RFI Answers for solicitation 3C24220B0060 Repair Front Entrance rev 3.docx

DOCX document 16 KB Posted

Attached to
Z1DA--528A7-18-717 RENOVATE FRONT ENTRANCE FOR PHYSICAL SECURITY |
Solicitation number
36C24221B0060
Issued by

About this file

This document contains answers to requests for information (RFI) regarding solicitation number 36C24221B0060 for the renovation of the front entrance at the Syracuse VA Medical Center located in Syracuse, New York. The renovation project will consist of approximately 4,000 square feet of work and includes the construction of a new guard shack and canopy at the front entrance, site work, and associated electrical, mechanical, and plumbing work. The RFI answers clarify details of the door and hardware schedules, wall types, and hollow metal specifications. The total project duration is 255 calendar days and will be completed in three phases, with exterior work to be finished within 120 days of notice to proceed.

View the file

Other files

File Type Posted
36C24221B0060 0005.docx DOCX document
36C24221B0060 0004.docx DOCX document
36C24221B0060 0003.docx DOCX document
RFI Answers for solicitation 3C24220B0003 Repair Syracuse Access Roads.pdf PDF
36C24221B0060 0002.docx DOCX document
36C24221B0060 0001.docx DOCX document
NY20210026.pdf PDF
36C24221B0060_2.docx DOCX document
Front Entrance FORCE DWGS 2 11 2021 epg use this.pdf PDF
2020-08-12_528A7-18-717 SPECIFICATIONS_OTBID.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Answers for Solicitation 3C24221B0060 Renovate Front Entrance Project: 528A7-18-717 Renovate Front Entrance Answered By: Emery P. Gasparek Jr Date: 8-26-21

12.Which doors schedule should we be using ?—Dwg. A-100 or A-100-A ?
A-100-A

13. Do not see a Hollow Metal Door Spec. ?-----unless the one HM door ( 100-1 ) is a Security Door It is a Security Door Section 083453 –do not see it as indicated that way. ---Advise. –if so is it “FE” or ”BR” ? FE

14. Do not see a wall type / Jamb depth for C137A-1 On Drawings

15. Is the HM Jamb suppose to wrap the full wall thickness at Door 100-1 ?

See Drawing A-180

16.Door Schedule on Dwg. A-100-A.----Answered Above Door C137A-1 is an Acrovyn door with a Paint Finish. –Is this Correct On Drawings Door 100-1 is a Steel door with a Classic Maple Finish.
–Is this Correct ? On Drawings Door C137-1 has no Door Material or Hardware Set. ( Dwg. A-100 has it as Alum. w/ Hdwe. Set 2A ) On Drawings

17. Set 2A ( if for C-137-1 ) has an Exit Device –with Crash Bar , and then Concealed Vertical Rods. ( door is a single ) On Drawings Review Is a Rim or Vertical Rod required ? On Drawings Review Is the Device Electrified ? –Nothing spec.’d. --( Has EL. Hinge and ADO & PS ) On Drawings Set 2B ( C136-1 )----Pair of Doors. Only has 1 hinge spec.’d. ? On drawings Rim or Concealed Rod required ? Concealed Is the Device Electrified ? Review Electrical Drawings–Nothing spec.’d. –( Has 1 El Hinge , ADO & PS ) Review entire Drawing Package Is the ADO for the pair ? –or is a manual closer required also ? Review Drawings

18. Hardware Set E1---Do not see a detail for the Threshold. Review details on Drawings

19. Hardware Sets 8 , 8A—8F are in the Spec. ----do not see where they are used. Use Hardware sets that are applicable to schedules outlined on drawings