This document outlines requirements for a roof replacement and repointing project at the Montrose VA Medical Center. The project involves replacing the roof on Building 29 and conducting selective tuckpointing of exterior walls. Key specifications include using half round copper roof vents to match the historical design. Bidding is open with responses due by April 30, 2022. The award is expected in June 2022, with work to be completed within 260 calendar days. Health and safety standards like those in OSHA 29 CFR 1926 must be followed. The project is funded by the Department of Veterans Affairs Veterans Health Administration VISN 2 under solicitation number 36C24221B0067.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOP 138-68HV
TRENCHING AND EXCAVATION
VA Hudson Valley Health Care System Issue Date: 5.28.2013 Update: 5.28.2016
1. PURPOSE: To establish policy, responsibilities, procedural guidance, and safety requirements for trenching and excavation operations by VA Hudson Valley HCS and/or contractor personnel.
2. POLICY:
a. The VA Hudson Valley HCS has established mechanisms to operate under the rules and regulations as outlined by the U.S. Department of Labor, Occupational Safety and Health Standards covering all excavations.
b. The mechanisms include the use of support systems, sloping and benching systems, and other systems which are used as protection against excavation cave-ins, the means of access to and egress from excavations and also the employees’ exposure to vehicular traffic, falling loads, hazardous atmospheres, water accumulation, and unstable structures in and adjacent to excavations.
3. RESPONSIBILITIES:
a. The Chief, Engineering Service is responsible for the implementation and reinforcing the requirements outlined in this policy
b. The Engineering Shop Supervisors or designees are responsible for:
1) Ensuring that the excavation or trench is safe and in compliance with 29 CFR 1926, Subpart P
2) Acting as "competent persons" after the completion of excavation training, as designated.
c. Engineering Employees are responsible for following the requirements of this policy and 29 CFR 1926,Subpart P.
d. Project Section Employees are responsible for ensuring contractors comply with the requirements of this policy and 29 CFR 1926, Subpart P.
4. PROCEDURES:
a. Definitions:
1) Cave-in means the separation of a mass of soil or rock material from the side of an excavation either by falling or sliding, in sufficient quantity so that it could entrap, bury or otherwise injure and immobilize a person.
2) Competent person means one who is capable of identifying existing and predictable hazards in the environment, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
3) Excavation means any man-made cut, cavity, trench, or depression in an earth surface, formed by earth removal.
4) Hazardous atmosphere means an atmosphere which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritation, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury.
5) Trench (Trench excavations) means a narrow excavation (in relation to its length) made below the surface of the ground. In general the depth is greater than the width. If the width of a trench (measured at the bottom) is not greater than 15 feet, then the excavation is also considered a trench.
6) Bell-bottom Pier Hole means a type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a bell shape.
b. Mandatory Requirements:
1) New York state law requires that you call Dig Safety New York prior to any type of excavation work. Call center operators at Dig Safely New York are available 24 hours a day, seven days a week to receive and process calls to the toll-free phone number at (1- 800-962-7962).
Customer Service Representations will provide a faxed copy of the request with a ticket reference confirmation number. Each Excavation request requires a (2) to (10) day advance notice of the planned start date (not counting the day of the call).
Dig Safety New York will notify all member utilities of the pending excavation so each can come out and mark the location of their underground lines. Confirmation must be received from each utility and have marked the ground area being disturbed. Work may not start before the stated commencement date, unless you have been notified by EVERY operator that they have no underground utilities in your work area.
2) The walls and faces of trenches 5 feet or more deep and all excavations in which employees are exposed to changes from moving grounds or cave-in shall be guarded by a shoring system, sloping of the ground or a shielding system.
3) Trenches 4 feet or more deep shall have an adequate means of exit such as ladders, steps, or ramps located so as to require no more than 25 feet of lateral travel. Ladders must be secured and must extend 36 inches above the landing.
4) In all excavations which employees may be required to enter; all equipment, excavated material, or other material shall be effectively stored and retained at least 2 feet or more from the edge of the excavations.
5) Daily inspections of excavations, protective systems, and adjacent areas shall be made by a competent person for any hazardous conditions which might exist. An "Excavation Checklist" (Attachment A) will be used as a guide for compliance and will be filled out for each excavation or trench. Where a competent person finds such a hazard, exposed employees shall be removed from the area until actions have been taken to insure their safety. These inspections are required only when employee exposure is reasonably anticipated.
6) All material removed from an excavation will be considered Class C soil unless otherwise determined. All protective systems will; therefore, be constructed for Type C soil. The maximum allowable slope will be 35 degrees (1 ½:1) on all Type C excavations.
7) When an excavation is near vehicular traffic, exposed employees shall be provided with, and shall wear warning vests or other suitable garments marked with or made of reflectorized or high-visibility material.
8) Prior to opening an excavation, as-built plans or any other feasible method will be used to determine the location of utility installations such as sewer, telephone, fuel, electrical/water lines, or any other installation.
c. Additional Requirements:
1) In excavations where hazardous atmospheres or engulfment may exist, the excavation will be treated as a permit-required confined space. The procedures of the confined space policy shall be followed.
2) Mobile equipment shall be protected by using hand signals, barricades, or stop logs if operator visibility is restricted.
3) Excavations shall be protected from the accumulations of water by water-removal equipment, dikes, diversion ditches, or other suitable means. Excavations subject to heavy rains or run-off shall be inspected by a competent person prior to entering the excavation.
4) Employees shall be protected with personal protective equipment for the protection of the head, eyes, respiratory tract, feet and other body parts as required.
5) Unattended excavations or trenches will be effectively guarded against unauthorized entry by chain link fencing no lower than 10 feet high that will include appropriate construction-site signage as necessary.
6) Unattended machinery, equipment and construction dumpsters must be secured by a chain link fence no lower than (8) feet high that will include warning signage
6) Steel Trench Plates are permitted as an alternative to chain link fencing providing that the plates extend beyond the edges of the trench wall a minimum of (12”) inches.
7) Excavated areas protected by temporary trench plates must be protected by a ( 48”) high orange colored Snow/Safety fence staked at intervals not less than every (8’)
8) Signage reading: Construction Site, Hard Hats Required must be attached to each side of any fencing installed every 10 feet or each fence panel.
9) No employee shall be permitted underneath loads handled by lifting or digging equipment. Employees must stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling materials.
d. Requirements for Protective Systems:
1) Protection of Employees in Excavations:
(a) Each employee in an excavation shall be protected from cave-ins by an adequate protection system designed in accordance with a checklist and applicable testing requirements along with training objectives except when:
(1) Excavations are made entirely in stable rock; or,
(2) Excavations are less than 5 feet (1.52m) in depth and examination of the ground by a competent person provides no indication of a potential cave-in.
(b) Protective systems shall have the capacity to resist without failure all loads that are intended or could reasonably be expected to be applied or transmitted to the system.
2) Design of Sloping and Benching Systems:
The slopes and configurations of sloping and benching systems shall be in accordance with the requirements previously stated in Paragraph 5b. and as follows:
(a) Option 1- Allowable Configurations and Slopes (See 29 CFR 1926, Subpart P.):
(1) Excavations shall be sloped at an angle not steeper than one and one-half horizontal to one vertical (34 degrees measured from the horizontal, unless the employer uses on of the other options listed below).
(2) Slopes specified in paragraph b.1) of this section shall be excavated to form configurations that are in accordance with slopes shown for Type 3 soil (see 29 CFR 1926, Subpart P.).
(b) Option 2- Determination of Slopes and Configurations (see 29 CFR 1926, Subpart
P). Maximum allowable slopes and allowable configurations for sloping and benching systems shall be determined in accordance with the conditions and requirements set forth in 29 CFR 1926, Subpart P.
(c) Option 3- Designs Using Other Tabulated Data:
(1) Designs of sloping or benching systems shall be selected from and be in accordance with tabulated data such as tables and charts found in 29 CFR 1926, Subpart P.
(2) The tabulated data shall be in written form and shall include the following:
a) Identification of the parameters that affect the selection of a sloping or benching system drawn from such data;
b) Identification of the limits of use of the data, to include the magnitude and configuration of slopes and determined to be safe;
c) Explanatory information as may be necessary to aid the user in making a correct selection of a protective system from the data.
(3) At least one copy of the tabulated data which identifies the Registered Professional
Engineer who approved the data shall be maintained at the job site during construction of the protective system. After that time, the data may be stored off the job site, but a copy of the data shall be made available to the secretary upon request.
(d) Option 4 - Design by a Registered Professional Engineer.
(1) Sloping and benching systems not utilizing option (1) or option (2) or option (3) under paragraph (b) of this section shall be approved by a registered professional engineer.
(2) Designs shall be in written form and shall include at least the following:
a) The magnitude of the slopes that were determined to be safe for the particular project;
b) The configurations that were determined to be safe for the particular project; and,
c) The identity of the registered professional engineer approving the design.
(3) At least one copy of the design shall be maintained at the job site while the slope is being constructed. After that time, the design need not be at the job site, but a copy shall be made available to the Engineering Design Section upon request.
3) Design of Support Systems, Shield Systems, and Protective Systems
Designs of support systems, shield systems, and other protective systems shall be selected and constructed by the employer or his designee and shall be in accordance with the requirements as follows:
(a) Option 1 - Designs for timber shoring in trenches shall be determined in accordance with the conditions and requirements set forth in 29 CFR 1926, Subpart P. Designs for aluminum hydraulic shoring shall be in according with paragraph c)2 of this section, but if manufacturer’s tabulated data cannot be utilized, designs shall be in accordance with (see 29 CFR 1926, Subpart P).
(b) Option 2 - Designs using manufacturer tabulated data:
(1) Design of support systems, shield systems, or other protective systems that are drawn from manufacturer’s tabulated data shall be in accordance with all specifications, recommendations, and limitations issued or made by the manufacturer.
(2) Deviation from the specifications, recommendations, and limitations issued or made by the manufacturer shall only be allowed after the manufacturer issues specific written approval.
(3) Manufacturer’s specifications, recommendations, and limitations, and manufacturer’s approval to deviate from the specifications, recommendations, and limitations shall be in written form at the job site during construction of the protective system. After that time, this data may be stored off the job site, but a copy shall be made available to the Engineering Design Section upon request.
(c) Option 3 - Designs using other tabulated data:
(1) Designs of support systems, shield systems, or other protective systems shall be selected from and be in accordance with tabulated data, such as table and charts.
(2) The tabulated data shall be in written form and include all of the following:
a) Identification of the parameters that affect the selection of protective systems drawn from such data;
b) Identification of the limits of use of the data;
c) Explanatory information as may be necessary to aid the user in making a correct selection of a protective system from the data.
d) At least one copy of the tabulated data which identifies the registered professional engineer who approved the data shall be maintained at the job site during the construction of the protective system. After that time the data may be stored off the job site, but a copy of the data shall be made available to an inspector upon request.
(d) Option 4 - Design by a registered professional engineer. Support systems, shields, and other protective systems not utilizing Option 1, Option 2, or Option 3 above shall be approved by a Registered Professional Engineer.
(e) Designs shall be in written form and shall include the following:
(1) A plan indicating the sizes, types, and configurations of the materials to be used in the protective systems; and
(2) The identity of the registered engineer approving the design.
(f) At least one copy of the design shall be maintained at the job site during construction of the protective system. After that time, the design may be stored off the job site, but a copy of the design shall be made available to the Engineering Design Section upon request.
(g) Materials and Equipment. Materials and equipment used for protective systems shall be free from damage or defects that might impair their proper function.
(h) Manufactured materials and equipment used for protective systems shall be used and maintained in a manner that is consistent with the recommendations of the manufacturer, and in a manner that will prevent employee exposure to hazards.
(i) When material or equipment that is used for protective systems is damaged, a competent person shall examine the material or equipment and evaluate its suitability for continued use. If the competent person cannot assure the material or equipment is able to support the intended loads or is otherwise suitable for safe use, then such material or equipment shall be removed from service, and shall be evaluated and approved by a registered professional engineer before being returned to service.
(j) Installation and removal of support: In general, members of the support systems shall be securely connected together to prevent sliding, falling, kick-outs, or other predictable failure.
(k) Support systems shall be installed and removed in a manner that protects employees from cave-ins, structural collapses, or from being struck by members of the support systems.
(l) Individual members of support systems shall not be subjected to loads exceeding the load limits which individual members were designed to withstand.
(m) Before temporary removal of individual members begins, additional precautions shall be taken to ensure the safety of employees, such as installing other structural members to carry the loads imposed on the support system.
(n) Removal shall begin at, and progress from the bottom of the excavation. Members shall be released slowly so as to note any indication of possible failure of the remaining members of the structure or possible cave-ins of the sides of the excavation.
(o) Backfilling shall progress together with the removal of support systems from excavations.
(p) Additional requirements for support systems for trench excavations: Excavation of material to a level no greater than 2 feet (.61m) below the bottom of the members of a support system shall be permitted, but only if the system is designed to resist the forces calculated for the full depth of the trench, and there are no indications while trench is open of a possible loss of soil from behind or below the bottom of the support systems.
(q) Installation of a support system shall be closely coordinated with the excavation of trenches.
(r) Sloping and benching systems: Employees shall not be permitted to work on the faces of sloped or benched excavation at level above other employees except when employees at the lower levels are adequately protected from the hazard of falling, rolling, or sliding material or equipment.
(s) Shield systems: Shield systems shall not be subjected to loads exceeding those which the system was designed to withstand.
(t) Shields shall be installed in a manner to restrict lateral or other hazardous movement of the shield in the event of the application of sudden lateral loads.
(u) Employees shall be protected from the hazard of cave-ins when entering or exiting the areas protected by shields.
(v) Employees shall not be allowed in shields when shields are being installed, removed, or moved vertically.
(w) Additional requirement for shield systems used in trench excavations: Excavation of earth material to a level not greater than 2 feet (.61m) below the bottom of a shield shall be permitted, but only if the shield is designed to resist the forces calculated for the full depth of the trench, and there are no indications while the trench is open of a possible loss of soil behind or below the bottom of the shield.
e. Emergency Rescue Equipment:
1) Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, shall be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment shall be attended when in use and shall be made available by the Fire Department.
2) Employees entering bell-bottom pier holes, or other similar deep and confined footing excavations, shall wear a harness with a lifeline securely attached to it. The lifeline shall be separate from any line used to handle materials, and shall be individually attended at all times while the employee wearing the lifeline is in the excavation and shall be made available by the section supervisor.
f. Stability of Adjacent Structures:
1) Where the stability of adjoining buildings, walls, or other structures is endangered by excavation operations; support systems such as shoring, bracing, or underpinning shall be provided to ensure the stability of such structures for the protection of employees under the guidance of the section chief, Engineering Design Section, or
OSH&FP.
2) Excavation below the level of the base or footing of any foundation or retaining wall that could be reasonably expected to pose a hazard to employees shall not be permitted except when:
(a) A support system, such as underpinning, is provided to ensure the safety of employees and the stability of the structure, if this has been approved by both the section supervisor, Engineering Design Section, and OSH&FP; or,
(b) The excavation is in stable rock; or,
(c) A registered professional engineer has approved the determination that the structure is sufficiently removed from the excavation so as to be unaffected by the excavation activity; or a registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees.
3) Sidewalks, pavements, and appurtenant structure shall not be undermined unless a support system or another method of protection is provided to protect employees from the possible collapse of such structures and this system has been approved by both the section supervisor and OSH&FP.
4) When outside contractors are used, the above criteria will be included in the VA contract specifications.
5) Protection of Employees from Loose Rock or Soil:
(a) Adequate protection shall be provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection shall consist of scaling to remove loose material, installation of protective barricades at intervals, as necessary, on the face to stop and contain falling material, or other means that provide equivalent protection.
(b) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both, if necessary.
5. REFERENCE:
OSHA 29 CFR 1926, Subpart P, Excavations NYS Code Rule 753 Master agreement between the Department of Veterans Affairs and the American
Federation of Government Employees
6. RESCISSION: SOP 138-68, Trenching and Excavation. Issued July 1, 2009.
//s//
JOHN CLIFFE
Chief, Engineering Service
Attachments: A – Originals kept on file within the Engineering Office
Distribution: WEB Originator: 138BSE-JRD
Attachment A
Excavation Checklist
To be completed by the Competent Person
Site Location:
Date: __________ Time: ____________ Competent Person: ___________________
Excavation Depth: ____________________ Excavation Width: ___________________
Type of Protective System Used:
1. General Inspection of Jobsite:
a. Surface encumbrances removed or supported.
Ye s No N.A.
b. Employees protected from loose rock or soil that could pose a hazard by falling or rolling into the excavation.
Ye s No N.A.
c. Hardhats worn by all employees.
Ye s No N.A.
d. Spoils, materials, and equipment set back at least 2 feet from the edge of the excavation.
Ye s No N.A.
e. Barriers provided at all remotely located excavations, wells, pits, shafts, etc.
Ye s No N.A.
f. Warning vests or other highly-visible clothing provided and worn by all employees exposed to vehicular traffic.
Ye s No N.A.
g. Employees required to stand away from vehicles being loaded and unloaded.
Ye s No N.A.
h. Warning system established and utilized when mobile equipment is operating near the edge of the excavation.
Ye s No N.A.
i. Employees prohibited from going under suspended loads.
Ye s No N.A.
j. Employees prohibited from working on the faces of sloped or benched excavations above other employees.
2. Utilities:
a. Exact location of utilities marked.
Ye s No N.A.
b. Underground installations protected, supported, or removed when excavation is open.
Building 29 Roof Replacement and Selective Tuckpointing Project 620-14-104 VAMC Montrose, NY
SOP 138-22HV
Construction Standard Operating Procedures Quality Assurance for Projects
VA Hudson Valley Healthcare System Issue Date:
HVHCS FDR & CP Campus
DIG AND EXCAVATING PERMIT REQUEST
(Electrical, water, gas, fiber optic, sewer, other)
ANY PENETRATIONS INTO THE GROUND ON VA PROPERTY REQUIRES A DIG
PERMIT
When locating is COMPLETE, an APPROVED copy will be attached to the completed 138-022 Construction Safety form Contact or Project Manager: _____________________Phone # Dig Location: ____________________ Start Date:
A DRAWING WITH DIG LOCATION IDENTIFIED MUST BE ATTACHED TO THIS
REQUEST WHEN POSSIBLE.
(Drawings are available in the Engineering Office)
DO NOT START unless you have received an approved hard copy of this request.
Purpose for digging: To bury electrical grounding rods.
Section doing the digging: _________________________ Phone
Certified Equipment operator:
Equipment to be used:
Is fence required: Yes: ______________ No:
All excavation on the HVHCS Campuses will be performed following the OSHA Regulations (Standards - 29 CFR) Specific Excavation Requirements 1926.651. All excavation will also conform to the facility’s trenching and excavation SOP.
There are also some Electrical, Fiber Optic and Cable TV conductors owned by private companies on campus. It is the responsibility of the Contact Person or Project Manager to contact the local utility companies to obtain an approved dig permit. Please contact the Engineering Program Manager with any questions.
PROJECT #/WORK ORDER #._______________________________
Area utilities located and identified by:
_________________________ Date: _________
Electrical Supervisor approval:
Pipe fitter Supervisor approval:
Engineering Program Manager/Designee approval:
Comments:
SOP 138-022
HAZARD EVALUATION
Project Title: BUILDING 29 REPLACE ROOF & TUCKPOINT Project Number: 620-14-104 Bldg/Room: Building 29 Roof/Exterior Walls Project Engineer: MARK
COOPERMAN
Section A: Yes No Signature Date
1. Asbestos Survey Report reviewed. Is Asbestos Present?
3. Has this finding been confirmed by the Industrial Hygienist or designee?
4. C.O.T.R./Project Engineer/ Shop Foreman is aware of asbestos.
4. Is Lead paint present?
5. Project has been discussed with GEMS Coord.
6. Project has been discussed with Energy Mngr
7. Project has been discussed with Fire Chief Comments / Action / Follow Up:
Section B: Check if utility is effected:
Heat Air Conditioning Shop Signature: _______________ Date ________ Water Steam Shop Signature: _______________ Date ________ Electricity Shop Signature: _______________ Date ________ Elevators Shop Signature: _______________ Date ________ Medical Gases Plumbing Waste (Sewage) Shop Signature: _________________
Date ________
Engineering General Foreman Signature: _________________________Date: __________ Section C: The Project Does Impact: (check all that apply)
Air Quality/ Dust Excavation (Dig Permit) Noise Level Penetrations (Penetration Permit) Vibration Confined Space (Penetration Permit) Utility Services Lockout/Tagout Emergency Procedures Fall Protection Structural Integrity ILSM Access to job site through patient care areas Disposal of debris through patient care areas
Project Engineer Signature: ____________________________________Date: __________ Section D: Infection Control Risk Assessment Class of Precautions : Class I Class II Class III Class IV
Infection Control Signature: ____________________________________Date: __________
SOP 138-022
ATTACHMENT A
Infection Control Risk Assessment WORK PERMIT
Infection Control Risk Assessment WORK PERMIT Permit #: Prepared by: DCS Infrastructure LLC Telephone: Date:
Project # and Location: 620-14-104, Montrose, NY VAMC Project Start Date:
Project Manager & Telephone: Gary Cooperman
(914) 737-4400 ext. 2615 Estimated Duration: 260 Days
Contractor Performing work: Permit Expiration Date:
Contractor Supervisor & Cell Phone:
YES RISK Level YES Construction Activity TYPE
Low Risk Area TYPE A: Inspection, non-invasive activity
X Medium Risk Area TYPE B: Small scale, short duration, minimal levels of dust
High Risk Area X TYPE C: Activity generates moderate to high levels of dust.
Highest Risk Area TYPE D: Major duration and construction activities.
CONSTRUCTION
ACTIVITY→
TYPE A
TYPE B
TYPE C
TYPE D
RISK GROUP
↓ ICRA Level↓: ICRA Level↓: ICRA Level↓: ICRA Level↓:
Low Risk I II II III or IV Medium Risk I II III IV High Risk I III III or IV IV Highest Risk III III or IV III or IV IV
Note: Infection Control approval and an ICRA Work Permit will be required for Level III or Level IV projects.
Complete the following for Level III and Level IV projects.
Identify the areas surrounding the project area and the risk level for those locations.
If more than one risk level is identified, select the higher risk level.
Unit Below Unit Above Lateral Lateral Behind Front
Risk Group: Risk Group: Risk Group: Risk Group: Risk Group: Risk Group
Specific site of activity (patient room, corridor, medication room, storage room, etc):
Possible HVAC, plumbing, and electrical issues and the probability of unplanned outages that will impact patient care:
Indicate potential risk of water incursion occurring outside the work zone:
N/A HVAC: Describe local or system isolation of work site:
N/A What shifts will the majority of the work be done?
8:00 am – 4:30 pm
ICRA containment Barrier type:
ICRA containment Door type:
N/A Ante-room (yes/no):
Attached airlock to work area.
Size of HEPA negative air machine and to where it will be exhausted:
2,000 cfm.
Will a continuous read negative air pressure monitor (chart recorder) be used? Yes
All Infection Control Interventions for the assigned classification levels will be implemented in addition to the previous interventions.
LEVEL
I
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection.
3. All policies & procedures for renovation/construction/maintenance will be followed.
4. Contractor is educated before the start of the project about the importance of adhering to Infection Control measures.
5. When complete immediately clean up any dirt or debris.
LEVEL
II
1. Provide active means to prevent air-borne dust from dispersing into atmosphere, which may include the use of a Control Cube.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with masking tape.
4. Block off and seal air vents.
5. Doors and windows within the work zone to remain closed at all times except during ingress/egress.
6. Place adhesive mat at entrance and exit of work area as necessary.
7. Cover transport receptacles or carts.
8. Contain construction waste before transport in tightly covered containers.
9. Use designated removal route/elevators for removal of debris.
10. Wet mop and/or vacuum with HEPA filtered vacuum at end of job or end of work shift. Area to be free of dust and or debris.
III
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system. Maintain until barrier is removed at completion of project.
2. Designate entry and exit traffic pattern, unauthorized personnel are not permitted to enter work zone, traffic control signs placed.
3. Complete all critical barriers or implement control cube method before construction begins. Will stay in place until IC or PM authorizes removal.
4. Maintain negative pressure within work site and utilize HEPA equipped negative air machines. Both will be maintained until project & terminal cleaning are completed and IC authorizes removal.
5. Air pressure to be monitored & documented at least daily.
6. Adhesive mats placed at all entrances & exists of work area.
7. The contractor will maintain the construction zone in a clean manner.
• The area will be HEPA-vacuumed or damp mopped daily or more often as necessary to minimize dust.
• Daily cleanup of debris, material and waste shall be completed.
• Adhesive mats monitored & changed on a regular basis so that they remain effective.
• Any dust or construction debris tracked outside of the work area will be promptly cleaned.
8. Terminal cleaning will be performed following protocol.
9. The terminal cleaning will be inspected by the Owner prior to the authorization for the barrier removal.
10. Air samples may be performed following IC/Safety protocol.
11. Barriers will be removed carefully to minimize spreading of construction dust and debris.
IV
1. Seal all holes, pipes and conduits penetrations in work area.
2. Construct anteroom for staging of equipment & donning of coveralls.
3. Workers will wear coveralls in work area. Upon completion of major dust generating activities, coverall requirement is removed.
3. Coveralls are removed in work zone before entering anteroom.
4. Any residual dust left on workers shall be removed by vacuum.
5. Shoe covers will be worn by workers and removed in the ante room when exiting area.
6. All renovation, construction, maintenance & tool carts leaving area must be covered & the wheels wiped down with a disinfectant solution.
7. Environmental Management Service (EMS) or a contract cleaner will vacuum or damp mop the area outside the work zone and adjacent areas.
PRE-CONSTRUCTION RISK ASSESSMENT FOR THE TRANSMISSION OF TUBERCULOSIS (TB) TO THE CONTRACTED CONSTRUCTION WORKER
_X_ NOT REQUIRED: No potential risk of contact or shared air space with TB patient/clinical specimen __ REQUIRED: Potential risk of contact or potential of shared air space with TB patients / clinical specimen
ADDITIONAL COMMENTS OR REQUIREMENTS:
Work Permit released and authorized by: Date:
Issued to Project Manager: Date:
Issued to Contractor (print name and signature) Date:
ATTACHMENT B INSTRUCTIONS FOR COMPLETION OF INFECTION CONTROL RISK ASSESSMENT WORK PERMIT
Attachment C PRODUCTS AND MATERIALS FOR ICRA CONTAINMENT-
EXAMPLES
A. Barrier types: Fire retardant polyethylene, usually 6-mil thickness, gypsum wall board, fire rated fiberglass reinforced plastic (similar to Fire-X Glassboard), plywood and Masonite (must be painted with fire resistant paint (Flame Control Coatings, #320A or similar) prior to entering the building), and/or other fire resistive materials as specified in the ICRA Work Permit.
B. Carpet Vacuum: Nobles Ultra-glide 18" w/ dual motors and HEPA filters, or an equivalent commercial grade carpet vacuum cleaner. An equivalent vacuum must have HEPA filters.
C. Control Cube: Portable Ceiling Access Module, “Kontrol Kube Jr.” with heavy duty vinyl enclosure as manufactured by Fiberlock Technologies, Inc. 680 Putnam Ave. Cambridge, MA 02139 or similar.
D. Door types: Solid core wood door in wood or metal frame, metal door in metal frame, zipper door in polyethylene, or an overlapped polyethylene entrance as specified in the ICRA Work Permit.
Masonite doors may be used if painted with fire resistant paint (Flame Control Coatings, #320A or similar) prior to entering the building.
E. Exhaust Hoses: Heavy duty, flexible steel reinforced; Ventilation Blower Hose, WPG as manufactured by Federal Hose Mtg. Co Painsville, OH 44077 or similar.
F. HEPA Vacuum: A ‘shop style’ vacuum with a HEPA filter cartridge filter at 99.97% filtration @ 0.5 microns, similar to Dayton part # 4TB93. This filter shall be used in conjunction with a dust collection pre-filter bag for fine particles and dust, similar to Dayton part # 1UG85.
G. Negative Air Machine: HEPA filter equipped negative air machines that provide roughing filters, primary filters, and HEPA final filters, with a rating of 200 to 2000 cubic feet per minute (CFM).
HEPA filters to be a minimum of 99.97% efficient. The HEPA filter will be factory scan tested and factory accepted after manufacture. No leaks greater than 0.01 of the upstream concentration at rated capacity of 2,000 CFM. Initial clean resistance shall be no more than 1.35” W. C. @ 2,000 CFM (for 2000 CFM machines). Supplier: Airborne Contamination Identification Associates, Abatement Technologies, or similar.
NOTE: The HEPA filter in the negative air machine will be certified upon new installation into the machine and at least semi-annually thereafter. More frequent certification may be required as determined necessary during the ICRA process
H. Walk-Off Mats (adhesive): Provide minimum size mats of 18 inches x 24 inches as manufactured by 3M,St. Paul, MN 55144 or similar.
I. Dust Control Tools: (Drills, sanders, saws, grinder) as manufactured by Hilti or similar..
ATTACHMENT D
DAILY CONSTRUCTION - INFECTION CONTROL INTERVENTIONS COMPLIANCE MONITOR
DATE: PROJECT:
PROJECT PM: PROJECT LOCATION:
OBSERVATIONS BY:
INFECTION CONTROL INTERVENTIONS YES NO NA COMMENT
ICRA Permit Posted for Level III or Level IV
HEPA Vacuum, coveralls, booties, cleaning supplies available at the work zone entrance.
Construction barriers intact, no visual evidence of dust escaping the work zone
Traffic restricted to construction personnel and traffic control signs posted and intact
Construction personnel using designated entrance/exits and are following designated travel routes
Walk off adhesive mats clean & adequate to contain construction dust
Negative air machine running, ducting intact, filters certified as necessary – no excess fumes/vapor
Negative air pressure maintained & documented
All windows closed behind barrier. Debris chute (if applicable) closed if not in use
HVAC vents remain isolated and sealed off
Daily cleaning of the work zone.
Ante Room clean (if required)
Entrance/exit & adjacent areas free of dust & debris
Carts covered during transport of debris and materials, designated route, designated elevator
Workers removing coveralls in work zone before entering anteroom. Workers removing booties in ante room.
Negative air fans working properly. No dust accumulation at exhaust location
No signs of water leakage
No signs of vermin – insects, birds, mice, squirrels
No food trash found in work zone, or cavities in the work zone
All workers Safety and ICRA trained Other observed or reported problems:
39 Spruce Street * East Longmeadow, MA 01028 * FAX 413/525-6405 * TEL. 413/525-2332
July 2, 2020
Thomas Egan
Egan Environmental Consulting, Inc.
14 High Street
Mahwah, NJ 07430
Project Location: 2094 Albany Post Road, Montrose, NY - Bldg 29
Client Job Number:
Project Number: 20120314 FDR Veterans Affair Med Ctr
Laboratory Work Order Number: 20F0985
Enclosed are results of analyses for samples received by the laboratory on June 19, 2020. If you have any questions concerning this report, please feel free to contact me.
Sincerely, Raymond J. McCarthy
Project Manager
Table of Contents
Sample Summary 3
Case Narrative 4
Sample Results 5
20F0985-01 5
20F0985-02 6
20F0985-03 7
20F0985-04 8
Sample Preparation Information 9
QC Data 10
Polychlorinated Biphenyls with 3540 Soxhlet Extraction 10
B260921 10
Flag/Qualifier Summary 11
Certifications 12
Chain of Custody/Sample Receipt 13
ANALYTICAL SUMMARY
7/2/2020
Egan Environmental Consulting, Inc.
14 High Street
Mahwah, NJ 07430
ATTN: Thomas Egan
20120314 FDR Veterans Affair Med Ctr
20F0985
The results of analyses performed on the following samples submitted to the CON-TEST Analytical Laboratory are found in this report.
PROJECT LOCATION:
PURCHASE ORDER NUMBER:
PROJECT NUMBER:
REPORT DATE:
WORK ORDER NUMBER:
FIELD SAMPLE # LAB ID: MATRIX TESTSAMPLE DESCRIPTION SUB LAB
2094 Albany Post Road, Montrose, NY - Bldg 29
01 North Gutter Caulk 20F0985-01 Caulk SW-846 8082A
02 South Gutter Cauk 20F0985-02 Caulk SW-846 8082A
03 East Gutter Caulk 20F0985-03 Caulk SW-846 8082A
04 West Gutter Caulk 20F0985-04 Caulk SW-846 8082A
[TOC_1]Sample Summary[TOC]
CASE NARRATIVE SUMMARY
All reported results are within defined laboratory quality control objectives unless listed below or otherwise qualified in this report.
[TOC_1]Case Narrative[TOC]
The results of analyses reported only relate to samples submitted to the Con-Test Analytical Laboratory for testing.
I certify that the analyses listed above, unless specifically listed as subcontracted, if any, were performed under my direction according to the approved methodologies listed in this document, and that based upon my inquiry of those individuals immediately responsible for obtaining the information, the material contained in this report is, to the best of my knowledge and belief, accurate and complete.
Lisa A. Worthington
Technical Representative
Date Received: 6/19/2020
Work Order: 20F0985Sample Description:Project Location: 2094 Albany Post Road, Montrose
Sample ID: 20F0985-01
Field Sample #: 01 North Gutter Caulk
Sample Matrix: Caulk
Sampled: 6/17/2020 00:00
[TOC_2]20F0985-01[TOC]
AnalystAnalyzedDilution Flag/QualRLResultsAnalyte
Date/Time
Units
Date
PreparedMethod
Polychlorinated Biphenyls with 3540 Soxhlet Extraction
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1016 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1221 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1232 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1242 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1248 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1254 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1260 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1262 [1]
ND 0.78 7/1/20 16:37 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1268 [1]
Surrogates % Recovery Recovery Limits Flag/Qual
Decachlorobiphenyl [1] 97.2 7/1/20 16:3730-150
Decachlorobiphenyl [2] 107 7/1/20 16:3730-150
Tetrachloro-m-xylene [1] 105 7/1/20 16:3730-150
Tetrachloro-m-xylene [2] 114 7/1/20 16:3730-150
[TOC_1]Sample Results[TOC]
Work Order: 20F0985Sample Description:Project Location: 2094 Albany Post Road, Montrose
Sample ID: 20F0985-02
Field Sample #: 02 South Gutter Cauk
Sample Matrix: Caulk
Sampled: 6/17/2020 00:00
[TOC_2]20F0985-02[TOC]
AnalystAnalyzedDilution Flag/QualRLResultsAnalyte
Date/Time
Units
Date
PreparedMethod
Polychlorinated Biphenyls with 3540 Soxhlet Extraction
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1016 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1221 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1232 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1242 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1248 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1254 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1260 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1262 [1]
ND 0.73 7/1/20 16:55 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1268 [1]
Surrogates % Recovery Recovery Limits Flag/Qual
Decachlorobiphenyl [1] 89.7 7/1/20 16:5530-150
Decachlorobiphenyl [2] 97.4 7/1/20 16:5530-150
Tetrachloro-m-xylene [1] 96.6 7/1/20 16:5530-150
Tetrachloro-m-xylene [2] 99.4 7/1/20 16:5530-150
Work Order: 20F0985Sample Description:Project Location: 2094 Albany Post Road, Montrose
Sample ID: 20F0985-03
Field Sample #: 03 East Gutter Caulk
Sample Matrix: Caulk
Sampled: 6/17/2020 00:00
[TOC_2]20F0985-03[TOC]
AnalystAnalyzedDilution Flag/QualRLResultsAnalyte
Date/Time
Units
Date
PreparedMethod
Polychlorinated Biphenyls with 3540 Soxhlet Extraction
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1016 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1221 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1232 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1242 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1248 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1254 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1260 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1262 [1]
ND 0.77 7/1/20 17:12 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1268 [1]
Surrogates % Recovery Recovery Limits Flag/Qual
Decachlorobiphenyl [1] 93.0 7/1/20 17:1230-150
Decachlorobiphenyl [2] 102 7/1/20 17:1230-150
Tetrachloro-m-xylene [1] 97.3 7/1/20 17:1230-150
Tetrachloro-m-xylene [2] 106 7/1/20 17:1230-150
Work Order: 20F0985Sample Description:Project Location: 2094 Albany Post Road, Montrose
Sample ID: 20F0985-04
Field Sample #: 04 West Gutter Caulk
Sample Matrix: Caulk
Sampled: 6/17/2020 00:00
[TOC_2]20F0985-04[TOC]
AnalystAnalyzedDilution Flag/QualRLResultsAnalyte
Date/Time
Units
Date
PreparedMethod
Polychlorinated Biphenyls with 3540 Soxhlet Extraction
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1016 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1221 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1232 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1242 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1248 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1254 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1260 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1262 [1]
ND 0.70 7/1/20 17:29 JMBmg/Kg 6/29/20SW-846 8082A4Aroclor-1268 [1]
Surrogates % Recovery Recovery Limits Flag/Qual
Decachlorobiphenyl [1] 95.3 7/1/20 17:2930-150
Decachlorobiphenyl [2] 104 7/1/20 17:2930-150
Tetrachloro-m-xylene [1] 97.2 7/1/20 17:2930-150
Tetrachloro-m-xylene [2] 106 7/1/20 17:2930-150
Sample Extraction Data
Prep Method: SW-846 3540C Analytical Method: SW-846 8082A
Lab Number [Field ID] Batch DateInitial [g] Final [mL]
B260921 06/29/200.516 10.020F0985-01 [01 North Gutter Caulk]
B260921 06/29/200.546 10.020F0985-02 [02 South Gutter Cauk]
B260921 06/29/200.519 10.020F0985-03 [03 East Gutter Caulk]
B260921 06/29/200.569 10.020F0985-04 [04 West Gutter Caulk]
[TOC_1]Sample Preparation Information[TOC]
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Limit Notes Analyte
Polychlorinated Biphenyls with 3540 Soxhlet Extraction - Quality Control
QUALITY CONTROL
[TOC_2]Polychlorinated Biphenyls with 3540 Soxhlet Extraction[TOC]
Batch B260921 - SW-846 3540C
[TOC_3]B260921[TOC]
Blank (B260921-BLK1) Prepared: 06/29/20 Analyzed: 07/01/20
Aroclor-1016 mg/Kg0.20ND
Aroclor-1016 [2C] mg/Kg0.20ND
Aroclor-1221 mg/Kg0.20ND
Aroclor-1221 [2C] mg/Kg0.20ND
Aroclor-1232 mg/Kg0.20ND
Aroclor-1232 [2C] mg/Kg0.20ND
Aroclor-1242 mg/Kg0.20ND
Aroclor-1242 [2C] mg/Kg0.20ND
Aroclor-1248 mg/Kg0.20ND
Aroclor-1248 [2C] mg/Kg0.20ND
Aroclor-1254 mg/Kg0.20ND
Aroclor-1254 [2C] mg/Kg0.20ND
Aroclor-1260 mg/Kg0.20ND
Aroclor-1260 [2C] mg/Kg0.20ND
Aroclor-1262 mg/Kg0.20ND
Aroclor-1262 [2C] mg/Kg0.20ND
Aroclor-1268 mg/Kg0.20ND
Aroclor-1268 [2C] mg/Kg0.20ND mg/Kg 4.00 30-150Surrogate: Decachlorobiphenyl 90.43.62 mg/Kg 4.00 30-150Surrogate: Decachlorobiphenyl [2C] 97.63.90 mg/Kg 4.00 30-150Surrogate: Tetrachloro-m-xylene 95.73.83 mg/Kg 4.00 30-150Surrogate: Tetrachloro-m-xylene [2C] 1034.11
LCS (B260921-BS1) Prepared: 06/29/20 Analyzed: 07/01/20
Aroclor-1016 mg/Kg0.20 4.00 40-14086.33.5
Aroclor-1016 [2C] mg/Kg0.20 4.00 40-14093.13.7
Aroclor-1260 mg/Kg0.20 4.00 40-14078.53.1
Aroclor-1260 [2C] mg/Kg0.20 4.00 40-14080.33.2 mg/Kg 4.00 30-150Surrogate: Decachlorobiphenyl 86.83.47 mg/Kg 4.00 30-150Surrogate: Decachlorobiphenyl [2C] 94.03.76 mg/Kg 4.00 30-150Surrogate: Tetrachloro-m-xylene 96.03.84 mg/Kg 4.00 30-150Surrogate: Tetrachloro-m-xylene [2C] 1034.13
LCS Dup (B260921-BSD1) Prepared: 06/29/20 Analyzed: 07/01/20
Aroclor-1016 mg/Kg0.20 4.00 3040-14084.4 2.173.4
Aroclor-1016 [2C] mg/Kg0.20 4.00 3040-14091.1 2.143.6
Aroclor-1260 mg/Kg0.20 4.00 3040-14078.0 0.7443.1
Aroclor-1260 [2C] mg/Kg0.20 4.00 3040-14079.3 1.233.2 mg/Kg 4.00 30-150Surrogate: Decachlorobiphenyl 88.83.55 mg/Kg 4.00 30-150Surrogate: Decachlorobiphenyl [2C] 96.23.85 mg/Kg 4.00 30-150Surrogate: Tetrachloro-m-xylene 93.33.73 mg/Kg 4.00 30-150Surrogate: Tetrachloro-m-xylene [2C] 1004.01
[TOC_1]QC Data[TOC]
FLAG/QUALIFIER SUMMARY
* QC result is outside of established limits.
� Wide recovery limits established for difficult compound.
� Wide RPD limits established for difficult compound.
# Data exceeded client recommended or regulatory level
Percent recoveries and relative percent differences (RPDs) are determined by the software using values in the calculation which have not been rounded.
No results have been blank subtracted unless specified in the case narrative section.
RL Reporting Limit is at the level of quantitation (LOQ)
DL Detection Limit is the lower limit of detection determined by the MDL study
MCL Maximum Contaminant Level
ND Not Detected
[TOC_1]Flag/Qualifier Summary[TOC]
CertificationsAnalyte
CERTIFICATIONS
Certified Analyses included in this Report
No certified Analyses included in this Report
[TOC_1]Certifications[TOC]
The CON-TEST Environmental Laboratory operates under the following certifications and accreditations:
Code Description Number Expires
100033AIHA-LAP, LLC - ISO17025:2017AIHA 03/1/2022
M-MA100Massachusetts DEPMA 06/30/2021
PH-0567Connecticut Department of Publilc HealthCT 09/30/2021
10899 NELAPNew York State Department of HealthNY 04/1/2021
2516 NELAPNew Hampshire Environmental LabNH-S 02/5/2021
LAO00112Rhode Island Department of HealthRI 12/30/2020
652North Carolina Div. of Water QualityNC 12/31/2020
MA007 NELAPNew Jersey DEPNJ 06/30/2021
E871027 NELAPFlorida Department of HealthFL 06/30/2021
LL015036Vermont Department of Health Lead LaboratoryVT 07/30/2021
2011028State of MaineME 06/9/2021
460217Commonwealth of VirginiaVA 12/14/2020
2557 NELAPNew Hampshire Environmental LabNH-P 09/6/2020
VT-255716Vermont Department of Health Drinking WaterVT-DW 06/12/2021
25703North Carolina Department of HealthNC-DW 07/31/2020
68-05812Commonwealth of Pennsylvania DEPPA 06/30/2021
Appendix III
List of Brand Name or Equal Equipment
Make, Model and Salient Characteristics
Reference: Drawing 29-AS-04
Item: Half Round Copper Roof Vents (Dormers)
Vendor: Copper Summit, Inc., Tulsa, OK (www.coppersummitinc.com)
Model: Contractor shall verify size required
Salient Characteristics:
• The copper louvers, also known as copper gable end vents, are made with 16 oz. copper with a steel mesh screen to provide a barrier for debris and wildlife.
• Copper louvers provide ventilation for the attic space.
• Handcrafted to fit specifications.
• Copper will last a lifetime and does not rot like wood, rust like steel, or crack like clay.
• Copper louvers will match the historical design of the existing building 29 and the buildings surrounding the campus.
• Patina finish available (aged green copper look).
All characteristics are for reference purposes only and the VA will consider similar substitutions provided the intent of this project is still met and no federal, state or VA standards are violated.
Bidding On: _______________________________________
Manufacturer Name: _______________________________________
Brand: _______________________________________
No.: _______________________________________
I n f o r m a t i o n a l S h e e t : F r e e A i r S p a c e C o p p e r L o u v e r W a l l V e n t – H a l f R o u n d
1 Square Foot of Free Air Space = 250 Square Feet of Attic Space
Free Air for Copper Louver Wall Vent – Half Round Roof Vent Size Free Air Area (Square Inches) Free Air Area (Square Feet)
24” x 12” +/- 98.2 sq. inches +/- 0.68 sq. feet +/-
36 x 18” +/- 251.3 sq. inches +/- 1.75 sq. feet +/-
48 x 24 +/- 475.2 sq. inches +/- 3.30 sq. feet +/-
60” x 30" +/- 769.7 sq. inches +/- 5.35 sq. feet +/-
72” x 36" +/- 1,134.9 sq. inches +/- 7.88 sq. feet +/-
Custom Sizes Please call 877-836-9488
This is the start of the file's text. The full file is on GovTribe.