36C24218R0590 - Bid RFI Log.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24220B0058
About this file
This document contains a bid response log for federal contract opportunity number 36C24220B0058 for steam and condensate line replacement at a Department of Veterans Affairs medical center. The log details 27 questions received from prospective bidders and the contracting agency's responses. Key areas addressed include clarifying the scope of asbestos abatement and piping removal, requirements for temporary equipment like boilers and generators, responsibilities for fuel and other costs, and specifications for buried piping systems. Photo documentation was also provided to bidders to help illustrate existing conditions. The contracting agency sought to provide bidders with information to facilitate accurate estimates for this project replacing steam and condensate lines at a VA medical facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24220B0058 0004.docx | DOCX document | |
| S06 - 36C24218R0590 - Bid RFI Log - Addendum No. 4.pdf | ||
| 36C24220B0058 0003.docx | DOCX document | |
| 36C24220B0058 0002.docx | DOCX document | |
| S06 - Attachments to Addendum 2.zip | ZIP file | |
| 36C24220B0058 0001.docx | DOCX document | |
| S04- Pre-Bid Attendance Sign In.pdf | ||
| 36C24220B0058_1.docx | DOCX document | |
| S02 - Specifications Vol. 2.zip | ZIP file | |
| S02 - Drawings Final Full Set.pdf | ||
| S02 - Specifications Vol. 1.zip | ZIP file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No.
From
(Company) Contact RFI Question(s) Response Reviewer
Serviam
Construction
LLC
Jayme
Rhodes
Drawing PP-441, propane schedule note #2, has contractor purchasing propane for the duration of the contract. There is no way to know the consumption of the temporary water heaters or to estimate the quantity of propane to be used. May we suggest an allowance be used to keep the bidding fair?
Refer to Bid Addendum No. 2 for Estimated Fuel
Consumption and assumed length of shutdown that the temporary water heating plant will be online.
Patriot
002A
Spec 23 05 11, item 3.3D – states: “ Refer to Specification, 23 52
33.01, “Temporary Water-Tube Steam Boilers,” for temporary boiler requirements to maintain steam service throughout construction.”
This spec was not included in the bid package. Please clarify.
This reference should be to Specification 223433.01, "Temporary, Fuel-Fired, Domestic Water Heating Plant to maintain domestic hot water service to Building 76 throughout construction".
002B
Drawing MP-441, Keynote 2 – States to Provide PRV Station. There does not seem to be a schedule for these PRVs. Please clarify.
Keynote also mentions a piping detail on drawing MS-511. The detail does not seem to be there. Please clarify.
Refer to Bid Addendum No. 2 for PRV Station Schedule
& Detail.
002C Drawing MP-421, keynote 2 – Will the PRV be re-used or will it be new? If new, please provide a schedule.
Provide new PRV Stations, including all trim. Refer to
Bid Addendum No. 2 for PRV Station Schedule.
002D Drawings MD-442 and MP-442, Plan 3: Building 76 Annex -
Drawings note this work as Deduct Alternate 2. Is this correct?
Yes. However, the Annex scope has been eliminated from the project. Refer to Bid Addendum No. 2.
002E
Drawing MS-510, Steam Trap Schedule, note 2 – Requires SS valves and strainers for SS traps. Spec 23 22 13, paragraphs 2.5 and 2.6 do not contain any descriptions for SS valves or strainers. Please clarify.
Note 2 should only apply to the stainless steel trap stations and not include the cast iron trap stations
(8A/8B, 9A/9B, and 10A/10B). Note 4 on the Trap
Schedule describes the stainless steel trap and accessory requirements - Refer to Specification 232213, Article
2.9.D.3.a for stainless steel trap requirements - All valves (Isolation x 2, Test, & Blow Down) are integral to the 316 Stainless Steel, in-line, field repairable, trap station.
Patriot Tim
Witte
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
Postler &
Jaeckle Corp.
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
The asbestos specification gives us the gross quantities of the materials to be abated. It does not give us the amount to be deducted from the base bid for the alternates. The pipe we can measure off the other prints.
What is the quantity of the vapor barrier, abatement note AA-10, to be deducted from the base bid for Alt# 2 in building #76 and alt# 3 in building #30 ?
003B How high are the walls and is it also on the ceiling, Please be more specific as to the locations of the vapor barrier removals.
Regarding the vapor barrier removals for Deduct Alt. #2
(B76 Annex) and Deduct Alt. #3 (B30), the vapor barrier is an assumed ACM located on the exterior building foundation wall below grade. Assume 30 SF of removal per location. There is no interior vapor barrier in the locations scheduled for demolition.
004 Arric Corp Ken
Keller
Asbestos spec section 02 82 11 on page 49 requires us to have a CPIH sign off on the work along with the contractor. Are we expected to have a CPIH on site to inspect our work daily? How can the VA expect a CPIH to sign off on this unless they are full time on site?
This could be very expensive.
The VA will hire a 3rd party asbestos project air monitor who will fulfill the role of the CPIH as defined by the specification in Attachment 1. A CPIH is therefore not required to be hired by the contractor.
Watts
The spec section 02 82 11 includes NYCR 56 for us to follow. If this was under the jurisdiction of NY we would be allowed to obtain a variance for the crawl spaces to install an attached decontamination unit, negative pressure, critical barriers, drop cloth, and then glove bag the pipe.
Will this method just described be acceptable? The reason I ask, is that in the past, I've had experiences at other VA hospitals under federal jurisdiction where they would not allow us to follow the
OSHA regulations and still required us to comply with the more stringent NYS code without allowing us to use a variance method commonly approved by New York DOL.
003A
Note that the Annex Scope (Entirety of Bid Deduct
Alternate No. 2) has been eliminated from the project.
Alternate 1 Revised and included in Addendum 2.
Alternate 3 is listed in the specification 30 SF.
The local VA has indicated they follow NYSCR 56.
Standard Variances allowed under this code rule will be accepted, contingent upon review and approval of the revised abatement plan from the contractor.
NYSDOL Variances, however, will not apply to this project. No variances will be granted by NYS for VA work.
Please note that at the Pre-Bid walkthrough it was indicated that another De-Con near the B-76 North
Mechanical room would be advisable. There is a De-
Con planned immediately adjacent to the North Mech.
Room Entry Door for the buried, shallow box tunnel & steam pipe removal at this location. This De-Con may also be utilized for B-76.
Watts
WattsArric Corp Ken
Keller
Arric Corp Ken
Keller
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
006A Arric Corp Ken
Keller
Drawing HA-300 note AA-6 at tunnel between buildings 31 and 30 instructs contractor to remove tunnel walls and floor with asbestos waterproofing on them, drawing SS-101 instructs contractor to remove only top two feet, which note is correct ?
Note has been Amended, As shown HA-300. Refer to
Bid Addendum No. 2 for update.
Watts
The Tunnel that runs between B-30 & B-31 is being partially removed: The tunnel cap and a 2'-0" height of the wall is being removed below grade. The remainder of the B-30/31 tunnel will remain intact. Note that the vault (A1) between B-30/31 is to be demolished in its entirety. Refer to Drawing SS-101 for B-30/31 tunnel height.
Once the steam piping leaves vault A1 it traverses the site in a shallow concrete box tunnel up to the disconnection point shown on Dwg. MD-300 at the SE corner of Argonne & San Juan Avenues. The shallow box trench size may vary along the route, but the interior clear width is approximately 3'-6" and the interior clear height varies from 2'-8" to 3'-0". Exact wall thickness for the shallow box tunnel is unknown, but assumed to vary between 6" and 12" thick along the route.
006C
We need this information for disposal purposes: Will shoring be required when removing the tunnel from under the area way between buildings 33 and 30 ?
The Tunnel stops on either side of the space below the
B-30/33 Connecting Corridor - Sleeved penetrations through the foundation wall of this space below the corridor shall be provided and sealed as shown on Dwg.
MS-300. Refer to Bid Addendum for Photographic
Documentation of this space.
Patriot
Arric Corp Ken
Keller
From the tunnel that runs between buildings 31 and 30 up to
Argonne Ave we are to remove the entire tunnel, per drawing HA-
300. Insert on drawing shows typical tunnel construction with walls on each side to be one foot thick and six feet deep. How thick is the floor of the tunnel ?
006B Watts
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
007A Buckpitt Jim
Parks
Would the VA accept a used electric steam generator for SG-1? The other temporary equipment the VA is purchasing (water heater trailers) will most likely be used equipment. A used steam generator could provide significant cost savings.
The Government (VA) will not accept used equipment of any kind. The Bid Documents Do Not indicate any used equipment. However, please note that Bid Deduct
No. 2 (Annex) has been eliminated in its entirety from the project.
Patriot
007B Buckpitt Jim
Parks
Would a 460/3/60 electric steam generator be acceptable in lieu of
208/3/60?
460 is not available. 208 must be used. However, please note that Bid Deduct No. 2 (Annex) has been eliminated in its entirety from the project.
Patriot
The note implies “approximately” six inches (6”) shall be removed.
Must ALL 6” of soil in the “hatched” area be abated and disposed of as hazardous? In other words if the “hatched area” is remediated to a depth less than 6” inches, tested and found to be negative, must the non-contaminated soil be removed and disposed of a hazardous?
6" Depth of Excavation is minimum requirement.
008B Can we assume the area to be abated, shown as hatched on the drawing, are the limits of removal?
These are the estimated limits of removal.
008C Can we get a square footage of the “hatched area”?
Estimated Abatement quantities are listed in the
Division 2 Specifications and Bid Addendum No. 2.
008D If areas outside the “hatched area” are found to be contaminated will that constitute a change order?
The limited abatement regulated work area should be separated from the rest of the work area. Work should not occur outside of the regulated abatement area.
008E
If while removing the 6” of soil, pipes that bear on the soil, such as sanitary lines, require the addition of hangers will that be a change order?
Piping is typically supported with threaded rod / hangers from beams or ground floor slab above. Contractor responsible for maintaining service of any adjacent existing utilities other than the steam / condensate, while performing work.
008A
Welch
Construction
Inc.
Douglas R.
Arnold
Patriot &
Watts
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
008F If other debris, such as old pipe, garbage, materials left behind by previous efforts is found, will that disposal be additional?
Removal of misc. debris such as plastic etc. that may be laying on the contaminated soil and should be removed by the contractor. All piping removals are shown on the
MD Series of Drawings.
008G
It was also noted that there is mechanical pipe removal which may have flanged gaskets that may contain asbestos. Can we get a count on the number of mechanical joints that must be remediated?
Refer to the MD Series of Drawings - The piping to be removed is indicated there.
009A Note #8 asks that we provide a 70A Breaker, yet has us installing #8 wire. Should the wire be #4awg or should the breaker be 40A 3Ø.
This should be #4 awg in 1-1/4” conduit. The note should read "3 #4, 1 #4 G, 1-3/4” C". However, please note that the Bid Addendum removed all scope associated with Bid Deduct Alternate No. 2 (Annex) from the project.
Patriot
009B
Additionally, we install a j-box in the annex, how far are we running the conduit and wire from this point? Looks to be about 100’ per the drawings to the second floor.
Please note that the Bid Addendum removed all scope associated with Bid Deduct Alternate No. 2 (Annex) from the project.
Patriot
Refer to sheet SS-502 Note 1. (See screen shot below):
Is the contractor responsible for hiring the third party testing firm for the items listed in the tables on SS-502?
010B Is the contractor responsible for hiring the third party abatement monitor and the required testing?
The VA will hire a 3rd party asbestos project air monitor in compliance with NYSCR 56.
Watts
Welch
Construction
Inc
Douglas R.
Arnold
The contractor is responsible for hiring the testing agency. The testing lab results are to be submitted to
VA within 3 days of the testing being completed.
010A
Billitier
Electric
Dean
Brickey
Popli
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
Environmental
Construction
Group (ECG)
Patrick
Crandall
Is the confined space in the crawl space of building 76 considered permit required confined space by OSHA? If so, will each sub-contractor be required to hire an emergency response team for doing work in the space?
The areas noted as confined space are permit required confined space as defined by OSHA. The VA Bath Fire
Department are the on-site emergency responders for the facility, including EMT / Ambulance. All confined space permits are filed on site with the Bath VA Fire
Department Chief – These need to be opened and closed on a daily basis. The contractor is responsible for providing the entry supervisor and entry attendant
(These may be the same person).
Patriot
012A
Drawing MP-441: keynote 7 calls for a concrete pier to support the pipe anchors. We cannot seem to find a detail for these piers. Please clarify.
Concrete piers are not required. The note was revised via Bid Addendum No. 2.
Patriot
012B
Drawing MP-441, keynote 7: Is it the intent that the guides rest on the same piers as the pipe anchors or can they be hung from the ceiling?
Concrete piers are not required. The note was revised via Bid Addendum No. 2.
Patriot
013A
Drawings SS-104, SS-105, MS-505 and MS-506: Please provide a spec for the vault vent piping. Drawings make notes labeling it as 12” dia.
Galvanized sch. 80. Is true schedule 80 required or just extra-strong?
Is the intent to have black carbon steel pipe and fittings welded together, then hot-dipped galvanized?
013B Can standard weight type 304 SS be substituted?
014A Drawing MS-200 not in bid package
MS-200 is not a drawing in the bid package. Steam Line
Profiles are included on MS-201 & MS-202. References to MS-200 should be interpreted as a reference to MS-
201.
014B Request for submersible pump substitute brand/ manufacturer.
This is a publicly bid project. We must entertain other manufacturer's that can provide an equivalent product.
However, any alternate product must meet the performance & material requirements specified.
Tim
Witte
Postler &
Jaeckle Corp.
Tim
Witte
Sch 80 is the required rating for the pipe wall thickness.
The concern is for potential damage, thus, Stainless Steel may be substituted, but it must be of equal strength / thickness.
Postler &
Jaeckle Corp.
Patriot
Diversified Site
Services LLC
Brian
Cannava Patriot
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
014C Vaults A1 to A7 are dry sump pits, no pumps required; is that correct?
That is correct. The vaults, if properly installed and waterproofed as specified, should mostly remain dry.
Leak detection is being provided to notify the owner if water starts to collect so that they can pump out the vaults with their own pumps.
014D Can we request a bid extension? Turnaround times for material pricing and availability have been impacted.
Refer to new bid date on the Beta.Sam website posted under Addendum No. 1.
015A Can a copy of the sign in sheet from the pre-bid walkthrough be provided ?
Sign-In sheet was provided as an attachment in Bid
Addendum No. 1.
015B Can additional photographs be provided within existing tunnels and crawl spaces in buildings 76, Annex, 31 and 30.
Additional Photographic Documentation is Provided as an Attachment to Bid Addendum No. 2.
015C Please confirm that the ASME Code requirements for this project are subject to B31.9, Building Services Piping
VA Standards require installation in accordance with
ASME, B31 Standards - With the Design Pressures indicated (< 150 psig), B31.9, Building Services Piping is the appropriate Standard. Both Specifications 232213
& 336300 list B31.9.
015D Will the mechanical installation contractor be required to hold an
ASME U, S, H or R stamp ?
ASME H-Stamp & S-Stamp are for boilers and U-Stamp is for Pressure Vessels, none of which relate to the scope of this project. Likewise, the R-Stamp, for repairs, does not apply. The contractor's welders shall be qualified in accordance with B31.9.
015E
Will hydrostatic testing be sufficient on all pipe welds or will x-ray be required?
If X-ray is required, what percentage of welds and who will be responsible for the cost of testing?
ASME, B31.9-2017, Chapter VI, "Inspection, Examination, and Testing" requires Visual Inspection of all Welds, and Leak and Pressure Testing of the Entire
System. X-Ray testing of individual joints is not a requirement of B31.9. However, VA Standards do require a certain percentage of welded joints to be tested.
(Response Continued On Next Page)
Diversified Site
Services LLC
Brian
Cannava Patriot
All State
Construction
Pete
Pare
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
Specification Section 232213, Article 3.2.H and Section
336300, Article 3.15.H both require that 50% of the first
10 welds must undergo radiographic examination (X-Ray
Inspection), followed by 10% of all additional welds. If more than 25% of welds fail X-Ray Inspection the owner has the right to request, at no cost, that up to
100% of all welds undergo radiographic examination.
For the purposes of bidding assume that the first 10 welds and next 10% of welds applies and will be tallied separately for the piping within the building (232213) and the site piping (336300).
Note that the pre-engineered, buried piping system described in specification 336300 also requires air testing of the outer casing in addition to the above requirements for the service piping.
015F Will the asbestos abatement contractor be responsible for removal of all pipe insulation weather containing asbestos; or not?
All piping demolition is indicated on the MD-Series
Drawings. All areas where piping includes ACM insulation, gaskets, etc. are indicated on the HA-series drawings. All piping indicated for removal shall be removed as asbestos containing waste as indicated on the HA-Series drawings. Note certain portions of piping may have had some ACM insulation removed over the years, but was not necessarily cleaned and tested to the standards required by this contract's specifications and
VA Standards. Thus, tall piping to be removed under the scope of this project is indicated to be removed as
Asbestos Containing Waste.
All State
Construction, Inc.
Pete
Pare Patriot
015E
(Cont.)
015E, Response Continued
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
015G
Drawing HA-300 identifies all of building 76 including Annex building as Deduct #2. Drawing HA-441 identifies building 76 as
Alt. #1 and the Annex as Alt. #2. Please confirm
Bid Deduct Alternate No. 1 includes B-76 Confined
Space. Bid Deduct Alternate No. 2 includes only the
Annex and piping beneath the roadway between B-76 and the Annex. Consider this RFI response to have amended he Deduct Alternate Call-Out on HA-300, accordingly.
015H Who is responsible for demolition of existing mechanical piping ?
This is a single Prime Contract. The VA will only enter into a single contract with the Prime Contractor.
Management of all sub-consultants and segregation of work between sub-contractors is the sole responsibility of the Prime Contractor. However, please note, that all areas of piping demolition indicated on the HA-Series
Drawings shall be accomplished under a regulated asbestos abatement project and removed as asbestos containing waste.
015I Please confirm who is responsible for the cost of fuel for temporary boilers ?
The contractor is responsible for all costs associated with the Temporary Water Heating Plant, including fuel for the entire duration in which the domestic hot water to B-
76 is not online. If the contractor exceeds the milestone calendar days indicated in the contract documents to complete and turn over the steam system and its components, additional fuel costs shall also be the responsibility of the contractor until such time that normal domestic hot water operation can be restored. It is therefore advantageous for the contractor to finish the work as expeditiously as possible, to minimize fuel consumption costs. Refer to Bid Addendum No. 2 for an estimate of fuel consumption.
Patriot Pete
Pare
All State
Construction
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
015J After backfilling, topsoil and seed have been applied who is responsible for watering ?
The contractor is responsible for establishing all turf and vegetation and shall make arrangements to water as required. Again the only contract is between the VA and the Prime Contractor, all sub-contractors are the responsibility of the Prime.
015K Will water be provided by the VA?
Water on-site may be utilized at no cost. If the contractor chooses to connect to a hydrant, they are responsible for providing an RPZ and coordinating with the owner for use. Otherwise, hose bibbs within
Mechanical Rooms or on exterior building walls are the best location to gather water.
016A
Drawing PP-441, propane schedule note #2, has contractor purchasing propane for the duration of the contract. There is no way to know the consumption of the temporary water heaters and no way to estimate the quantity of propane to be used. I would suggest an allowance be used to keep the bidding fair.
Refer to the Response Provided for RFI# 015I.
016B
On MS300 note’s #1 talks about a pre-engineered direct bury piping for the Steam and condensate lines, there is nothing in the spec in regard to this? Please advise.
Pre-Engineered, Buried Piping is specified under Section
336300, "Steam Energy Distribution". Specification
232213 is for steam and condensate piping within the limits of the buildings.
016C
Drawing HA-441, shows abatement to occur in the Building 76 crawlspace. The notes indicate that the abatement is to occur largely down the center of the crawlspace. Are the crawlspace areas not shown to be abated, required to be isolated from the abatement areas?
The drawings do not indicate any measures (i.e. plastic barriers) required to isolate the abatement area(s) from the non-abatement areas. Please advise.
A regulated abatement area must be constructed around the work area in accordance with the Division 02
Specifications. Refer to Bid Addendum No. 2 for updates to drawing HA-441 clarifying abatement areas.
Separation of the regulated area form non-regulated area is required, refer to specs for requirements. Also, refer to MD-Series of Drawings for detailed layout of piping to be removed.
Patriot U.S. Innovative
Construction
Robert
Tates
All State
Construction, Inc.
Pete
Pare
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
016D
Drawing HA-300 shows abatement notes AA-5 &AA-6 in the tunnel connecting Building 31 & Building 30. Per note AA-6, “Tunnel walls and floor with waterproofing tar to be removed and disposed of as an
ACM". This would indicate that this entire tunnel should be demolished. Per drawing SS-101 details 1, 2 & 3, along with drawing
MD-100 note 6, it appears that only the concrete tunnel cap and top layers of masonry are to be removed. Please clarify.
The Tunnel that runs between B-30 & B-31 is being partially removed: The tunnel cap and a 2'-0" height of the wall is being removed below grade. The remainder of the B-30/31 tunnel will remain intact. Note that the vault (A1) between B-30/31 and the shallow box trenches, up to the points of disconnection shown on
MD-300, are to be demolished in their entirety. Refer to
Drawing SS-101 for B-30/31 tunnel height And revised drawing in Addendum No. 2.
016E
Please provide a specification for the temp steam generator, there was not one included with the original bid documents. Please advise.
Please note that Bid Addendum No. 2 removed all scope associated with Bid Deduct Alt. No. 2 (Annex) from the project, including the Steam Generator.
017 Arric Corp Ken
Keller
It is difficult to tell from the drawings, how many pipe lines are in the tunnel from Argonne Ave back to where it intersects with the tunnel that runs between buildings 30 and 31, and how many pipe lines are in the tunnel that runs between buildings 30 and 31.
Pipes to be demolished are indicated on MD-300; Refer to Keynotes 1 & 2 for the piping to be removed from shallow box trench and B-30/31 tunnel, respectively.
Refer to MD-310 provided with Bid Addendum No. 2 for more info. Also, refer to MD-300, 421, 431, and 432.
Patriot
018 Buckpitt Jim
Parks
In an effort to accurately estimate propane consumption, could you please provide the following information:
• Total bed count for the hospital
• Typical occupancy rate
Refer to the Response Provided for RFI# 015I. Patriot
019 Arric Corp Ken
Keller
For the bidding of the asbestos pipe removals, should we use the quantities shown in the specifications section or the quantities shown on the MD drawings? As some of the drawings seem to show a larger quantity to be removed than the specifications do.
Steam pipe removal quantities shall be determined from the MD-Series drawings and shall be removed as asbestos containing waste. Where a discrepancy exists between the asbestos drawings or specs and the MD-
Series drawings, the contractor shall carry the larger quantity in their bid.
Patriot
U.S. Innovative
Construction
Robert
Tates
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
020 Buckpitt Jim
Parks
The schedule calls for 125 psig rating on the unit, but the Chromalox
CAS-20CM is only rated to 100 psig. Can you please clarify the actual rating that is required? 125 psig is very unusual for electric steam generators.
Note that all work associated with Bid Deduct Alternate
No. 2 for the B-76 Annex has been eliminated from the project scope via Addendum No. 2 - This includes the steam generator.
Patriot
DiSanto
Propane
Robert M
Brewer
I am representing the propane supply company bidding on the Bath
VAMC temporary water heat for the project. On DRAWING PP-
442 it has indicated tank saddles for 1000 gallon ASME above ground propane tanks. Saddles are NOT standard on the manufactured tanks that we would be supplying (attached spec sheet) nor is it standard to the industry. The tanks are manufactured with feet (attached spec sheet). Is this a detail that is a specific requirement for these tanks and or is possibly a misinterpretation?
This is important to bid the supply of the tanks, as saddles would affect the cost to the supply of the tanks, as tanks with saddles would increase the cost of the tanks supplied as apposed to the standard
ASME constructed tanks (attached spec sheet)?
Where Tank Saddles are noted on the contract documents this is meant to refer to standard outdoor tank feet similar to what DiSanto is indicating. Full saddles are not required.
Patriot
022 Arric Corp Ken
Keller
Drawing HA-431 shows the pipe abatement as the cross hatched area, the spec section requires us to remove 24' of 2"-6" pipe and 10' of 6" pipe in addition to 50sf of debris. The drawing MD-431, demolition notes #1,2,and 4 on the steam lines and demolition notes # 1,3,4, for the condensate lines show larger amounts of piping to be removed and in a larger area then what is shown on the abatement drawing;
close to 120' more than what the spec calls for. Which quantity of steam and condensate lines should we use in estimating our quote ?
The one in the spec, or what is shown on drawing MD-431 ?
Steam pipe removal quantities shall be determined from the MD-Series drawings and shall be removed as asbestos containing waste. Where a discrepancy exists between the asbestos drawings or specs and the MD-
Series drawings, the contractor shall carry the larger quantity in their bid.
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
023A
Dwg PP-441, propane schedule notes #2, has contractor purchasing propane for the duration of the contract. There is no way to know the consumption of the temporary water heaters and no way to estimate the quantity of propane to be used. Can you provide information we can use for bidding/estimate?
Refer to the Response Provided for RFI# 015I.
023B
Do you have pictures of existing conditions of pipes to be removed;
are pipes on floor of tunnels?
- Tunnel from/to B-76 & B-76 Annex (see MD-442 plan#1)
- Tunnel B-76 north mech. room (also see MD-441 plan#2)
- Shallow tunnel along San Juan Ave accessible
- Tunnel to B-30 & B-31
Additional Photographic Documentation is Provided as an Attachment to Bid Addendum No. 2.
023C MS-300 Drawing Note 4: Dwg. MS-200 is not in bid package.
This note indicates to "REFER TO MS-100 & MS-200
SERIES DRAWINGS…" There is no MS-200, rather the 200-series starts at MS-201.
024A
On MD-300, assuming tunnel from B-76 up to shallow tunnel to B-30
& B-31 were demo’d to be able to access existing steam and condensate pipes removal: Are you going to carry steam & condensate pipes demo?
Only portions of the tunnels are being demolished. A large portion of the shallow box tunnel and the Concrete
Tunnel along Argonne Avenue are not in scope to be removed as indicated by the Point of Disconnection symbols. Wherever the tunnels are showed to be demoed, all piping is also indicated to be removed as
ACM waste.
Do you have pictures of existing conditions of pipes to be removed;
are pipes on floor of tunnels?
- Tunnel from / to B-76 & B-76 Annex (see MD-442, plan#1)
- Tunnel B-76 north mech’l. room (also see MD-441 plan#2)
- Shallow tunnel along San Juan Ave accessible
- Tunnel to B-30 & B-31.
Click Here for Link to Contractor's Sketch. 'RFI-024C'!A1
On MD-441, do you have pictures of exist. pipes to be removed?
Click Here for Link to Contractor's Sketch. 'RFI-024C'!A1
Tim
Long
Serviam
Construction
LLC
Patriot
Robert F.
Hyland and
Sons, LLC
Michael
Stockslader Patriot
024C Additional Photographic Documentation is Provided as an Attachment to Bid Addendum No. 2.
024B Additional Photographic Documentation is Provided as an Attachment to Bid Addendum No. 2.
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
OnPoint
Sales
Eric
Eder
We are quoting your Project# 585A6-18-621 but need more information regarding the control panel AUX Contacts in
Specification 221333, Section# 2.1 – H1: (Provide auxiliary contacts for remote alarming to the Engineering Control Center and BACnet compatible open-protocol type interface to DDC Controls System).
We need to know what is being “hooked” to the aux contact so that we make sure the contact can handle the load.
The Sump Pump Schedule on Drawing PP-442 indicates that run status and alarm be communicated to the BMS system. The BMS system is by Trane utilizing a BACNet
MSTP protocol. The run status and alarm contacts should be rated to operate on standard 4-20 mA
(24Volt) with twisted pair wiring. Alternatively, a
BACNet connection may be extended directly to the nearest Trane Control Panel via Cat 5 cable if sump pump controls panels can be equipped to communicate with the existing Trane BMS system. Coordinate with
Trane for interface and programming of all controls.
Patriot
NorthEast
HVAC
Solutions
Donald
Ferguson
My company represents ROVANCO for all of upstate New York.
We/Rovanco would very much like to bid on the material required for this project. Rovanco makes a superior product for this application and we have bid and supplied many projects in New York as well as all over the country. We have two minor exceptions to the spec that we do somewhat differently. If you go to the third page of the scope attached you will see the Rovanco quote alternate to the spec:
(Question Continued on Next Page)
We have reviewed the preliminary material provided by
Rovanco and although we do not pre-approve any supplier without completion of the required submittal process, we can offer the following in response:
(Response Continued on Next Page) x
Patriot
1. Rovanco's indicated HDPE casing (jacket) thickness at ~.175" - .200" average thickness, depending on casing OD, is acceptable.
2. We take no exception to Rovanco's standard approach to leak detection.
Click Here for Link to Vendor's Data Sheets. 'RFI-026 - Cut
Sheets'!A1
Providing Rovanco's standard seamless HDPE jacket thickness.
'We would request that we be allowed to provide a material bid for this project. Can we obtain that approval in writing / addendum so we may bid? Please let me know if you should have any questions and thank you in advance for your consideration.
Patriot
(Cont.)
NorthEast
HVAC
Solutions
Donald
Ferguson
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
Spec 27 10 10 (Part 3 Installation):
The responsibility for installing the sensing cable and non-sensing cable for the vault water detection and alarm system is not clear.
Is this the responsibility of division 23 09 23 or division 26?
This is a single Prime Contract. The VA will only enter into a single contract with the Prime Contractor.
Management of all sub-consultants and segregation of work between sub-contractors is the sole responsibility of the Prime Contractor.
The leak Detection Cable was specified in Division 27.
Specification Section 271000, Article 1.2 indicates that materials, including, but not limited to, conduit, junction boxes, buried conduit, and wiring in support of the leak detection system installation are specifed in various
Division 26 Specifications.
All associated earthwork was specified in Division 31.
Specification 230923 describes work associated with the interface of alarm and status signals from various panels throughout the project with the existing Trane BMS system. This includes, but is not limited to, various sump pump alarm and status signals from their associated control panels, the buried steam/condensate piping leak detection systems, and the vault water detection systems.
(Response Continued on Next Page) X
Patrick
Leach
Patriot
Trane027
(Company) Contact RFI Question(s) Response Reviewer
585A6-18-621 - Bid RFI & Response Log (Issued with Bid Addendum No. 2)
(Cont.)
Trane Patrick
Leach (Response Continued from Previous Page)
Ultimately, the final agreements between a Prime
Contractor and their Sub-Consultants as to whom installs what portion of the work are the responsibility of the Prime Contractor. It is reasonable to assume this work could be sub-contracted to many different combinations of electrical or controls contractors.
However, please note that the final terminations/connections at/to the Trane Control
Panels and all programming is required to be provided by Trane, as these are existing control panels.
Patriot
END OF LOG
RFI-024B - Attachment
RFI-024C - Attachment
RFI-026 - Attachment