This document is Standard Form 30, an Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs, James J. Peters VA Medical Center, Network Contracting Office 2 in Bronx, NY. Amendment 0001, effective February 4, 2026, addresses Request for Information (RFI) responses for solicitation 36C24226B0030 (Project Number 630-23-108). The amendment covers two construction projects at the VA Manhattan facility: renovation of a 12W Cardiac Stress Lab and construction of two offices in a 12W Cath Lab area. Offerors must acknowledge receipt of this amendment prior to the specified hour and date by completing the amendment form and returning it, acknowledging receipt on offer copies, or submitting separate written communication referencing the solicitation and amendment numbers.

The RFI responses clarify project requirements for both construction efforts. For the Cardiac Stress Lab renovation, the completion time is 150 calendar days (5 months), work requires three phases with specific construction barrier requirements, 10 existing sprinkler heads are to remain with three heads (SH-7, SH-8, SH-9) to be replaced with new matching units, and attached construction drawings and sprinkler system plans are provided. For the Two Offices project, the completion time is 120 calendar days (4 months), only one louver count requires removal, the new window is a double-hung unit approximately 72"W by 66"H with the contractor responsible for verifying final dimensions in the field, and attached construction drawings and sprinkler system plans are provided. The Contracting Officer is directed to upload all attached project drawings to the Sambeta site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

0001 02-04-2026 630-23-108

36C242

Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468

36C242

Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx NY 10468

To all Offerors/Bidders

36C24226B0030

X

X X

X 1

The purpose of amendment 0001 is to answer RFI's.

Response

1. Completion Time: 150 calendar days (5 months)

2. Correct, all the work of demolition and new construction required 3 phases.

3. Refer to G004 Phasing Note 2 for construction barriers. For Phase 1, use existing wall and door as construction barrier for demolition and install door closer as needed. Install Fire Rated plastic sheeting and zipped door for construction.

4. See A603 Equipment Schedule JSN E0201, below 3D rendering and elevation view.

5. There are 10 existing sprinkler heads, SH-1 to SH-6 and SH-10 to remain, SH-7, SH-8 and SH-9 to be replaced with new to match existing or approved equal see attached sprinkler system plans for details.

6. CO to upload attached project drawings to Sambeta site.

1. Completion Time: 120 calendar days (4 months)

2. Correct, only one count of louver needs to be removed.

3. It is a double hung window, approximately 72”W by 66” H contractor to verify window size in the field.

4. CO to upload attached project drawings to Sambeta site.

See attached document: 630-23-108 - 12W CATH LAB TWO OFFICES CONSTRUCTION

DRAWINGS -BID DOCUMENTS.

See attached document: 630-23-108 - 12W CARDIAC STRESS LAB CONSTRUCTION

DRAWINGS - BID DOCUMENTS.

See attached document: 12TH FLOOR STRESS LAB SPRINKLER SYSTEM PLAN 1-9-26.