RFIs and Responses 561A4-18-111 Reno AMH B143 BW CN - Part II.pdf

PDF 110 KB Posted

Attached to
Y1DA--561A4-18-111 Renovate Acute Mental Health Building 143 Units B-West & C-North
Solicitation number
36C24223B0009
Issued by

About this file

This document contains responses to questions regarding a solicitation to renovate acute mental health buildings at a Veterans Affairs medical center. The solicitation seeks bids to renovate two units, B-West and C-North, at Building 143. Key details include that Unit C-North must be completed within the first 240-day phase to allow for patient transfers from Unit B-West. The contractor will be provided keys to use two dedicated service elevators for deliveries and access. The government architect will provide construction period services such as submittal reviews and responding to requests for information or clarification. Resilient flooring types have been updated in the specifications from the shorthand codes used in earlier drawings. Other clarifications addressed specific flooring removal details and locations of finishes and fixtures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information (RFI) Solicitation No. 36C24223B0009 Project No. 561A4-18-111 Renovate Acute Health Building 143 BW & CN

Question 8: AD101 - Level B - Demolition Plan - Area A: Sheet AD101, general demolition notes 1 states: refer to specifications section 024119 - selective demolition for additional requirements and information, but this section is missing in the specifications, please clarify.

Response 8: Refer to 024100 Demolition for demolition scope; disregard general demolition note 1 on sheet AD101.

Question 9: AE301 - Casework and Millwork Elevations and Details Sheet AE301, detail 9 states see equipment sheet for info for the mirror. but the equipment sheet is missing in the drawings, please clarify.

Response 9: Equipment can be found on AQ series of drawings. On sheet AQ102, in the changing area the mirror is tagged as A1086.

Question 10: Page 9 of solicitations states that upon award the contractor should procure plumbing fixtures and water closets. Please clarify, how many days the fixtures need to be installed and which areas are high priority.

Response 10: Because of the possibility of long delivery times the Government is requesting that plumbing fixtures be procured at the onset of the project. The contractor may invoice for these items when delivered to the site and inspected and accepted by the Government.

Question 11: Please provide more detail on the construction phasing, and if there’s any duration limitation for each phase.

Response 11: CN wing must be completed first so that the patients in BW can be transferred to CN. The allotted time for each phase is 240 days.

Question 12: Can the contractor use any dedicated elevator to access the site and deliver material?

Response 12: There are two service elevators that will be used by the contractor, The contractor will be issued keys to the service elevator lobby.

Question 13: Please confirm what kind of technical services we should expect from Acela Architects after the award, should we expect any changes in the design and Specs?

Response 13: ACELA will be performing construction period services which include submittal reviews, shop drawing reviews, RFI responses, and review of any RFP if warranted. The Government does not anticipate any design changes but this could happen.

Question 14: Clarifications on the floor finish key- The drawings call out floor finish WSF-1, WSF-2 an WSF-3, but the schedule for finishes does not have WSF material listed.

Requests for Information (RFI) Solicitation No. 36C24223B0009 Project No. 561A4-18-111 Renovate Acute Health Building 143 BW & CN

Response 14: The AI series of drawings indicate finishes. The specifications have the schedule for finishes. See 090600 for Schedule. Resilient Sheet Floor (RSF-) and Resilient Sheet Floor Rods (RSFR-) have taken place of WSF and WSF rods respectively.

Question 15: AD102 does not show the existing floors in rooms W219 & W220 being removed, But in Al201 Shows a new floor. Is the floor being installed on top of the existing floor?

Response 15: Demo existing flooring in Conference Room (W219) and Day Room (W220). The new flooring is not to be installed on top of existing. TRAN-1 is to be used at transition between LVT to WSF.

Question 16: Drawing Al203 has a floor finish code SPF-1, but this is not referenced on the finish schedule?

Response 16: SPF-1 is Specialty Padded Flooring – these details can be found on Sheet AI101 and SPF-1 is referenced on Sheet AI203. More information can be found in specifications

111950 PROTECTIVE PADDING SYSTEM.