This document is a set of architectural floor plans depicting sprinkler system modifications for a cardiac care facility. The plans illustrate both demolition and construction phases for a nuclear medicine and cardiology department that includes a stress laboratory, stress testing room, echo room, hot lab, and cardiology fellows room, among other spaces.
The demolition plan specifies the removal of sprinkler heads 7 through 9, while sprinkler heads 1 through 6 and 10 are to remain in place. The construction plan indicates the installation of three new sprinkler heads (11 through 13) to accommodate the modified facility layout. The plans use standard architectural notation with triangular symbols representing sprinkler head locations and rectangular markers indicating room designations. Red boxes highlight the areas undergoing sprinkler system modification, showing the spatial extent of the construction work required in the cardiac care section of the facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NUCLEAR
MEDICINE
A12014AW
STRESS LABORATORY
12015W
CARDIAC NURSE
12014W
CARDIOLO
GY
FELLOWS
ROOM
12013W
CARDIAC
CATHETERIZAT
ION NURSES
12016W
NEW
OFFICE
12013W
WAITING
AREA
HALLWAY
12012W
HALLWAYHALLWAY
STORAGE
12117W
TOILET
12011W
DARK
ROOM
12010W
JANITOR
12009W
SOILED
UTILITY
12007W
WEST
STAIRWAY
STAIR 2
SH-3SH-2SH-1
SH-4
SH-5
SH-6
SH-7 SH-8
SH-9
SH-10
HOT LAB
A12015AW
STRESS TESTING ROOM
12015W
ECHO ROOM
12014W
CARDIOLO
GY
FELLOWS
ROOM
12013W
CARDIAC
CATHETERIZAT
ION NURSES
12016W
NEW
OFFICE
12013W
WAITING
AREA
HALLWAY
12015CW
HALLWAYHALLWAY
STORAGE
12117W
TOILET
12011W
DARK
ROOM
12010W
JANITOR
12009W
SOILED
UTILITY
12007W
WEST
STAIRWAY
STAIR 2
T
SPRINKLER SYSTEM CONSTRUCTION PLAN
SH-3SH-2SH-1
SH-4
SH-5
SH-6
SH-11
SH-12
SH-10
SH-13
SPRINKLER SYSTEM DEMOLITION PLAN
SPRINKLER HEADS 1 TO 6 AND 10 TO REMAIN
SPRINKLER HEADS 7 TO 9 TO BE REMOVED
SPRINKLER HEADS 1 TO 6 AND 10 TO REMAIN
SPRINKLER HEADS 11 TO 13 TO BE INSTALLED