04-Architectural Draw.pdf
PDF 31 MB Posted
- Attached to
- Y1DZ--620A4-18-204|Relocation of Audiology -
- Solicitation number
- 36C24221B0045
About this file
This document provides details of a federal contract solicitation for relocation of audiology services at the Castle Point VA Medical Center. The solicitation seeks proposals for relocation of Audiology at the Castle Point VAMC located in Castle Point, New York. The contract completion time is 730 calendar days from notice to proceed. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses certified in the VetBiz Vendor Information Pages database. Proposals will only be accepted from responsible and responsive SDVOSBs with a NAICS code of 236220 and size standard of $39.5 million. The cost range for proposals is between $1,000,000 to $5,000,000 and bonds are required. The solicitation will be released on June 18, 2021 with bid submission instructions included. Questions may be sent to the point of contact by July 13, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24221B0045 0002.docx | DOCX document | |
| 36C24221B0045 0001.docx | DOCX document | |
| 620A4-18-204_Bid Specifications - Vol II.pdf | ||
| 02-Civil.pdf | ||
| 620A4-18-204_Bid Specifications Vol I 02.pdf | ||
| 00-General.pdf | ||
| 01-Hazardous Materials.pdf | ||
| 620A4-18-204_Bid Specifications Vol I.pdf | ||
| 08-Electrical.pdf | ||
| 09-Reference.pdf | ||
| 06-Plumbing.pdf | ||
| 04-Architectural.pdf | ||
| P07 - Wage Determination 02.pdf | ||
| 36C24221B0045_1.docx | DOCX document | |
| 07-Mechanical.pdf | ||
| 05-Fire Protection.pdf | ||
| 03-Structural.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL SYMBOLS
CONCRETE MASONRY UNITS
(CMU)
CONCRETE
BRICK
CEMENT, SAND, GROUT, PLASTER, OR
GYPSUM WALL BOARD
EARTH
STONE, GRAVEL, OR POROUS
FILL
CARPET
PLYWOOD
WOOD (FINISHED)
WOOD (ROUGH)
RIGID INSULATION
BATT. OR LOOSE INSULATION
STEEL
WOOD (BLOCKING)
PARTICLE BOARD
ARCHITECTURAL DRAWINGS SYMBOLS
MATCH LINE
ELEVATION LINE
EXISTING COLUMN LINE
REFERENCES
DOOR TAGS
BUILDING SECTIONS
WALL SECTIONS
ARCHITECTURAL ABBREVIATIONS
A
X-XXX
X-XXX
X-XXX
DETAIL NO
SHEET NO
DETAIL NO
SHEET NO
A
B
CENTERLINE OF GYP BD
AT GYP BD/STUD
PARTITION
(U.O.N.)
NOMINAL FACE
OF MASONRY AND CONCRETE
WALL / PARTITIONS
(U.O.N.)
NOMINAL FACE
OF COLUMN
(U.O.N.)
TYPICAL PLAN DIMENSIONING
NOMINAL FACE OF
EXISTING PARTITION
(U.O.N.)
B
A: Area AB: Anchor Bolt ABV: Above ACC: Access ACOUST: Acoustical ACR: Acrylic ACST: Acoustic ACT: Acoustical Tile AD: Access Door ADH: Adhesive ADJ: Adjust, Adjustable, Adjacent AFF: Above Finished Floor AGGR: Aggregate ALT: Alternate ALUM: Aluminum ANOD: Anodized AP: Access Panel APPROX: Approximate ATC: Acoustical Tile Ceiling
BDRM: Bedroom BETW: Between BF: Board Foot BIT: Bituminous BLDG: Building BLKG: Blocking BOT: Bottom BPL: Bearing Plate BRG: Bearing BRK: Brick BRZ: Bronze BS: Both Sides BSMT: Basement BUR: Built-up Roof
C/C: Center to Center CAB: Cabinet CAR: Carpet CAV: Cavity CCW: Counter Clockwise CCTV: Closed Circuit TV CEM: Cement CER: Ceramic CF: Cubic Feet CHAM: Chamfer CJ: Control Joint CK: Caulking CL: Centerline CLG: Ceiling CLKG: Caulking CLR: Clear CLR OPG: Clear Opening CMT: Ceramic Mosaic Tile CMU: Concrete Masonry Unit COL: Column CONC: Concrete CONSTR: Construction CONT: Continuous CONTR: Contractor COP: Copper CPR: Copper CPT: Carpet CT: Ceramic Tile CW: Clockwise
EA: Each EB: Expansion Bolt EE: Each End EF: Each Face EIFS: Exterior Insulation and Finish System EJ: Expansion Joint EL: Elevation, Elevator ELEC: Electrical ELEV: Elevator, Elevation ENCL: Enclosure EPDM: Ethylene Propylene Diene Monomer EQ: Equal EQUIP: Equipment ETR: Existing To Remain EW: Each Way EXG: Existing EXH: Exhaust EXIST: Existing EXP: Exposed
GA: Gauge, Gage GALV: Galvanized GC: General Contractor GL: Glass GL BLK: Glass Block GRND: Ground GRTG: Grating GVL: Gravel GYP: Gypsum GYP BD: Gypsum Board
WINDOW TAG/LOUVER TAG
DETAIL SECTIONS
X-XXX
DETAIL NO
SHEET NO
P. LAM: Plastic Laminate PAR: Parallel PBD: Particle Board PERIM: Perimeter PERP: Perpendicular PL: Plate PLBG: Plumbing PLYWD: Plywood PLUMB: Plumbing PR: Pair PREFAB: Prefabricated PRES: Pressure PRESS: Pressure PRMLD: Premolded PRTN: Partition PSF: Pounds per square foot PSI: Pounds per square inch
PT: PAINT
PTD: Painted, Paper Towel Dispenser PTD/R: Combination Paper Towel Dispenser/Receptacle PTN: Partition
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
DETAIL CALL OUTS
DETAIL NO0
X-XXX
DETAIL NO
SHEET NO
X-XXX2 4
SHEET NO
WALL TYPE
ROOM TAGROOM #
ROOM AREA
# DEMO KEYNOTE
REVISION SYMBOL AND
CLOUD
C
D
E
F
G P
H
I
J
L
M
N
O
Q
R
S
T
DBL: Double DEG: Degree DEMO: Demolition DF: Drinking Fountain DIAG: Diagonal DIA: Diameter DIAM: Diameter DIFF: Diffuser DN: Down DR: Door DWG: Drawing DWGS: Drawings DWR: Drawer
FB: Face Brick FD: Floor drain FDC: Fire Department Connection FDN: Foundation FDTN: Foundation FE: Fire Extinguisher FEC: Fire Extinguisher Cabinet FFE: Finished Floor Elevation FF&E: Fixtures, Furnishings & Equipment FFL: Finished Floor Line FGL: Fiberglass FHC: Fire Hose Cabinet FIN: Finish, finished FIXT: Fixture FL: Floor FLR: Floor FO: Finished Opening FOF: Face of Finish FOS: Face of Studs FP: Fireproof FRT: Fire Retardant FT: Foot, Feet, FTG: Footing, Fitting FURN: Furnish, Furniture FURR: Furring
HDCP: Handicapped (better called "Accessible") HDW: Hardware HDWD: Hardwood HGT: Height HM: Hollow Metal HORIZ: Horizontal HR: Hour HWD: Hardwood
ID: Inside Diameter IN: Inch INCL: Include INFO: Information INSTL: Install INSUL: Insulation INT: Interior INTERM: Intermediate
JAN: Janitor JC: Janitor's Closet JT: Joint
FINISH KEYNOTE
LAB: Laboratory, Labor LAV: Lavatory LB: Pound (weight) LBL: Label LINO: Linoleum LNTL: Lintel
MAINT: Maintenance MAN; Manual MAR: Marble MARB: Marble MAS: Masonry MAT: Material MATL: Material MAX: Maximum MECH: Mechanical MEMB: Membrane MFD: Manufactured MFG: Manufacturer, Manufacturing MFR: Manufacture, Manufacturer MI: Malleable Iron, Miles MIKE: Microphone MIN: Minimum MIR: Mirror MISC: Miscellaneous MK: Mark ML&P: Metal Lath & Plaster MLD: Molding MLDG: Molding MM: Millimeter MMB: Membrane MO: Masonry Opening MOD: Module MONO: Monolithic MOV: Movable MP: Metal Acoustical Panel MPS: Medium Pressure Steam MR: Mop Receptor MRD: Metal Roof Deck MT: Mount, Mounted MTD: Mounted MTL: Material, Metal MTR: Motor MUL: Mullion MULL: Mullion MV: Mercury Vapor MWP: Maximum Working Pressure MWK: Millwork
N: North, Nitrogen NAP: Napkin NAT: Natural NATL: Natural NB: "Nota Bene" Latin phrase for "Take Special Note" NC: Normally Closed, Noise Criteria NEC: National Electrical Code NEUT: Neutral NF: Near Face NFWH: Non-freeze Wall Hydrant NI: Nickel NIC: Not In Contract NK: Neck NMT: Non-Metallic NO: Number, Normally Open NOM: Nominal NR: Noise Reduction NRC: Noise Reduction Coefficient NTS: Not To Scale
OB: Obscure OBS: Obscure OC: On Center OD: Outside Diameter OF: Outside Face OFF: Office OH: Overhead OHD: Overhead Door OPNG: Opening OPP: Opposite OPP H: Opposite Hand
QUAL: Quality QT: Quarry Tile, Quart QTY: Quantity
RB: Rubber Base RCP: Reflected Ceiling Plan RD: Roof Drain, Round, Receptacle Distribution Panel REBAR: Reinforcing Bar REF: Refer, Reference, Refrigerator REFL: Reflected, REFR: Refrigerate, Refrigerator REINF: Reinforcement, or Reinforce REQD: Required RESIL: Resilient RF: Roof RGH: Rough RGH OPNG: Rough Opening RO: Rough Opening RT: Rubber Tile
SALV: Salvage SCHED: Schedule SF: Square Foot SHR: Shower SHT: Sheet SPEC: Specification, Specifications SPECS: Specifications SQ: Square SS: Stainless Steel STC: Sound Transmission Class STD: Standard STL: Steel STOR: Storage STRT: Straight STRUC: Structural STRUCT: Structural SUR: Surface SUSP: Suspended, Suspend
T&B: Top and Bottom T&G: Tongue & Groove TB: Towel Bar TD: Trench Drain TERR: Terrazzo THK: Thick, Thickness THRU: Through TLT: Toilet TPD: Toilet paper Dispenser TPH: Toilet Paper Holder TPTN: Toilet Partition TYP: Typical TZ: Terrazzo
UNFIN: Unfinished UNO: Unless Noted Otherwise UON: Unless Otherwise Noted UP: Unpainted UR: Urinal
VAT: Vinyl Asbestos Tile VBC: Vinyl Base (Coved) VCT: Vinyl Composition Tile VERT: Vertical VEST: Vestibule VIF: Verify In the Field VT: Vinyl Tile VTR: Vent Through Roof VWC: Vinyl Wall Covering
W/: With W/O: Without WAINS: Wainscot WC: Watercloset WD: Wood
U
V
W
A101
SIM
CS12.0b
W-
ROOM NAME
150 SF
XXX
# PLAN/ELEVATION KEYNOTE
CONSTRUCTION SHALL CONFORM TO THE “NEW YORK STATE UNIFORM FIRE PROTECTION AND BUILDING CODE”, LATEST REVISION, THE NEW YORK STATE ENERGY CODE AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN
WHICH THE PROJECT IS BEING CONSTRUCTED.
CONSTRUCTION SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL CODES AND REGULATIONS.
ALL DRAWINGS ARE GRAPHIC REPRESENTATIONS OF APPROXIMATE LOCATIONS OF NEW MATERIALS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
CONTRACTORS ARE RESPONSIBLE FOR ALL MATERIALS, CONSTRUCTION METHODS AND CRAFTSMANSHIP.
CONTRACTORS ARE TO VERIFY ALL EXISTING CONDITIONS, REQUIREMENTS, NOTES, CODES AND DIMENSIONS, PRIOR TO THE START OF CONSTRUCTION AND SHALL NOTIFY THE ARCHITECT IF CONDITIONS VARY FROM THOSE SHOWN ON
THE DOCUMENTS.
CONTRACTORS ARE TO PROVIDE ADEQUATE SUPPORT OF EXISTING FOUNDATION WALLS, LOAD BEARING WALLS AND
PARTITIONS DURING DEMOLITION AND CONSTRUCTION.
THOROUGHLY COORDINATE WORK WITH OTHER TRADES AND DETERMINE THE EXACT ROUTE AND LOCATION OF
UTILITIES, MATERIALS AND EQUIPMENT BEFORE FABRICATION AND INSTALLATION.
WHEN EXISTING CONSTRUCTION IS REMOVED, DISTURBED, DAMAGED, REPLACED OR RENOVATED IN ANY WAY, CONTRACTORS SHALL PROVIDE PATCHING, PAINTING AND MATERIALS OF SAME TYPE AND QUALITY AS TO MATCH
ADJACENT EXISTING SURFACES, UNLESS OTHERWISE NOTED.
CONTRACTORS PROVIDE ALL BLOCKING, FURRING AND SHIMMING FOR INSTALLATION AND COMPLETION OF WORK.
ALL NEW WORK SHALL BE PLUMB, LEVEL AND SQUARE. SCRIBE AND MAKE FIT ALL NEW TO EXISTING.
CONTRACTORS VERIFY ALL DIMENSIONS BEFORE ORDERING MATERIAL OR DOING WORK. NO EXTRA COMPENSATION OR CHARGES WILL BE ACCEPTED DUE TO DIFFERENCES BETWEEN THE ACTUAL MEASUREMENTS AND
MEASUREMENTS INDICATED ON THE DRAWINGS.
ALL DETAILS ARE SUBJECT TO CHANGE DUE TO EXISTING FIELD CONDITIONS. CONTRACTOR MUST NOTIFY ARCHITECT
OF SAME.
NO SITE VISITS WILL BE MADE BY THE ARCHITECT. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CHANGES
TO THESE DRAWINGS AND COMPLETION OF COMPLIANT WORK.
ARCHITECT TO COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.
THESE DRAWINGS DO NOT PURPORT TO SHOW ALL ITEMS AND PROCEDURES REQUIRED FOR A COMPLETE INSTALLATION. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF THE GENERAL ARCHITECTURAL DESIGN CONCEPT, THE LOCATION/DIMENSIONS OF THE CONSTRUCTION AND MAJOR ELEMENTS OF
CONSTRUCTION.
CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS ASSOCIATED WITH THE WORK OF
THEIR CONTRACT.
ITEMS NOTED AS 'BY OWNER” ARE TO BE FURNISHED AND INSTALLED BY THE OWNER OR THE OWNER'S VENDOR.
GENERAL CONSTRUCTION NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
GENERAL REMOVAL NOTES:
DASHED LINES INDICATE ITEMS TO BE REMOVED.
ELEMENTS TO REMAIN IN PLACE SHALL BE PROTECTED FROM DAMAGE, DUST AND DEBRIS.
DUST CONTROL SHALL BE THE FULL RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PERFORM CLEAN UP OF ALL REFUSE, RUBBISH, SCRAP MATERIALS AND DEBRIS CAUSED BY THE
WORK ON A DAILY BASIS. CLEANING OF AREA SURROUNDING THE WORK AREA WHERE
CONSTRUCTION DEBRIS OR DUST ACCUMULATES WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTIONS
DRAWINGS FOR DEMOLITION OF ADDITIONAL ITEMS.
UNDERSLAB UTILITIES HAVE BEEN IDENTIFIED IN LOCATIONS THAT MAY IMPACT PROPOSED SLAB
RECESSES AND REMOVALS. CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE CONTENT
OF THE UNDERSLAB ANALYSIS, AS WELL AS UNDERSLAB DEMOLITION AND NEW WORK INDICATED
IN OTHER CONSTRUCTION DOCUMENTS.
REFER TO ABATEMENT DRAWINGS FOR HAZARDOUS MATERIAL DEMOLITION ITEMS.
CONTRACTOR TO MAINTAIN WATER TIGHT INTEGRITY OF BUILDING AT ALL TIMES.
EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUCTION
DOCUMENTS WHEN AVAILABLE AND ARE NOT GUARANTEED. CONTRACTORS ARE RESPONSIBLE
FOR EXAMINING THE BUILDING AND VERIFYING EXISTING CONDITIONS AND ARE TO CONTACT THE
OWNER REPRESENTATIVE REGARDING ANY DISCREPANCIES.
DEMOLITION WORK SHALL INCLUDE REMOVAL OF ALL ITEMS INDICATED TO BE REMOVED AND/OR
SALVAGED, AND LEGAL DISPOSAL OF ITEMS NOT INTENDED FOR SALVAGE. WORK SHALL ALSO
INCLUDE REMOVAL OF ALL MINOR SUPPORTS, BRACKETS, FASTENERS, CONDUITS, PIPING, AND
SIMILAR ITEMS WHICH ARE NOT INDICATED TO REMAIN.
ALL FLOOR AND WALL CONDITIONS WHICH ARE TO RECEIVE NEW CONSTRUCTION ARE TO BE
DEMOLISHED AS INDICATED AND PROPERLY PREPPED TO RECEIVE NEW FINISHES, U.N.O.
ALL FLOOR, WALL, AND CEILING CONDITIONS THAT ARE DISTURBED BY DEMOLITION ARE TO BE PATCHED, REPAIRED AND/OR PAINTED, WITH SIMILAR MATERIALS AND COLORS. REFER TO NEW
WORK FLOOR PLANS, REFLECTED CEILING PLANS, AND FINISH SCHEDULE.
AT WALL REMOVAL FOR MECHANICAL PENETRATIONS, OPENING TO BE APPROXIMATELY 6"
LARGER THAN DUCT SIZE ON ALL SIDES. COORDINATE WITH MECHANICAL DRAWINGS.
ALL EMBOSSED DECORATIVE DOOR KNOBS TO BE SALVAGED AND TURNED OVER TO OWNER.
FOR ADDITIONAL REMOVAL INFORMATION REFER TO SECTIONS AND DETAILS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
UNLESS OTHERWISE NOTED, ALL MASONRY DIMENSIONING IS NOMINAL TO FACE OF
MASONRY, ALL NON-MASONRY DIMENSIONING IS TO FACE OF PARTITIONS OR WALLS AND ALL
CONCRETE DIMENSIONING IS FACE TO FACE OF WALL.
ALL DIMENSIONS ARE TO THE OUTSIDE FINISH SURFACE OF WALLS OR TO COLUMN
CENTERLINES.
ALL DIMENSIONS ARE FINISHES DIMENSIONS FROM FINISH FACE OF GYPSUM BOARD OR
SCHEDULED WALL FINISH UNLESS OTHERWISE NOTED.
PROVIDE CONCEALED BLOCKING IN ALL STUD PARTITIONS AND WALLS BEHIND SURFACE FOR
SEMI-RECESSED, FULLY RECESSED OR SURFACE MOUNTED ACCESSORIES AND MILLWORK.
DIMENSIONS NOTED AS “CLEAR” ARE TO FINISHED SURFACE AND ARE CRITICAL FOR
ACCESSIBILITY REQUIREMENTS OR BUILT-IN FURNISHINGS.
CONTRACTOR SHALL FIELD VERIFY FINISHED DIMENSIONS AND CLEARANCES IN SPACES
INDICATED TO RECEIVE BUILT-IN FURNISHINGS OR CASEWORK PRIOR TO FABRICATION.
ALL VERTICAL CONCRETE SURFACES WHICH WILL BE EXPOSED TO VIEW UPON COMPLETION
OF WORK SHALL RECEIVE A SMOOTH RUBBED FINISH.
ALL ENDS OF MASONRY WALLS THAT WILL BE EXPOSED TO VIEW UPON COMPLETION OF
WORK SHALL BE PLAIN END UNITS.
FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM EXCEPT
WHERE DIMENSIONED OTHERWISE.
SEALANT SHALL BE PROVIDED AT THE INTERIOR AND EXTERIOR PERIMETER OF ALL WINDOWS,
DOOR FRAMES, LOUVERS OR OTHER ITEMS INSERTED IN AN EXTERIOR WALL.
SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM
EACH MOST REMOTE WALL, IN EACH DIRECTION, WITH NO TILES LESS THAN 6” UNLESS
OTHERWISE INDICATED.
WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK, WITHIN
2'-0” OF GRADE AND IN OTHER LOCATIONS OUTSIDE THE BUILDING ENVELOPE WHERE
EXPOSED TO THE WEATHER SHALL BE PRESSURE TREATED LUMBER OR PLYWOOD.
INSTALL ALL WORK AS INDICATED AND VERIFY EXACT LOCATION AND ELEVATIONS ON THE
JOB.
DO NOT SCALE DRAWINGS. REFER TO DIMENSIONS AND SPECIFIED MATERIALS. CONTACT
THE ARCHITECT IF ADDITIONAL DIMENSIONS ARE REQUIRED.
COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.
FIRST FLOOR LEVEL DATUM ELEVATION (0'-0") IS EQUAL TO ACTUAL
ELEVATION (XX'-XX"). ARCHITECTURAL ELEVATIONS U.O.N. ARE TAKEN FROM FINISHED FIRST
FLOOR LEVEL DATUM ELEVATION (0'-0").
INTERIOR WALL AND CEILING FINISH MINIMAL REQUIREMENTS (FINISH CLASSIFICATIONS IN
ACCORDANCE WITH ASTM E84) ARE AS FOLLOWS:
VERTICAL EXITS AND EXIT PASSAGEWAYS - CLASS B
EXIT ACCESS CORRIDORS AND OTHER EXIT WAYS - CLASS C
ROOMS AND ENCLOSED SPACES - CLASS C
TRUSS IDENTIFICATION SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH TITLE 19 NYCRR
PART 1264 AND APPENDIX H OF THE FIRE CODE OF NEW YORK STATE 2010. TRUSS
IDENTIFICATION SIGNS SHALL BE LOCATED AT BUILDING ENTRANCE DOORS, EXTERIOR
DISCHARGE DOORS AND FIRE DEPARTMENT HOSE CONNECTIONS.
A. ATTACH SIGN TO FACE OF DOOR, OR ATTACHED TO A SIDELIGHT OR FACE
OF THE BUILDING NOT MORE THAN 12 INCHES HORIZONTALLY FROM THE LATCH SIDE OF THE
DOOR JAMB, AND NOT LESS THAN 42 INCHES NOR MORE THAN 60 INCHES ABOVE THE
ADJOINING WALKING SURFACES.
B. ATTACH SIGN AT EACH END OF A ROW OF DOORS AT A MAXIMUM
HORIZONTAL DISTANCE OF 12 FEET BETWEEN SIGNS, AND NOT LESS THAN 42 INCHES NOR
MORE THAN 60 INCHES ABOVE THE ADJOINING WALKING SURFACE.
C. AT FIRE DEPARTMENT HOSE CONNECTIONS ATTACH TO THE FACE OF
BUILDING, NOT MORE THAN 12 INCHES HORIZONTALLY FROM THE CENTER LINE OF THE FIRE
DEPARTMENT HOSE CONNECTION, AND NOT LESS THAN 42 INCHES NOR MORE THAN 60
INCHES ABOVE THE ADJOINING WALKING SURFACE.
D. SIGNS IDENTIFYING THE EXISTENCE OF TRUSS CONSTRUCTION SHALL
CONSIST OF A CIRCLE 6 INCHES IN DIAMETER, WITH A STROKE WIDTH OF 1/2 INCH. THE SIGN
BACKGROUND SHALL BE REFLECTIVE WHITE IN COLOR. THE CIRCLE AND CONTENTS SHALL BE
REFLECTIVE RED IN COLOR, CONFORMING TO PANTONE MATCHING SYSTEM (PMS) # 187.
WHERE A SIGN IS DIRECTLY APPLIED TO A DOOR OR SIDELIGHT, IT MAY BE A PERMANENT
STICKER OR DECAL. SIGNS NOT DIRECTLY APPLIED TO DOORS OR SIDELIGHTS SHALL BE
STURDY, NON-FADING, WEATHER RESISTANT MATERIAL.
F. SIGNS SHALL CONTAIN THE ROMAN ALPHANUMERIC DESIGNATION OF THE
CONSTRUCTION TYPE OF THE BUILDING, IN ACCORDANCE WITH THE PROVISIONS FOR THE
CLASSIFICATION OF TYPES SET FORTH IN SECTION 602 OF THE BUILDING CODE OF NEW YORK
STATE 2010, AND AN ALPHABETIC DESIGNATION FOR THE STRUCTURAL COMPONENTS THAT
ARE OF TRUSS CONSTRUCTION AS FOLLOWS:
"F" SHALL MEAN FLOOR FRAMING, INCLUDING GIRDERS AND BEAMS
"R" SHALL MEAN ROOF FRAMING
"FR" SHALL MEAN FLOOR AND ROOF FRAMING
G. THE CONSTRUCTION TYPE DESIGNATION SHALL BE PLACED AT TWELVE
O'CLOCK POSITION OVER THE STRUCTURAL COMPONENT DESIGNATION, WHICH SHALL BE
PLACED AT THE SIX O'CLOCK POSITION. REFER TO FOLLOWING SYMBOL FOR THIS BUILDING:
GENERAL ARCHITECTURAL NOTES
IIB
R
ROMAN ALPHANUMERIC
DESIGNATION OF CONSTRUCTION
ALPHABETIC DESIGNATION FOR THE
STRUCTURAL COMPONENTS THAT
ARE TRUSS CONSTRUCTION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
OVERHEAD
VISIBLE ITEMS
BREAK LINE
HIDDEN OR NOT IN CONTRACT
CENTER LINE OR COLUMN GRID
C.M.U. WALL / PARTITION - SEE PARTITION TYPES
EXISTING WALL CONSTRUCTION
METAL STUD PARTITION - SEE PARTITION TYPES
WALL/ PARTITION DESIGNATIONS
BRICK FACE
LINE TYPES
Engineering Architecture Environmental Planning
300 State Street Suite 201
Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com
LaBella Powered by partnership.
Miller-RemickLLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0119
A S e rv ic e
D i s a b l e d
Ve t e r an Owne d
S m a l l
B u s iness
SDVOSB
CVE Location
Issue Date o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT RELOCATION OF AUDIOLOGY
CASTLE POINT CAMPUS
WAPPINGERS FALLS, NY
620A4-18-204
15E
Project Director
C U s e rs
\R M o n ig le
\D o c u m e n ts \R e v it L o c a l F ile s \2
C a s tl e P o in t V
A M
C
A u d io lo g y C lin ic
R rm o n ig le
.r v t
BID DOCUMENTS
2021-05-17 JPR REM
GI001
NOTES, SYMBOLS & ABBREVIATIONS
ARCHITECTURAL DRAWING INDEX
GENERAL
GI001 NOTES, SYMBOLS & ABBREVIATIONS
GI100 CODE COMPLIANCE AND LIFE SAFETY PLAN OF BUILDING 15E
GI101 SMOKE COMPARTMENT PLAN
GI102 DUST CONTROL & ICRA PHASING PLAN
SITE
AS101 ARCHITECTURAL SITE PLAN
ARCHITECTURAL
A001 PARTITION TYPES
AD100 BASEMENT REMOVAL PLAN
A100 OVERALL BASEMENT FLOOR PLAN OF BUILDING 15E
A110 ENLARGED BASEMENT FLOOR PLAN
A120 BASEMENT EQUIPMENT PLAN
A130 BASEMENT REFLECTED CEILING PLAN
A210 INTERIOR ELEVATIONS
A400 ENLARGED PLANS & INT. ELEVATIONS
A500 DETAILS
A501 DETAILS
A600 DOOR & WINDOW SCHEDULES, TYPES AND DETAILS
INTERIORS
I100 SIGNAGE SCHEDULE & LEGEND, FINISH LEGEND
I110 BASEMENT FLOOR FINISH PLAN
I301 FIRST FLOOR FURNITURE PLAN
NO: DESCRIPTION: DATE:
(E)S (E)S
2FB 2FB
PCS PCS
(E)2FB (E)2FB
R E
F
(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB
(E )2
F B
(E )2
F B
(E)S
(E )S
(E)S (E)S (E)S (E)S (E)S
(E )S
(E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S
(E )S
(E )S
(E )S
(E )S
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB
(E)2FB
(E)2FB
(E )2
F B
(E )2
F B
(E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB
(E)2FB
(E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)2FB (E)2FB (E)2FB
(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB (E)2FB
(E)2FB
P C
S P
C S
P C
S P
C S
PCS PCS
P C
S P
C S
P C
S
EXIT DISCHARGE
TRAVEL DISTANCE AND DIRECTION OF TRAVEL
COMMON PATH OF EGRESS
REMOTE POINT OF TRAVEL
XX'-XX"
EXIT
EXITE
FIRE EXTINGUISHER CABINET
(1 PER 75 FT RADIUS AND 3,000 SF AREA)
FX
EXISTING 2 HOUR FIRE BARRIER
LIFE SAFETY LEGEND
EXISTING 30 MINUTE SMOKE BARRIER
2 HOUR FIRE BARRIER
SELF-CLOSING DOOR(S) (PROJECT AREA)SC
EXIT LIGHT (IN RELEVANT PROJECT AREA)
• ARROW SHOWS DIRECTION OF EGRESS
• SHADED PORTION SHOWS ILLUMINATED FACE
WALL RATINGS
OUT OF SCOPE OF PROJECT
PATIENT CARE SUITE (ADVISORY)
CODE REVIEW INFORMATION
NFPA 101 LIFE SAFETY CODE 2018 & 2020 BUILDING CODE OF NEW YORK STATE
BUILDING DATA FIRE RESISTANCE RATINGS
NYS REQ'D PROVIDED
USE DESCRIPTION
OCCUPANCY
NYS CHAPTER 3
NFPA 6.1.1
CLASSIFICATION OF WORK
NYS CHAPTER 6
NFPA 4.6.7
CONSTRUCTION TYPE
NYS CHAPTER 6
NFPA TABLE A.8.2.2
NO. OF STORIES
BUILDING HEIGHT
NYS 504
AUTOMATIC SPRINKLER SYSTEM
NYS 903
LOCAL
ALLOWABLE BUILDING AREA (At) NYS 506
INCREASE FOR FRONTAGE (If) NYS 506.3
TOTAL ALLOWABLE BUILDING AREA (Aa) NYS 506
UL
N/A
UL
TOTAL GROSS BUILDING AREA
NUMBER OF OCCUPANTS
NYS 1004.1
NFPA TABLE 7.3.1.2
SEE OCCUPANCY SCHEDULE BELOW
MIN. NUMBER OF EXITS
NYS 1006
NFPA 7.4.1, 18.2.4
MIN. EXIT WIDTH PER OCCUPANT
NYS 1005.3
NFPA 7.3.3.1
PER OCC.
x
MIN. DOOR WIDTH
NYS 1010.1.1
NFPA 38.2.2.2 (7.2.1.2.3)
COMPLIES
MIN. STAIRWAY WIDTH
NYS 1011.2
NFPA 7.2.2.2
COMPLIES
MIN. CORRIDOR WIDTH
NYS 1005.1 / NYS 1020.2
NFPA 7.3.4.1
COMPLIES
MAX. TRAVEL DISTANCE
NYS TABLE 1017.2
NFPA TABLE A7.6 / 18.2.6 COMPLIES
MAX. COMMON
PATH OF TRAVEL
NYS TABLE 1006.2.1
NFPA TABLE A7.6 COMPLIES
MAX. DEAD END CORRIDOR
NYS 1020.4
NFPA TABLE A7.6 COMPLIES
NYS 718
NFPA 8.6.11
CONCEALED SPACE
DRAFTSTOPPING
SMOKE COMPARTMENT NYS 407 / NFPA 18.3.7
INTERIOR FINISHES CLASS
INTERIOR EXIT STAIRWAYS AND RAMPS AND
EXIT PASSAGEWAYS
NYS TABLE 803.11
CORRIDORS AND ENCLOSURE FOR EXIT ACCESS
STAIRWAYS AND RAMPS
ROOMS AND ENCLOSED SPACES
COMPLIES
COMPLIES
COMPLIES
NYS TABLE 906.3
NFPA 9.9
FIRE EXTINGUISHER
SPACING COMPLIES
STANDPIPE SYSTEM
NYS 905
NFPA 9.10
COMPLIES
SMOKE AND FIRE DETECTION NYS 907 COMPLIES
FIRE ALARM SYSTEM NYS 907 COMPLIES
VERTICAL ACCESS REQUIRED NYS 1104.4 COMPLIES
ACCESSIBLE ENTRANCE NYS 1105 COMPLIES
PASSENGER LOADING ZONES NYS 1106.7 COMPLIES
BUILDING ELEMENT TABLE NFPA REQ'D PROVIDED
PRIMARY STRUCTURAL FRAME
EXTERIOR BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS , OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
INTERIOR BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS , OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
COLUMNS
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS , OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
BEAMS, GIRDERS, TRUSSES, AND ARCHES
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS , OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
FLOOR-CEILING ASSEMBLIES
ROOF-CEILING ASSEMBLIES
INTERIOR NON-BEARING WALLS
EXTERIOR NON-BEARING WALLS
FLOOR CONSTRUCTION AND
ASSOCIATED SECONDARY MEMBERS
ROOF CONSTRUCTION AND ASSOCIATED
SECONDARY MEMBERS
ABBREVIATIONS:
N/A
NC
C
NR
B
NOT APPLICABLE / NOT PART OF THIS PROJECT
NON-COMBUSTIBLE
COMBUSTIBLE
NOT REQUIRED
BARRIER TO LIMIT TRANSFER OF SMOKE
STRUCTURAL DESIGN:
REFER TO SPECIFIC DRAWING AND SPECIFICATION
SECTIONS FOR ADDITIONAL STRUCTURAL DESIGN CRITERIA
INCLUDING BUT NOT LIMITED TO, LIVE LOAD, DEAD LOAD,
AND LATERAL LOADS APPLICABLE TO THIS PROJECT.
NOTES:
FIRE WALLS
NYS TABLE 601
NFPA TABLE A.8.2.1.2
NYS TABLE 706.4
FIRE BARRIERS NYS TABLE 707 / NFPA 8.3
VERTICAL EXIT ENCLOSURE
NYS 1023
NFPA 7.1.3.2
FIRE PARTITIONS NYS 708
EXIT PASSAGEWAY
NYS 1024
NFPA 7.1.3.2
HORIZONTAL EXIT
SEPARATION
NYS 1026
NFPA 7.2.4
INCIDENTAL USE
AREAS
NYS 509
NFPA 18.3.2.1
OCCUPANCY
SEPARATION
NYS 508
NFPA TABLE 6.1.14.4.1
SHAFT ENCLOSURE NYS 713.4
NFPA TABLE 8.6
CORRIDOR WALLS
NYS TABLE 1020.1
NFPA 18.3.6.2
SMOKE BARRIERS
NYS 709.3
NFPA 18.3.7
CONTRACTOR TO VERIFY / MAINTAIN / PATCH ANY
AND ALL AREAS OF FIREPROOFING OR UL
ASSEMBLIES WITHIN SCOPE OF WORK
COMPLIES
COMPLIES
COMPLIES
SPECIAL REQUIREMENTS NYS CHAPTER 4 N/A N/A
MIXED OCCUPANCY
NYS 508
NFPA 6.1.14
MIN. EXIT WIDTH NYS 1005.3
NFPA 7.3.4
COMPLIES
NFPA REQ'D
PER OCC.
NYS REQ'D
GROSS PROJECT AREA
4.20
AUDIOLOGY
BUSINESS
1A
MAINTAIN
EXISTING
UNLIMITED
UNLIMITED
54'
YES
14856 SF
0.3
0.3 28
32"
36"
36"
300'
100'
50'
NC COMPLIES
22,500 SF COMPLIES
B
B
B
1/3,000
75'
NO
YES
YES
YES
YES
YES
COMPLIES
4 HR
4 HR
4 HR
3 HR
3 HR
4 HR
3 HR
3 HR
4 HR
2 HR
2 HR
2 HR
2 HR
0 HR
0 HR
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
COMPLIES
NR
NR
2 HR
EXIST.
COMPLIES
1 HR COMPLIES
2 HR COMPLIES
NR NR
NR NR
2 HR COMPLIES
NR COMPLIES
1 HR COMPLIES
ALTERATION
LEVEL 1
YES
N/A N/A
YES
4.2
AUDIOLOGY
HEALTHCARE/
BUSINESS
MODIFICATION
I (442)
N/A
N/A
0.3
32"
36"
28"
200'
100'
30'
NR
NR
1/3,000
75'
NO
YES
YES
N/A
YES
>27"
3 HR
3 HR
3 HR
0 HR
0 HR
2 HR
1.5 HR
2 HR
NR
NR
2 HR
1 HR
2 HR
NR
NR
2 HR
0 HR
1 HR
4855 SF
DESCRIPTION
FIRE WALLS
FIRE BARRIERS (EXIT ENCLOSURE
HORIZONTAL EXIT INCIDENTAL
USE/HAZARD OCCUPANCY SEPARATION)
SHAFT ENCLOSURES (FIRE BARRIER AT
ELEVATOR, STAIR OR MECH. SHAFT)
FIRE PARTITION (ELEV. LOBBY, CORRIDOR
WALL, TENANT SEPARATION)
SMOKE BARRIERS (1 HOUR RATED AT
OTHER OCCUPANCIES)
FIRE BARRIER/SMOKE BARRIERS (SMOKE
BARRIER COINCIDING W/ FIRE BARRIER -
INCIDENTAL USE, EXIT ENCLOSURE, ETC.)
SHAFT ENCLOSURE/SMOKE BARRIERS
(SMOKE BARRIER COINCIDING W/ SHAFT
ENCLOSURE)
FIRE WALL/SMOKE BARRIERS (SMOKE
BARRIER COINCIDING W/ FIRE WALL)
SMOKE PARTITIONS (SP) (UNRATED SMOKE
RESISTANT CONSTRUCTION - CORRIDOR)
HORIZONTAL ASSEMBLIES (HA)
(RATED ENGINEERED CEILINGS)
NON-RATED WALLS
OWNER STENCILING REQUIREMENTS
STENCIL WORDING
FW-2HR
FW-3HE
FB-1HR
FB-2HR
SE-1HR
SE-2HR
FP-1HR
SB-1HR
FBSB-1HR
FBSB-2HR
SESB-1HR
SESB-2HR
FWSB-1HR
FWSB-2HR
SP-0HR
HA-1HR
HA-2HR
NR
1) THE INTENT OF THIS PLAN IS TO PORTRAY COMPLIANCE
ACHIEVED AFTER CONSTRUCTION IS COMPLETED IN PROJECT
SCOPE AREAS. DESIGNATIONS IN AREAS OUTSIDE OF SCOPE
ARE FOR REFERENCE ONLY.
2) ALL PROJECT SCOPE AREAS TO BE FULLY SPRINKLERED
UPON COMPLETION OF CONSTRUCTION.
3) CONTRACTOR TO VERIFY ALL FIELD CONDITIONS PRIOR TO
STARTING WORK. REPORT ANY DISCREPANCIES OR PROBLEMS
TO THE ARCHITECT, IN WRITING, BEFORE BEGINNING DEMOLITION
OR CONSTRUCTION
4) CONTRACTOR IS RESPONSIBLE FOR ALL WORK AND MATERIALS
NECESSARY TO CONSTRUCT OR UPGRADE WALLS TO COMPLY W/
THE REQUIREMENTS SHOWN IN THIS CODE COMPLIANCE DRAWING.
WORK SHALL INCLUDE, BUT NOT BE LIMITED TO: PENETRATIONS,
PERIMETER JOINTS, AND TOP OF WALL CONDITIONS.
5) REFER TO BUILDING DATA SHEET FOR ADDITIONAL BUILDING
CODE INFORMATION
6) REFER TO UL DESIGNS IN FIRE RESISTANCE RATING ON BUILDING
DATA SHEET FOR SPRAYED FIREPROOFING REQUIREMENTS OF ALL NEW
CONSTRUCTION AND AS INDICATED AT EXISTING
BUILDING COMPONENTS.
7) CAULKING AT ALL PENETRATIONS AS REQUIRED TO MATCH
CONSTRUCTION/PARTITION TYPE; CONTRACTOR SHALL REVIEW
ENTIRE WORK AREA AND IDENTIFY ANY PRE-EXISTING DEFICIENT
CONDITIONS, SUCH AS UNSEALED PENETRATIONS, SUBSTANDARD
INSTALLATIONS, ETC. AND REPAIR AS REQUIRED.
8) VERIFY EXISTING FIRE EXTINGUISHER LOCATIONS. RELOCATE
AND REINSTALL AS REQ'D TO COMPLY WITH OWNER STANDARDS
(PROVIDE (1) 10 LB. ABC FIRE EXTINGUISHER PER 6000 SF AREA.
MAXIMUM TRAVEL DISTANCE TO EXTINGUISHER IS 75').
9) APPLY STENCILED LETTERING INDICATING PARTITION RATING
OR TYPE PER OWNER STANDARDS (RED IN COLOR, 4" TALL
LETTERING, ABOVE THE CEILING SPACED EVERY 10'-0").
PENETRATIONS BY ALL TRADES IN RATED OR SMOKE RESISTANT
PARTITIONS ARE TO BE SEALED OR FIRE STOPPED WITH
APPROVED ASSEMBLIES:
GENERAL CODE PLAN NOTES
81 SF
ELEC. ROOM
E011
413 SF
CORRIDOR
112 SF
RECEPTION
E013
408 SF
AUDIOMETRIC
ROOM 3
E023
349 SF
AUDIOMETRIC
ROOM 4
E024
338 SF
WAITING
E010
86 SF
EXIT VESTIBULE
E022
91 SF
OFFICE
E016
56 SF
STAFF TOILET
E025
349 SF
AUDIOMETRIC
ROOM 1
E019
415 SF
AUDIOMETRIC
ROOM 2
E020 246 SF
VESTIBULAR EXAM
E018
146 SF
SPEECH THERAPY
E017
68 SF
WORKROOM
E013A
CLEAN SUPPLY
E014
SOILED HOLD
E015
23 SF
STORAGE
E021
125 SF
CLINIC ROOM
E026
207 SF
LAB
E028
PASSAGEWAY
E012
246 SF
BREAKROOM /
CONFERENCE RM
E027
21 SF
STOR.
E020A
21 SF
STOR.
E023A
TRAVEL DISTANCE: 44'-8"
TRAVEL DISTANCE: 29'-4"
TRAVEL DISTANCE: 23'-1"
5' - 2"
5' - 2"
7' - 11 1/2"
5' - 0"
5' - 0"
8'
5' - 0"
A B TRAVEL DISTANCE: 22'-10"
TRAVEL DISTANCE: 42'-5"
C
C
A/B
FX
FX
E
E
SMALLEST DOOR = 36"
CLEAR OPENING = 34"
34"/0.3 OCC = 113 OCC.
ACTUAL OCC. = 20 OCC.
SMALLEST DOOR = 36"
CLEAR OPENING = 34"
34"/0.2 OCC = 170 OCC.
ACTUAL OCC. = 21 OCC.
D
EA
D E N D 3' -4
X
D
EA
D E N D 5' -3
X
TYP.
2' - 8"
TOTAL TRAVEL
DISTANCE
A: 67'-9"
B: 142'-3"
C: 110'-8"
1 2 3 4 5 6 7
A
B
TRAVEL DISTANCE: 45'-5"
D
EA
D E N D
'-4
X
STORAGE ROOM UNDER
STAIRS IS SEPARATED FROM
STAIR WELL BY 2-HOUR
RATING AT UNDERSIDE OF
STAIR.
WALKWAY ABOVE
EXISTING ENCLOSURE
CONSTRUCTION OF THESE
AREAS IS TO BE INSPECTED
FOR POSSIBLE FIRE RATING.
PROVIDE MIN. 1 HR RATED
CONSTRUCTION. PATCH
/REPAIR ANY BREACHES IN
ENCLOSURE.
EXIST
CONFERENCE RM
042D
EXIST
ASSOCIATE PATH.
042B
EXIST
LAB. CHIEF
042C
EXIST
TOILET
EXIST
OFFICE
042A
EXIST
ADMIN. SUPPORT
EXIST
STAFF LOCKER
EXIST
HISTOLOGY
EXIST
STORAGE
EXIST
RECEIVING
EXIST
COLD RM
EXIST
LOADING BAY
EXIST
CORRIDOR
EXIST
CORRIDOR
E033C
EXIST
TRAVEL
E033C2
EXIST
H.A.S. CHECK-IN
E033
EXIST
STOR.
EXIST
DAV
E033C1
EXIST
STOR. 01
E033B
EXIST
HEMOTOLOGY
COAGUZATION
EXIST
CHEMISTRY
EXIST
BLOOD BANK
EXIST
OFFICE
EXIST
MICRO BIOLOGY
EXIST
FLOUR. CL.
032B
EXIST
ISOLATION
032A
EXIST
CORRIDOR
EXIST
CORRIDOR
EXIST
MECHANICAL
ROOM
EXIST
TOILET
EXIST
RECEPTION
016A
EXIST
OFFICE
016B
EXIST
PHLEBOTOMY
WAITING ROOM
EXIST
LABORATORY
016C
EXIST
TOILET
016D
EXIST
PHLEBOTOMY
EXIST
WAITING ROOM
E010
EXIST
OFFICE
E031
EXIST
OFFICE
E030
EXIST
SUPERVISOR
OFFICE
E033A
EXIST
OEF/OIF/OND
OFFICE
E032
EXIST
ELEGIBILITY
OFFICE
E034
EXIST
MECH. /
ELEC.
E036B
EXIST
HAC
E037
EXIST
MECH. /
ELEC. ROOM
E036B1
EXIST
URGENT CARE
WAITING ROOM
E036A1
EXIST
WOMEN'S
WAITING
ROOM
E036A
EXIST
URGENT CARE
LOBBY
E036
EXIST
VESTIBULE
E040
EXIST
CORRIDOR
EXIST
MEN'S
TOILET
E038
EXIST
WOMEN'S
TOILET
E039
EXIST
CONFERENCE
ROOM
H015
EXIST
STAFF TOILET
H016
EXIST
CORRIDOR
EXIST
EXAM
009E
EXIST
EXAM
009F
EXIST
EXAM
009G
EXIST
EXAM
009HEXIST
HALL
011A
EXIST
STAFF LOUNGE
EXIST
DATA
CLOSET
EXIST
ELEVATOR
E1
EXIST
CLOSET
011C
EXIST
DATA CLOSET
011B
EXIST
NURSE'S
STATION
EXIST
NURSE'S
STATION
EXIST
CORRIDOR
EXIST
ENTRY
EXIST
CORRIDOR
E035
EXIST
COMPRESSOR
ROOM
019A
EXIST
STORAGE
019B
EXIST
STAIR HALL
EXIST
ELEV.
MECH.
ROOM
H-053
EXIST
MECH. EQUIP. RM.
H-054
EXIST
MULTI-PURPOSE
STOR.
H003
EXIST
MULTI-PURPOSE RM
H008
EXIST
CLEAN
LIN.
H014
EXIST
OBSV. RM.
H012B
EXIST
PAT. TLT.
H012B1 EXIST
OBSV. RM.
H012C
EXIST
PAT. TLT.
H012D1
EXIST
FEMALE
EXAM / OBSV.
H012D
EXIST
NURSE
TRIAGE
H012E
EXIST
CLEAN
SUPPLY
STOR.
H012F
EXIST
STAIR
H017
EXIST
C.A.T. SCAN
EXIST
STOR.
005B
EXIST
CONTROL
005A
3RD FLOOR HOSPITAL FUNCTIONS
2ND FLOOR HOSPITAL FUNCTIONS
1ST FLOOR HOSPITAL FUNCTIONS
URGENT CARE / HISTOLOGYAUDIOLOGY
(PROJECT AREA)
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
SCOPE OF WORK
BUSINESS OCCUPANCY
PROJECT AREA: 4855 SF
EXIT TO GRADE AT BASEMENT
BASEMENT FLOOR
STACK DIAGRAM
PENTHOUSE FLOOR
MECHANICAL FUNCTIONS
Engineering Architecture Environmental Planning
300 State Street Suite 201
Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com
LaBella Powered by partnership.
Miller-RemickLLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0119
A S e rv ic e
D i s a b l e d
Ve t e r an Owne d
S m a l l
B u s iness
SDVOSB
CVE
KEYPLAN
PLAN
NORTH
ACTUAL
NORTH
Location
Issue Date o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT RELOCATION OF AUDIOLOGY
CASTLE POINT CAMPUS
WAPPINGERS FALLS, NY
620A4-18-204
15E
Project Director
C U s e rs
\R M o n ig le
\D o c u m e n ts \R e v it L o c a l F ile s \2
C a s tl e P o in t V
A M
C
A u d io lo g y C lin ic
R rm o n ig le
.r v t
BID DOCUMENTS
2021-05-17 JPR REM
GI100
CODE COMPLIANCE AND LIFE
SAFETY PLAN OF BUILDING 15E
SCALE: 1/8" = 1'-0"GI100
1 OVERALL BASEMENT CODE COMPLIANCE OF BUILDING 15E
ROOM OCCUPANCY SCHEDULE
ROOM
NUMBER ROOM NAME AREA
OCCUPANT
LOAD
FACTOR
OCCUPANCY
LOAD
E019 AUDIOMETRIC ROOM 1 349 SF 150 SF 3
E020 AUDIOMETRIC ROOM 2 415 SF 150 SF 3
E023 AUDIOMETRIC ROOM 3 408 SF 150 SF 3
E024 AUDIOMETRIC ROOM 4 349 SF 150 SF 3
E025 STAFF TOILET 56 SF 150 SF 1
E026 CLINIC ROOM 125 SF 150 SF 1
E027 BREAKROOM / CONFERENCE RM 246 SF 150 SF 2
E028 LAB 207 SF 150 SF 2
TOTAL OCCUPANCY FOR SCOPE OF WORK 28
ROOM OCCUPANCY SCHEDULE
ROOM
NUMBER ROOM NAME AREA
OCCUPANT
LOAD
FACTOR
OCCUPANCY
LOAD
BASEMENT FLOOR
E010 WAITING 338 SF 150 SF 3
E011 ELEC. ROOM 81 SF 150 SF 1
E013 RECEPTION 112 SF 150 SF 1
E013A WORKROOM 68 SF 150 SF 1
E016 OFFICE 91 SF 150 SF 1
E017 SPEECH THERAPY 146 SF 150 SF 1
E018 VESTIBULAR EXAM 246 SF 150 SF 2
R E
F
(E)S
(E )S
(E)S (E)S (E)S (E)S (E)S
(E )S
(E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S
(E )S
(E )S
(E )S
(E )S
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB
(E)2FB
(E)2FB
(E )2
F B
(E )2
F B
(E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB
(E)2FB
(E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)2FB (E)2FB (E)2FB
(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB (E)2FB
(E)2FB
1 2 3 4 5 6 7
A
B
MORGUE
COOLERS
EXISTING SMOKE COMPARTMENT: 6,183 SF
EXISTING SMOKE COMPARTMENT: 14,856 SF
EXISTING SMOKE COMPARTMENT: 13,173 SF
SMOKE COMPARTMENT LEGEND
HATCH PATTERNS DESIGNATE
SMOKE COMPARTMENTS
BOLD LINE REPRESENTS A SMOKE
BARRIER
Engineering Architecture Environmental Planning
300 State Street Suite 201
Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com
LaBella Powered by partnership.
Miller-RemickLLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0119
A S e rv ic e
D i s a b l e d
Ve t e r an Owne d
S m a l l
B u s iness
SDVOSB
CVE
KEYPLAN
PLAN
NORTH
ACTUAL
NORTH
Location
Issue Date o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT RELOCATION OF AUDIOLOGY
CASTLE POINT CAMPUS
WAPPINGERS FALLS, NY
620A4-18-204
15E
Project Director
C U s e rs
\R M o n ig le
\D o c u m e n ts \R e v it L o c a l F ile s \2
C a s tl e P o in t V
A M
C
A u d io lo g y C lin ic
R rm o n ig le
.r v t
BID DOCUMENTS
2021-05-17 JPR REM
GI101
SMOKE COMPARTMENT PLAN
SCALE: 1/8" = 1'-0"GI101
1 SMOKE COMPARTMENT PLAN
F
(E)S
(E )S
(E)S (E)S (E)S (E)S (E)S
(E )S
(E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S
(E )S
(E )S
(E )S
(E )S
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB
(E)2FB
(E)2FB
(E )2
F B
(E )2
F B
(E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB
(E)2FB
(E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)S
(E)2FP
(E)2FB (E)2FB (E)2FB
(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB
(E )2
F B
(E )2
F B
(E )2
F B
(E)2FB (E)2FB
(E)2FB
XXXXXXXXX
X X
X X
X X
X
X X X
X
X
X
1 2 3 4 5 6 7
A
B
MORGUE
COOLERS
ENTRANCE/EXIT
ENTRANCE/EXIT
ENTRANCE/EXIT
ENTRANCE/EXIT
ENTRANCE/EXIT
ENTRANCE/EXIT
ACCESSIBLE
ENTRANCE/EXIT TO
UPPER FLOOR
ENTRANCE/
EXIT TO
UPPER
FLOOR
ENTRANCE/
EXIT
PROVIDE
DUST
CONTROL
WALK OFF
MATS AT
DOOR
PROVIDE DUST
CONTROL WALK
OFF MATS AT
DOOR
ENTRANCE/EXIT
PROVIDE PROTECTIVE PLASTIC
COVERING FOR DUST CONTROL
AT ELECTRICAL AREA
MIN.
4' - 0"
M
IN
5'
COORDINATE LOCATION OF SITE
CONSTRUCTION FENCING TO
MAINTAIN ACCESS FOR EGRESS
RAMP IN THIS AREA.
M
IN
2' /4
P
P
P
1. ENSURE RENOVATED AREA IS TO BE COMPLETELY SEALED OFF FROM SURROUNDING AREAS.
2. MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING CONSTRUCTION. RESTRICT ACCESS TO FLOOR FROM WITHIN STAIRWELL DURING
CONSTRUCTION.
3. COORDINATE PHASING SCHEDULE WITH COR PRIOR TO STARTING CONSTRUCTION. VA HAS A MAXIMUM TIME LIMIT AREAS OF CONSTRUCTION CAN BE
CLOSED.
4. CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS IS THE CONTRACTOR'S RESPONSIBILITY TO BE REINSTALLED TO
PRE-CONSTRUCTION CONDITIONS.
5. SECOND FLOOR CALL CENTER IS TO BE FULLY OPERATIONAL AND BE ABLE TO BE ACCESSED BY STAFF AT ALL TIMES. WORK THAT WOULD DISRUPT THE
SECOND FLOOR MUST BE COORDINATED WITH COR PRIOR TO CONSTRUCTION.
6. CONSTRUCTION AREA TO BE SECURED AT ALL TIMES. PROVIDE STOREROOM LOCK ON ALL CONSTRUCTION/ICRA BARRIER DOORS.
DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT
PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC POLICIES OR
CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.
FOR THE PURPOSE OF THIS RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED ADJACENT TO MEDIUM RISK AND COMPRISES WORK WHICH COULD GENERATE MODERATE TO HIGH LEVELS OF DUST NOT WITHIN THE CONFINES OF A SUITE OR OFFICE AND INCLUDES EXTENSIVE CONSTRUCTION WORK (DEMOLITION) IN BUILDING 6 THROUGHOUT THE FIRST, SECOND FLOOR CEILING AND BASEMENT. THE DUST CONTROL PLAN SHALL BE DISTRIBUTED AND REVIEWED
BY ALL CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT.
EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF FEASIBLE SEAL OFF ADJACENT AIR INTAKES.
• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND REPLACE AS NEEDED TO AVOID BUILDUP OF
PARTICULATE.
• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND CORRIDORS)
ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING MINIMAL DUST MAY
USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF INSECTS AND FLIES, WET
CEILING TILE, ETC.
• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHOULD BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITH
PRIOR APPROVAL OF THE VAMC.
• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
• CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS SHOULD BE REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.
VENTILATION AND ENVIRONMENTAL CONTROLS
• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR; FILTERS SHOULD BE ADDED OR
RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA
FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.
• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR
CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE THROUGHOUT THE PROJECT.
• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE PARTITION.
CONTAMINATION OF PATIENT ROOMS
• WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA.
IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
• CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING
OF HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS.
INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION
(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)
STEP #1: SELECT ACTIVITY TYPES BELOW:
CONSTRUCTION ACTIVITY TYPES:
TYPE B
SMALL SCALE, SHORT DURATION (LESS THAN 1 DAY) ACTIVITIES
WHICH CREATE MINIMAL DUST
INCLUDES, BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING
• ACCESS TO CHASE SPACES
• CUTTING OF WALLS OR CEILINGS WHERE DUST
MIGRATION CAN BE CONTROLLED
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST
OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
INCLUDES, BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING
• REMOVAL OF FLOOR COVERING, CEILING TILES, AND
CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE
CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A
SINGLE WORK SHIFT
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET
• PAINTING (BUT NOT SANDING)
• WALL COVERING
• ELECTRICAL TRIM WORK
• MINOR PLUMBING
• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE
CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER
THAN FOR VISUAL INSPECTION TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT NOT LIMITED TO:
• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK
SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A
COMPLETE CABLING SYSTEM.
• NEW CONSTRUCTION
IT IS LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT
RISK FOR INFECTION WITH TUBERCULOSIS? YES / NO
IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE
WATER SYSTEM/LINES DURING ACTIVITY? YES / NO
STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF
COLUMN
A.) INFECTION CONTROL RISK GROUPS
GROUP 1 - LOW - OFFICE AREAS
GROUP 2 - MEDIUM - CARDIOLOGY, ECHOCARDIOLOGY,
ENDOSCOPY, NUCLEAR MEDICINE, PHYSICAL THERAPY, RADIOLOGY
/ MRI, RESPIRATORY THERAPY
GROUP 3 - HIGH RISK - CCU, EMERGENCY ROOM, LABORATORIES,
OUTPATIENT SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT,
SURGICAL UNITS
GROUP 4 - HIGHEST RISK - ANY AREA CARING FOR
IMMUNOCOMPRIMISED PATIENTS, CARDIAC CATH LABS, CENTRAL
SUPPLY, INTENSIVE CARE UNITS, MEDICAL UNITS, NEGATIVE
AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS
STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:
CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS
** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS
II, III, IV PRECAUTIONS ARE REQUIRED.
RISK LEVEL
GROUP 1
GROUP 2
GROUP 3
GROUP 4
TYPE 'A'
I
I
I
II
TYPE 'B'
II
II
II
III / IV
TYPE 'C'
II
III
III / IV
III / IV
TYPE 'D'
III / IV
IV
IV
IV
CONSTRUCTION TYPE:
D
RISK GROUP:
MEDIUM
RISK ASSESSMENT:
IV
PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL
ELECTRICAL
YES
POTABLE WATER
YES
HVAC
YES
MEDICAL VACUUM
YES
SEWER
YES
STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:
CLASS I - DURING CONSTRUCTION PROJECT
1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION
CLASS II - DURING CONSTRUCTION PROJECT
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS III - DURING CONSTRUCTION PROJECT
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT ) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED
AIR FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED
CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS
USED.
CLASS IV - DURING CONSTRUCTION PROJECT
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC,
TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING & SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZE HEPA-
EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE; OR THEY CAN WEAR CLOTH OR
PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE
WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL
& THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT.
CLASS I - UPON COMPLETION OF WORK
1. CLEAN WORK UPON COMPLETION OF TASK
CLASS II - UPON COMPLETION OF WORK
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM BEFORE LEAVING WORK AREA
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING
PERFORMED.
CLASS III - UPON COMPLETION OF WORK
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY
CLEANED BY ENVIRONMENTAL MANAGEMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT &
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA-FILTER VACUUMS.
4. WET MOP WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
CLASS IV - UPON COMPLETION OF WORK
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT & DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CONTRACTOR'S…
This is the start of the file's text. The full file is on GovTribe.