04-Architectural Draw.pdf

PDF 31 MB Posted

Attached to
Y1DZ--620A4-18-204|Relocation of Audiology -
Solicitation number
36C24221B0045
Issued by

About this file

This document provides details of a federal contract solicitation for relocation of audiology services at the Castle Point VA Medical Center. The solicitation seeks proposals for relocation of Audiology at the Castle Point VAMC located in Castle Point, New York. The contract completion time is 730 calendar days from notice to proceed. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses certified in the VetBiz Vendor Information Pages database. Proposals will only be accepted from responsible and responsive SDVOSBs with a NAICS code of 236220 and size standard of $39.5 million. The cost range for proposals is between $1,000,000 to $5,000,000 and bonds are required. The solicitation will be released on June 18, 2021 with bid submission instructions included. Questions may be sent to the point of contact by July 13, 2021.

View the file

Other files

File Type Posted
36C24221B0045 0002.docx DOCX document
36C24221B0045 0001.docx DOCX document
620A4-18-204_Bid Specifications - Vol II.pdf PDF
02-Civil.pdf PDF
620A4-18-204_Bid Specifications Vol I 02.pdf PDF
00-General.pdf PDF
01-Hazardous Materials.pdf PDF
620A4-18-204_Bid Specifications Vol I.pdf PDF
08-Electrical.pdf PDF
09-Reference.pdf PDF
06-Plumbing.pdf PDF
04-Architectural.pdf PDF
P07 - Wage Determination 02.pdf PDF
36C24221B0045_1.docx DOCX document
07-Mechanical.pdf PDF
05-Fire Protection.pdf PDF
03-Structural.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL SYMBOLS

CONCRETE MASONRY UNITS

(CMU)

CONCRETE

BRICK

CEMENT, SAND, GROUT, PLASTER, OR

GYPSUM WALL BOARD

EARTH

STONE, GRAVEL, OR POROUS

FILL

CARPET

PLYWOOD

WOOD (FINISHED)

WOOD (ROUGH)

RIGID INSULATION

BATT. OR LOOSE INSULATION

STEEL

WOOD (BLOCKING)

PARTICLE BOARD

ARCHITECTURAL DRAWINGS SYMBOLS

MATCH LINE

ELEVATION LINE

EXISTING COLUMN LINE

REFERENCES

DOOR TAGS

BUILDING SECTIONS

WALL SECTIONS

ARCHITECTURAL ABBREVIATIONS

A

X-XXX

X-XXX

X-XXX

DETAIL NO

SHEET NO

DETAIL NO

SHEET NO

A

B

CENTERLINE OF GYP BD

AT GYP BD/STUD

PARTITION

(U.O.N.)

NOMINAL FACE

OF MASONRY AND CONCRETE

WALL / PARTITIONS

(U.O.N.)

NOMINAL FACE

OF COLUMN

(U.O.N.)

TYPICAL PLAN DIMENSIONING

NOMINAL FACE OF

EXISTING PARTITION

(U.O.N.)

B

A: Area AB: Anchor Bolt ABV: Above ACC: Access ACOUST: Acoustical ACR: Acrylic ACST: Acoustic ACT: Acoustical Tile AD: Access Door ADH: Adhesive ADJ: Adjust, Adjustable, Adjacent AFF: Above Finished Floor AGGR: Aggregate ALT: Alternate ALUM: Aluminum ANOD: Anodized AP: Access Panel APPROX: Approximate ATC: Acoustical Tile Ceiling

BDRM: Bedroom BETW: Between BF: Board Foot BIT: Bituminous BLDG: Building BLKG: Blocking BOT: Bottom BPL: Bearing Plate BRG: Bearing BRK: Brick BRZ: Bronze BS: Both Sides BSMT: Basement BUR: Built-up Roof

C/C: Center to Center CAB: Cabinet CAR: Carpet CAV: Cavity CCW: Counter Clockwise CCTV: Closed Circuit TV CEM: Cement CER: Ceramic CF: Cubic Feet CHAM: Chamfer CJ: Control Joint CK: Caulking CL: Centerline CLG: Ceiling CLKG: Caulking CLR: Clear CLR OPG: Clear Opening CMT: Ceramic Mosaic Tile CMU: Concrete Masonry Unit COL: Column CONC: Concrete CONSTR: Construction CONT: Continuous CONTR: Contractor COP: Copper CPR: Copper CPT: Carpet CT: Ceramic Tile CW: Clockwise

EA: Each EB: Expansion Bolt EE: Each End EF: Each Face EIFS: Exterior Insulation and Finish System EJ: Expansion Joint EL: Elevation, Elevator ELEC: Electrical ELEV: Elevator, Elevation ENCL: Enclosure EPDM: Ethylene Propylene Diene Monomer EQ: Equal EQUIP: Equipment ETR: Existing To Remain EW: Each Way EXG: Existing EXH: Exhaust EXIST: Existing EXP: Exposed

GA: Gauge, Gage GALV: Galvanized GC: General Contractor GL: Glass GL BLK: Glass Block GRND: Ground GRTG: Grating GVL: Gravel GYP: Gypsum GYP BD: Gypsum Board

WINDOW TAG/LOUVER TAG

DETAIL SECTIONS

X-XXX

DETAIL NO

SHEET NO

P. LAM: Plastic Laminate PAR: Parallel PBD: Particle Board PERIM: Perimeter PERP: Perpendicular PL: Plate PLBG: Plumbing PLYWD: Plywood PLUMB: Plumbing PR: Pair PREFAB: Prefabricated PRES: Pressure PRESS: Pressure PRMLD: Premolded PRTN: Partition PSF: Pounds per square foot PSI: Pounds per square inch

PT: PAINT

PTD: Painted, Paper Towel Dispenser PTD/R: Combination Paper Towel Dispenser/Receptacle PTN: Partition

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS

DETAIL CALL OUTS

DETAIL NO0

X-XXX

DETAIL NO

SHEET NO

X-XXX2 4

SHEET NO

WALL TYPE

ROOM TAGROOM #

ROOM AREA

# DEMO KEYNOTE

REVISION SYMBOL AND

CLOUD

C

D

E

F

G P

H

I

J

L

M

N

O

Q

R

S

T

DBL: Double DEG: Degree DEMO: Demolition DF: Drinking Fountain DIAG: Diagonal DIA: Diameter DIAM: Diameter DIFF: Diffuser DN: Down DR: Door DWG: Drawing DWGS: Drawings DWR: Drawer

FB: Face Brick FD: Floor drain FDC: Fire Department Connection FDN: Foundation FDTN: Foundation FE: Fire Extinguisher FEC: Fire Extinguisher Cabinet FFE: Finished Floor Elevation FF&E: Fixtures, Furnishings & Equipment FFL: Finished Floor Line FGL: Fiberglass FHC: Fire Hose Cabinet FIN: Finish, finished FIXT: Fixture FL: Floor FLR: Floor FO: Finished Opening FOF: Face of Finish FOS: Face of Studs FP: Fireproof FRT: Fire Retardant FT: Foot, Feet, FTG: Footing, Fitting FURN: Furnish, Furniture FURR: Furring

HDCP: Handicapped (better called "Accessible") HDW: Hardware HDWD: Hardwood HGT: Height HM: Hollow Metal HORIZ: Horizontal HR: Hour HWD: Hardwood

ID: Inside Diameter IN: Inch INCL: Include INFO: Information INSTL: Install INSUL: Insulation INT: Interior INTERM: Intermediate

JAN: Janitor JC: Janitor's Closet JT: Joint

FINISH KEYNOTE

LAB: Laboratory, Labor LAV: Lavatory LB: Pound (weight) LBL: Label LINO: Linoleum LNTL: Lintel

MAINT: Maintenance MAN; Manual MAR: Marble MARB: Marble MAS: Masonry MAT: Material MATL: Material MAX: Maximum MECH: Mechanical MEMB: Membrane MFD: Manufactured MFG: Manufacturer, Manufacturing MFR: Manufacture, Manufacturer MI: Malleable Iron, Miles MIKE: Microphone MIN: Minimum MIR: Mirror MISC: Miscellaneous MK: Mark ML&P: Metal Lath & Plaster MLD: Molding MLDG: Molding MM: Millimeter MMB: Membrane MO: Masonry Opening MOD: Module MONO: Monolithic MOV: Movable MP: Metal Acoustical Panel MPS: Medium Pressure Steam MR: Mop Receptor MRD: Metal Roof Deck MT: Mount, Mounted MTD: Mounted MTL: Material, Metal MTR: Motor MUL: Mullion MULL: Mullion MV: Mercury Vapor MWP: Maximum Working Pressure MWK: Millwork

N: North, Nitrogen NAP: Napkin NAT: Natural NATL: Natural NB: "Nota Bene" Latin phrase for "Take Special Note" NC: Normally Closed, Noise Criteria NEC: National Electrical Code NEUT: Neutral NF: Near Face NFWH: Non-freeze Wall Hydrant NI: Nickel NIC: Not In Contract NK: Neck NMT: Non-Metallic NO: Number, Normally Open NOM: Nominal NR: Noise Reduction NRC: Noise Reduction Coefficient NTS: Not To Scale

OB: Obscure OBS: Obscure OC: On Center OD: Outside Diameter OF: Outside Face OFF: Office OH: Overhead OHD: Overhead Door OPNG: Opening OPP: Opposite OPP H: Opposite Hand

QUAL: Quality QT: Quarry Tile, Quart QTY: Quantity

RB: Rubber Base RCP: Reflected Ceiling Plan RD: Roof Drain, Round, Receptacle Distribution Panel REBAR: Reinforcing Bar REF: Refer, Reference, Refrigerator REFL: Reflected, REFR: Refrigerate, Refrigerator REINF: Reinforcement, or Reinforce REQD: Required RESIL: Resilient RF: Roof RGH: Rough RGH OPNG: Rough Opening RO: Rough Opening RT: Rubber Tile

SALV: Salvage SCHED: Schedule SF: Square Foot SHR: Shower SHT: Sheet SPEC: Specification, Specifications SPECS: Specifications SQ: Square SS: Stainless Steel STC: Sound Transmission Class STD: Standard STL: Steel STOR: Storage STRT: Straight STRUC: Structural STRUCT: Structural SUR: Surface SUSP: Suspended, Suspend

T&B: Top and Bottom T&G: Tongue & Groove TB: Towel Bar TD: Trench Drain TERR: Terrazzo THK: Thick, Thickness THRU: Through TLT: Toilet TPD: Toilet paper Dispenser TPH: Toilet Paper Holder TPTN: Toilet Partition TYP: Typical TZ: Terrazzo

UNFIN: Unfinished UNO: Unless Noted Otherwise UON: Unless Otherwise Noted UP: Unpainted UR: Urinal

VAT: Vinyl Asbestos Tile VBC: Vinyl Base (Coved) VCT: Vinyl Composition Tile VERT: Vertical VEST: Vestibule VIF: Verify In the Field VT: Vinyl Tile VTR: Vent Through Roof VWC: Vinyl Wall Covering

W/: With W/O: Without WAINS: Wainscot WC: Watercloset WD: Wood

U

V

W

A101

SIM

CS12.0b

W-

ROOM NAME

150 SF

XXX

# PLAN/ELEVATION KEYNOTE

CONSTRUCTION SHALL CONFORM TO THE “NEW YORK STATE UNIFORM FIRE PROTECTION AND BUILDING CODE”, LATEST REVISION, THE NEW YORK STATE ENERGY CODE AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN

WHICH THE PROJECT IS BEING CONSTRUCTED.

CONSTRUCTION SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL CODES AND REGULATIONS.

ALL DRAWINGS ARE GRAPHIC REPRESENTATIONS OF APPROXIMATE LOCATIONS OF NEW MATERIALS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

CONTRACTORS ARE RESPONSIBLE FOR ALL MATERIALS, CONSTRUCTION METHODS AND CRAFTSMANSHIP.

CONTRACTORS ARE TO VERIFY ALL EXISTING CONDITIONS, REQUIREMENTS, NOTES, CODES AND DIMENSIONS, PRIOR TO THE START OF CONSTRUCTION AND SHALL NOTIFY THE ARCHITECT IF CONDITIONS VARY FROM THOSE SHOWN ON

THE DOCUMENTS.

CONTRACTORS ARE TO PROVIDE ADEQUATE SUPPORT OF EXISTING FOUNDATION WALLS, LOAD BEARING WALLS AND

PARTITIONS DURING DEMOLITION AND CONSTRUCTION.

THOROUGHLY COORDINATE WORK WITH OTHER TRADES AND DETERMINE THE EXACT ROUTE AND LOCATION OF

UTILITIES, MATERIALS AND EQUIPMENT BEFORE FABRICATION AND INSTALLATION.

WHEN EXISTING CONSTRUCTION IS REMOVED, DISTURBED, DAMAGED, REPLACED OR RENOVATED IN ANY WAY, CONTRACTORS SHALL PROVIDE PATCHING, PAINTING AND MATERIALS OF SAME TYPE AND QUALITY AS TO MATCH

ADJACENT EXISTING SURFACES, UNLESS OTHERWISE NOTED.

CONTRACTORS PROVIDE ALL BLOCKING, FURRING AND SHIMMING FOR INSTALLATION AND COMPLETION OF WORK.

ALL NEW WORK SHALL BE PLUMB, LEVEL AND SQUARE. SCRIBE AND MAKE FIT ALL NEW TO EXISTING.

CONTRACTORS VERIFY ALL DIMENSIONS BEFORE ORDERING MATERIAL OR DOING WORK. NO EXTRA COMPENSATION OR CHARGES WILL BE ACCEPTED DUE TO DIFFERENCES BETWEEN THE ACTUAL MEASUREMENTS AND

MEASUREMENTS INDICATED ON THE DRAWINGS.

ALL DETAILS ARE SUBJECT TO CHANGE DUE TO EXISTING FIELD CONDITIONS. CONTRACTOR MUST NOTIFY ARCHITECT

OF SAME.

NO SITE VISITS WILL BE MADE BY THE ARCHITECT. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CHANGES

TO THESE DRAWINGS AND COMPLETION OF COMPLIANT WORK.

ARCHITECT TO COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.

THESE DRAWINGS DO NOT PURPORT TO SHOW ALL ITEMS AND PROCEDURES REQUIRED FOR A COMPLETE INSTALLATION. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF THE GENERAL ARCHITECTURAL DESIGN CONCEPT, THE LOCATION/DIMENSIONS OF THE CONSTRUCTION AND MAJOR ELEMENTS OF

CONSTRUCTION.

CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS ASSOCIATED WITH THE WORK OF

THEIR CONTRACT.

ITEMS NOTED AS 'BY OWNER” ARE TO BE FURNISHED AND INSTALLED BY THE OWNER OR THE OWNER'S VENDOR.

GENERAL CONSTRUCTION NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

GENERAL REMOVAL NOTES:

DASHED LINES INDICATE ITEMS TO BE REMOVED.

ELEMENTS TO REMAIN IN PLACE SHALL BE PROTECTED FROM DAMAGE, DUST AND DEBRIS.

DUST CONTROL SHALL BE THE FULL RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PERFORM CLEAN UP OF ALL REFUSE, RUBBISH, SCRAP MATERIALS AND DEBRIS CAUSED BY THE

WORK ON A DAILY BASIS. CLEANING OF AREA SURROUNDING THE WORK AREA WHERE

CONSTRUCTION DEBRIS OR DUST ACCUMULATES WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR.

REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTIONS

DRAWINGS FOR DEMOLITION OF ADDITIONAL ITEMS.

UNDERSLAB UTILITIES HAVE BEEN IDENTIFIED IN LOCATIONS THAT MAY IMPACT PROPOSED SLAB

RECESSES AND REMOVALS. CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE CONTENT

OF THE UNDERSLAB ANALYSIS, AS WELL AS UNDERSLAB DEMOLITION AND NEW WORK INDICATED

IN OTHER CONSTRUCTION DOCUMENTS.

REFER TO ABATEMENT DRAWINGS FOR HAZARDOUS MATERIAL DEMOLITION ITEMS.

CONTRACTOR TO MAINTAIN WATER TIGHT INTEGRITY OF BUILDING AT ALL TIMES.

EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUCTION

DOCUMENTS WHEN AVAILABLE AND ARE NOT GUARANTEED. CONTRACTORS ARE RESPONSIBLE

FOR EXAMINING THE BUILDING AND VERIFYING EXISTING CONDITIONS AND ARE TO CONTACT THE

OWNER REPRESENTATIVE REGARDING ANY DISCREPANCIES.

DEMOLITION WORK SHALL INCLUDE REMOVAL OF ALL ITEMS INDICATED TO BE REMOVED AND/OR

SALVAGED, AND LEGAL DISPOSAL OF ITEMS NOT INTENDED FOR SALVAGE. WORK SHALL ALSO

INCLUDE REMOVAL OF ALL MINOR SUPPORTS, BRACKETS, FASTENERS, CONDUITS, PIPING, AND

SIMILAR ITEMS WHICH ARE NOT INDICATED TO REMAIN.

ALL FLOOR AND WALL CONDITIONS WHICH ARE TO RECEIVE NEW CONSTRUCTION ARE TO BE

DEMOLISHED AS INDICATED AND PROPERLY PREPPED TO RECEIVE NEW FINISHES, U.N.O.

ALL FLOOR, WALL, AND CEILING CONDITIONS THAT ARE DISTURBED BY DEMOLITION ARE TO BE PATCHED, REPAIRED AND/OR PAINTED, WITH SIMILAR MATERIALS AND COLORS. REFER TO NEW

WORK FLOOR PLANS, REFLECTED CEILING PLANS, AND FINISH SCHEDULE.

AT WALL REMOVAL FOR MECHANICAL PENETRATIONS, OPENING TO BE APPROXIMATELY 6"

LARGER THAN DUCT SIZE ON ALL SIDES. COORDINATE WITH MECHANICAL DRAWINGS.

ALL EMBOSSED DECORATIVE DOOR KNOBS TO BE SALVAGED AND TURNED OVER TO OWNER.

FOR ADDITIONAL REMOVAL INFORMATION REFER TO SECTIONS AND DETAILS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

UNLESS OTHERWISE NOTED, ALL MASONRY DIMENSIONING IS NOMINAL TO FACE OF

MASONRY, ALL NON-MASONRY DIMENSIONING IS TO FACE OF PARTITIONS OR WALLS AND ALL

CONCRETE DIMENSIONING IS FACE TO FACE OF WALL.

ALL DIMENSIONS ARE TO THE OUTSIDE FINISH SURFACE OF WALLS OR TO COLUMN

CENTERLINES.

ALL DIMENSIONS ARE FINISHES DIMENSIONS FROM FINISH FACE OF GYPSUM BOARD OR

SCHEDULED WALL FINISH UNLESS OTHERWISE NOTED.

PROVIDE CONCEALED BLOCKING IN ALL STUD PARTITIONS AND WALLS BEHIND SURFACE FOR

SEMI-RECESSED, FULLY RECESSED OR SURFACE MOUNTED ACCESSORIES AND MILLWORK.

DIMENSIONS NOTED AS “CLEAR” ARE TO FINISHED SURFACE AND ARE CRITICAL FOR

ACCESSIBILITY REQUIREMENTS OR BUILT-IN FURNISHINGS.

CONTRACTOR SHALL FIELD VERIFY FINISHED DIMENSIONS AND CLEARANCES IN SPACES

INDICATED TO RECEIVE BUILT-IN FURNISHINGS OR CASEWORK PRIOR TO FABRICATION.

ALL VERTICAL CONCRETE SURFACES WHICH WILL BE EXPOSED TO VIEW UPON COMPLETION

OF WORK SHALL RECEIVE A SMOOTH RUBBED FINISH.

ALL ENDS OF MASONRY WALLS THAT WILL BE EXPOSED TO VIEW UPON COMPLETION OF

WORK SHALL BE PLAIN END UNITS.

FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM EXCEPT

WHERE DIMENSIONED OTHERWISE.

SEALANT SHALL BE PROVIDED AT THE INTERIOR AND EXTERIOR PERIMETER OF ALL WINDOWS,

DOOR FRAMES, LOUVERS OR OTHER ITEMS INSERTED IN AN EXTERIOR WALL.

SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM

EACH MOST REMOTE WALL, IN EACH DIRECTION, WITH NO TILES LESS THAN 6” UNLESS

OTHERWISE INDICATED.

WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK, WITHIN

2'-0” OF GRADE AND IN OTHER LOCATIONS OUTSIDE THE BUILDING ENVELOPE WHERE

EXPOSED TO THE WEATHER SHALL BE PRESSURE TREATED LUMBER OR PLYWOOD.

INSTALL ALL WORK AS INDICATED AND VERIFY EXACT LOCATION AND ELEVATIONS ON THE

JOB.

DO NOT SCALE DRAWINGS. REFER TO DIMENSIONS AND SPECIFIED MATERIALS. CONTACT

THE ARCHITECT IF ADDITIONAL DIMENSIONS ARE REQUIRED.

COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.

FIRST FLOOR LEVEL DATUM ELEVATION (0'-0") IS EQUAL TO ACTUAL

ELEVATION (XX'-XX"). ARCHITECTURAL ELEVATIONS U.O.N. ARE TAKEN FROM FINISHED FIRST

FLOOR LEVEL DATUM ELEVATION (0'-0").

INTERIOR WALL AND CEILING FINISH MINIMAL REQUIREMENTS (FINISH CLASSIFICATIONS IN

ACCORDANCE WITH ASTM E84) ARE AS FOLLOWS:

VERTICAL EXITS AND EXIT PASSAGEWAYS - CLASS B

EXIT ACCESS CORRIDORS AND OTHER EXIT WAYS - CLASS C

ROOMS AND ENCLOSED SPACES - CLASS C

TRUSS IDENTIFICATION SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH TITLE 19 NYCRR

PART 1264 AND APPENDIX H OF THE FIRE CODE OF NEW YORK STATE 2010. TRUSS

IDENTIFICATION SIGNS SHALL BE LOCATED AT BUILDING ENTRANCE DOORS, EXTERIOR

DISCHARGE DOORS AND FIRE DEPARTMENT HOSE CONNECTIONS.

A. ATTACH SIGN TO FACE OF DOOR, OR ATTACHED TO A SIDELIGHT OR FACE

OF THE BUILDING NOT MORE THAN 12 INCHES HORIZONTALLY FROM THE LATCH SIDE OF THE

DOOR JAMB, AND NOT LESS THAN 42 INCHES NOR MORE THAN 60 INCHES ABOVE THE

ADJOINING WALKING SURFACES.

B. ATTACH SIGN AT EACH END OF A ROW OF DOORS AT A MAXIMUM

HORIZONTAL DISTANCE OF 12 FEET BETWEEN SIGNS, AND NOT LESS THAN 42 INCHES NOR

MORE THAN 60 INCHES ABOVE THE ADJOINING WALKING SURFACE.

C. AT FIRE DEPARTMENT HOSE CONNECTIONS ATTACH TO THE FACE OF

BUILDING, NOT MORE THAN 12 INCHES HORIZONTALLY FROM THE CENTER LINE OF THE FIRE

DEPARTMENT HOSE CONNECTION, AND NOT LESS THAN 42 INCHES NOR MORE THAN 60

INCHES ABOVE THE ADJOINING WALKING SURFACE.

D. SIGNS IDENTIFYING THE EXISTENCE OF TRUSS CONSTRUCTION SHALL

CONSIST OF A CIRCLE 6 INCHES IN DIAMETER, WITH A STROKE WIDTH OF 1/2 INCH. THE SIGN

BACKGROUND SHALL BE REFLECTIVE WHITE IN COLOR. THE CIRCLE AND CONTENTS SHALL BE

REFLECTIVE RED IN COLOR, CONFORMING TO PANTONE MATCHING SYSTEM (PMS) # 187.

WHERE A SIGN IS DIRECTLY APPLIED TO A DOOR OR SIDELIGHT, IT MAY BE A PERMANENT

STICKER OR DECAL. SIGNS NOT DIRECTLY APPLIED TO DOORS OR SIDELIGHTS SHALL BE

STURDY, NON-FADING, WEATHER RESISTANT MATERIAL.

F. SIGNS SHALL CONTAIN THE ROMAN ALPHANUMERIC DESIGNATION OF THE

CONSTRUCTION TYPE OF THE BUILDING, IN ACCORDANCE WITH THE PROVISIONS FOR THE

CLASSIFICATION OF TYPES SET FORTH IN SECTION 602 OF THE BUILDING CODE OF NEW YORK

STATE 2010, AND AN ALPHABETIC DESIGNATION FOR THE STRUCTURAL COMPONENTS THAT

ARE OF TRUSS CONSTRUCTION AS FOLLOWS:

"F" SHALL MEAN FLOOR FRAMING, INCLUDING GIRDERS AND BEAMS

"R" SHALL MEAN ROOF FRAMING

"FR" SHALL MEAN FLOOR AND ROOF FRAMING

G. THE CONSTRUCTION TYPE DESIGNATION SHALL BE PLACED AT TWELVE

O'CLOCK POSITION OVER THE STRUCTURAL COMPONENT DESIGNATION, WHICH SHALL BE

PLACED AT THE SIX O'CLOCK POSITION. REFER TO FOLLOWING SYMBOL FOR THIS BUILDING:

GENERAL ARCHITECTURAL NOTES

IIB

R

ROMAN ALPHANUMERIC

DESIGNATION OF CONSTRUCTION

ALPHABETIC DESIGNATION FOR THE

STRUCTURAL COMPONENTS THAT

ARE TRUSS CONSTRUCTION

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

OVERHEAD

VISIBLE ITEMS

BREAK LINE

HIDDEN OR NOT IN CONTRACT

CENTER LINE OR COLUMN GRID

C.M.U. WALL / PARTITION - SEE PARTITION TYPES

EXISTING WALL CONSTRUCTION

METAL STUD PARTITION - SEE PARTITION TYPES

WALL/ PARTITION DESIGNATIONS

BRICK FACE

LINE TYPES

Engineering Architecture Environmental Planning

300 State Street Suite 201

Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com

LaBella Powered by partnership.

Miller-RemickLLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0119

A S e rv ic e

D i s a b l e d

Ve t e r an Owne d

S m a l l

B u s iness

SDVOSB

CVE Location

Issue Date o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

B

A

C

D

E

F

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT RELOCATION OF AUDIOLOGY

CASTLE POINT CAMPUS

WAPPINGERS FALLS, NY

620A4-18-204

15E

Project Director

C U s e rs

\R M o n ig le

\D o c u m e n ts \R e v it L o c a l F ile s \2

C a s tl e P o in t V

A M

C

A u d io lo g y C lin ic

R rm o n ig le

.r v t

BID DOCUMENTS

2021-05-17 JPR REM

GI001

NOTES, SYMBOLS & ABBREVIATIONS

ARCHITECTURAL DRAWING INDEX

GENERAL

GI001 NOTES, SYMBOLS & ABBREVIATIONS

GI100 CODE COMPLIANCE AND LIFE SAFETY PLAN OF BUILDING 15E

GI101 SMOKE COMPARTMENT PLAN

GI102 DUST CONTROL & ICRA PHASING PLAN

SITE

AS101 ARCHITECTURAL SITE PLAN

ARCHITECTURAL

A001 PARTITION TYPES

AD100 BASEMENT REMOVAL PLAN

A100 OVERALL BASEMENT FLOOR PLAN OF BUILDING 15E

A110 ENLARGED BASEMENT FLOOR PLAN

A120 BASEMENT EQUIPMENT PLAN

A130 BASEMENT REFLECTED CEILING PLAN

A210 INTERIOR ELEVATIONS

A400 ENLARGED PLANS & INT. ELEVATIONS

A500 DETAILS

A501 DETAILS

A600 DOOR & WINDOW SCHEDULES, TYPES AND DETAILS

INTERIORS

I100 SIGNAGE SCHEDULE & LEGEND, FINISH LEGEND

I110 BASEMENT FLOOR FINISH PLAN

I301 FIRST FLOOR FURNITURE PLAN

NO: DESCRIPTION: DATE:

(E)S (E)S

2FB 2FB

PCS PCS

(E)2FB (E)2FB

R E

F

(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB

(E )2

F B

(E )2

F B

(E)S

(E )S

(E)S (E)S (E)S (E)S (E)S

(E )S

(E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S

(E )S

(E )S

(E )S

(E )S

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB

(E)2FB

(E)2FB

(E )2

F B

(E )2

F B

(E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB

(E)2FB

(E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)2FB (E)2FB (E)2FB

(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB (E)2FB

(E)2FB

P C

S P

C S

P C

S P

C S

PCS PCS

P C

S P

C S

P C

S

EXIT DISCHARGE

TRAVEL DISTANCE AND DIRECTION OF TRAVEL

COMMON PATH OF EGRESS

REMOTE POINT OF TRAVEL

XX'-XX"

EXIT

EXITE

FIRE EXTINGUISHER CABINET

(1 PER 75 FT RADIUS AND 3,000 SF AREA)

FX

EXISTING 2 HOUR FIRE BARRIER

LIFE SAFETY LEGEND

EXISTING 30 MINUTE SMOKE BARRIER

2 HOUR FIRE BARRIER

SELF-CLOSING DOOR(S) (PROJECT AREA)SC

EXIT LIGHT (IN RELEVANT PROJECT AREA)

• ARROW SHOWS DIRECTION OF EGRESS

• SHADED PORTION SHOWS ILLUMINATED FACE

WALL RATINGS

OUT OF SCOPE OF PROJECT

PATIENT CARE SUITE (ADVISORY)

CODE REVIEW INFORMATION

NFPA 101 LIFE SAFETY CODE 2018 & 2020 BUILDING CODE OF NEW YORK STATE

BUILDING DATA FIRE RESISTANCE RATINGS

NYS REQ'D PROVIDED

USE DESCRIPTION

OCCUPANCY

NYS CHAPTER 3

NFPA 6.1.1

CLASSIFICATION OF WORK

NYS CHAPTER 6

NFPA 4.6.7

CONSTRUCTION TYPE

NYS CHAPTER 6

NFPA TABLE A.8.2.2

NO. OF STORIES

BUILDING HEIGHT

NYS 504

AUTOMATIC SPRINKLER SYSTEM

NYS 903

LOCAL

ALLOWABLE BUILDING AREA (At) NYS 506

INCREASE FOR FRONTAGE (If) NYS 506.3

TOTAL ALLOWABLE BUILDING AREA (Aa) NYS 506

UL

N/A

UL

TOTAL GROSS BUILDING AREA

NUMBER OF OCCUPANTS

NYS 1004.1

NFPA TABLE 7.3.1.2

SEE OCCUPANCY SCHEDULE BELOW

MIN. NUMBER OF EXITS

NYS 1006

NFPA 7.4.1, 18.2.4

MIN. EXIT WIDTH PER OCCUPANT

NYS 1005.3

NFPA 7.3.3.1

PER OCC.

x

MIN. DOOR WIDTH

NYS 1010.1.1

NFPA 38.2.2.2 (7.2.1.2.3)

COMPLIES

MIN. STAIRWAY WIDTH

NYS 1011.2

NFPA 7.2.2.2

COMPLIES

MIN. CORRIDOR WIDTH

NYS 1005.1 / NYS 1020.2

NFPA 7.3.4.1

COMPLIES

MAX. TRAVEL DISTANCE

NYS TABLE 1017.2

NFPA TABLE A7.6 / 18.2.6 COMPLIES

MAX. COMMON

PATH OF TRAVEL

NYS TABLE 1006.2.1

NFPA TABLE A7.6 COMPLIES

MAX. DEAD END CORRIDOR

NYS 1020.4

NFPA TABLE A7.6 COMPLIES

NYS 718

NFPA 8.6.11

CONCEALED SPACE

DRAFTSTOPPING

SMOKE COMPARTMENT NYS 407 / NFPA 18.3.7

INTERIOR FINISHES CLASS

INTERIOR EXIT STAIRWAYS AND RAMPS AND

EXIT PASSAGEWAYS

NYS TABLE 803.11

CORRIDORS AND ENCLOSURE FOR EXIT ACCESS

STAIRWAYS AND RAMPS

ROOMS AND ENCLOSED SPACES

COMPLIES

COMPLIES

COMPLIES

NYS TABLE 906.3

NFPA 9.9

FIRE EXTINGUISHER

SPACING COMPLIES

STANDPIPE SYSTEM

NYS 905

NFPA 9.10

COMPLIES

SMOKE AND FIRE DETECTION NYS 907 COMPLIES

FIRE ALARM SYSTEM NYS 907 COMPLIES

VERTICAL ACCESS REQUIRED NYS 1104.4 COMPLIES

ACCESSIBLE ENTRANCE NYS 1105 COMPLIES

PASSENGER LOADING ZONES NYS 1106.7 COMPLIES

BUILDING ELEMENT TABLE NFPA REQ'D PROVIDED

PRIMARY STRUCTURAL FRAME

EXTERIOR BEARING WALLS

SUPPORTING MORE THAN ONE FLOOR,

COLUMNS , OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

INTERIOR BEARING WALLS

SUPPORTING MORE THAN ONE FLOOR,

COLUMNS , OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

COLUMNS

SUPPORTING MORE THAN ONE FLOOR,

COLUMNS , OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

BEAMS, GIRDERS, TRUSSES, AND ARCHES

SUPPORTING MORE THAN ONE FLOOR,

COLUMNS , OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

FLOOR-CEILING ASSEMBLIES

ROOF-CEILING ASSEMBLIES

INTERIOR NON-BEARING WALLS

EXTERIOR NON-BEARING WALLS

FLOOR CONSTRUCTION AND

ASSOCIATED SECONDARY MEMBERS

ROOF CONSTRUCTION AND ASSOCIATED

SECONDARY MEMBERS

ABBREVIATIONS:

N/A

NC

C

NR

B

NOT APPLICABLE / NOT PART OF THIS PROJECT

NON-COMBUSTIBLE

COMBUSTIBLE

NOT REQUIRED

BARRIER TO LIMIT TRANSFER OF SMOKE

STRUCTURAL DESIGN:

REFER TO SPECIFIC DRAWING AND SPECIFICATION

SECTIONS FOR ADDITIONAL STRUCTURAL DESIGN CRITERIA

INCLUDING BUT NOT LIMITED TO, LIVE LOAD, DEAD LOAD,

AND LATERAL LOADS APPLICABLE TO THIS PROJECT.

NOTES:

FIRE WALLS

NYS TABLE 601

NFPA TABLE A.8.2.1.2

NYS TABLE 706.4

FIRE BARRIERS NYS TABLE 707 / NFPA 8.3

VERTICAL EXIT ENCLOSURE

NYS 1023

NFPA 7.1.3.2

FIRE PARTITIONS NYS 708

EXIT PASSAGEWAY

NYS 1024

NFPA 7.1.3.2

HORIZONTAL EXIT

SEPARATION

NYS 1026

NFPA 7.2.4

INCIDENTAL USE

AREAS

NYS 509

NFPA 18.3.2.1

OCCUPANCY

SEPARATION

NYS 508

NFPA TABLE 6.1.14.4.1

SHAFT ENCLOSURE NYS 713.4

NFPA TABLE 8.6

CORRIDOR WALLS

NYS TABLE 1020.1

NFPA 18.3.6.2

SMOKE BARRIERS

NYS 709.3

NFPA 18.3.7

CONTRACTOR TO VERIFY / MAINTAIN / PATCH ANY

AND ALL AREAS OF FIREPROOFING OR UL

ASSEMBLIES WITHIN SCOPE OF WORK

COMPLIES

COMPLIES

COMPLIES

SPECIAL REQUIREMENTS NYS CHAPTER 4 N/A N/A

MIXED OCCUPANCY

NYS 508

NFPA 6.1.14

MIN. EXIT WIDTH NYS 1005.3

NFPA 7.3.4

COMPLIES

NFPA REQ'D

PER OCC.

NYS REQ'D

GROSS PROJECT AREA

4.20

AUDIOLOGY

BUSINESS

1A

MAINTAIN

EXISTING

UNLIMITED

UNLIMITED

54'

YES

14856 SF

0.3

0.3 28

32"

36"

36"

300'

100'

50'

NC COMPLIES

22,500 SF COMPLIES

B

B

B

1/3,000

75'

NO

YES

YES

YES

YES

YES

COMPLIES

4 HR

4 HR

4 HR

3 HR

3 HR

4 HR

3 HR

3 HR

4 HR

2 HR

2 HR

2 HR

2 HR

0 HR

0 HR

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

COMPLIES

NR

NR

2 HR

EXIST.

COMPLIES

1 HR COMPLIES

2 HR COMPLIES

NR NR

NR NR

2 HR COMPLIES

NR COMPLIES

1 HR COMPLIES

ALTERATION

LEVEL 1

YES

N/A N/A

YES

4.2

AUDIOLOGY

HEALTHCARE/

BUSINESS

MODIFICATION

I (442)

N/A

N/A

0.3

32"

36"

28"

200'

100'

30'

NR

NR

1/3,000

75'

NO

YES

YES

N/A

YES

>27"

3 HR

3 HR

3 HR

0 HR

0 HR

2 HR

1.5 HR

2 HR

NR

NR

2 HR

1 HR

2 HR

NR

NR

2 HR

0 HR

1 HR

4855 SF

DESCRIPTION

FIRE WALLS

FIRE BARRIERS (EXIT ENCLOSURE

HORIZONTAL EXIT INCIDENTAL

USE/HAZARD OCCUPANCY SEPARATION)

SHAFT ENCLOSURES (FIRE BARRIER AT

ELEVATOR, STAIR OR MECH. SHAFT)

FIRE PARTITION (ELEV. LOBBY, CORRIDOR

WALL, TENANT SEPARATION)

SMOKE BARRIERS (1 HOUR RATED AT

OTHER OCCUPANCIES)

FIRE BARRIER/SMOKE BARRIERS (SMOKE

BARRIER COINCIDING W/ FIRE BARRIER -

INCIDENTAL USE, EXIT ENCLOSURE, ETC.)

SHAFT ENCLOSURE/SMOKE BARRIERS

(SMOKE BARRIER COINCIDING W/ SHAFT

ENCLOSURE)

FIRE WALL/SMOKE BARRIERS (SMOKE

BARRIER COINCIDING W/ FIRE WALL)

SMOKE PARTITIONS (SP) (UNRATED SMOKE

RESISTANT CONSTRUCTION - CORRIDOR)

HORIZONTAL ASSEMBLIES (HA)

(RATED ENGINEERED CEILINGS)

NON-RATED WALLS

OWNER STENCILING REQUIREMENTS

STENCIL WORDING

FW-2HR

FW-3HE

FB-1HR

FB-2HR

SE-1HR

SE-2HR

FP-1HR

SB-1HR

FBSB-1HR

FBSB-2HR

SESB-1HR

SESB-2HR

FWSB-1HR

FWSB-2HR

SP-0HR

HA-1HR

HA-2HR

NR

1) THE INTENT OF THIS PLAN IS TO PORTRAY COMPLIANCE

ACHIEVED AFTER CONSTRUCTION IS COMPLETED IN PROJECT

SCOPE AREAS. DESIGNATIONS IN AREAS OUTSIDE OF SCOPE

ARE FOR REFERENCE ONLY.

2) ALL PROJECT SCOPE AREAS TO BE FULLY SPRINKLERED

UPON COMPLETION OF CONSTRUCTION.

3) CONTRACTOR TO VERIFY ALL FIELD CONDITIONS PRIOR TO

STARTING WORK. REPORT ANY DISCREPANCIES OR PROBLEMS

TO THE ARCHITECT, IN WRITING, BEFORE BEGINNING DEMOLITION

OR CONSTRUCTION

4) CONTRACTOR IS RESPONSIBLE FOR ALL WORK AND MATERIALS

NECESSARY TO CONSTRUCT OR UPGRADE WALLS TO COMPLY W/

THE REQUIREMENTS SHOWN IN THIS CODE COMPLIANCE DRAWING.

WORK SHALL INCLUDE, BUT NOT BE LIMITED TO: PENETRATIONS,

PERIMETER JOINTS, AND TOP OF WALL CONDITIONS.

5) REFER TO BUILDING DATA SHEET FOR ADDITIONAL BUILDING

CODE INFORMATION

6) REFER TO UL DESIGNS IN FIRE RESISTANCE RATING ON BUILDING

DATA SHEET FOR SPRAYED FIREPROOFING REQUIREMENTS OF ALL NEW

CONSTRUCTION AND AS INDICATED AT EXISTING

BUILDING COMPONENTS.

7) CAULKING AT ALL PENETRATIONS AS REQUIRED TO MATCH

CONSTRUCTION/PARTITION TYPE; CONTRACTOR SHALL REVIEW

ENTIRE WORK AREA AND IDENTIFY ANY PRE-EXISTING DEFICIENT

CONDITIONS, SUCH AS UNSEALED PENETRATIONS, SUBSTANDARD

INSTALLATIONS, ETC. AND REPAIR AS REQUIRED.

8) VERIFY EXISTING FIRE EXTINGUISHER LOCATIONS. RELOCATE

AND REINSTALL AS REQ'D TO COMPLY WITH OWNER STANDARDS

(PROVIDE (1) 10 LB. ABC FIRE EXTINGUISHER PER 6000 SF AREA.

MAXIMUM TRAVEL DISTANCE TO EXTINGUISHER IS 75').

9) APPLY STENCILED LETTERING INDICATING PARTITION RATING

OR TYPE PER OWNER STANDARDS (RED IN COLOR, 4" TALL

LETTERING, ABOVE THE CEILING SPACED EVERY 10'-0").

PENETRATIONS BY ALL TRADES IN RATED OR SMOKE RESISTANT

PARTITIONS ARE TO BE SEALED OR FIRE STOPPED WITH

APPROVED ASSEMBLIES:

GENERAL CODE PLAN NOTES

81 SF

ELEC. ROOM

E011

413 SF

CORRIDOR

112 SF

RECEPTION

E013

408 SF

AUDIOMETRIC

ROOM 3

E023

349 SF

AUDIOMETRIC

ROOM 4

E024

338 SF

WAITING

E010

86 SF

EXIT VESTIBULE

E022

91 SF

OFFICE

E016

56 SF

STAFF TOILET

E025

349 SF

AUDIOMETRIC

ROOM 1

E019

415 SF

AUDIOMETRIC

ROOM 2

E020 246 SF

VESTIBULAR EXAM

E018

146 SF

SPEECH THERAPY

E017

68 SF

WORKROOM

E013A

CLEAN SUPPLY

E014

SOILED HOLD

E015

23 SF

STORAGE

E021

125 SF

CLINIC ROOM

E026

207 SF

LAB

E028

PASSAGEWAY

E012

246 SF

BREAKROOM /

CONFERENCE RM

E027

21 SF

STOR.

E020A

21 SF

STOR.

E023A

TRAVEL DISTANCE: 44'-8"

TRAVEL DISTANCE: 29'-4"

TRAVEL DISTANCE: 23'-1"

5' - 2"

5' - 2"

7' - 11 1/2"

5' - 0"

5' - 0"

8'

5' - 0"

A B TRAVEL DISTANCE: 22'-10"

TRAVEL DISTANCE: 42'-5"

C

C

A/B

FX

FX

E

E

SMALLEST DOOR = 36"

CLEAR OPENING = 34"

34"/0.3 OCC = 113 OCC.

ACTUAL OCC. = 20 OCC.

SMALLEST DOOR = 36"

CLEAR OPENING = 34"

34"/0.2 OCC = 170 OCC.

ACTUAL OCC. = 21 OCC.

D

EA

D E N D 3' -4

X

D

EA

D E N D 5' -3

X

TYP.

2' - 8"

TOTAL TRAVEL

DISTANCE

A: 67'-9"

B: 142'-3"

C: 110'-8"

1 2 3 4 5 6 7

A

B

TRAVEL DISTANCE: 45'-5"

D

EA

D E N D

'-4

X

STORAGE ROOM UNDER

STAIRS IS SEPARATED FROM

STAIR WELL BY 2-HOUR

RATING AT UNDERSIDE OF

STAIR.

WALKWAY ABOVE

EXISTING ENCLOSURE

CONSTRUCTION OF THESE

AREAS IS TO BE INSPECTED

FOR POSSIBLE FIRE RATING.

PROVIDE MIN. 1 HR RATED

CONSTRUCTION. PATCH

/REPAIR ANY BREACHES IN

ENCLOSURE.

EXIST

CONFERENCE RM

042D

EXIST

ASSOCIATE PATH.

042B

EXIST

LAB. CHIEF

042C

EXIST

TOILET

EXIST

OFFICE

042A

EXIST

ADMIN. SUPPORT

EXIST

STAFF LOCKER

EXIST

HISTOLOGY

EXIST

STORAGE

EXIST

RECEIVING

EXIST

COLD RM

EXIST

LOADING BAY

EXIST

CORRIDOR

EXIST

CORRIDOR

E033C

EXIST

TRAVEL

E033C2

EXIST

H.A.S. CHECK-IN

E033

EXIST

STOR.

EXIST

DAV

E033C1

EXIST

STOR. 01

E033B

EXIST

HEMOTOLOGY

COAGUZATION

EXIST

CHEMISTRY

EXIST

BLOOD BANK

EXIST

OFFICE

EXIST

MICRO BIOLOGY

EXIST

FLOUR. CL.

032B

EXIST

ISOLATION

032A

EXIST

CORRIDOR

EXIST

CORRIDOR

EXIST

MECHANICAL

ROOM

EXIST

TOILET

EXIST

RECEPTION

016A

EXIST

OFFICE

016B

EXIST

PHLEBOTOMY

WAITING ROOM

EXIST

LABORATORY

016C

EXIST

TOILET

016D

EXIST

PHLEBOTOMY

EXIST

WAITING ROOM

E010

EXIST

OFFICE

E031

EXIST

OFFICE

E030

EXIST

SUPERVISOR

OFFICE

E033A

EXIST

OEF/OIF/OND

OFFICE

E032

EXIST

ELEGIBILITY

OFFICE

E034

EXIST

MECH. /

ELEC.

E036B

EXIST

HAC

E037

EXIST

MECH. /

ELEC. ROOM

E036B1

EXIST

URGENT CARE

WAITING ROOM

E036A1

EXIST

WOMEN'S

WAITING

ROOM

E036A

EXIST

URGENT CARE

LOBBY

E036

EXIST

VESTIBULE

E040

EXIST

CORRIDOR

EXIST

MEN'S

TOILET

E038

EXIST

WOMEN'S

TOILET

E039

EXIST

CONFERENCE

ROOM

H015

EXIST

STAFF TOILET

H016

EXIST

CORRIDOR

EXIST

EXAM

009E

EXIST

EXAM

009F

EXIST

EXAM

009G

EXIST

EXAM

009HEXIST

HALL

011A

EXIST

STAFF LOUNGE

EXIST

DATA

CLOSET

EXIST

ELEVATOR

E1

EXIST

CLOSET

011C

EXIST

DATA CLOSET

011B

EXIST

NURSE'S

STATION

EXIST

NURSE'S

STATION

EXIST

CORRIDOR

EXIST

ENTRY

EXIST

CORRIDOR

E035

EXIST

COMPRESSOR

ROOM

019A

EXIST

STORAGE

019B

EXIST

STAIR HALL

EXIST

ELEV.

MECH.

ROOM

H-053

EXIST

MECH. EQUIP. RM.

H-054

EXIST

MULTI-PURPOSE

STOR.

H003

EXIST

MULTI-PURPOSE RM

H008

EXIST

CLEAN

LIN.

H014

EXIST

OBSV. RM.

H012B

EXIST

PAT. TLT.

H012B1 EXIST

OBSV. RM.

H012C

EXIST

PAT. TLT.

H012D1

EXIST

FEMALE

EXAM / OBSV.

H012D

EXIST

NURSE

TRIAGE

H012E

EXIST

CLEAN

SUPPLY

STOR.

H012F

EXIST

STAIR

H017

EXIST

C.A.T. SCAN

EXIST

STOR.

005B

EXIST

CONTROL

005A

3RD FLOOR HOSPITAL FUNCTIONS

2ND FLOOR HOSPITAL FUNCTIONS

1ST FLOOR HOSPITAL FUNCTIONS

URGENT CARE / HISTOLOGYAUDIOLOGY

(PROJECT AREA)

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

SCOPE OF WORK

BUSINESS OCCUPANCY

PROJECT AREA: 4855 SF

EXIT TO GRADE AT BASEMENT

BASEMENT FLOOR

STACK DIAGRAM

PENTHOUSE FLOOR

MECHANICAL FUNCTIONS

Engineering Architecture Environmental Planning

300 State Street Suite 201

Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com

LaBella Powered by partnership.

Miller-RemickLLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0119

A S e rv ic e

D i s a b l e d

Ve t e r an Owne d

S m a l l

B u s iness

SDVOSB

CVE

KEYPLAN

PLAN

NORTH

ACTUAL

NORTH

Location

Issue Date o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

B

A

C

D

E

F

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT RELOCATION OF AUDIOLOGY

CASTLE POINT CAMPUS

WAPPINGERS FALLS, NY

620A4-18-204

15E

Project Director

C U s e rs

\R M o n ig le

\D o c u m e n ts \R e v it L o c a l F ile s \2

C a s tl e P o in t V

A M

C

A u d io lo g y C lin ic

R rm o n ig le

.r v t

BID DOCUMENTS

2021-05-17 JPR REM

GI100

CODE COMPLIANCE AND LIFE

SAFETY PLAN OF BUILDING 15E

SCALE: 1/8" = 1'-0"GI100

1 OVERALL BASEMENT CODE COMPLIANCE OF BUILDING 15E

ROOM OCCUPANCY SCHEDULE

ROOM

NUMBER ROOM NAME AREA

OCCUPANT

LOAD

FACTOR

OCCUPANCY

LOAD

E019 AUDIOMETRIC ROOM 1 349 SF 150 SF 3

E020 AUDIOMETRIC ROOM 2 415 SF 150 SF 3

E023 AUDIOMETRIC ROOM 3 408 SF 150 SF 3

E024 AUDIOMETRIC ROOM 4 349 SF 150 SF 3

E025 STAFF TOILET 56 SF 150 SF 1

E026 CLINIC ROOM 125 SF 150 SF 1

E027 BREAKROOM / CONFERENCE RM 246 SF 150 SF 2

E028 LAB 207 SF 150 SF 2

TOTAL OCCUPANCY FOR SCOPE OF WORK 28

ROOM OCCUPANCY SCHEDULE

ROOM

NUMBER ROOM NAME AREA

OCCUPANT

LOAD

FACTOR

OCCUPANCY

LOAD

BASEMENT FLOOR

E010 WAITING 338 SF 150 SF 3

E011 ELEC. ROOM 81 SF 150 SF 1

E013 RECEPTION 112 SF 150 SF 1

E013A WORKROOM 68 SF 150 SF 1

E016 OFFICE 91 SF 150 SF 1

E017 SPEECH THERAPY 146 SF 150 SF 1

E018 VESTIBULAR EXAM 246 SF 150 SF 2

R E

F

(E)S

(E )S

(E)S (E)S (E)S (E)S (E)S

(E )S

(E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S

(E )S

(E )S

(E )S

(E )S

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB

(E)2FB

(E)2FB

(E )2

F B

(E )2

F B

(E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB

(E)2FB

(E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)2FB (E)2FB (E)2FB

(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB (E)2FB

(E)2FB

1 2 3 4 5 6 7

A

B

MORGUE

COOLERS

EXISTING SMOKE COMPARTMENT: 6,183 SF

EXISTING SMOKE COMPARTMENT: 14,856 SF

EXISTING SMOKE COMPARTMENT: 13,173 SF

SMOKE COMPARTMENT LEGEND

HATCH PATTERNS DESIGNATE

SMOKE COMPARTMENTS

BOLD LINE REPRESENTS A SMOKE

BARRIER

Engineering Architecture Environmental Planning

300 State Street Suite 201

Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com

LaBella Powered by partnership.

Miller-RemickLLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0119

A S e rv ic e

D i s a b l e d

Ve t e r an Owne d

S m a l l

B u s iness

SDVOSB

CVE

KEYPLAN

PLAN

NORTH

ACTUAL

NORTH

Location

Issue Date o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

B

A

C

D

E

F

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT RELOCATION OF AUDIOLOGY

CASTLE POINT CAMPUS

WAPPINGERS FALLS, NY

620A4-18-204

15E

Project Director

C U s e rs

\R M o n ig le

\D o c u m e n ts \R e v it L o c a l F ile s \2

C a s tl e P o in t V

A M

C

A u d io lo g y C lin ic

R rm o n ig le

.r v t

BID DOCUMENTS

2021-05-17 JPR REM

GI101

SMOKE COMPARTMENT PLAN

SCALE: 1/8" = 1'-0"GI101

1 SMOKE COMPARTMENT PLAN

F

(E)S

(E )S

(E)S (E)S (E)S (E)S (E)S

(E )S

(E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S (E)S

(E )S

(E )S

(E )S

(E )S

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB

(E)2FB

(E)2FB

(E )2

F B

(E )2

F B

(E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB

(E)2FB

(E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)S

(E)2FP

(E)2FB (E)2FB (E)2FB

(E)2FB (E)2FB (E)2FB (E)2FB (E)2FB (E)2FB

(E )2

F B

(E )2

F B

(E )2

F B

(E)2FB (E)2FB

(E)2FB

XXXXXXXXX

X X

X X

X X

X

X X X

X

X

X

1 2 3 4 5 6 7

A

B

MORGUE

COOLERS

ENTRANCE/EXIT

ENTRANCE/EXIT

ENTRANCE/EXIT

ENTRANCE/EXIT

ENTRANCE/EXIT

ENTRANCE/EXIT

ACCESSIBLE

ENTRANCE/EXIT TO

UPPER FLOOR

ENTRANCE/

EXIT TO

UPPER

FLOOR

ENTRANCE/

EXIT

PROVIDE

DUST

CONTROL

WALK OFF

MATS AT

DOOR

PROVIDE DUST

CONTROL WALK

OFF MATS AT

DOOR

ENTRANCE/EXIT

PROVIDE PROTECTIVE PLASTIC

COVERING FOR DUST CONTROL

AT ELECTRICAL AREA

MIN.

4' - 0"

M

IN

5'

COORDINATE LOCATION OF SITE

CONSTRUCTION FENCING TO

MAINTAIN ACCESS FOR EGRESS

RAMP IN THIS AREA.

M

IN

2' /4

P

P

P

1. ENSURE RENOVATED AREA IS TO BE COMPLETELY SEALED OFF FROM SURROUNDING AREAS.

2. MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING CONSTRUCTION. RESTRICT ACCESS TO FLOOR FROM WITHIN STAIRWELL DURING

CONSTRUCTION.

3. COORDINATE PHASING SCHEDULE WITH COR PRIOR TO STARTING CONSTRUCTION. VA HAS A MAXIMUM TIME LIMIT AREAS OF CONSTRUCTION CAN BE

CLOSED.

4. CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS IS THE CONTRACTOR'S RESPONSIBILITY TO BE REINSTALLED TO

PRE-CONSTRUCTION CONDITIONS.

5. SECOND FLOOR CALL CENTER IS TO BE FULLY OPERATIONAL AND BE ABLE TO BE ACCESSED BY STAFF AT ALL TIMES. WORK THAT WOULD DISRUPT THE

SECOND FLOOR MUST BE COORDINATED WITH COR PRIOR TO CONSTRUCTION.

6. CONSTRUCTION AREA TO BE SECURED AT ALL TIMES. PROVIDE STOREROOM LOCK ON ALL CONSTRUCTION/ICRA BARRIER DOORS.

DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT

PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC POLICIES OR

CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.

FOR THE PURPOSE OF THIS RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED ADJACENT TO MEDIUM RISK AND COMPRISES WORK WHICH COULD GENERATE MODERATE TO HIGH LEVELS OF DUST NOT WITHIN THE CONFINES OF A SUITE OR OFFICE AND INCLUDES EXTENSIVE CONSTRUCTION WORK (DEMOLITION) IN BUILDING 6 THROUGHOUT THE FIRST, SECOND FLOOR CEILING AND BASEMENT. THE DUST CONTROL PLAN SHALL BE DISTRIBUTED AND REVIEWED

BY ALL CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT.

EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES

• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF FEASIBLE SEAL OFF ADJACENT AIR INTAKES.

• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND REPLACE AS NEEDED TO AVOID BUILDUP OF

PARTICULATE.

• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND CORRIDORS)

ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING MINIMAL DUST MAY

USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF INSECTS AND FLIES, WET

CEILING TILE, ETC.

• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHOULD BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITH

PRIOR APPROVAL OF THE VAMC.

• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

• CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS SHOULD BE REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.

VENTILATION AND ENVIRONMENTAL CONTROLS

• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR; FILTERS SHOULD BE ADDED OR

RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.

• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA

FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.

• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR

CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE THROUGHOUT THE PROJECT.

• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE PARTITION.

CONTAMINATION OF PATIENT ROOMS

• WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA.

IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE

CONSTRUCTION ZONE OR WORK AREA.

• CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING

OF HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS.

INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION

(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)

STEP #1: SELECT ACTIVITY TYPES BELOW:

CONSTRUCTION ACTIVITY TYPES:

TYPE B

SMALL SCALE, SHORT DURATION (LESS THAN 1 DAY) ACTIVITIES

WHICH CREATE MINIMAL DUST

INCLUDES, BUT NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING

• ACCESS TO CHASE SPACES

• CUTTING OF WALLS OR CEILINGS WHERE DUST

MIGRATION CAN BE CONTROLLED

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST

OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES

INCLUDES, BUT NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING

• REMOVAL OF FLOOR COVERING, CEILING TILES, AND

CASEWORK

• NEW WALL CONSTRUCTION

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE

CEILINGS

• MAJOR CABLING ACTIVITIES

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A

SINGLE WORK SHIFT

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET

• PAINTING (BUT NOT SANDING)

• WALL COVERING

• ELECTRICAL TRIM WORK

• MINOR PLUMBING

• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE

CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER

THAN FOR VISUAL INSPECTION TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT NOT LIMITED TO:

• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK

SHIFTS.

• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A

COMPLETE CABLING SYSTEM.

• NEW CONSTRUCTION

IT IS LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT

RISK FOR INFECTION WITH TUBERCULOSIS? YES / NO

IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE

WATER SYSTEM/LINES DURING ACTIVITY? YES / NO

STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF

COLUMN

A.) INFECTION CONTROL RISK GROUPS

GROUP 1 - LOW - OFFICE AREAS

GROUP 2 - MEDIUM - CARDIOLOGY, ECHOCARDIOLOGY,

ENDOSCOPY, NUCLEAR MEDICINE, PHYSICAL THERAPY, RADIOLOGY

/ MRI, RESPIRATORY THERAPY

GROUP 3 - HIGH RISK - CCU, EMERGENCY ROOM, LABORATORIES,

OUTPATIENT SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT,

SURGICAL UNITS

GROUP 4 - HIGHEST RISK - ANY AREA CARING FOR

IMMUNOCOMPRIMISED PATIENTS, CARDIAC CATH LABS, CENTRAL

SUPPLY, INTENSIVE CARE UNITS, MEDICAL UNITS, NEGATIVE

AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS

STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:

CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS

** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS

II, III, IV PRECAUTIONS ARE REQUIRED.

RISK LEVEL

GROUP 1

GROUP 2

GROUP 3

GROUP 4

TYPE 'A'

I

I

I

II

TYPE 'B'

II

II

II

III / IV

TYPE 'C'

II

III

III / IV

III / IV

TYPE 'D'

III / IV

IV

IV

IV

CONSTRUCTION TYPE:

D

RISK GROUP:

MEDIUM

RISK ASSESSMENT:

IV

PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL

ELECTRICAL

YES

POTABLE WATER

YES

HVAC

YES

MEDICAL VACUUM

YES

SEWER

YES

STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:

CLASS I - DURING CONSTRUCTION PROJECT

1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION

OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION

CLASS II - DURING CONSTRUCTION PROJECT

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS III - DURING CONSTRUCTION PROJECT

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT ) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED

AIR FILTRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED

CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS

USED.

CLASS IV - DURING CONSTRUCTION PROJECT

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC,

TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE

METHOD (CART WITH PLASTIC COVERING & SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZE HEPA-

EQUIPPED AIR FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS

THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM

CLEANER BEFORE LEAVING WORK SITE; OR THEY CAN WEAR CLOTH OR

PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE

WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR

SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE

WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED

PROJECT IS INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL

& THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT.

CLASS I - UPON COMPLETION OF WORK

1. CLEAN WORK UPON COMPLETION OF TASK

CLASS II - UPON COMPLETION OF WORK

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM BEFORE LEAVING WORK AREA

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING

PERFORMED.

CLASS III - UPON COMPLETION OF WORK

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY

CLEANED BY ENVIRONMENTAL MANAGEMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT &

DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA-FILTER VACUUMS.

4. WET MOP WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

CLASS IV - UPON COMPLETION OF WORK

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CONTRACTOR'S…

This is the start of the file's text. The full file is on GovTribe.