This document is a Statement of Work (SOW) for a federal contract opportunity to renovate the Utilities Building 13 at the Northport VA Medical Center in New York.

The key details are:

  • The project is to renovate specific rooms within the existing Laundry Facility in Building 13, including general construction, mechanical, plumbing, electrical, and structural work to support the installation of new laundry equipment by the VA.
  • The contract completion time is 365 calendar days from the Notice to Proceed.
  • The contractor is required to utilize the VISN 2 Autodesk Build Construction management platform for all project-related communication, documentation, and collaboration at no cost.
  • The contractor must comply with all federal records management laws and regulations, including the preservation and protection of all records related to the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S.G. S.M.

NORTHPORT VAMC

RENOVATE UTILITIES - BUILDING 13

PROJECT NO. 632-23-109

PROJECT COVER SHEET & NOTES

DRAWINGS INDEX

DRAWING TITLE

G-01 PROJECT COVER SHEET & NOTES

A-01 ARCHITECTURAL NOTES & SYMBOLS

A-02 ARCHITECTURAL DEMOLITION FLOOR PLAN

A-03 ARCHITECTURAL INSTALLATION FLOOR PLAN

A-04 REFLECTED CEILING FLOOR PLAN

A-05 ARCHITECTURAL DETAILS 1 OF 2

A-06 ARCHITECTURAL DETAILS 2 OF 2

E-01 ELECTRICAL SYMBOLS LIST, ABBREVIATIONS & NOTES

E-02 ELECTRICAL DEMOLITION FLOOR PLAN

E-03 ELECTRICAL POWER INSTALLATION FLOOR PLANS

E-04 ELECTRICAL REFLECTED CEILING INSTALLATION PLAN

E-05 FIRE ALARM INSTALLATION FLOOR PLAN

E-06 ELECTRICAL ONE-LINE RISER DIAGRAMS

E-07 ELECTRICAL DETAILS

E-08 ELECTRICAL SCHEDULES - EXISTING

E-09 ELECTRICAL SCHEDULES - NEW

FP-01 FIRE PROTECTION NOTES, SYMBOLS & RISER DIAGRAM

FP-02 FIRE PROTECTION DEMOLITION & INSTALLATION FLOOR PLAN

M-01 HVAC NOTES & SYMBOLS

M-02 HVAC DEMOLITION FLOOR PLAN

M-03 HVAC INSTALLATION FLOOR PLAN

M-04 HVAC SCHEDULES

M-05 HVAC DETAILS

M-06 HVAC DETAILS & CONTROLS

M-07 HVAC CONTROLS

M-08 HVAC SEISMIC DETAILS 1 OF 2

M-09 HVAC SEISMIC DETAILS 2 OF 2

P-01 PLUMBING NOTES & SYMBOLS

P-02 PLUMBING BASEMENT DEMOLITION & INSTALLATION FLOOR PLANS

P-03 PLUMBING DEMOLITION & INSTALLATION FLOOR PLANS

P-04 PLUMBING RISER

Q-01 WASHER SPECIFICATIONS

Q-02 WASHER SPECIFICATION SHEETS

Q-03 DRYER SPECIFICATIONS

Q-04 DRYER SPECIFICATION SHEETS

S-01 STRUCTURAL NOTES

S-02 STRUCTURAL BASEMENT PLAN

S-03 STRUCTURAL FLOOR PLAN

S-04 STRUCTURAL ROOF PLAN

S-05 CONCRETE DETAILS 1 OF 2

S-06 CONCRETE DETAILS 2 OF 2

W E

SN

4O

0 25

SITE OF WORK

LOCATION MAP

N.T.S.

APPLICABLE STANDARDS AND CODES:

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL

CAD STANDARD APPLICATION GUIDE, AND

OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

(HTTP://WWW.CFM.VA.GOV/TIL/).

2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY

REFERENCED IN VA DESIGN DOCUMENTS, SEE

NOTES BELOW)

2021 NFPA 101 LIFE SAFETY CODE

2021 NFPA 90A STANDARDS FOR THE INSTALLATION OF AIR-CONDITIONING

AND VENTILATING SYSTEMS

2021 NFPA 96 STANDARDS FOR VENTILATION CONTROL AND FIRE PROTECTION

OF COMMERCIAL COOKING OPERATIONS

2019 NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION,

AND DEMOLITION OPERATIONS

2018 NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND

NFPA 900

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

2019 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2020 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70)

2018 INTERNATIONAL PLUMBING CODE (IPC)

2015 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

INCLUDING VA SUPPLEMENT, BARRIER FREE

DESIGN GUIDE (PG-18-13)

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13514: FEDERAL LEADERSHIP IN ENVIRONMENTAL,

ENERGY, AND ECONOMIC PERFORMANCE.

ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL

BUILDINGS - ASHRAE STANDARD 90.1- 2016.

UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES,

REGULATIONS, STANDARDS,

MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY

AGENCIES, SHALL MEAN

THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT

SUBMISSION (U.N.O.)

G-01

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

100% CONSTRUCTION DOCUMENTS

ISSUE FOR BID

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

DECEMBER 27, 2023

ADDENDUM MAY 24,2024 1

632-23-109RENOVATE UTILITIES

BUILDING 13

DEMOLITION NOTES:

1. CONTRACTOR SHALL COORDINATE WITH OWNER ITEMS TO BE

STORED ON SITE FOR RE-USE AND ITEMS NOT HAVING ANY

VALUE TO OWNER TO BE LEGALLY DISPOSED OFF SITE.

2. SEE MECHANICAL, ELECTRICAL, PLUMBING AND STRUCTURAL

DRAWINGS FOR ADDITIONAL NOTES AND SCOPE OF WORK FOR

APPROPRIATE TRADES.

3. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY (DUST

TIGHT) BARRIERS AND PROTECTIVE FLOOR COVERING SO TO

PROTECT EXISTING FLOORS, WALLS, CEILINGS AND OWNERS

EQUIPMENT. BARRIERS SHALL NOT BE REMOVED UNTIL

COMPLETION OF PROJECT OR AS AGREED UPON BY OWNER.

SEE TEMPORARY PROTECTION NOTES ON THIS SHEET.

4. CONTRACTOR SHALL PROTECT EXISTING FACILITIES AS

REQUIRED DURING DEMOLITION. DEMOLITION CONTRACTOR

SHALL REPLACE AT HIS COST ANY DAMAGE INCURRED DURING

DEMOLITION TO ANY EXISTING BUILDING COMPONENTS, WHICH

ARE TO REMAIN.

5. CONTRACTOR SHALL TEMPORARILY SUPPORT ELECTRICAL

CONDUITS, PIPING, DUCTWORK AND OTHER SERVICES AND

EQUIPMENT AFFECTED BY DEMOLITION WHICH ARE TO REMAIN.

6. ALL EXTERIOR WALL AND ROOF OPENINGS NO LONGER

REQUIRED DUE TO DEMOLITION WORK SHALL BE SEALED

WATERTIGHT AND WEATHER TIGHT. CONTRACTOR TO CLEARLY

MARK AND ERECT BARRIERS FOR ANY POTENTIALLY

HAZARDOUS CONDITIONS.

7. ALL WORK SHALL CONFORM TO ALL OSHA REGULATIONS.

8. ALL DEMOLITION AREAS SHALL BE CLEARLY MARKED WITH

SIGNAGE AND PHYSICAL BARRIER. AS PER OSHA AND OWNERS

REQUIREMENTS TO INSURE SAFETY TO OWNERS PERSONNEL

THROUGHOUT DEMOLITION PHASE OF WORK.

9. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY

CLOSURES FOR ALL FLOOR OPENING DUE TO PIPE AND

DUCTWORK REMOVALS. DEMOLITION CONTRACTOR SHALL

FURNISH AND INSTALL TEMPORARY BARRIERS AT FLOOR

OPENINGS AS PER OSHA AND ALL GOVERNING AUTHORITIES.

10. CONTRACTOR SHALL COORDINATE TEMPORARY STORAGE AND

LAYDOWN LOCATIONS WITH VA. DEMOLITION CONTRACTOR

SHALL FURNISH AND PAY FOR ALL DUMPSTER AND DEBRIS

REMOVAL.

11. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES

FOR REQUIRED DEMOLITION WORK INCLUDING PROVISIONS FOR

REQUIRED FLOOR WALL AND ROOF OPENINGS TO

ACCOMMODATE NEW WORK

12. WHERE SUSPECTED HAZARDOUS MATERIAL IS ENCOUNTERED

CONTRACTOR SHALL NOTIFY VA WHO WILL HAVE MATERIAL

TESTED AND LEGALLY REMOVED. VA WILL BE RESPONSIBLE

FOR REMOVAL OF HAZARDOUS MATERIAL IN PROJECT AREA.

13. CONTRACTOR SHALL REMOVE ALL WALLS, DOORS, DOOR

FRAMES, LOUVERS, WINDOWS, ETC. AS INDICATED ON

DRAWINGS.

14. CONTRACTOR SHALL REMOVE ALL CONCRETE BLOCK,

TERRACOTTA BLOCK AND DRYWALL PARTITIONS AS INDICATED

ON DRAWINGS.

15. CONTRACTOR SHALL REMOVE ALL SUPPORTS AND HANGERS

NO LONGER REQUIRED DUE TO DUCTWORK AND PIPING

REMOVALS. ALL HANGERS FOR HUNG CEILING SHALL BE

REMOVED.

16. ELECTRICAL DISCONNECTIONS AND PANEL RELOCATIONS

SHALL BE PERFORMED BY LICENSED CONTRACTOR AND

COORDINATED BY DEMOLITION CONTRACTOR.

17. CAPPING OF ALL PIPING SERVICES AND DISCONNECTIONS

SHALL BE PERFORMED BY LICENSED PLUMBING CONTRACTOR

AND COORDINATED BY DEMOLITION CONTRACTOR.

18. CONTRACTOR SHALL FURNISH TEMPORARY LIGHTING AS

REQUIRED IN ALL AREAS WHERE WORK IS BEING DONE.

19. ALL EXISTING FLOOR DRAINS IN AREA OF WORK DESIGNATED

TO REMAIN SHALL BE TEMPORARILY SEALED TO KEEP ALL

DEBRIS FROM ENTERING TRAP.

20. NO EQUIPMENT, HVAC UNITS, SERVICE MAIN, ELECTRICAL

PANELS AND SERVICES SHALL BE DISCONNECTED OR SHUT

DOWN WITHOUT PRIOR REVIEW WITH THE VA TO CONFIRM THAT

AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED.

21. WHERE AN AREA WILL BE AFFECTED BY A SHUTDOWN,

REMOVAL OR A DISCONNECTION, CONTRACTOR SHALL FURNISH

2 WEEKS ADVANCE NOTICE GIVEN TO THE VA REGARDING THE

PROPOSED SHUTDOWN, AND DURATION OF THE SHUTDOWN.

VA WILL REVIEW THE PROPOSED SHUTDOWN AND PROVIDE

INSTRUCTION.

22. EACH CONTRACTOR SHALL COORDINATE WITH ALL OTHER

TRADES FOR REQUIRED DEMOLITION WORK INCLUDING

PROVISIONS FOR NEEDED FLOOR AND WALL OPENINGS TO

ACCOMMODATE NEW WORK.

23. SPRINKLER PIPING SHALL BE TAKEN OUT OF SERVICE SECTION

BY SECTION, TO THE EXTENT PRACTICAL, AND CAPPED AS

DEMOLITION PROGRESSES. THE BUILDING SPRINKLER SYSTEM

SHALL BE RESTORED TO FULL OPERATING CONDITION AT THE

END OF EACH WORK DAY. COORDINATE WORK SCOPE WITH

FIRE PROTECTION DOCUMENTS.

24. THE STORAGE OF COMBUSTIBLE MATERIALS SHALL NOT BE

PERMITTED IN ANY AREA WHERE THE SPRINKLER SYSTEM HAS

BEEN TEMPORARILY SHUTDOWN.

25. WHERE NEW FLOOR FINISH ARE REQUIRED, CONCRETE SLAB

SHALL BE PREPARED AS PER MANUFACTURER'S

RECOMMENDATIONS FOR INSTALLATION OF NEW FLOOR

FINISHES.

26. WITHIN THE AREA OF WORK DEFINED BY THE DEMOLITION PLAN,

THE SURFACE OF THE EXISTING CONCRETE SLAB SHALL BE

FLASH PATCHED TO FILL IN ALL FASTENER HOLES, CHIPS AND

POCKETS CREATED BY DEMOLITION WORK AND AS NEEDED TO

PROVIDE A SMOOTH FLAT SURFACE READY TO RECEIVE NEW

CONSTRUCTION.

632-23-109

S.G. S.M.

A-01

ARCHITECTURAL NOTES & SYMBOLS

GENERAL PROTECTION NOTES:

1. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY (DUST

TIGHT) BARRIERS. CONTRACTOR SHALL MAINTAIN THE WORK

AREA UNDER NEGATIVE PRESSURE IN RELATION TO THE

SURROUNDING AMBIENT SPACE. CONTRACTOR SHALL

FURNISHED, TEMPORARY SMOKE EATERS SHALL BE USED WITH

A MINIMUM EXHAUST CAPACITY OF .06 CFM/ SQ. FT. OF WORK

AREA. ALL OPENINGS SHALL BE PROTECTED WITH BARRIERS

BETWEEN CONSTRUCTION AND ADJACENT SPACES.

CONTRACTOR SHALL COORDINATE WITH THE OWNER ON THE

EXACT PLACEMENT OF TEMPORARY PARTITIONS, SO AS NOT TO

IMPEDE OR INTERFERE WITH FACILITY OPERATIONS.

TEMPORARY BARRIER/PARTITION SYSTEM SHALL BE AS

MANUFACTURED BY “ZIPWALL” OR AN OWNER APPROVED EQUAL.

2. CONTRACTOR SHALL PROTECT EXISTING BUILDING

COMPONENTS, EQUIPMENT AND FURNISHINGS TO REMAIN

WITHIN THE PROJECT AREAS. ANY DAMAGE TO EXISTING TO

REMAIN BUILDING COMPONENTS, EQUIPMENT AND FURNISHINGS

SHALL BE PROMPTLY CORRECTED BY THE CONTACTOR AT NO

ADDITIONAL COST TO OWNER. IF DAMAGES CANNOT BE

RECTIFIED, CONTRACTOR SHALL REPLACE THE DAMAGED ITEM IN

KIND AT NO ADDITIONAL COST TO OWNER. CONTRACTOR SHALL

DO EITHER OF THE FOLLOWING TO PROVIDE PROTECTION:

A. CONTRACTOR SHALL TEMPORARILY REMOVE/RELOCATE

EXISTING BUILDING COMPONENTS, EQUIPMENT AND

FURNISHINGS AS REQUIRED. ALL REMOVALS/RELOCATIONS

SHALL BE COORDINATED WITH THE OWNER FOR WHAT CAN AND

CANNOT BE REMOVED/RELOCATED AND WHERE THEY CAN BE

PLACED.

B. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY

PROTECTIVE COVERINGS FOR EXISTING BUILDING COMPONENTS,

EQUIPMENT AND FURNISHINGS WHICH SHALL REMAIN.

TEMPORARY PROTECTION SHALL BE MAINTAINED CONSISTENTLY

THROUGHOUT THE DEMOLITION AND CONSTRUCTION OF EACH

OF THE AREAS AND NOT REMOVED UNTIL AREA HAS BEEN

APPROVED BY THE OWNER. TEMPORARY PROTECTION SHALL

EXTEND BEYOND THE PROJECT AREA AS REQUIRED TO PROTECT

AGAINST DEMOLITION AND CONSTRUCTION ACTIVITIES.

TEMPORARY PROTECTIVE COVERINGS SHALL INCLUDE BUT NOT

BE LIMITED TO THE FOLLOWING:

1. FLOORS: CONTRACTOR SHALL PROTECT THE EXISTING FLOORS

TO REMAIN. PROTECTION SHALL PROTECT FLOOR FINISH AND

SUBSTRATE FROM ANY DAMAGE, SCUFFS, DIRT, ETC.

2. WALLS AND BASE: EXISTING WALLS AND BASE TO REMAIN SHALL

BE PROTECTED FROM DAMAGE, SCUFFS, DIRT, ETC.

3. WALL MOUNTED COMPONENTS: CONTRACTOR SHALL

COORDINATE WITH OWNER FOR WALL MOUNTED COMPONENTS

THAT SHALL BE MOVED/RELOCATED. ALL OTHER COMPONENTS

TO REMAIN SHALL BE FURNISHED WITH A PROTECTIVE COVERING

AS REQUIRED TO PROTECT FROM DAMAGE, SCUFFS, DIRT, ETC.

GENERAL PROJECT REQUIREMENTS:

1. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS FOR

CONTRACTORS IN ALL TRADES TO FURNISH A COMPLETE PROJECT TO

THE VA. CONTRACTOR SHALL FURNISH ALL LABOR, SUPERVISION,

MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE ALL

DEMOLITION AND NEW WORK SHOWN IN THE PROJECT DOCUMENTS.

2. CONTRACTOR SHALL COORDINATE WITH THE VA FOR THE FOLLOWING

BEFORE STARTING WORK: BUILDING ACCESS, RULES AND

REGULATIONS, REMOVALS, DUMPSTER REQUIREMENTS, SAFETY,

DAILY CLEANUP AND REMOVALS, MATERIAL MOVEMENT THROUGH

THE GROUNDS AND FACILITY, STORAGE OF MATERIALS AND TIE-INS

TO EXISTING SERVICES.

3. CONTRACTOR IS RESPONSIBLE FOR ALL REALLOCATIONS OF

EXISTING SERVICES THAT ARE TO REMAIN, AND WHICH INTERFERE

WITH NEW WORK.

4. ROOMS AND CORRIDORS ADJACENT TO THE PROJECT AREA SHALL

REMAIN IN USE BY THE VA DURING DEMOLITION AND CONSTRUCTION

WORK ASSOCIATED WITH THE PROJECT. CONTRACTOR SHALL

MAINTAIN ALL SERVICES TO THESE OCCUPIED AREAS AND NOT

INTERFERE WITH ON-GOING OPERATIONS. WHERE NEW SERVICE

MAINS ARE TO BE INSTALLED, CONTRACTOR SHALL SCHEDULE TIE-INS

TO ACTIVE AREAS WITH THE PROJECT COR. SCHEDULED TIE-INS

SHALL BE SCHEDULED DURING AREA SHUTDOWNS.

5. ALL CONTRACTORS ARE RESPONSIBLE TO VERIFY ALL SITE, FIELD

AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND

COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN

DRAWINGS AND FIELD CONDITIONS, CONTRACTOR SHALL SUBMIT A

REQUEST FOR INFORMATION TO THE VA FOR A RESOLUTION.

6. ALL DIMENSIONS ON THE DRAWINGS ARE TO BE FIELD VERIFIED AND

COORDINATED BY THE CONTRACTOR. CONTRACTOR SHALL SUBMIT

ELECTRONIC COPIES OF EACH SHOP DRAWING FOR REVIEW.

7. CONTRACTOR SHALL MAINTAIN AT THE SITE ONE (1) RECORD COPY

OF ALL CONTRACT DRAWINGS AND SPECIFICATIONS, ADDENDA,

CHANGE ORDERS, SHOP DRAWINGS, PRODUCT DATA, SAMPLES,

OPERATION AND MAINTENANCE DATA AND OTHER MODIFICATIONS IN

GOOD ORDER, MARKED CURRENTLY TO RECORD ALL CHANGES MADE

DURING CONSTRUCTION. THESE SHALL BE DELIVERED TO THE VA

PRIOR TO THE END OF THE WORK. UPON COMPLETION OF THE WORK

CONTRACTOR SHALL DELIVER TO THE PROJECT COR AN ELECTRONIC

COPY OF THE FOLLOWING:

a. “AS BUILT” RECORD DRAWINGS.

b. ALL CONTRACT AND SHOP DRAWINGS.

c. APPROVED PRODUCT DATA AND OPERATION AND MAINTENANCE

DATA.

ALL DOCUMENTS SHALL BE CLEARLY LEGIBLE.

8. ALL EXISTS FROM THE BUILDING SHALL ALWAYS REMAIN

UNOBSTRUCTED AND OPERABLE.

9. EXISTING SPRINKLER AND ALARM SYSTEMS SHALL REMAIN OPERABLE

AT ALL TIMES. CONTRACTOR SHALL COORDINATE WITH THE VA ANY

SHUTDOWNS OF THE SPRINKLER OR ALARM SYSTEMS.

10. SHUTDOWNS OF MECHANICAL, PLUMBING, OR ELECTRICAL SYSTEMS

SHALL BE COORDINATED WITH THE VA.

11. CONTRACTOR SHALL FURNISH, INSTALL, AND MAINTAIN ALL SAFETY

BARRICADES TO PROTECT FLOOR AND WALL OPENINGS AS REQUIRED

TO PROTECT ALL PERSONNEL WORKING ON SITE.

12. ALL CONSTRUCTION PERSONNEL SHALL BE RESTRICTED TO THE

AREA OF THE FACILITY UNDER CONSTRUCTION. ALL OTHER AREAS

OF THE FACILITY SHALL DEEMED OFF-LIMITS.

13. CONTRACTORS' PERSONNEL AND MATERIAL ENTRANCE SHALL BE

APPROVED IN ADVANCE BY VA.

14. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE VA FOR ALL

TEMPORARY ELECTRICAL POWER TIE-INS, WATER HOOKUPS AND

MATERIAL STORAGE REQUIRED FOR THEIR WORK. CONTRACTOR

SHALL MAKE ALL NECESSARY ARRANGEMENTS FOR THEIR

SUBCONTRACTORS.

15. CONTRACTOR SHALL DURING THE PROJECT, MAINTAIN ALL

WORKING AREAS INCLUDING MATERIAL HANDLING, STAGING AREAS,

ENTRIES, EXITS, FIELD OFFICE, AND TOOLBOX AREAS FREE FROM

RUBBISH AND DEBRIS. RUBBISH AND DEBRIS SHALL BE REMOVED

FROM THE PREMISES DAILY. ALL AREAS SHALL BE KEPT BROOM

CLEAN. EACH CONTRACTOR SHALL BE RESPONSIBLE TO CLEAN ANY

DIRT/DUST THAT DEMOLITION AND CONSTRUCTION WORK CAUSES IN

OTHER AREAS OF THE FACILITY. AT THE COMPLETION OF THE

PROJECT, ALL SURFACES SHALL BE LEFT CLEAN AND UNDAMAGED.

16. ANY DAMAGE DONE TO THE EXISTING BUILDING COMPONENTS OR

VA OWNED EQUIPMENT DURING DEMOLITION AND/OR CONSTRUCTION

SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

CONTRACTOR SHALL MATCH MATERIALS/FINISHES IN ALL AREAS

AFFECTED BY THE WORK.

17. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED

INSPECTIONS.

18. THE CONTRACTOR SHALL COORDINATE WITH THE VA THE LOCATION

OF ANY TRAILERS, STAGING AREAS, AND THE LOCATION OF ANY

EQUIPMENT INCLUDING CRANES TO BE USED ON SITE.

19. CONTRACTOR SHALL PROVIDE TEMPORARY TOILET FACILITIES FOR

ALL CONSTRUCTION PERSONNEL. THE LOCATION OF THE FACILITIES

SHALL BE COORDINATED WITH THE COR.

20. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL VA

FURNISHED EQUIPMENT. CONTRACTOR SHALL OBTAIN ALL

REQUIREMENTS FOR INSTALLATION INCLUDING ROUGHING

DIAGRAMS, INSTALLATION INSTRUCTIONS, ELECTRICAL SCHEMATICS,

TEMPLATES, LAYOUTS, DIMENSIONS, AND ALL OTHER INFORMATION

NECESSARY FOR A WELL-COORDINATED INSTALLATION.

21. ALL WORK SHALL BE GUARANTEED, INCLUDING LABOR AND

MATERIALS FOR A PERIOD OF ONE YEAR AFTER FINAL COMPLETION

AND ACCEPTANCE BY THE VA.

CONTRACT LIMIT LINE

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

HIDDEN FEATURES LINE

NEW LINE

PROPERTY LINE

SMOKE BARRIER LINE

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

DOOR OPENING/BORROWED LIGHT IDENTIFIER

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

ARCHITECTURAL SYMBOLS

CENTER LINE

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

DRAWING BLOCK TITLE

1 1/2" = 1'-0"C4

A-201 A4

A2 A-202

A

BC

D

A-202 A2

A-201 A4

A-512 D2

A-512 D2

A-512 D2

AA

COLUMN GRID

KEYNOTE

WALL OR PARTITION TYPE

NORTH ARROW

NORTH

V V ITEM - VA SUPPLIED & INSTALLED

VC ITEM - VA SUPPLIED & CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED & INSTALLED

A4 A-201

DETAIL NUMBER

SHEET WHERE REF.

SHEET WHERE DRAWN

A3.1 A4.3

BUILDING SECTION INDICATOR

DETAIL INDICATOR

A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

100% CONSTRUCTION DOCUMENTS

ISSUE FOR BID

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

DECEMBER 27, 2023

ADDENDUM MAY 24,2024 1

RENOVATE UTILITIES

BUILDING 13

MATERIALS LEGEND

EXISTING

CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION

TO BE REMOVED

NEW CONSTRUCTION

CONCRETE

EARTH

BASE COURSE

RIGID

INSULATION

BATT

INSULATION

WORK SHOWN IS NOT IN CONTRACT, AND WILL BE

CONSTRUCTED BY IN-HOUSE STAFF, AND IS PROVIDED FOR COORDINATION ONLY

N.I.C.

REVISION TAG#

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 6WF15EXIST. 6WF15EXIST. 6WF15EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 8WF17 EXIST. 8WF17 EXIST. 8WF17 EXIST. 8WF17

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

2L S x

1/ x

5/

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

3 4 5 6 7 8 9 10 11

A

B

C

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" ROD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" ROD CROSS BRACING

EXIST. 7/8" ROD CROSS BRACING

4'-10 1/2"

5'-6 1/4" 7'-11 1/4" 4'-0 3/4"

7' -2

/2

3'-3 1/2"

7' -1

/2

5' -7

/2

1'-10"

8'-1 1/2" 6'

-1

/2

2' -7

/2

2' -7

/2

7' -1

/2

3'-7 1/2"

'-1

0"

CL

CL

CLCLCLCLCLCL

CLCL

CL

CL

CL

RESTROOM

LINEN DISTRIBUTION AREA

LOADING DOCK

3 4 5 6 7 8 9 10 11

A

B

C

DN

UP

AIR HANDLER

CHILLER

STORAGE ROOM

ALCOVE

WOMEN'S

WOMEN'S

LOCKER ROOM

LA

D

D

ER

DATA ROOM

(FUTURE)

9' -9

16'-0"

19'-1"

6' -4

10'-4"

6' -0

3' -7

5' -0

5'

-0

5'-2" 5'-4 1/4" 5'-2"

4' -0

7' -5

'-5

'-5

'-5

'-5

'-5

'-1

1"

16'-8"

2'-0" 2'-0"

'-4

2'-3" 6'-0"

2' -2

2'-2"

2'-10"

2' -1

0"

3'-3 1/2"

3' -1

3' -9

16'-1 1/4"

4' -0

/4

9'

-9

(TYP)

4'-1 3/4" 8'-4"

12'-0" 3'-6 1/4"

6' -0

FD FDFD

4' -0

"3'-0"

S.G. S.M.

N N

ARCHITECTURAL DEMOLITION

FLOOR PLAN

A-02

DEMOLITION FLOOR PLAN - PARTIAL BUILDING 13

3/16"= 1'-0"

DEMOLITION ROOF PLAN - PARTIAL BUILDING 13

1/8"= 1'-0"

DEMOLITION KEYED NOTES:

1. REMOVE EXISTING GYPSUM BOARD AND WALL FRAMING IN ITS ENTIRETY TO PREPARE AREA FOR NEW INSTALLATIONS. REMOVAL SHALL INCLUDE BUT NOT BE

LIMITED TO; THE PLYWOOD WAINSCOT, WALL MOUNTED ELECTRICAL SERVICES, CONDUITS, AND WIRES, PLUMBING SERVICES, SOAP DISPENSER EQUIPMENT, ETC. FROM EACH SIDE OF THE WALL. COORDINATE REMOVALS WITH MEP DRAWINGS.

2. REMOVE EXISTING GRATING FROM THE TRENCH DRAINS. COORDINATE WITH THE DEMOLITION DETAIL (4) AND NEW INSTALLATION DETAILS (5) & (6) ON

DRAWING A-06.

3. REMOVE ANGLE FRAMES FROM THE PERIMETER OF THE TRENCH DRAIN, DRAIN PIT AND FROM FLOOR AREAS TO PREPARE FOR NEW INSTALLATIONS. SAW CUT THE FLOOR AROUND THE FRAMES TO A DEPTH OF 1”, CHIP AWAY THE CONCRETE AS REQUIRED TO REMOVE THE STEEL ANGLES. COORDINATE WITH THE TRENCH DRAIN DEMOLITION DETAIL (4) AND FLOOR PATCH DETAIL (5 & 6) ON DRAWING A-06.

4. REMOVE CONCRETE HOUSEKEEPING PADS IN ITS ENTIRETY. HOUSEKEEPING PAD REMOVAL SHALL REQUIRE SAW CUTTING THE FLOOR AROUND THE PADS TO A DEPTH OF 1” AND CHIPPING AWAY THE CONCRETE AS REQUIRED TO REMOVE ALL ASSOCIATED REBAR, WIRE MESH, STEEL PINS OR DOWELS EMBEDDED IN THE FLOOR. COORDINATE THE EXTENT OF THE REMOVALS WITH THE TRENCH DRAIN PATCH DETAIL (6) SHOWN ON DRAWING A-06.

5. SERVICE PIPING TO BE REMOVED, COORDINATE SERVICE REMOVALS WITH MEP DRAWINGS. PREPARE FLOOR PENETRATION FOR INFILL REPAIR. COORDINATE WITH FLOOR REPAIR DETAILS ON STRUCTURAL DRAWINGS. (ALL EXISTING PENETRATIONS NO LONGER USED SHALL BE PREPARED FOR INFILL REPAIR.

CONTRACTOR SHALL FIELD VERIFY NUMBER AND SIZE OF LOCATIONS)

6. REMOVE EXISTING DOOR PANELS, DOOR FRAME AND HARDWARE.

7. REMOVE EXISTING VCT FLOOR TILE, MASTIC, ETC. AND PREPARE CONCRETE SUB-FLOOR FOR NEW FINISH INSTALLATIONS. CONTRACTOR SHALL TEST FLOOR TILE AND MASTIC FOR HAZARDOUS MATERIALS. IF HAZARDOUS MATERIALS ARE FOUND CONTRACTOR SHALL NOTIFY COR TO ARRANGE ABATEMENT.

8. SCARIFY AND DRILL CONCRETE TO PREPARE SURFACE AND SET PINS FOR NEW HOUSEKEEPING PADS. COORDINATE REQUIREMENTS WITH NEW INSTALLATION DRAWINGS, APPROVED VENDOR SHOP DRAWINGS AND HOUSEKEEPING PAD INSTALLATION DETAILS ON STRUCTURAL DRAWINGS.

9. LOCATION OF NEW EQUIPMENT PAD. EXCAVATE AND PREPARE AREA FOR INSTALLATION OF A NEW EQUIPMENT PAD. FURNISH AND INSTALL ALL OSHA REQUIRED SHORING AND FOLLOW ALL VAMC SAFETY REQUIREMENTS. COORDINATE WITH STRUCTURAL DRAWINGS FOR INSTALLATION REQUIREMENTS.

10. LOCATION OF NEW BOLLARD. EXCAVATE AND PREPARE FOR INSTALLATION OF NEW BOLLARDS. COORDINATE WITH DETAILS ON STRUCTURAL DRAWINGS.

11. REMOVE THE EXISTING ROOF CURB, EQUIPMENT, AND A PORTION OF THE EXISTING ROOFING SYSTEM TO PREPARE ROOF PENETRATION FOR A ROOF PATCH.

ROOFING SYSTEM SHALL BE CUT BACK A MINIMUM OF 12” BEYOND THE ROOF OPENING. COORDINATE WITH DETAIL 1 ON DRAWING A-06. COORDINATE WITH

MECHANICAL DEMOLITION DRAWINGS.

12. PREPARE ROOF SYSTEM FOR NEW MECHANICAL INSTALLATIONS. COORDINATE LOCATIONS AND SIZE OF OPENINGS WITH MECHANICAL DRAWINGS. FURNISH AND INSTALL SUPPLEMENTAL STEEL AS SHOWN ON STRUCTURAL DRAWINGS AND CUT A NEW OPENING THROUGH THE ROOF DECKING. REMOVE A PORTION OF THE EXISTING ROOF AS REQUIRED FOR NEW INSTALLATIONS. COORDINATE WITH ROOFING DETAILS SHOWN ON DRAWING A-06.

13. REMOVE ENTIRE WINDOW AND PREPARE FOR NEW INSTALLATIONS.

14. INSTALL NEW STEEL LINTELS. SAW-CUT AND REMOVE MASONRY AS REQUIRED TO PREPARE WALL FOR NEW DOOR INSTALLATION. COORDINATE WITH NEW

INSTALLATION 1 ON DRAWING A-05.

15. REMOVE A PORTION OF THE EXISTING CEILING SUPPORTING STRUCTURE PLYWOOD DECK, ETC. AS REQUIRED TO PREPARE AREA FOR NEW WORK. THE CEILING OF THE NEW ELECTRICAL ROOM WILL BE THE ROOF STRUCTURE AND UNDERSIDE OF ROOF DECK ABOVE.

16. PREPARE THE TOP OF THE EXISTING MASONRY AS REQUIRED TO EXTEND THE WALL TO THE UNDERSIDE OF DECK ABOVE. COORDINATE WITH THE NEW WORK

ON DRAWING A-03.

17. REMOVE FOR RELOCATION (13) EXISTING LOCKERS. SEE DRAWING A-03 FOR NEW LOCATION AND INSTALLATION REQUIREMENTS.

18. SAW-CUT AND REMOVE A PORTION OF THE LOCKER HOUSEKEEPING PAD. PREPARE CONCRETE FLOOR FOR NEW FINISHING. COORDINATE WITH NEW WORK ON

DRAWING A-03.

19. EXISTING FLOOR DRAIN SHALL BE REMOVED. COORDINATE WORK WITH PLUMBING DRAWINGS. PREPARE FLOOR PENETRATION FOR INFILL REPAIR.

COORDINATE WITH FLOOR REPAIR DETAILS ON STRUCTURAL DRAWINGS.

20. CORE-DRILL AND PREPARE FLOOR SLAB FOR THE INSTALLATION OF NEW FLOOR DRAIN. COORDINATE LOCATION WITH EXISTING BUILDING STRUCTURE AND

PLUMBING DRAWINGS AND INSTALLATION DETAILS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

100% CONSTRUCTION DOCUMENTS

ISSUE FOR BID

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

DECEMBER 27, 2023

ADDENDUM MAY 24,2024 1

632-23-109RENOVATE UTILITIES

BUILDING 13

N.I.C.

1DEMOLITION KEYED NOTES CONT'D:

21. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION BARRIERS

AS NOTED IN THE GENERAL PROTECTION NOTES ON DRAWING A-01.

EXIST. 8BL13

EXIST. 8BL13

EXIST. 6WF15EXIST. 6WF15EXIST. 6WF15EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 6WF15

EXIST. 6WF15

EXIST. 6WF15

EXIST. 8WF17 EXIST. 8WF17 EXIST. 8WF17 EXIST. 8WF17

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EXIST. 8BL13

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

2L S x

1/ x

5/

EX

IS

T.

LS

x

/2 x

/1

EX

IS

T.

LS

x

/2 x

/1

3 4 5 6 7 8 9 10 11

A

B

C

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" ROD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" R

OD CROSS BRACING

EXIST. 7/8" ROD CROSS BRACING

EXIST. 7/8" ROD CROSS BRACING

4'-10 1/2"

5'-6 1/4" 7'-11" 4'-0 3/4"

7' -2

/2

2' -9

/4

5' -7

/2

1'-10"

8'-1 1/2"

3'-5 1/2"

2' -7

/2

1' -2

/4

4'-7 1/4"

3'-7 1/2"

'-1

0"

CLEAN SIDE

DRYER ROOM

SOILED LINENS

WASH ROOM

MECH. ROOM

RESTROOM

LINEN DISTRIBUTION AREA

LOADING DOCK

3 4 5 6 7 8 9 10 11

A

B

C

DN

UP

AIR HANDLER

CHILLER

ALCOVE

ELECTRICAL

ROOM

WOMEN'S

WOMEN'S

LOCKER ROOM

LA

D

D

ER

PLANT MANAGER

DATA ROOM

(FUTURE)

9' -9

16'-0"

19'-1"

6' -4

6' -0

3' -7

5' -0

5'

-0

5'-2" 5'-4 1/4" 5'-2"

4' -0

7' -5

'-5

'-5

'-5

'-5

'-5

'-1

1"

16'-8"

2'-0" 2'-0"

8'-2 1/2" 6'-0" 19'-5 1/2"

33'-8"

'-1

1"

13'-10"

5'-8"2' -8

2'-6"

2' -6

3' -1

1" 3'

-0

'-1

0" 7"

'-3

1' -0

6'

-0

'-3

2'-2 1/2"6'-0"2'-2 1/2"

10'-4 1/2" 6'-0"

44'-11"

2'-10"

2' -1

0"

3'-3 1/2"

9' -9

4'

-0

/4

8'-4 1/4"

3'-8"

2' -0

2'-0"

6' -0

6' -0

10'-4"

'-4

2'-3" 6'-0"

3' -9

3' -1

WASHER

WASHER

WASHER WASHER

DRYER DRYER DRYER DRYER

AIR HANDLER

CHILLER

NEW WALL ONLY

12'-0"

3'-6 1/4"

6' -0

2'-8"

1'-8"

(TYP)

3'-0"

3' -6

NEW WALL ONLY

(EACH SIDE)

3'-0"

15'-0 1/2"

3' -6

13'-2 1/2"

3' -7

1'-10"

4"

ABOVE

'-1

FDFD

'-1

9'-1"

2' -6

3'

-0

S.G. S.M.

A-03

N

ARCHITECTURAL INSTALLATION

FLOOR PLAN

N

INSTALLATION FLOOR PLAN - PARTIAL BUILDING 13

3/16"= 1'-0"

INSTALLATION ROOF PLAN - PARTIAL BUILDING 13

1/8"= 1'-0"

NEW WORK KEYED NOTES:

1. INSTALL NEW METAL FRAMED AND GYPSUM BOARD WALL AS SHOWN ON THE PLAN, AS

INDICATED BY WALL TYPE "A" SHOWN ON DRAWING A-5 WITH MATERIALS SPECIFIED. THE WALL

SHALL EXTEND FROM THE FINISHED FLOOR TO THE UNDERSIDE OF THE ROOF DECK. INSTALL

FIREPROOFING AT THE TOP AND BOTTOM OF THE WALL ASSEMBLY AND AT ALL PENETRATIONS

TO MEET OR EXCEED THE REQUIRED 1 HOUR FIRE RATING. COORDINATE WITH PENETRATIONS

DETAILS AS SHOWN ON A-06. FINISH WALL SURFACES WITH EPOXY PAINT AS SPECIFIED.

CONTRACTOR SHALL COORDINATE WITH COR FOR VA INSTALLATION PRIOR TO INSTALLATION

OF GYPSUM BOARD.

2. INSTALL A NEW WAINSCOT. WAINSCOT SHALL BE; 18 GA., 304 STAINLESS SHEET STEEL, WITH A

#4 EXPOSED FINISH. WAINSCOT SHALL EXTEND FROM THE FINISHED FLOOR TO A MINIMUM OF

4'-0” AFTER FINISHED FLOOR. ALL EDGES SHALL BE FILLETED TO REMOVE ALL SHARP EDGES.

INSTALL USING CONSTRUCTION ADHESIVE AND FASTENERS EQUALLY SPACED NOT TO EXCEED

8” O.C. AROUND THE PERIMETER AND 16” O.C. IN THE FIELD OF THE PANEL. FASTENERS SHALL

BE A MINIMUM 1 1/2" LONG, 18-8 STAINLESS STEEL, NO. 12, FLAT HEAD SCREWS.

CONSTRUCTION ADHESIVE SHALL BE SUITABLE FOR BONDING STAINLESS STEEL TO GYPSUM

BOARD (DRYWALL), WATERPROOF AND 100% SOLID AFTER CURING. INSTALL PANELS WITH A

1/8” GAP BETWEEN EACH PANEL. SEAL PANEL GAPS AND ALL EDGES OF THE PANELS WITH A

WATERPROOF NON-POROUS, NON-SAGGING, SHRINK AND CRACK-PROOF SILICONE SEALANT

COLOR TO MATCH THE WAINSCOT. EXTEND FROM WAINSCOT FROM CORNER TO CORNER OF

WALL.

3. INSTALL NEW DOOR PANELS, DOOR FRAME AND REQUIRED HARDWARE. COORDINATE WITH

DOOR SCHEDULE AND DETAILS ON DRAWING A-05. COORDINATE COMPONENT SELECTION

WITH PROJECT SPECIFICATIONS. FINISH WITH PAINT AS SPECIFIED FOR INTERIOR METAL

SURFACES.

4. INSTALL NEW TRENCH DRAIN AND GRATING. COORDINATE INSTALLATION WITH TRENCH DRAIN

INSTALLATION DETAIL (5) ON DRAWING A-06 AND AS INDICATED ON PLUMBING DRAWINGS.

5. PATCH EXISTING CONCRETE FLOOR. COORDINATE INSTALLATION WITH TRENCH DRAIN PATCH

INSTALLATION DETAIL (6) ON DRAWING A-06. TROWEL SMOOTH AND LEVEL WITH ADJACENT

SURFACES.

6. PATCH ALL FLOOR PENETRATIONS NO LONGER IN USE. SEE DETAIL ON STRUCTURAL

DRAWINGS FOR INSTALLATION REQUIREMENTS. CONTRACTOR SHALL FIELD VERIFY NUMBER

AND SIZE OF LOCATIONS.

7. INSTALL NEW HOUSEKEEPING PADS. COORDINATE SIZE AND LOCATION WITH LOCKERS,

APPROVED VENDER SHOP DRAWINGS AND/OR MEP DRAWINGS. SEE DETAIL ON STRUCTURAL

DRAWINGS FOR INSTALLATION REQUIREMENTS.

8. INSTALL NEW CORNER GUARD. CORNER GUARD SHALL BE 3" x 3" x 3/16" AND SHALL EXTEND FROM FINISHED FLOOR TO MINIMUM OF 4'-0" AFTER FINISHED FLOOR. CORNER GUARDS SHALL

BE PRE-DRILLED AND COUNTER SUNK FOR FASTENERS IN THE SHOP. FASTENERS SHALL BE A

MINIMUM 1 1/2" LONG, 18-8 STAINLESS STEEL, NO. 12, FLAT HEAD SCREWS.

9. EXISTING LOUVERS TO REMAIN. FURNISH AND INSTALL 2”X 2”X 1/8” SUPPLEMENTAL STEEL

ANGLES AS REQUIRED TO FASTEN 18 GA. FACTORY PRIMED SHEET METAL TO THE EXTERIOR

OF THE EXISTING LOUVER. PRIME COAT ALL STEEL AND CUT EDGES. FINISH WITH PAINT AS

SPECIFIED FOR EXTERIOR METAL SURFACES. PROVIDE GASKETING AND SEALANT TO MAKE

WEATHER TIGHT.

10. PREPARE CONCRETE FLOOR AND WHERE APPLICABLE HOUSEKEEPING PAD SURFACES FOR

NEW FINISHES AS SPECIFIED AND RECOMMENDED IN FINISH MANUFACTURERS PUBLISHED

INSTALLATION INSTRUCTIONS. INSTALL NEW EPOXY FLOOR COATING, IN THE ENTIRE ROOM.

COATING SHALL BE INSTALLED TO COVER THE NEW HOUSEKEEPING PADS.

11. INSTALL A NEW EPOXY WALL COATING ON EACH WALL OF THE ROOM. (U.O.N)

12. INSTALL A NEW EQUIPMENT PAD FOR MECHANICAL EQUIPMENT. COORDINATE SIZE AND

LOCATION WITH MECHANICAL DRAWINGS AND APPROVED VENDER SHOP DRAWINGS.

COORDINATE THE INSTALLATION OF THE EQUIPMENT PAD WITH DETAILS ON STRUCTURAL

DRAWINGS.

13. INSTALL NEW HOUSEKEEPING PAD ON NEW EQUIPMENT PAD (SEE KEYED NOTE 12)

COORDINATE SIZE AND LOCATION WITH MECHANICAL DRAWINGS AND APPROVED VENDOR

SHOP DRAWINGS. COORDINATE THE HOUSEKEEPING PADS WITH DETAILS ON STRUCTURAL

DRAWINGS.

14. INSTALL A NEW CHAIN-LINK FENCE WITH A 6'-0” LOCKABLE DOUBLE SWING GATE.

15. PATCH EXISTING ROOF DECK AND ROOFING SYSTEM AS SHOWN IN DETAIL (1) ON DRAWING A-06.

16. INSTALL A NEW ROOF CURB AS SHOWN IN DETAIL (2) ON DRAWING A-06. COORDINATE SIZE

AND LOCATION WITH MECHANICAL DRAWINGS AND APPROVED VENDOR SHOP DRAWINGS.

17. INSTALL A NEW EQUIPMENT CURB AS SHOWN IN DETAIL (3) ON DRAWING A-06. COORDINATE

SIZE AND LOCATION WITH MECHANICAL DRAWINGS AND APPROVED VENDOR SHOP DRAWINGS.

18. INSTALL (13) BALLARDS 6" DIA x 4'-7" HT. (SEE DWG DETAIL (2) ON DWG. S-03)

19. INSTALL BALLARD 4" DIA. X 4'-0" HT. (SEE DWG DETAIL (3) ON DWG. S-03)

20. PATCH EXISTING CONCRETE FLOOR TROWEL SMOOTH AND LEVEL WITH ADJACENT SERVICES.

21. CONTRACTOR TO FURNISH AND INSTALL A FLOOR MOUNTED 1 1/2" DIA., 304 STAINLESS STEEL

PIPE GUARD. MINIMUM 12INCHES HIGH AND 3 FEET LONG. INSTALL TO PROTECT ELECTRICAL

DISCONNECTS.

22. INSTALL NEW FLOOR TRANSITION STRIP WHERE FLOOR FINISHES DIFFER. SEE DETAIL (4) ON

DRAWING A-05.

23. INSTALL TYPE 'A' AS SHOWN ON DRAWING A-05 TO EXTEND FROM THE TOP OF THE EXISTING

MASONRY TO THE UNDERSIDE OF ROOF DECK. FASTEN BOTTOM TRACK SECURELY TO

MASONRY. GROUT TOP OF MASONRY WALL AS REQUIRED TO PROVIDE LEVEL, ANCHOR

SURFACE FOR WALL EXTENSION.

24. INSTALL RELOCATED LOCKERS. SECURE LOCKERS TO HOUSEKEEPING PAD AND WALL. VERIFY

LOCKERS OPERATE AS INTENDED AND REPAIR AS NECESSARY. FURNISH AND INSTALL

CLOSURE STRIPS AND SLOPED TOPS TO PROVIDE A UNIFORM FINISH.

25. INSTALL NEW VINYL BASE TO PERIMETER WALLS OF ROOM.

26. CONTRACTOR SHALL FURNISH AND INSTALL NEW FLOOR DRAIN. COORDINATE WORK WITH

PLUMBING DRAWINGS. SEE DETAIL ON DRAWING P-01 FPR F;PPR DRAIN INSTALLATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

100% CONSTRUCTION DOCUMENTS

ISSUE FOR BID

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

DECEMBER 27, 2023

ADDENDUM MAY 24,2024 1

632-23-109RENOVATE UTILITIES

BUILDING 13

N.I.C.

LEGEND:

CEILING GRID AND TILE

2X4 LIGHTING TROFFER

CEILING DIFFUSER

CEILING REGISTER

EXHAUST DUCT

2X2 LIGHTING TROFFER

CLEAN SIDE

DRYER ROOM

SOILED LINENS

WASH ROOM

MECH. ROOM

3 4 5 6 7 8 9 10 11

A

B

C

DN

UP

ELECTRICAL

ROOM

LA

D

D

ER

PLANT MANAGER

1'-5 1/2"

2' -7

/2

1'

-9

11"

EX EX

S.G S.M.

A-04

ARCHITECTURAL REFLECTED

CEILING PLAN

REFLECTED CEILING FLOOR PLAN - PARTIAL BUILDING 13

3/16= 1'-0"1

REFLECTED CEILING KEYED NOTES:

1. INSTALL NEW ACOUSTIC TILE CEILING AND GRID. COORDINATE WITH DETAIL 5 ON DRAWING A-05.

CEILING TO BE INSTALLED AT AN ELEVATION OF 9'-0” ABOVE FINISHED FLOOR. COORDINATE WITH

STRUCTURAL DRAWINGS FOR SEISMIC DESIGN CATEGORY REQUIREMENTS, AND MANUFACTURERS

PUBLISHED INSTALLATION INSTRUCTIONS AND DETAILS FOR THE IDENTIFIED SEISMIC CATEGORY.

2. LED CEILING TROFFERS. TO BE FURNISHED AND INSTALLED BY CONTRACTOR. COORDINATE

INSTALLATION WITH ELECTRICAL DRAWING.

3. INSTALL NEW CEILING DIFFUSERS AND REGISTERS. COORDINATE SIZE AND LOCATION WITH

MECHANICAL DRAWINGS AND APPROVED VENDOR SHOP DRAWINGS.

4. COORDINATE WITH FIRE PROTECTION DRAWINGS FOR LOCATIONS OF MODIFIED SPRINKLER

SYSTEM AND NEW SPRINKLER HEADS.

5. COORDINATE WITH MEP DRAWING FOR WALL PENETRATIONS AND EQUIPMENT INSTALLATIONS.

6. LED PENDANT FIXTURES TO BE FURNISHED AND INSTALLED BY CONTRACTOR. COORDINATE

INSTALLATION WITH ELECTRICAL DRAWINGS.

7. LED PENDANT FIXTURES TO BE FURNISHED AND INSTALLED BY VAMC. SHOWN FOR COORDINATE

PURPOSES.

6. PATCH TO MATCH EXISTING CEILING CONSTRUCTION AND FINISH AT CONNECTION OF NEW WALL

CONSTRUCTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le P at h

/1

5/

1:

:0

AM

100% CONSTRUCTION DOCUMENTS

ISSUE FOR BID

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

DECEMBER 27, 2023

ADDENDUM MAY 24,2024 1

632-23-109RENOVATE UTILITIES

BUILDING 13

N.I.C.

CONC. SLAB SEAMLESS EPOXY FLOORING

VINYL TRANSITION STRIP

AS MFD BY JOHNSONITE,

MODEL No. CTA-40-X OR

AN APPROVED EQUAL.

DOOR PANEL

℄ OF TRANSITION TO MATCH ℄

OF DOOR

SCALE:

TRANSITION - VCT TO SEAMLESS EPOXY FLOORING

6" = 1'-0"4

VCT FLOOR

FINISH

JAMB DETAIL

HEAD DETAIL

SCALE:

SINGLE RABBETED FRAME IN DRYWALL PARTITION (1-LAYER ON

EACH SIDE) W/ AUTO-SWING DOOR OPERATOR

3" = 1'-0"2

WALL BOARD:

(1) LAYER ON EACH SIDE PER

WALL TYPE AND

SPECIFICATIONS

STEEL CRIPPLE STUDS:

STUD AT 16" 0.C.

(COORDINATE WIDTH WITH

WALL TYPE.)

FRAME REINFORCED FOR

INSTALLATION OF AUTOMATIC

DOOR OPERATOR

STEEL RUNNER AS HEADER

ATTACH TO STRUT-STUD

ALIGN DOOR FRAME AND WALL

SURFACE FLUSH

AUTOMATIC DOOR

OPERATOR AS

SPECIFIED

18 GA. BRUSHED STAINLESS

STEEL HOOD WITH END CAPS

AS FURNISHED BY OPERATOR

MANUFACTURER

6" HIGH x 1/8" THICK STEEL

BLOCKING PLATE. PLATE SHALL

BE FABRICATED FROM A SINGLE

PIECE & SHALL BE SCREW

FASTENED TO STUD FRAMING.

(1) LAYER OF 1/2" WALL BOARD

MOUNTED OVER BLOCKING

PLATE. WALL BOARD VARIETY

PER WALL TYPE AND

SPECIFICATIONS.

DOOR FRAME (REFER

TO DOOR SCHEDULE

FOR MATERIAL)

FASTEN "ZEE" ANCHOR TO

STUD USING SCREWS

WALL BOARD:

(1) LAYER ON EACH SIDE

PER WALL TYPE AND

SPECIFICATIONS

STEEL STRUT-STUDS:

WALL STUDS AT 16" 0.C.

(COORDINATE WIDTH WITH

WALL TYPE.)

'ZEE' ANCHORS (MIN. 3 PER JAMB)

(MIN. 4 FOR 8'-0" HIGH DOORS)

DOOR FRAME (REFER TO DOOR

SCHEDULE FOR MATERIAL)

CONTINUOUS SEALANT, BOTH

SIDES OF FRAME

ALIGN DOOR FRAME AND WALL

SURFACE FLUSH, (TYP.)

METAL "J"-TRIM, EACH SIDE

CONTINUOUS SEALANT

JAMB DETAIL

HEAD DETAIL

SCALE:

DOUBLE RABBETED FRAME IN DRYWALL PARTITION

(1-LAYER ON EACH SIDE)

3" = 1'-0"3

WALL BOARD:

(1) LAYER ON EACH SIDE PER

WALL TYPE AND

SPECIFICATIONS

STEEL CRIPPLE STUDS:

STUD AT 16" 0.C.

(COORDINATE WIDTH WITH

WALL TYPE.)

STEEL RUNNER AS HEADER

ATTACH TO STRUT-STUD

CONTINUOUS SEALANT, BOTH

SIDES OF FRAME

DOOR FRAME (REFER

TO DOOR SCHEDULE

FOR MATERIAL)

FASTEN "ZEE" ANCHOR TO

STUD USING SCREWS

CONTINUOUS SEALANT, BOTH

SIDES OF FRAME

DOOR FRAME (REFER TO DOOR

SCHEDULE FOR MATERIAL)

WALL BOARD:

(1) LAYER ON EACH SIDE PER

WALL TYPE AND

SPECIFICATIONS

STEEL STRUT-STUDS:

WALL STUDS AT 16" 0.C.

(COORDINATE WIDTH WITH

WALL TYPE.)

'ZEE' ANCHORS (MIN. 3 PER JAMB)

(MIN. 4 FOR 8'-0" HIGH DOORS)

STEEL DECKING OF

STRUCTURE ABOVE

CONT. 3 5/8" GALV.

STEEL TRACK.

3 5/8" STEEL STUDS @ 16" O.C.

(TYPICAL)

LAYER OF 5/8" GYP.

BD. (TYPICAL BOTH

SIDES)

SEE FINISHES AS IDENTIFIED

ON THE PLAN.

DEEP LEG DEFLECTION TRACK.

BOLTED TO CEILING (TYP.)1/4"Ø KWIK BOLT II @

48" O.C. (3-1/2" EMBED)

TYP. ALL STUD

PARTITIONS

BLOCKING:

CONT. 3 5/8" GALV. STEEL

TRACK AT THE TOP OF

WAINSCOT, WAINSCOT

FIELD, AND AS REQUIRED

FOR WALL MOUNTED

EQUIPMENT AND CASEWORK

SCALE:

PARTITION TYPE A

1 1/2" = 1'-0"A

PACK VOID WITH MINERAL WOOL

COORDINATE WITH MEP

DRAWING FOR THROUGH WALL

PENETRATIONS

SEE PENETRATION DETAILS ON

A-06

INSTALL FIRE

SEALANT FOR

EACH SIDE TOP &

BOTTOM

SCALE:

DOOR TYPE ELEVATIONS

1/4" = 1'-0"B

JAMB DETAIL

SCALE:

DOUBLE RABBETED FRAME IN MASONRY PARTITION (INTERIOR)

3" = 1'-0"1

DOOR FRAME (REFER TO DOOR

SCHEDULE FOR MATERIAL)

EXISTING WALL ANCHOR

REINFORCEMENT (MIN. 3 PER

JAMB) (MIN. 4 FOR 8'-0" HIGH

DOORS) SET ANCHOR IN EPOXY

MORTAR.

HEAD DETAIL

DOOR FRAME (REFER TO

DOOR SCHEDULE FOR

MATERIAL)

EXISTING MASONRY WALL

JAMB ANCHOR, PRE-DRILL

MASONRY AND SET ANCHOR IN

EPOXY MORTAR. (MIN. 3 PER JAMB)

(MIN. 4 FOR 8'-0" HIGH DOORS)

SAW-CUT EXISTING

MASONRY FOR NEW

DOOR OPENING.

EXISTING MASONRY WALL

LINTEL:

3 x 3 1/2 x 1/4" STEEL ANGLE

(EACH SIDE) WITH 8" BEARING

EACH SIDE.

SAW-CUT EXISTING

MASONRY FOR DOOR

OPENING.

NON SHRINK GROUT

NON SHRINK GROUT

ALL AROUND FRAME

(EACH SIDE)

3 5/8" METAL

STUD & TRACK

FRAMING 16" O.C. MAX.

0.040 MIN. ALUMINUM FLASHING

SCALE:

LOUVER AND WINDOW DETAIL

1 1/2" = 1'-0"6

EXISTING EXTERIOR WALL

BATT INSULATION

0.040 MIN. ALUMINUM FLASHING

NEW LOUVER SEE DWG. (M-03)

FOR DETAILS

0.040 PRE-FINISHED ALUMINUM

SHEET5/8 " TYPE 'X' MOLD &

MOISTURE RESISTANT

GYP. BD. EACH SIDE

LAY IN GRID

HANGER WIRE SHALL BE 12 GA. AND

SPACED 4'-0" O.C. (WIRES SHALL NOT BE

HUNG FROM PIPES, DUCTS OR

EQUIPMENT)

ACOUSTIC CEILING TILE

WALL CONSTRUCTION

CEILING INSTALLATION NOTES:

1. CEILING INSTALLATION TO CONFORM TO THE

REQUIREMENTS OF ASTM C636.

2. ALL WIRE TIES ARE TO BE THREE TURNS AROUND

ITSELF WITHIN THREE INCHES.

SCALE:

DETAIL AT ACOUSTIC CEILING TILE

3" = 1'-0"5

HANG FROM ROOF

STRUCTURE

6'-0" x 7'-0"

DOOR SCHEDULE

DOOR

NO.ROOM NAME SIZE MAT. TYPE

DOOR

MAT. DETAIL

FRAME

PARTITION

TYPE

FIRE

RATING REMARKS

01 DRYER ROOM

02 DRYER ROOM

03 MECHANICAL ROOM

04 WASH ROOM

05 WASH ROOM

HM 2HG *2/A-05 A

DOOR

NO.

HARDWARE

SET

6'-0" x 7'-0" 6'-0" x 7'-0" 6'-0" x 7'-0" 3'-0" x 7'-0"

HM 2/A-05

HM 2FL 3/A-05

HM 2/A-05

HM HG 3/A-05

1 HR

HM

HM

HM

HM

HM

A A A A

1 HR

1 HR

1 HR

1 HR

2HG

2HG

06 ELECTRICAL ROOM (NIC) 43'-6" x 7'-0" 06HM FL 1/A-05HM A 1 HR 07 OFFICE 33'-0" x 7'-0" 07HM HG 3/A-05HM A 1 HR

S.G S.M.

A-05

ARCHITECTURAL DETAILS 1 OF 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

100% CONSTRUCTION DOCUMENTS

ISSUE FOR BID

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

DECEMBER 27, 2023

ADDENDUM MAY 24,2024 1

632-23-109RENOVATE UTILITIES

BUILDING 13

ROOM FINISH GENERAL NOTES:

1. FINAL COLOR SELECTIONS AND/OR PATTERN SELECTIONS FOR FINISHES SHALL BE PERFORMED BY THE VA.

2. WHERE MATERIALS ARE NOT REFERENCED ON DRAWINGS, ARE NOT SPECIFIED AND ARE NECESSARY TO COMPLETE THE WORK OF THIS CONTRACT, IT IS INTENDED TO MATCH EXISTING MATERIALS. WHERE MATERIALS ARE INTENDED TO MATCH EXISTING, PROVIDE CLOSEST POSSIBLE MATCH. ALL SELECTIONS ARE SUBJECT TO VA'S APPROVAL.

3. ALL ITEMS AND WORK ON DRAWINGS ARE NEW, UNLESS OTHERWISE NOTED.

4. ALL NEW INSTALLATIONS OR BUILDING COMPONENTS TO REMAIN, THAT ARE DAMAGED DURING DEMOLITION OR CONSTRUCTION, SHALL BE REPAIRED OR REPLACED. WHERE ITEMS CANNOT BE REPAIRED TO A "NEW CONDITION", OR THE STRUCTURAL INTEGRITY HAS BEEN AFFECTED, ITEM SHALL BE REPLACED AT NO COST TO THE VA.

5. ALL CONTRACTORS ARE RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, SUBMIT A REQUEST FOR INFORMATION TO VA FOR RESOLUTION.

6. WHERE EXISTING CONSTRUCTION OR BUILDING COMPONENTS HAVE BEEN REMOVED AND/OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, THE RESULTING SURFACES SHALL BE INFILLED/RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. ALL ABANDONED OPENINGS (I.E. DUCT/PIPE REMOVALS, ETC.) AT WALLS, ROOF OR FLOOR TO BE INFILLED SOLID.

7. WHERE REMOVAL OF EXISTING CONSTRUCTION HAS RESULT IN DEPRESSIONS AND/OR UNEVEN FLOOR CONDITIONS, PATCH, LEVEL AND FEATHER AREAS AS REQUIRED TO

PROVIDE LEVEL, SMOOTH SURFACE FOR INSTALLATION OF NEW FLOOR FINISH.

8. ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, DEMOLITION/REMOVAL AND REPAIR/REINSTALLATION IS REQUIRED IN SOME AREAS AFFECTED BY MEP WORK. WORK MAY INCLUDE BY NOT NECESSARILY BE LIMITED TO; THE REMOVAL/REPLACEMENT OF PORTIONS OF CEILINGS, WALLS, FINISHES, AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM THE INSTALLATIONS OF MEP SYSTEMS. ONCE INSTALLATIONS ARE COMPLETE, CONTRACTOR SHALL RESTORE THESE SPACES, AREAS, AND/OR BUILDING COMPONENTS

TO THEIR ORIGINAL CONDITION.

9. CONTRACTOR SHALL OBTAIN FROM VA ALL REQUIREMENTS FOR INSTALLATION OF VA PROVIDED EQUIPMENT INCLUDING ROUGHING DIAGRAMS, INSTALLATION INSTRUCTIONS, ELECTRICAL SCHEMATICS, TEMPLATES, LAYOUTS AND DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER, WELL-COORDINATED INSTALLATION. PRIOR TO

ROUGH-IN OF SERVICES, CONFER WITH OWNER FOR EXACT LOCATION OF ALL ITEMS.

10. ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS SHALL BE FIRE STOPPED. ALL GAPS AND JOINTS AT RATED FLOORS, ROOFS AND WALLS SHALL BE FIRE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK, WALL TO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRE

STOPPING INCLUDES FOAM OR SEALANT AND THE FILL, VOID OR CAVITY PACKING MATERIAL.

11. SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED, THE GENERAL CONTRACTOR SHALL COORDINATE THE WORK OF EACH TRADE WITH OTHER CONTRACTORS WHO MAY BE ON SITE ON OTHER PROJECTS. SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED

INSTALLATION.

12. CONTRACTOR SHALL COORDINATE ALL ACTIVITIES WITH OWNER TO PREVENT DISRUPTION TO BUSINESS OPERATIONS.

13. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING TEMPORARY DUST TIGHT PARTITIONS TO SEGREGATE AREAS UNDER CONSTRUCTION FROM OCCUPIED SPACES. SEE

GENERAL PROTECTION NOTES ON DRAWING A-01.

14. ALL EXTREME DUST, NOISE AND VIBRATION CREATING ACTIVITIES SHALL BE COORDINATED WITH THE VA AND IF DIRECTED, THEY SHALL BE DONE OFF HOURS.

15. ALL CEILING SUSPENSION SYSTEMS AS WELL AS OTHER CONSTRUCTION SYSTEMS SHALL COMPLY WITH THE GOVERNING CODE REQUIREMENTS FOR SEISMIC CONDITIONS. THE

CONTRACTOR SHALL INCORPORATE THESE REQUIREMENT INTO HIS BID PRICE.

16. AS A MINIMUM REQUIREMENT, CLASS C DESIGNATED INTERIOR FINISH MATERIALS SHALL BE FURNISHED AND INSTALLED WITHIN ALL SPACES SCHEDULED TO RECEIVE NEW INTERIOR WALL AND CEILING FINISHES. WITHIN SPACES DESIGNATED TO RECEIVE NEW FLOOR FINISHES, PROVIDE CLASS II OR BETTER MATERIALS.

17. ANY CRACKS FOUND IN CONCRETE SLAB SHALL BE REPAIRED UTILIZING A HIGH STRENGTH, TWO-COMPONENT, 100% SOLIDS EPOXY CRACK FILLER. PRODUCT SHALL BE TK-9000

EPOXY FILLER AS MANUFACTURED BY TK PRODUCTS, OR AN APPROVED EQUAL.

18. ALL EXISTING PAINTED SURFACES AFFECTED BY DEMOLITION AND/OR NEW WORK SHALL BE TOUCHED UP AS NEEDED TO MATCH ADJACENT SURFACES.

19. ALL EXIST. PAINTED WALL SURFACES AFFECTED BY DEMOLITION AND OR NEW WORK SHALL RECEIVE A NEW PAINT FINISH. PAINT ENTIRE WALL PLANE, CORNER TO CORNER.

COLOR TO MATCH ADJACENT EXISTING WALL SURFACES.

20. WHERE THE FINISHES STIPULATES RESINOUS FLOOR INSTALLATION, CONTRACTOR SHALL SHOT BLAST AND PREPARE EXISTING FLOOR FOR INSTALLATION OF NEW FINISHES AS

REQUIRED IN MANUFACTURERS PUBLISHED INSTALLATION MANUAL.

SEALING MASTIC

STAINLESS STEEL CLAMPING

RING

GALV. STEEL CAP

GALV. STEEL

COUNTERFLASHING

COVER BOARD

DUCT INSULATION

PRE-FAB INSULATED METAL ROOF

CURB WITH BUILT-IN RAISED CANT

& WOOD NAILER

BASE FLASHING BONDED TO CURB

(EXTEND FLASHING UP AND OVER

WOOD BLOCKING AT TOP OF CURB).

INSTALL PER MANUFACTURERS

INSTALLATION INSTRUCTIONS.

EXISTING BUILT-UP

ROOFING MEMBRANE

CONT. TREATED WOOD

BLOCKING

20 GA. "J" CLOSURE STRIP OVER

EDGE OF DECK

NEW REINFORCEMENT (TYP.)

COORDINATE WITH

STRUCTURAL DRAWINGS.

EXISTING METAL DECK

20 GA. SHT. METAL CLOSURE

ALL AROUND

EXISTING RIGID

INSULATION

MECH. EQUIPMENT (SEE MECH.

DWGS.)

FULLY ADHERE FLASHING TO

INSULATED ROOF CURB (FLASHING

TO EXTEND UP CURB AND OVER

WOOD BLOCKING AT TOP OF CURB).

INSTALL PER MANUFACTURERS

INSTALLATION INSTRUCTIONS.

EXISTING COVER BOARD

EXISTING RIGID INSULATION

EXISTING METAL DECK

NEW REINFORCEMENT (TYP.)

COORDINATE WITH

STRUCTURAL DRAWINGS.

20 GA. "J" CLOSURE STRIP

OVER EDGE OF DECK

PREFABRICATED 18 GA. GALV. STEEL

INSULATED ROOF CURB, W/FACTORY

INSTALLED WOOD NAILER AND BUILT-IN

RAISED CANT

SECURE ROOFING AND FLASHING TO

TREATED WOOD NAILERS TOP AND

BOTTOM

METAL CURB FLASHING

AND DRIP (SUPPLIED BY

FAN MANUF.)

CANT STRIP

EXISTING BUILT-UP

ROOFING MEMBRANE

SEALING MASTIC

EXISTING BUILT-UP

ROOFING MEMBRANE

OVERLAP DECK PATCH A

MINIMUM OF 12" ALL

AROUND EXISTING

OPENING.

EXISTING OPENING.

COORDINATE WITH

MECHANICAL DRAWINGS

AND FIELD CONDITIONS.

OVERLAP EXISTING

BUILT-UP ROOFING WITH

NEW A MINIMUM OF 12"

ALL AROUND.

CUT BACK EXISTING

ROOFING SYSTEM A

MINIMUM OF 12" ALL

AROUND EXISTING

OPENING.

NEW METAL ROOF

DECKING TO MATCH

EXISTING.

NEW RIGID INSULATION

TO MATCH EXISTING.

NEW COVER BOARD TO

MATCH EXISTING.

NEW BUILT-UP ROOFING

MEMBRANE SHALL BE

COMPATIBLE WITH THE

EXISTING SYSTEM

SEALING MASTIC

SCALE:

TYPICAL ROOF OPENING REPAIR DETAIL

1 1/2" = 1'-0"1 SCALE:

TYPICAL ROOF CURB DETAIL (DUCT PENETRATION)

1 1/2" = 1'-0"2 SCALE:

TYPICAL ROOF EQUIPMENT CURB DETAIL

1 1/2" = 1'-0"3

CONT. TREATED WOOD

CONU. BLOCKING

ANSI/UL1479 (ASTM E814)

SECTION A-A

A

A

1B

1A

1. WALL ASSEMBLY — SHALL BE CONSTRUCTED AS INDICATED BY WALL TYPE. THE FOLLOWING INDICATES THE MINIMUM REQUIREMENTS FOR THE

PENETRATION:

THE 1 OR 2 HR FIRE RATED GYPSUM BOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL U300, U400, V400 OR W400 SERIES WALL AND PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING

CONSTRUCTION FEATURES:

A. STUDS — WALL FRAMING SHALL CONSIST STEEL CHANNEL STUDS. STEEL STUDS TO BE MIN 2-1/2 IN. WIDE AND SPACED MAX 24 IN. OC.

B. GYPSUM BOARD* — 5/8 IN. THICK, 4 FT WIDE WITH SQUARE OR TAPERED EDGES. THE GYPSUM BOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER

TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL WALL AND PARTITION DESIGN. MAX DIA. F OPENING IS 7-1/2 IN. THE HOURLY F AND FH RATINGS OF THE FIRESTOP SYSTEM ARE EQUAL TO THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED.

2. THROUGH PENETRATES — ONE METALLIC PIPE OR TUBING TO BE CENTERED WITHIN THE FIRESTOP SYSTEM. PIPE OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES OR TUBING MAY BE USED:

A. STEEL PIPE — NOM 4 IN. DIAM (OR SMALLER) SCHEDULE 40 (OR HEAVIER) STEEL PIPE.

B. COPPER TUBING — NOM 2 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING.

C. COPPER PIPE — NOM 2 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.TUBE INSULATION — PLASTICS+ — MIN 1/2 IN. TO MAX 1 IN. THICK

ACRYLONITRILE BUTADIENE/POLYVINYL CHLORIDE (AB/PVC) FLEXIBLE FOAM FURNISHED IN THE FORM OF TUBING. AN ANNULAR SPACE OF MIN 0 IN. (POINT CONTACT) TO MAX 1-1/2 IN. IS REQUIRED WITHIN THE FIRESTOP SYSTEM. THE T, FT AND FTH RATINGS ARE 1 HR WHEN THE 1 IN. THICK TUBE INSULATION IS USED AND 3/4 HR WHEN THE 3/4 IN. THICK TUBE INSULATION IS USED. WHEN TUBE INSULATION THICKNESS IS LESS THAN 3/4 IN., THE T, FT AND FTH

RATINGS ARE 0 HR.

SEE PLASTICS+ (QMFZ2) CATEGORY IN THE RECOGNIZED COMPONENT DIRECTORY FOR NAMES OF MANUFACTURERS. ANY RECOGNIZED COMPONENT TUBE INSULATION MATERIAL MEETING THE ABOVE SPECIFICATIONS AND HAVING A UL 94 FLAMMABILITY CLASSIFICATION OF 94-5VA MAY BE USED.

3. FILL, VOID OR CAVITY MATERIAL* — SEALANT — MIN 5/8 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH BOTH SURFACES OF WALL. AT THE POINT CONTACT LOCATION BETWEEN PIPE COVERING AND GYPSUM BOARD, A MIN 1/2 IN. DIAM BEAD OF FILL MATERIAL SHALL BE APPLIED AT

THE PIPE COVERING/GYPSUM BOARD INTERFACE ON BOTH SURFACES OF WALL.

* INDICATES SUCH PRODUCTS SHALL BEAR THE UL CERTIFICATION MARK FOR JURISDICTIONS EMPLOYING THE UL CERTIFICATION.

THE FOLLOWING ARE BASES OF DESIGN PRODUCTS ARE FS-ONE SEALANT OR FS-ONE MAX INTUMESCENT SEALANT AS MANUFACTURED BY HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC. CONTRACTOR MAY FURNISH FOR REVIEW AND ACCEPTANCE ALTERNATE MANUFACTURERS AND PRODUCTS

THAT MEET OR EXCEED THE IDENTIFIED PRODUCTS.

F Ratings — 1 and 2 Hr (See Item 1) T Ratings — 0, 3/4 and 1 Hr (See Item 3) L Rating At Ambient — Less Than 1 CFM/sq ft.

L Rating At 400 F — Less Than 1 CFM/sq ft

SCALE:

PIPE PENETRATION THROUGH 1-2HR. RATED FRAMED WALL

N.T.S.8

System No. W-L-5028

System No. W-L-7040

1. WALL ASSEMBLY — THE FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL U300, U400, V400 OR V400 SERIES WALL AND PARTITION DESIGNS IN THE FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE

THE FOLLOWING CONSTRUCTION FEATURES:

A. STUDS — WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN.

LUMBER SPACED 16 IN. OC. STEEL STUDS TO BE MIN 2-1/2 IN. WIDE AND SPACED MAX 24 IN. ADDITIONAL FRAMING MEMBERS SHALL BE USED TO

COMPLETELY FRAME AROUND OPENING.

B. GYPSUM BOARD* — NOM 5/8 IN.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .