This document contains an amendment to a solicitation for asbestos abatement work. The Stratton VA Medical Center in Albany, NY seeks a contractor to perform asbestos abatement, demolition, and floor restoration in accordance with the statement of work. The procurement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The work is to be completed at the Stratton VA campus by December 2021. The government anticipates awarding a firm-fixed price contract valued between $100,000 and $250,000. Offerors must acknowledge any amendments by the specified date and time. The Department of Veterans Affairs is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 36C24221B0009 0003.pdf | ||
| 36C24221B0009 0001.docx | DOCX document | |
| Specifications.zip | ZIP file | |
| Abate Flooring_3 Core and 3A Stem.pdf | ||
| 36C24221B0009_IFB_Abatement_528A8-19-803_Albany_NY.docx | DOCX document | |
| Survey Rpt Albany Bldg-1.pdf | ||
| P09 - SOW Flooring Renovation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 528A8-19-803 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 To all Offerors/Bidders
36C24221B0009 01-14-2021
X x x x This amendment is issued to keep interested parties informed of recent RFI questions and responses.
See continuation page for RFI questions and responses
CONTINUATION PAGE
Question: Will chemicals be permitted for the removal of floor mastic on the project?
Response: The Contractor would be permitted to use a soy-based (or approved, similar material) mastic remover.
Question: The drawings indicated that all negative air exhaust can be egressed to the building exterior. Please confirm that this is the case for all phases and NYSDOL variance will be needed to exhaust within the building.
Response: Per this project, all phases shall vent externally.
Question: HVAC systems feeding the abatement areas require shut down or cut and cap? Who is responsible for this?
Response: Contractor is responsible per the ICRA.
Question: The drawings show three (3) decons and work phases. Is it possible that multiple areas can be abated at the same time to expedite the work and minimize mobilizations?
Response: The number of phase and set-ups are part of the abatement plan. The Contractor can increase or decrease the number of phases as long as the timeframes specified are met. If the Contractor decides to increase the abatement areas to reduce the number of phases, they are going to have to prove they can do it. The phases are already large.
Question: Between phases will there be a place on site to store equipment and abatement supplies?
Response: The Contractor would be allowed to have a Conex box on VA grounds. Coordinate placement of box with VA upon kickoff meeting. On the afternoon, prior to the erection of respective abatement barrier, the Contractor would be able to store the barrier(s)’ materials in the 3A Waiting Room, provided they store it “out of the way” and block it with a temporary construction fence; coordinate with VA COR.
Question: Will there be a place for the asbestos waste container on-site? If so, ideally, we would like to reserve one (1) loading dock while on-site performing abatement / install.
Response: The Contractor cannot reserve a bay in the Loading Dock. Similar to Response #5, the VA can provide a location on VA grounds (if available) for the Contractor to temporarily store hazardous waste.
Question: For asbestos project filing purposes this building is federally owned. Are NYS project notifications and fees applicable to this work? or just EPA filing be required.
Response: Both need to be notified.
Question: The doors within the corridors will obstruct the abatement process. Will they be removed as part of this project by others or should we anticipate having to remove and reinstall?
Response: If the doors within or around the associated abatement area are obstructing the Contractor’s operation, the Contractor would be allowed to temporarily remove the doors, but shall (properly) reinstall the doors prior to the start of the VA work week.
Question: Existing walls may have blemishes from the abatement due to the use of tape, etc. What is the owner’s position on this matter as far as cleaning and appearance upon completion of abatement? Are the walls scheduled for painting, etc.? or will they require protection?
Response: No renovation work is currently scheduled outside flooring replacement. Per G-2, if existing conditions are damaged, the Contractor is responsible for repairing/restoring to the original construction or better.
Question: During the walk-thru we discussed one (1) freight elevator being designated for abatement use. Will the owner provide protection (hanging wall covers for the interior of the elevator cabs) Response: Per G-2, if existing conditions are damaged, the Contractor is responsible for repairing/restoring to the original construction or better. It’d be the Contractor’s best interest to implement those items.
Question: In area that have 12 x 12 non-asbestos flooring within the corridors adjacent to asbestos flooring schedule for removal; is the non-asbestos flooring to remove as part of the abatement or protected and left in place?
Response: If you’re referring to the rooms off the A-wing stem, per AB-100, the Contractor shall remove the asbestos flooring within the corridor & the transitional piece of flooring underneath every adjacent door.
Question: Will there be an electrician on-site that can provide connection and disconnection of GFI?
Response: The VA currently provides 120V for the Contractor through nearby receptacles. There may be nearby special (208V) receptacles in the corridor(s), but they would have to be reviewed for their electrical requirements (if the Contractor intends to use them). A VA electrician would NOT be available to tie-in temporary pigtails for the Contractor. The Contractor can temporarily use electrical panels to implement Contractor-supplied pigtails (and supporting equipment), but the Contractor must use a licensed electrician to install and remove the equipment during the respective abatement phase(s). There cannot be any exposed electrical devices during the VA’s work week. Contractor to coordinate electrical outage(s) with the VA, providing the VA a minimum of 14 calendar days advance notice.
Question: For water supply, does the mopsinks have a 3/4" adapter for hose connection?
Response: If there isn’t an available adapter, the Contractor shall supply adapter(s) & all supporting equipment.