This is a Request for Information (RFI) from Siloecon, LLC dated June 25, 2026, regarding Reference 632-24-105 for conducting a ductbank survey at Northport VA Medical Center, directed to Mr. Charlie Augustin.
The RFI contains seven substantive questions and corresponding responses addressing contractor responsibilities and site-specific requirements for the ductbank survey work. Key inquiries include: classification of active and abandoned medium-voltage electrical feeders; investigation protocols for obstructed or compromised conduits, including potential CCTV inspection; the scope of grounding and bonding system assessments (visual observation versus continuity and resistance testing); VA-specific traffic control requirements for manhole access in roadways and parking lots; relocation status of manhole P17; electrical safety policies and procedures for energized manhole entry, including arc-flash study availability and personal protective equipment requirements; and authorization to disturb cable coverings for identification purposes. The responses indicate that contractors must identify active and abandoned feeders, provide full conduit reports using their own methods, follow SOW specifications for grounding assessment, coordinate traffic controls with the Contracting Officer's Representative, reference a high-resolution PDF for manhole P17 location, and comply with electrical safety protocols and contractor methods for cable disturbance. The document addresses critical safety and technical clarifications necessary for bid preparation on this federal VA contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 1 Duct Bank Survey.docx | DOCX document | |
| 36C24226Q0694_2.docx | DOCX document | |
| S02 NY Tax Exempt Form.pdf | ||
| S02 Participation Goals for Minorities and Females 1.pdf | ||
| VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| P01 SITE Electrical Manholes Survey.pdf | ||
| S02 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| SF1449 RFQ 36C24226Q0694.docx | DOCX document | |
| P07 WAGE DETERMINATION SUFFOLK 5_18_26.pdf | ||
| 36C24226Q0694_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Siloecon, LLC | One Gateway Center | Newark, NJ 07102 | Phone (973)323-7013 Email: jean@siloecon.com | www.siloecon.com
June 25, 2026
REFERENCE: 632-24-105 Conduct Ductbank Survey at Northport VA Medical Center
Subject: Request for Information
RE: Mr. Charlie Augustin
1.) Are there any known abandoned MV electrical feeders? Will the Contractor be expected to classify active and abandoned feeders if so?
2.) If Mandheling shows an obstructed or compromised conduit, will the Contractor be expected to investigate further with other means such as CCTV?
3.) Please clarify the intended level of assessment for existing grounding and bonding systems. Is the evaluation limited to visual observations, or are continuity testing and/or ground resistance measurements anticipated?
4.) Please identify any VA-specific requirements for traffic control measures that will be required to access and inspect manholes located within roadways and parking lots;
i.e. P10,P19?
5.) P17 was not identified at the site map location. Has it been relocated?
6.) If they exist, can the following be provided: Electrical safety policy for energized manhole entry, Any existing medium-voltage work procedures including minimum arc-rated clothing requirements, Arc-flash study of the medium-voltage distribution system. The energized system the Contractor is exposed to is expected to be shielded conductors and enclosed splices. If NFPA 70E doesn't mandate PPE in a certain situation does VA work policy?
7.) Is the Contractor allowed to disturb cable coverings like wrap and tape for cable identification?
mailto:jean@siloecon.com http://www.siloecon.com/
VHANOPKULAKM
Text Box
VHANOPKULAKM
Text Box The contractor is to identify active and abandoned feeders.
VHANOPKULAKM
Text Box The contractor is to provide a full report on the conduits. The method of investigation is contractor's methods and means.
VHANOPKULAKM
Text Box See page 2 paragraph 4 of SOW. The method of investigation is the contractor's method and means.
VHANOPKULAKM
Text Box It is the contractors responsibility to install work site warning barriers. Traffic controls are to be coordinated with the COR.
VHANOPKULAKM
Text Box Manhole P17 is located in the Southwest corner of Building 12 and is shown on hi resolution PDF which will be provided with this RFI.
VHANOPKULAKM
Text Box Please see below for question six detail response.
VHANOPKULAKM
Text Box
Yes the contractor can disturb cable coverings as per contractor methods and means.
VHANOPKULAKM
Text Box Electrical Safety Policy for energized manhole entry your safety department should have a confined space policy- this would be just the requirements for entering a manhole in general, whether sewer, electrical or really any type of confined space. Your safety department should have requirements for permit required and non permit required confined spaces. An electrical manhole would certainly be a permit required confined space.
For a policy for specifically entering energized electrical manholes- you may or may not have that. In all likelihood you won’t have a policy. In such a scenario, the contractor safety procedures (and NFPA 70E) would dictate. You should still have a policy for energized electrical work however- that being a permit procedure for somebody to do energized work. The framework of the permit requirement is in the electrical directive but is mostly dictated by NFPA 70E.
Any Existing medium voltage work procedures including minimum arc rated clothing requirements Similar to above, you probably don’t have this if you don’t have qualified staff to do medium voltage electrical work. So this would fall back on the contractors safety plan and NFPA 70E.
Arc Flash Study Mike R should have the most up to date arc flash study that was done by NEI a couple years ago.
Does VA work policy-mandate PPE if not in NFPA 70E NFPA 70E establishes minimum requirements for PPE. But your facility policy might require more than the minimum PPE- like maybe you require electricians to wear arc resistant clothing, leather shoes, hard hats, etc…just to do their regular job so it would be impossible to answer this unless they outlined the scenario or type of work where no PPE is mandated by NFPA 70E compared with your own dress policy for electricians.
VHANOPKULAKM
Text Box Question 6 detail response.