This is a Scope of Work document for an architectural and engineering (A/E) study of the Syracuse VA Medical Center's 990-stall parking garage. The A/E firm must evaluate the remaining useful life of the eight-level garage located at 900 Irving Avenue, Syracuse, NY, and recommend repair solutions to extend its operational life to at least 2040. The existing structure consists of post-tensioned concrete construction (levels 1-6, built in 1987 and 2000) and precast concrete panels with steel beams (levels 7-8, built in 2009). The investigation must address recent tendon failures and vulnerabilities related to road salt and snow melt exposure. Deliverables include an investigative report detailing current condition, a scope of work with estimated repair costs, and a concept design with cost estimate for a new 130-to-180 stall parking garage to replace an off-site leased facility costing $324,000 annually (lease terminable June 30, 2031). The project has a 195-calendar-day performance period from Notice to Proceed.

The A/E must submit two formal submissions: an Investigative Report due 60 days after NTP (with 15-day VA review and 15-day A/E revision period), and Schematic Design due 60 days after receipt of VA comments (with 15-day VA review and 30-day A/E revision period). The Schematic Design submission must include construction methods, repair details, cost estimates, life-cycle cost analysis, and annual cost-per-stall projections. All drawings shall be provided in AutoCAD or PDF format, and cost estimates in Microsoft Excel format. The A/E must comply with the VA Parking Design Manual (April 2023) and VA Cost Estimating Requirements for Veterans Affairs Facilities. A minimum of one site visit or TEAMS meeting per design submission is required. This is a 100% Small Business Set Aside procurement under the Brooks Act (FAR Subpart 36.6) with NAICS code 541310 and a $25.5 million small business size standard. The anticipated contract award date is on or before September 30, 2026. SF 330 qualifications are due July 23, 2026 at 10:00 a.m. EST.

View the file

Other files

File Type Posted
36C24226R0096_2.docx DOCX document
EXHIBIT B-Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
EXHIBITC-Past Performance Questionnaire.docx DOCX document
36C24226R0096_1.docx DOCX document
36C24226R0096.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Study of Syracuse VA Medical Center Parking Garage

I. SUMMARY

The A/E shall evaluate the remaining life of the Syracuse VA Medical Center’s 990-stall parking garage located at 900 Irving Avenue, Syracuse, NY and offer repair solutions for extending life to at least 2040.

In recent years several post tensioned tendons have failed and further investigation by the medical center has uncovered other potential issues that requires investigation by an engineering firm with in-depth technical knowledge of post-tensioned parking garage construction and their vulnerabilities, including exposure to road salts and snow melt common in the nation’s historically snowiest city, and also costs to build, repair, extend life and maintain such garages.

Deliverables include an investigative report on the garage’s current condition, a scope of work and estimated cost to extend the life of the garage to 2040, and a concept and estimated cost to construct a new 180 stall parking garage located on the VAMC medical center campus.

The total project duration is 195 days.

II. SCOPE OF WORK

The A/E shall perform an analysis of the existing 990 parking stall garage located at the southwest corner of Irving Avenue and Van Buren Street, Syracuse, NY, 13210. The analysis shall consider the construction type, age, findings during recent repair work, analysis of as-built drawings and visual observations. The A/E shall determine the expected remaining useable life of the eight (8) level parking garage and the estimated maintenance and repair costs to extend life to 2040. The existing garage’s bottom four floors were constructed in 1987 using post-tensioned beams and slabs, except the bottom level which is slab-on-grade. The fifth and sixth floors are also of post-tensioned construction and were added in 2000. The seventh and eighth floors were constructed in 2009 using precast concrete panels and steel beams.

The A/E shall estimate the costs associated with extending the life of the existing garage and constructing a new smaller parking garage in the location of building 16, to include:

A. Demolition of an existing 3,700 square foot single story office building (building #16), relocation of adjacent bulk oxygen storage tanks, and the construction of a small parking structure to accommodate 130 to 180 parking stalls which would replace a current off-site parking lease for overflow parking. The concept of such a small (three-level) parking structure is attached.

B. Extending the life of the existing garage by correcting all identified deficiencies found during the investigation. Assume corrections to be made in a 2029 construction project for estimating purposes.

C. Savings due to cancellation of the 300-parking stall off-site J-lot parking lease upon completion of the replacement garage. The lease costs $324,000, annually, and can be exited on June 30th, 2031.

D. Comply with the VA Parking Design Manual (April 2023), available at: https://www.cfm.va.gov/til/dManual.asp

i. First Submission: INVESTIGATIVE. This submission shall be submitted to the Contracting Officer sixty (60) calendar days after receipt of the Notice to Proceed (NTP). This submission includes investigative services to determine the remaining life of the garage, with and without repairs and modifications, and the cost of the repairs and modifications to extend life to 2040. The A/E shall review the original garage design and past repair project designs and observations. The A/E shall also review the site and feasibility of constructing the small garage in the location of building 16, which includes relocating the oxygen storage tanks. The VA review time is fifteen (15) calendar days, and the A/E will have an additional fifteen (15) calendar days to respond and incorporate the review comments.

ii. Second Submission: SCHEMATIC DESIGN. This submission shall be submitted to the Contracting Officer sixty (60) calendar days after receipt of the VA’s comments on the first submission. This submission includes schematic drawings that include methods and details of anticipated repairs and upgrades, and a construction cost estimate for correcting all known deficiencies, and projected repairs and upgrades to extend the life of the existing garage. This submission shall also estimate the costs associated with the construction of the small parking structure, including the demolition of building 16 and relocation of the oxygen storage tanks. A life-cycle cost analysis is required, and it shall also estimate the annual cost per parking stall, including depreciation, and maintenance and operation costs. The A/E shall utilize the VA’s Cost Estimating Requirements for Veterans Affairs Facilities, available at: A/E Submissions & Review - Office of Construction & Facilities Management. The VA review time is fifteen (15) calendar days for the Second Submission submittal and the A/E will have thirty (30) calendar days to incorporate owner comments and resubmit the conceptual design documents.

iii. Total Period of Performance is estimated at one hundred and ninety-five (195) calendar days from Notice to Proceed.

III. MISCELLANEOUS REQUIREMENTS

A. Drawings and sketches shall be in AutoCAD or PDF format, or both.

B. Cost estimates shall be provided in Microsoft Excel format.

IV. REFERENCE MATERIALS

A. VA Parking Design Manual (April 2023), available at: https://www.cfm.va.gov/til/dManual.asp B. VA (owner) will provide the AE with the existing garage’s as-built drawings and the discoveries/concerns that were exposed during the repairs performed in calendar year 2024 and 2025.

C. Proposed 3-level parking structure sketch.

IV. SITE VISITS

Site visits will be required to verify existing conditions. Additionally, a minimum of one site visit or TEAMS meeting per design submission is required to review the progress submittals.

image1.emf

Garage 20.pdf

46 SPACES

9 10

46 SPACES

9' - 4" 9' - 4" 9' - 4" 9' - 4" 9' - 4" 9' - 4" 9' - 4" 9' - 4" 9' - 4"9' - 4" 9' - 4" 9' - 4" 9' - 4" 9' - 4"

8'

0"

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo t e a n d o n e h a lf in c h e s o n e fo e in c h o n e fo e q u a rt e rs in c h o n e fo e h a lf in c h o n e fo e e ig h th s in c h o n e fo n e q u a rt e r in c h o n e fo

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

R .m ed .v a.

go v\ V \S Y R \U se rs \V H A S Y R W E B E R K \D es kt op \G ar ag e .r vt

9/ 6/ :0 3:

P M

S.1

528A7-XX-XXX130 SPACES Garage 20

Approver 800 iRVING AVE

1" = 10'-0"1 Level 1

1" = 10'-0"2 Level 2

38 SPACES

BELOW GRADE

e e ig h th in c h o n e fo o e in c h e s o n e fo e a n d o n e h a lf in c h e s o n e fo e in c h o n e fo e q u a rt e rs in c h o n e fo e h a lf in c h o n e fo e e ig h th s in c h o n e fo n e q u a rt e r in c h o n e fo

.m ed .v a.

go v\ V \S Y R \U se rs \V H A S Y R W E B E R K \D es kt op \G ar ag e

:0 3:

S.2

528A7-XX-XXXUnnamed Garage 20

1" = 10'-0"1 Level A e e ig h th in c h o n e fo o e in c h e s o n e fo e a n d o n e h a lf in c h e s o n e fo e in c h o n e fo e q u a rt e rs in c h o n e fo e h a lf in c h o n e fo e e ig h th s in c h o n e fo n e q u a rt e r in c h o n e fo

.m ed .v a.

go v\ V \S Y R \U se rs \V H A S Y R W E B E R K \D es kt op \G ar ag e

:0 3:

S.3

528A7-XX-XXXUnnamed Garage 20

1 {3D}

S.1 - 130 SPACES

S.2 - Unnamed

S.3 - Unnamed

File details come from the government source that posted it. Updated .