARM- GROUND FLOOR NORTH
CONSTRUCTION PLANS
118 16-FA-601 BUILDING 16: FIRE ALARM- RISER DIAGRAM
00 01 15 - 5
119 17-FAD-101 BUILDING 17: FIRE ALARM- FIRST FLOOR & SECOND FLOOR
DEMOLITION PLANS
120 17-FAD-102 BUILDING 17: FIRE ALARM- THIRD FLOOR & ATTIC FLOOR
DEMOLITION PLANS
121 17-FA-101 BUILDING 17: FIRE ALARM- FIRST FLOOR & SECOND FLOOR
CONSTRUCTION PLANS
122 17-FA-102 BUILDING 17: FIRE ALARM- THIRD FLOOR & ATTIC FLOOR
CONSTRUCTION PLANS
123 17-FA-601 BUILDING 17: FIRE ALARM- RISER DIAGRAM
124 18-FAD-101 BUILDING 18: FIRE ALARM- GROUND FLOOR & FIRST FLOOR
DEMOLITION PLANS
125 18-FA-101 BUILDING 18: FIRE ALARM- GROUND FLOOR & FIRST FLOOR
CONSTRUCTION PLANS
126 18-FA-601 BUILDING 18: FIRE ALARM- RISER DIAGRAM
127 19-FAD-101 BUILDING 19: FIRE ALARM- GROUND FLOOR DEMOLITION
PLANS
128 19-FA-101 BUILDING 19: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLANS
129 19-FA-601 BUILDING 19: FIRE ALARM- RISER DIAGRAM
130 20-FAD-101 BUILDING 20: FIRE ALARM- GROUND FLOOR, PENTHOUSE
FLOOR & MEZZANINE FLOOR DEMOLITION PLANS
131 20-FA-101 BUILDING 20: FIRE ALARM- GROUND FLOOR, PENTHOUSE
FLOOR & MEZZANINE FLOOR CONSTRUCTION PLANS
132 20-FA-601 BUILDING 20: FIRE ALARM- RISER DIAGRAM
133 24-FAD-101 BUILDING 24 & 33: FIRE ALARM- GROUND FLOOR DEMOLITION
PLANS
134 24-FA-101 BUILDING 24 & 33: FIRE ALARM- GROUND FLOOR
CONSTRUCTION PLANS
135 24-FA-601 BUILDING 24 & 33: FIRE ALARM- RISER DIAGRAMS
136 26-FAD-101 BUILDING 26: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLANS
137 26-FAD-102 BUILDING 26: FIRE ALARM- FIRST FLOOR DEMOLITION PLANS
138 26-FA-101 BUILDING 26: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLANS
139 26-FA-102 BUILDING 26: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLANS
140 26-FA-601 BUILDING 26: FIRE ALARM- RISER DIAGRAM
141 27-FAD-101 BUILDING 27: FIRE ALARM- BASEMENT FLOOR & FIRST FLOOR
DEMOLITION PLANS
142 27-FAD-102 BUILDING 27: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
143 27-FA-101 BUILDING 27: FIRE ALARM- BASEMENT FLOOR & FIRST FLOOR
CONSTRUCTION PLANS
00 01 15 - 6
144 27-FA-102 BUILDING 27: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
145 27-FA-601 BUILDING 27: FIRE ALARM- RISER DIAGRAM
146 28-FAD-101 BUILDING 28: FIRE ALARM- BASEMENT FLOOR & FIRST FLOOR
DEMOLITION PLANS
147 28-FAD-102 BUILDING 28: FIRE ALARM- SECOND FLOOR, THIRD FLOOR &
ATTIC FLOOR DEMOLITION PLANS
148 28-FA-101 BUILDING 28: FIRE ALARM- BASEMENT FLOOR & FIRST FLOOR
CONSTRUCTION PLANS
149 28-FA-102 BUILDING 28: FIRE ALARM- SECOND FLOOR, THIRD FLOOR &
ATTIC FLOOR CONSTRUCTION PLANS
150 28-FA-601 BUILDING 28: FIRE ALARM- RISER DIAGRAM
151 29-FAD-101 BUILDING 29: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLAN
152 29-FAD-102 BUILDING 29: FIRE ALARM- FIRST FLOOR DEMOLITION PLAN
153 29-FAD-103 BUILDING 29: FIRE ALARM- SECOND FLOOR DEMOLITION PLAN
154 29-FAD-104 BUILDING 29: FIRE ALARM- THIRD FLOOR DEMOLITION PLAN
155 29-FAD-105 BUILDING 29: FIRE ALARM- ATTIC FLOOR DEMOLITION PLAN
156 29-FA-101 BUILDING 29: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLAN
157 29-FA-102 BUILDING 29: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLAN
158 29-FA-103 BUILDING 29: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLAN
159 29-FA-104 BUILDING 29: FIRE ALARM- THIRD FLOOR CONSTRUCTION PLAN
160 29-FA-105 BUILDING 29: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLAN
161 29-FA-601 BUILDING 29: FIRE ALARM- RISER DIAGRAM
162 30-FAD-101 BUILDING 30: FIRE ALARM- BASEMENT FLOOR DEMOLITION
PLAN
163 30-FAD-102 BUILDING 30: FIRE ALARM- FIRST FLOOR DEMOLITION PLAN
164 30-FAD-103 BUILDING 30: FIRE ALARM- SECOND FLOOR DEMOLITION PLAN
165 30-FAD-104 BUILDING 30: FIRE ALARM- THIRD FLOOR DEMOLITION PLAN
166 30-FAD-105 BUILDING 30: FIRE ALARM- FOURTH FLOOR DEMOLITION PLAN
167 30-FAD-106 BUILDING 30: FIRE ALARM- ATTIC FLOOR DEMOLITION PLAN
168 30-FA-101 BUILDING 30: FIRE ALARM- BASEMENT FLOOR CONSTRUCTION
PLAN
169 30-FA-102 BUILDING 30: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLAN
170 30-FA-103 BUILDING 30: FIRE ALARM- SECOND FLOOR CONSTRUCTION
PLAN
171 30-FA-104 BUILDING 30: FIRE ALARM- THIRD FLOOR CONSTRUCTION PLAN
172 30-FA-105 BUILDING 30: FIRE ALARM- FOURTH FLOOR CONSTRUCTION
PLAN
173 30-FA-106 BUILDING 30: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLAN
174 30-FA-601 BUILDING 30: FIRE ALARM- RISER DIAGRAM
00 01 15 - 7
175 31-FAD-101 BUILDING 31: FIRE ALARM- BASEMENT FLOOR, FIRST FLOOR,
SECOND FLOOR & ATTIC FLOOR DEMOLITION PLANS
176 31-FA-101 BUILDING 31: FIRE ALARM- BASEMENT FLOOR, FIRST FLOOR,
SECOND FLOOR & ATTIC FLOOR CONSTRUCTION PLANS
177 31-FA-601 BUILDING 31: FIRE ALARM- RISER DIAGRAM
178 36-FAD-101 BUILDING 36: FIRE ALARM- GROUND FLOOR DEMOLITION PLAN
179 36-FA-101 BUILDING 36: FIRE ALARM- GROUND FLOOR CONSTRUCTION
PLAN
180 36-FA-601 BUILDING 36: FIRE ALARM- RISER DIAGRAM
181 52-FAD-101 BUILDING 52: FIRE ALARM- BASEMENT FLOOR & FIRST FLOOR
DEMOLITION PLANS
182 52-FAD-102 BUILDING 52: FIRE ALARM- SECOND FLOOR & THIRD FLOOR
DEMOLITION PLANS
183 52-FAD-103 BUILDING 52: FIRE ALARM- ATTIC FLOOR DEMOLITION PLANS
184 52-FA-101 BUILDING 52: FIRE ALARM- BASEMENT FLOOR & FIRST FLOOR
CONSTRUCTION PLANS
185 52-FA-102 BUILDING 52: FIRE ALARM- SECOND FLOOR & THIRD FLOOR
CONSTRUCTION PLANS
186 52-FA-103 BUILDING 52: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLANS
187 52-FA-601 BUILDING 52: FIRE ALARM- RISER DIAGRAM
188 59-FA-101 BUILDING 59: FIRE ALARM- FIRST FLOOR CONSTRUCTION PLAN
& RISER DIAGRAM
189 CLC-FAD-101 CLC BUILDING: FIRE ALARM-PARTIAL BASEMENT FLOOR & FIRST
FLOOR DEMOLITION PLANS
190 CLC-FAD-102 CLC BUILDING: FIRE ALARM-ATTIC FLOOR DEMOLITION PLAN
191 CLC-FA-101 CLC BUILDING: FIRE ALARM- PARTIAL BASEMENT FLOOR & FIRST
FLOOR CONSTRUCTION PLANS
192 CLC-FA-102 CLC BUILDING: FIRE ALARM- ATTIC FLOOR CONSTRUCTION PLAN
193 CLC-FA-601 CLC BUILDING: FIRE ALARM- RISER DIAGRAM
END OF DRAWINGS
00 01 15 - 8
THIS PAGE INTENTIONALLY LEFT BLANK
11-01-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SCOPE OF WORK
1.2 SAFETY REQUIREMENTS
1.3 GENERAL INTENTION
1.4 STATEMENT OF BID ITEM(S)
1.5 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.6 CONSTRUCTION SECURITY REQUIREMENTS
1.7 OSHA REQUIREMENTS-SAFETY AND HEALTH REGULATIONS
1.8 SPECIFIC MEDICAL CENTER FIRE & SAFETY POLICIES,
PROCEDURES, AND REGULATIONS
1.9 FIRE SAFETY
1.10 HOT WORK PERMIT
1.11 ELECTRICAL WORK PERMIT
1.12 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
1.13 PHASING
1.14 ALTERATIONS
1.15 INFECTION PREVENTION MEASURES
1.16 DISPOSAL AND RETENTION
1.17 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS
1.18 RESTORATION
1.19 PHYSICAL DATA
1.20 WARRANTY MANAGEMENT
1.21 USE OF ROADWAYS
1.22 TEMPORARY USE OF MECHANICAL AND ELECTRICAL
EQUIPMENT
1.23 TEMPORARY USE OF EXISTING ELEVATORS
1.24 TEMPORARY TOILETS
1.25 AVAILABILITY AND USE OF UTILITY SERVICES
1.26 TELEPHONES
1.27 TESTS
1.28 TRAINING INSTRUCTIONS
1.29 RELOCATED EQUIPMENT ITEMS
1.30 HISTORIC PRESERVATION
1.31 SMOKE BARRIER PENETRATION PERMIT
1.32 CONTRACTOR PARKING
1.33 CONTRACTOR IDENTIFICATION BADGES
1.34 ACCESS INTO KEYED AREAS
01 00 00 -2
1.35 PROTECTIVE CLOTHING/EQUIPMENT
1.36 FEDERAL POLICE
1.37 REMOVAL OF GOVERNMENT PROPERTY
1.38 SEXUAL HARASSMENT
1.39 DRUGS AND ALCOHOL
1.40 FIREARMS AND EXPLOSIVES
1.41 INJURY ACCIDENTS
1.42 RECREATIONAL FACILITIES
1.43 DUST AND FUME CONTROL
1.44 NOISE
1.45 INSPECTION AND APPROVAL
1.46 SUBMITTALS
1.47 CONTRACT WORK HOURS
1.48 CONSTRUCTION SIGN
1.49 PHOTOGRAPHIC DOCUMENTATION
1.50 SCHEDULES FOR CONSTRUCTION CONTRACTS
1.51 Coordination Drawing Requirements – Fire Alarm System Upgrade
1.52 SUBMISSION OF SF 1413 – STATEMENT AND
ACKNOWLEDGMENT FORM
1.53 MINIMUM HOURLY RATE OF WAGES
1.54 CONTRACT MODIFICATION (CHANGE ORDER) PROCEDURES ...62
1.55 PUNCH LIST OMISSIONS
01 00 00 -3
GENERAL
1.1 SCOPE OF WORK
A. Refer to Specification 28 31 00, FIRE DETECTION AND ALARM, section 1.2 for the project scope of work.
1.2 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.3 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for
FIRE ALARM REPLACEMENT as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center
Engineering Officer.
C. Offices of FELLENZER ENGINEERING LLP, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking
01 00 00 -4 and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. All employees of Contractor shall comply with VA security management program and obtain permission of the VA police, be identified with a VA issued photo ID, and restricted from unauthorized access. All contractor visitors and employees identified as not having proper identification will be dismissed from the Medical Center grounds until such time as proper ID has been obtained. All employees of the Contractor will be required to be made available to Police Service at the Campus to apply for photo identification badge and fingerprinting. following badge production, the employee shall return in person to receive issuance of the badge. The Contractor is responsible to furnish the names of all employees scheduled to work to the VA COR within ten days of the
Notice to Proceed (NTP). The contractor shall identify on the construction schedule of work the date for start of work of short-term specialty subcontractors and two weeks prior to start of work process identification badge verification for employee issue prior to starting of work (Employees not issued identification badges will have to leave the site at no addition cost to the government).
G. All work required for the Project shall be performed by licensed and factory authorized fire alarm installation contractors or registered apprentices. The number of apprentices used to execute the Project shall not at any time exceed the number of licensed fire alarm installation contractors. The fire alarm installation contractors shall carry at all times when on VA property a copy of their license or registration
H. Training:
1. Beginning July 31, 2025, all contractor employees must have a 10-hour OSHA certified Construction Safety course and/or other relevant competency training as determined in writing by the VA COR.
2. Training records for all such employees must be submitted for approval before the start of work.
01 00 00 -5
I. Superintendent and Project Manager
1. The Superintendent must have five (5) years commercial experience in the installation of Fire Alarm systems. They must be a direct employee of the General
Contractor and have the authority to act as their authorized representative. They are responsible for day-to-day operations, including planning, quality control, material verification, subcontractor coordination, and execution of the complete project as per contract documents. The Superintendent must have a minimum of five years' experience in the building construction industry as a construction/project superintendent. They also must be licensed in one of the building construction trades relevant to the Project. Additionally, the Superintendent must have completed a 30-hour OSHA training for construction safety. A resume on company letterhead and relevant training certifications and licenses shall be submitted to the VA COR for
Superintendent approval within 30 days of the Notice to Proceed (NTP). The VA
COR has the right to reject any proposed superintendent who does not meet the minimum qualifications and experience as stated above.
2. Once approved by the COR, the Superintendent must be dedicated exclusively to the
Project until all construction activities are complete and cannot manage or work on any other project. The superintendent must also have no hands-on construction interaction.
3. The Superintendent must sign in at the beginning of each work day and sign out at the end of the day at the COR's office. No work can be performed by any contractors or subcontractors without the Superintendent present at the actual work site.
4. The Superintendent must provide written job site progress and inspection reports weekly, based on a walkthrough with the COR.
5. The Superintendent is responsible for submitting daily work logs to the VA COR at the end of every work day.
6. The General Contractor must also provide a Project Manager to support the
Superintendent and handle finance-related tasks and scheduling.
7. The VA's Engineering Service Office is open during normal weekday business hours, from 8:00 AM to 4:30 PM.
01 00 00 -6
8. Off-duty hours check-in must first be arranged with the VA COR at least 72 hours in advance and receive approval from the Contracting Officer.
1.4 STATEMENT OF BID ITEM(S)
ITEM I, GENERAL CONSTRUCTION: STATEMENT OF BID
Project: VAMC Montrose Fire Alarm System Upgrade
Bidder: [Contractor Name]
Date: [Insert Date]
1. General Commitment
We, [Contractor Name], hereby submit our bid to furnish all labor, materials, equipment, supervision, testing, training, and services necessary to complete the fire alarm system upgrades described in Specification 28 31 00, Section 1.2 Scope of Work. Our bid is based on the contract documents, drawings, and specifications provided, including all referenced codes and standards. The bid shall be itemized by each building and corresponding work area identified in the scope of work.
2. Scope of Work Acknowledgment
We acknowledge that this bid includes:
Upgrade fire alarm systems across twenty-eight (28) existing buildings, and two new buildings (CLC and 7B) each with its own Fire Alarm Control Panel (FACP).
PROVIDE BREAKDOWN OF BID IN DETAIL BY BUILDING NUMBER
Connect the new CLC building’s Fiber optic patch panel to Building 6 for a continuous campus fiber loop.
Establishing the Fire Department (Building 19) as the primary master station, including a networked monitoring computer to display notifications from each building.
01 00 00 -7
Providing a second master monitoring station at the Boiler Plant (Building 20) to ensure redundant and seamless monitoring.
Furnishing systems with manual voice communication capabilities and fire alarm graphics at both master locations for emergency management.
Providing a fully addressable, non-proprietary fire alarm system connected via the existing fiber optic loop, with interconnection to all buildings in the design.
Ensuring device locations, wiring, and installation comply with NFPA 72, project specifications, and drawings.
Delivering a system that allows successful operation, maintenance, and modification by qualified factory authorized personnel without proprietary restrictions.
Includes a 5-year repair and maintenance agreement which includes parts and labor.
3. Training & Documentation
Our bid includes providing factory-trained manufacturer’s representatives for two (2) full days of on-site training for up to ten (10) Fire Department and Electrical personnel.
Training shall cover:
operation, troubleshooting, and maintenance for each system component, field device, and the integrated system as a whole. All O&M manuals, as-built drawings, and test documentation will be delivered at project closeout.
4. Standards & Compliance
All work will be performed in compliance with:
1. NFPA 72 (National Fire Alarm and Signaling Code)
2. Applicable NFPA, IBC, and VA Fire Protection Design Manual standards
01 00 00 -8
3. Project drawings and specifications
5. Bid Value
Contractor shall provide a detailed, component-level breakdown of all fire alarm equipment and devices for each building. The breakdown shall include all new fire alarm system components across all the buildings within the project scope.
The total contract price to perform this work as described in the Scope of Work is:
Base Bid: $___________
(Complete fire alarm system upgrade for all existing buildings plus two (2) new buildings, CLC and 7B, fully networked and operational as described in the contract documents.)
Alternate 1: $___________
(Remove all fire alarm system work associated with the New CLC Building from the
Base Bid. Deduct all labor, materials, devices, wiring, programming, and testing associated with this building.)
Alternate 2: $___________
(Remove all fire alarm system work associated with the New CLC Building and Building
7B from the Base Bid. Deduct all labor, materials, devices, wiring, programming, and testing associated with these buildings.)
Alternate 3: $___________
(In Building 24, instead of installing the new Fire Alarm Control Panel (FACP) in the new switchgear room, Room #2, install the new FACP in the same room/space, Room
#1, as the existing FACP. Deduct all labor, materials, conduit, wiring, mounting, and associated work required for installation in the new switchgear room.)
01 00 00 -9
Basis of Bid / Contract Interpretation
Should a discrepancy arise between the drawings and the specs, the most stringent and the most expensive option shall be included in the base bid.
Exclusions/Clarifications
Number of completion days
Acceptance
This Statement of Bid is submitted as our binding offer to perform the Scope of Work.
We certify that all materials and workmanship will meet or exceed the requirements of the contract documents.
Submitted by:
Title: ___________________
Signature: _______________
Date: ___________________
A. Refer to specification 28 31 00, section 1.2 for the scope of work. Include the base bid and alternate bid amounts, and the number of completion days.
B. Bid documents shall be organized and issued separately for each building.
1.5 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.6 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
01 00 00 -10
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the
Contracting Officer so that security arrangements can be provided for the employees.
This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the
Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General
Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked
“Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
01 00 00 -11
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
D. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of 4 permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA
Medical Center Facility Manager.
1.7 OSHA REQUIREMENTS-SAFETY AND HEALTH REGULATIONS
A. Contractors are required to comply with the Occupational Safety and Health Standard found in CFR 1910 and 1926. Copies of these statements can be acquired from the
Superintendent of Documents, U.S. Government Printing Office Washington, D.C.
20420.
B. In addition, the Contractor will be required to comply with all applicable Medical Center fire, safety, and security regulations, policies and procedures. Each of the Contractor's employees, inclusive of subcontractors and their employees will be required to read this section, sign, and acknowledge understanding. Signed acknowledgment must be filed with the COR prior to any employee's assignment to the work site.
C. Contractors involved with the removal, alteration, or disturbance of asbestos type insulation or materials will be required to comply strictly with the regulations found in
CFR 1910.1001 and the appropriate EPA regulations regarding disposal of asbestos.
Assistance in identifying asbestos can be requested from the Medical Center's Industrial
Hygienist and the VA COR.
D. Contractors entering locations of asbestos contamination (i.e. pipe basements) shall be responsible for providing respiratory protection to their employees and ensuring
01 00 00 -12 respirators are worn in accordance with OSHA (CFR 1910.1001(g)). Asbestos contaminated areas shall be defined on Project drawings. The minimum equipment required shall be: a half- mask air-purifying respirator equipped with high efficiency filters and disposable Type coveralls.
E. Contractor, along with other submittals, and at least two weeks prior to bringing any materials on-site, must submit a complete list of chemicals the contractor will use and safety data sheets for all hazardous materials brought on-site.
F. Severe or constant violations may result in an immediate work stoppage or request for a
Compliance Officer from the Occupational Safety and Health Administration.
1.8 SPECIFIC MEDICAL CENTER FIRE & SAFETY POLICIES, PROCEDURES,
AND REGULATIONS
A. Introduction
1. The safety and fire protection of patients, employees, members of the public and government is one of the continuous concerns of this Medical Center.
2. Contractors, their supervisors, and employees are required to comply with Medical
Center policies to ensure the occupational safety and health of all. Failure to comply may result in work stoppage.
3. While working at this Medical Center, contractors are responsible for the
Occupational Safety and Health of their employees. Contractors are required to comply with the applicable OSHA standards found in 20 CFR 1910 for general industry and 29 CFR 1926 for construction. Failure to comply with these standards may result in work stoppage and a request to the Area director of OSHA for a compliance office to inspect the work site.
4. Contractors are to comply with the requirements found in the National Fire Protection
Association (NFPA) #241, "Building construction and Demolition Operation".
5. Questions regarding occupational safety and health issues can be addressed to the
Medical Center Safety and Occupational Health Specialist (ext. 2321 at Montrose
Campus).
B. Fires
01 00 00 -13
All fires must be reported. In the event of a fire in the work area, use the nearest pull box station and also notify Medical Center staff in the immediate area. Emergency notification can also be accomplished by dialing ext. 2222 at Montrose Campus. This is the fire department emergency phone only. Be sure to give the exact location from where you are calling. If a contractor has experienced a fire and it was rapidly extinguished, you still must notify the fire department (ext. 2332 at Montrose Campus) so that an investigation of the fire can be accomplished. Delay in reporting a fire is unacceptable.
C. Fire Alarms, Smoke Detection, And Sprinkler System
If the nature of your work requires the deactivation of the fire alarm, smoke detection or sprinkler system, you must notify the Medical Center Fire Department. Notification must be made well in advance so that ample time can be allowed to deactivate the system and provide an alternative measure for fire protection. Under no circumstance is a contractor allowed to deactivate any of the fire protection systems in this Medical Center.
D. Smoke Detectors
False alarms will not be tolerated. You are required to be familiar with the location of the smoke detectors in your work area. When performing cutting, burning, or welding or any other operation that may cause smoke or dust, you must take steps to temporarily cover smoke detectors in order to prevent false alarms. Failure to take the appropriate action will result in the COR assessing actual costs for government response for each false alarm that is preventable. Prior to covering the smoke detectors, the contractor will notify the VAMC Fire Department, who will also be notified when the covers are removed.
E. Hot Work Permit
1. If the nature of the work requires the use of welding equipment, cutting torch, soldering equipment or the performance of processes which produce sparks, heat or combustion, it will be required that the contractor notify the VA COR no less than one day in advance of such work. The VAMC Fire Department will inspect the work area and issue a "Hot Work Permit" authorizing the performance of such work.
2. A "Hot Work Permit" will be issued only for the period necessary to perform such work. In the event the time necessary will exceed one day, a "Hot Work Permit" may
01 00 00 -14 be issued for the period needed; however, the VAMC Fire Department will inspect the area daily.
3. Contractors will not be allowed to perform hot work processes without the appropriate permit.
F. Temporary Enclosures
Only non-combustible materials will be used to construct temporary enclosures for barriers at this Medical Center. Plastic materials and fabrics used to construct dust barriers must conform to NFPA #701, Standard Methods of fire Tests for Flame-Resistant
Textiles and Films.
G. Flammable Liquids
All flammable liquids will be kept in approved safety containers. Only the amount necessary for your immediate work will be allowed in the building. Flammable liquids must be removed from the building at the end of each day.
H. Compressed Gas Cylinders
Compressed gas shall be secured in an upright position at all times. A suitable cylinder cart will be used to transport compressed gas cylinders. Only those compressed gas cylinders necessary for immediate work will be allowed in occupied buildings. All others will be stored outside of buildings in a designated area. The contractor will comply with applicable standards for compressed gas cylinders found in 29 CFR 1910 and 1926
(OSHA).
I. Internal Combustion Engine-Powered Equipment
Equipment powered by an internal combustion engine such as saws, compressors, generators, etc., will not be used in an occupied building. Special consideration may be given for unoccupied buildings only if the OSHA and NFPA requirements have been met.
J. Power Activated Tools
In the event power activated tools are on the job site. Power activated tools will be kept in a secured manner at all times. When not in use, the tools will be kept locked up. When in use, the operator will have the tool under his/her immediate control.
K. Tools
01 00 00 -15
1. Under no circumstances are tools, equipment and other items of work to be left unattended for any reason. All tools, equipment and items of work must be under the immediate control of the employee.
2. If for some reason a work area must be left unattended, then it will be required that the tools and other equipment be placed in an appropriate box or container and locked. All tool boxes, containers or any other devices used for the storage of tools and equipment will be provided with a latch and padlock. All tool boxes, containers or any other device used for the storage of tools and equipment will be locked at all times except for putting in and removing tools.
3. All doors to work areas will be closed and locked when rooms are left unattended.
Failure to comply with this directive will be considered a violation of VA Regulation
1.218(b), "Failure to comply with signs of directive and restrictive nature posted for safety purposes", subject to a $50.00 fine. Subsequent similar violations may result in both imposition of such a fine as well, as the COR taking action under the Contract's
"Accident Prevention Clause", (FAR 52.236-13) to suspend all contract work until such violations may be satisfactorily resolved or under FAR 52.236-5 "Material and
Workmanship Clause" to remove from the work site any personnel deemed by the
COR to be careless to the point of jeopardizing the welfare of Facility patients of staff.
4. The contractor must report to the VA Police Department, Extension 2509, any tools or equipment that is missing.
5. Tools and equipment found unattended will be confiscated and removed from the work area.
L. Ladders
It is required that ladders not be left unattended in an upright position. Ladders must be attended at all times or taken down and securely chained to a stationary object.
M. Scaffolds
All scaffolds will be attended at all times. When not in use, an effective barricade (fence) will be erected around the scaffold to prevent use by unauthorized personnel.
N. Excavations
01 00 00 -16
All excavations left unattended shall be protected with a barricade suitable to prevent entry by unauthorized persons.
O. Storage
The contractor must make prior arrangements with the VA COR for the storage of building materials. Storage will not be allowed to accumulate in Medical Center
Buildings.
P. Trash And Debris
The contractor must remove all trash and debris from the work area on a daily basis.
Trash and debris will not be allowed to accumulate in the buildings and will be allowed to accumulate outside the buildings for future pick-up. The contractor is responsible for making arrangements for the removal of trash from the Medical Center Facility.
Q. Protection Of Floors
It may be necessary at times to take steps to protect floors from dirt, debris, paint, etc. A tarp or other protective covering shall be used. However, the contractor must maintain a certain amount of floor space for the safe passage of pedestrian traffic. Common sense must be used in this manner.
R. Signs
Signs must be placed at the entrance to work areas warning people of the construction activities. Signs must be suitable for the condition of the work. Small pieces of paper with printing or writing are not acceptable. The VAMC Safety Officer can be consulted in this matter.
S. Accidents And Injuries
Contractors must report all accidents and injuries involving employees. The contractor may use the VAMC Health Center, located on the ground floor of Building #3, Room 16 of the Campus.
T. Fire/Smoke Barrier Penetration Permit
1. If the nature of the work requires the penetration of a fire/smoke partition or barrier the contractor must obtain the proper fire/smoke barrier penetration permit. The
VAMC Fire Department will inspect the work area and issue a "Fire/Smoke Barrier
Penetration Permit" authorizing the performance of such work.
01 00 00 -17
2. A "Fire/Smoke Barrier Permit" will be issued only for the period necessary to perform such work. In the event the time necessary will exceed one day, a
"Fire/Smoke Barrier Permit" may be issued for the period needed; however, the
VAMC Fire Department will inspect the area daily.
3. Contractors will not be allowed to make any penetrations without the appropriate permit. See Attachment "B" for the standard form for obtaining a "Fire/Smoke Barrier
Permit".
1.9 FIRE SAFETY
A. Applicable Publications: Publications listed below form part of this general requirements specification to the extent referenced. Publications are referenced in text by basic designations only.
1. American Society for Testing and Materials (ASTM):
E84-2007.............Surface Burning Characteristics of Building Materials
2. National Fire Protection Association (NFPA):
10-2006..............Standard for Portable Fire Extinguishers
30-2003..............Flammable and Combustible Liquids Code
51B-2003.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work 70-2005..............National Electrical Code
241-2004.............Standard for Safeguarding Construction, Alteration, and Demolition
Operations
3. Occupational Safety and Health Administration (OSHA):
29 CFR 1926..........Safety and Health Regulations for Construction
B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29
CFR 1926. Prior to start of work, prepare a plan detailing Project-specific fire safety measures, including periodic status reports, and submit to VA COR and Facility Safety
Manager for review for compliance with contract requirements in accordance with
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the Contractor’s competent person per OSHA requirements.
This briefing shall include information on the construction limits, VAMC safety
01 00 00 -18 guidelines, means of egress, break areas, work hours, locations of restrooms, use of
VAMC equipment, etc. Documentation shall be provided to the VA COR that individuals have undergone contractor’s safety briefing.
C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with
NFPA 241.
D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).
E. Temporary Construction Partitions:
1. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas and adjoining areas. Construct partitions of gypsum board or treated plywood (flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire retardant treated wood or metal steel studs.
Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, ¾ hour fire/smoke rated doors with self-closing devices.
2. Install one-hour temporary construction partitions as shown on drawings to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, vertical shafts and openings enclosures.
3. Close openings in smoke barriers and fire-rated construction to maintain fire ratings.
Seal penetrations with listed through- penetration firestop materials in accordance with specifications.
F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.
G. Means of Egress: Do not block exiting for occupied buildings,
1. including paths from exits to roads. Minimize disruptions and
2. coordinate with VA COR and facility Safety Manager.
01 00 00 -19
H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to the VA COR and facility Safety
Manager.
I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA
241 and NFPA 10. Superintendent shall maintain records of monthly inspection of each fire extinguisher on the site. All subcontractors shall present fire extinguishers to the superintendent for inspection and documentation. Fire extinguishers shall display tag for date of inspection and initial of superintendent.
J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with
29 CFR 1926, NFPA 241 and NFPA 30.
K. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a
24-hour period. Request interruptions in accordance with Section, OPERATIONS AND
STORAGE AREAS, and coordinate with VA COR and facility Safety Manager. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the VA COR.
L. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and
NFPA 51B. Coordinate with VA COR. Obtain permits from facility Safety Manager/Fire
Department at least 24 hours in advance. Designate contractor's responsible Project-site fire prevention program manager to permit hot work. See paragraph 1.8 (Hot Work
Permit) for additional information
M. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly.
Coordinate with, and report findings and corrective actions weekly to VA COR and facility Safety Manager.
01 00 00 -20
N. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.
O. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.
P. Perform other construction, alteration and demolition operations in accordance with 29
CFR 1926.
Q. If required, submit documentation to the VA COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.
R. All temporary heating equipment shall be installed in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .