This document is an amendment to a solicitation for an emergency chiller rental at the JJP Bronx VA Medical Center. Key details:

The amendment announces responses to submitted questions, allows for an extra 1-2 days for chiller delivery and setup, revises the technical capability evaluation factor, and removes references to security alarm system services. The solicitation is for an unrestricted competitive procurement with no SDVOSB requirement. Offerors must demonstrate their ability to provide a chiller within the required timeframe and perform all electrical work per the Performance Work Statement. Veterans involvement is an applicable evaluation factor. The electrician does not need to be licensed by the New York Department of Buildings, but must be able to perform the required electrical work. A bid bond is not required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

ACHECKC C

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

07/31/2024

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

To all Offerors/Bidders

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER10A MODIFICATION OF CONTRACT/ORDER NUMBER

36C24224Q0863

07/30/2024 X

X X

____01

X ___________ co 01

This Amendment 0001 is to announce:

1. Responses to submitted questions (continuation pages).

2. Due to high chiller demand, facility will allow an extra day or two for the delivery, setup, and operational date notated on PWS section B.2.B.1.

3. Replace Technical Capability Evaluation Factor 1 (Section E.11, pg 40) with:

Firm must submit a capability statement demonstrating ability in how it will provide a chiller within the required time above and confirm ability to perform all electrical work needed for all installation requirements in PWS.

4. Remove Evaluation Factor 2 - Past Performance (Section E.11, pg. 40) sentence: “The contractor's firm must regularly perform security alarm system services detailed in the SOW." or any other reference found mentioning security alarm system as this does not pertain to this requirement.

Jacob Burg Contracting Officer

JACOB BURG Digitally signed by JACOB BURG Date: 2024.07.31 16:20:09 -04'00'

CONTINUATION PAGE

ANSWERS TO SUBMITTED QUESTIONS:

QUESTION #1:

Please confirmed this acquisition is Unrestricted as mentioned in box 10 and SDVOSB firm/contractor is not a requirement.

ANSWER #1:

Confirmed Unrestricted.

QUESTION #2:

Currently there is a scarcity of temporary chillers, temporary chiller may not be available from August 8th and may take few more days for rental. Please confirm this is acceptable.

ANSWER #2:

Your quote should notate timeframes of when you will be able to provide it onsite to facility and a fully operational date. We can allow for an extra day or two but will need the information available in the proposal.

QUESTION #3:

Solicitation page 40 Evaluation factor 2 states the contractor’s firm must regularly perform security alarm system services detailed in the SOW. --- There is no work of security alarm system in this project.

ANSWER #3:

That wording or any mention of security alarm system is now removed from the solicitation.

QUESTION #4:

Solicitation page 40 lists Evaluation Factor 4 – VETERANS INVOLVEMENT (if applicable) --- Please confirm this is not applicable.

ANSWER #4:

Its applicable per VAAR 852.215-70.

QUESTION #5:

Solicitation page 40 lists Evaluation Factor 1 – TECHNICAL CAPABILITY point no.2 states Electrician must be licensed by NY Department of Buildings to perform electrical work in New York City. --- Requesting to waive off this requirement as this is a federal government project.

ANSWER #5:

This Technical Factor 1 requirement has been removed and replaced with Page 1, Box 14, #3 Description. (Please follow those new instructions). The electrician does not need to be licensed but must be able to perform work in the PWS, this will need to be detailed and explained within the new Technical Capability submission requirement.

QUESTION #6:

Please confirm bid bond is not required.

ANSWER #6:

Bid bond is not required as this is service contract.