This document is a modification to a previous solicitation for the replacement of the ICU and 200N roofs at the Northport VA Medical Center in Northport, New York. The project will replace approximately 7,000 square feet of the ICU roof and 14,000 square feet of the 200N flat roof to meet current NFPA and VA design standards. It is a Veteran-Owned Small Business (VOSB) set-aside with an estimated cost between $2-5 million and a 400-calendar day period of performance from the Notice to Proceed. The solicitation number is 36C24224B0027, and the North American Industry Classification System (NAICS) code is 238160 for Roofing Contractors. The modification provides responses to questions and requests for information related to the roofing materials, installation methods, and other contract requirements.

View the file

Other files

File Type Posted
36C24224B0027 0005.docx DOCX document
36C24224B0027 0004.docx DOCX document
36C24224B0027 0002.docx DOCX document
36C24224B0027 0001.docx DOCX document
36C24224B0027.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

632-21-118 Replace ICU and 200N Roofs at Northport VA Medical Center 79 Middleville RD, Northport, NY 11768

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
10468-3904
SOLICITATION NUMBER*
36C24224B0027

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE
05-30-2024 9:00 AM EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
VSA
PRODUCT SERVICE CODE*
Y1DA
NAICS CODE*
238160
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904

POINT OF CONTACT*

Contract Specialist Yingjie Yeung yingjie.yeung@va.gov (347)949-1662

PLACE OF PERFORMANCE

ADDRESS
Northport VA Medical Center

79 Middleville Road

Northport NY

POSTAL CODE
11768
COUNTRY
United States of America

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
www.va.gov
EMAIL DESCRIPTION
Department of Veterans Affairs

Modification to a Previous Notice Modification to a Previous Notice

DESCRIPTION

*= Required Field
Modification to a Previous Notice

Modification to a Previous Notice

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05/23/2024 632-22-124 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx NY 10468-3904 To all Offerors/Bidders

36C24224B0027 4/26/2024

X X x May 30 th ,2024 at 9:00 AM X Replace ICU and 200N Roofs at Northport VA Medical Center 632-21-118

The purpose of this amendment is to provide the responses to the questions and requests for information.

Please see next page for responses.

Jean M. Paul Contracting Officer

Page 1 of Request for Information/Questions Responses

DATE: 5/23/2024

FROM: Yingjie Yeung, Contract Specialist

PROJECT: Replace ICU and 200N Roofs at Northport VAMC #36C24224B0027

SUBJECT: Request for Information and Questions Responses

1. Detail 5/A-104 shows a two (2) piece coping with the two (2) respective pieces hooked together. Detail 2/A-104 shows the two (2) piece coping with the two (2) respective pieces lapped. Given the format of the coping, hooking them as shown in detail 5/A-104 is not practical. May they be lapped as shown in 2/A-104?

Response:

Specification section 076000 Flashing and Sheetmetal section 2.4.C “Cleats” states flashing 12 inches or wider will need to be attached to the blocking with cleats. As long as the sections are followed you can use an alternative method than that shown.

It should be noted that the details in question should have been noted as 2/A-504, and 5/A-504. The locations of these details are shown on A-104 but detailed on A-504. The question as noted was hard to understand.

1. Core cuts of the roof assembly were not allowed during the walkthrough. 07 01 50.19.1.7.B.1.b stated that cores are available. So that the removal of the existing roof and calculation of any height issues may be determined, please provide photos and reports of the existing roof assembly on the each of the roof areas.

Response:

Core samples were not taken as we had a thermo-imaging report that shows the roofs and where the potential roof leaks are and a hazard materials report. Both of these may be available from the owner.

- In regards to the to the existing roof assemblies:

For liability purposes I cannot specifically state the exact roof constriction but will describe it in general detail as follows;

Roof 200N Revise roof sections as follows, -3/AD501, Concrete roof deck, 6” +/- Tapered rigid roof insulation, EPDM Roofing, and stone ballast.

-4/AD501 Concrete roof deck, 6” +/- Rigid roof insulation, EPDM roofing, with Stone Ballast -5/AD501, Steel deck, 6” +/- tapered roof insulation, EPDM roofing, with stone ballast -It should be noted that all of the existing roofs that are to be removed have stone ballas that will have to be removed. This ballast is not shown on all of the removal details as it would be redundant. These roof descriptions however were described in greater detail on the alternate drawings AD103, and AD104.

-AD101 & AD102, Key note 8 shall be revised to “Remove flat roof membrane and insulation, and stone ballast to concrete deck.

-AD101 & AD102, Key note 10 shall be revised to “Remove tapered insulation, roofing, and stone ballast to concrete deck.

-AD101 & AD102, Key note 21 shall be revised to “Remove tapered insulation, roofing, and stone ballast down to the metal deck.

-AD-1-1 General note 5 shall read, control to remove all materials including those noted and un-noted as there may be wood blocking, anchors, vapor barrier, etc. under the roof surface that is not indicated on the drawings.

-ICU Building, revise roof sections a follow;

-4/AD503 This section shall be revised as follows; steel roof deck, 5” +/- roof insulation, EPDM roofing and stone ballast.

-All of the roof areas for this building have stone ballast that will need to be removed.

1. Specification 04 01 00 is for masonry repairs. Our review of the plans did not show any masonry repairs. Can you clarify if there is masonry to be repaired?

Response:

For liability purposes I cannot specifically state where the masonry repairs will occur but refer to the details on A-501, though A-505. There are new scuppers to be installed, saw cuts, and other areas that will require masonry work.

1. Specification 07 22 00 2.5.C.2 calls for self adhered sheet vapor retarder. Specification 07 27 26 2.3.A calls for a fluid applied air barrier. Can the self adhered sheet vapor retarder, as it standard and acceptable for TPO systems be used?

Response:

The self-adhered vapor barrier can be used on the concrete decks only.

1. Specification 07 52 23 2.4.D.1 calls for “Metal Roof Edging products by roof membrane manufacturer.” Most manufacturer provide metal roof edging come in 12’ lengths. Specification 07 60 00 2.9.A.1 calls for metal edging not greater than 10’ in length. Should the 12’ manufacturer provide metal edging be used?

Response:

The 12-foot length material can be used.

1. The specification calls for water based bonding adhesive. Given Water based bonding adhesive’s acceptable temperature window, it may not be feasible to use. May low VOC spray applied bonding adhesive be used as is the standard for Firestone and other TPO manufacturers?

Response:

The low VOC spray applied bonding adhesive can be used.

1. Specification 07 54 23 3.5.D.4 calls for sealing the seams with lap sealant. This is non-standard for heat welded TPO seams. Must the seams be sealed with lap sealant against Firestone and other TPO manufacturer details?

Response:

The seams shall be sealed as per the manufacturer’s recommendations. The lap sealant will not be required.

1. Specification 07 54 23 3.6.D calls for field fabricated expansion joints. Field fabricated expansion joints are industry standard and are included under the manufacturer roof warranty. Specification 07 95 13 2.4 calls for a C/S Model RJT-200VF expansion joint. This would not be included under the manufacturer's roof warranty. Which expansion joint style should be used?

Response:

Use the field fabricated expansion joints

1. Specification 07 54 23 3.8.3 describe interlocking connectors for the pavers. What interlocking connectors specified?

Response:

Interlocking connectors for the pavers will not be required.

1. Many of the metal flanges specified for the respective metal trim call for a 4” flange. The flashing used to seal the metal trim is 6” wide, and is required to be half on and half off of the flange. May 3” flanges be used in order to be compliant with the manufacturer warranty requirements?

Response:

The 3” metal flashing flanges can be used.

1. Please advise where detail 6/AD504 for stone ballast removal is to be performed. We do not see this indicated in Plan view.

Response:

Detail 6/AD501 is for the removal of the roofing, insulation, and stone ballast for the stair roof alternates at building 200N.

1. Sign-in sheet request

Response:

No Further Questions.