36C24219Q0200-002.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 36C24219Q0200
About this file
36C24219Q0200 Pricing Schedule Table - VISN 2 Abatement Services.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219Q0200-0002000.docx | DOCX document | |
| 36C24219Q0200-0001000.docx | DOCX document | |
| 36C24219Q0200-001.docx | DOCX document | |
| 36C24219Q0200-003.docx | DOCX document | |
| 36C24219Q0200-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS
ITEM UNIT OF MEASURE UNIT PRICE
| PRE-WORK REQUIREMENTS | |
| Submittals | |
| Attend on-site pre-start meeting, prepare and submit brief asbestos abatement work plan, project schedule, decontamination unit sketches and worker qualifications | EA |
| Mobilize All Personnel and Equipment To Site (Within 24 Hour Notice) | EA |
| Mobilize All Personnel and Equipment To Site (Within 72 Hour Notice) | EA |
| Mobilize All Personnel and Equipment To Site (> 72 Hour Notice) | EA |
| CONTAINMENT & PREPARATION IN ASBESTOS ABATEMENT WORK AREA | |
| Remove and relocate within facility all movable furniture, etc. | HR |
| Hard Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 8' height | SF |
| Hard Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 12' height | SF |
| for heights above 12' add | |
| Remove Non-Asbestos Material (to access ACM for abatement). Establish HEPA-filtered negative pressure containment as stipulated in the project documents. | |
| Non-ACM Carpet | SF |
| Non-ACM Vinyl Cove Base Molding | SF |
| Non-ACM Vinyl Floor Tile with Non-ACM Mastic | SF |
| Non-ACM Concrete Masonry Unit Wall Chase | SF |
| Non-ACM Wall Plaster | SF |
| Non-ACM Ceiling Plaster | SF |
| Non-ACM Sheetrock Wall | SF |
| Non-ACM Sheetrock Ceiling | SF |
| Remove and store on-site existing Non-ACM suspended acoustical tile, metal T-grid to remain in place | SF |
| Remove, clean and store on-site existing suspended acoustical ceiling tile system complete with metal T-grid and tile | SF |
| Remove and Clean 2 x 4 Fluorescent Light fixtures, Store on Site | EA |
| Remove Asbestos-Contaminated Material (In accordance with all applicable regulations and contract requirements, including but not limited to preparation of work areas, installation of critical barriers, polyethylene sheeting containment barriers, installation/setup of HEPA Microtrap machines, decontamination enclosures, material removal and required cleaning to meet air clearance standard, dismantling and removal of containment and equipment at conclusion of project). | |
| Demolition in asbestos contaminated area, Plaster and Lath ceiling, including suspension system | SF |
| Demolition in asbestos contaminated area, ceiling, suspended acoustical tile | SF |
| Demolition in asbestos contaminated area, concealed spline ceiling system | SF |
| Demolition in asbestos contaminated area, ceiling, gypsum board | SF |
| Demolition in asbestos contaminated area, ceiling, Fiberglass Batt Insulation | SF |
| Demolition in asbestos contaminated area, ceiling, Fiberglass Pipe Insulation | LF |
| Remove Asbestos-Containing Material (In accordance with all applicable regulations and contract requirements, including but not limited to preparation of work areas, installation of critical barriers, polyethylene sheeting containment barriers, installation/setup of HEPA Microtrap machines, decontamination enclosures, material removal and required cleaning to meet air clearance standard, dismantling and removal of containment and equipment at conclusion of project). | |
| Transite Board | |
| Cement-asbestos Transite Board (i.e, in Laboratory Fume Hood or Benchtop) | SF |
| Surfacing (Plaster /Sheetrock) | |
| ACM Plaster Ceiling (including suspension system and lath) | SF |
| ACM Plaster Wall (including lath) | |
| ACM Sheetrock Ceiling (clean studs and leave in place) | |
| ACM Sheetrock Wall (clean studs and leave in place) | SF |
| ACM Sheetrock Ceiling including suspension system | |
| ACM Sheetrock Wall including studs | SF |
| Ceiling Tiles | |
| Ceiling Tiles with ACM Mastic (glue daubs) | SF |
| Vinyl Asbestos Floor Tile/Mastic | |
| Single Layer of Vinyl Asbestos Tile and ACM Mastic | SF |
| for each additional Layer of VAT and ACM Mastic add | SF |
| Single Layer of Vinyl Composition Tile (non-ACM) & ACM Mastic | SF |
| for each additional Layers of non-ACM VCT and ACM Mastic add | SF |
| Remove ACM Mastic (only) from Concrete floors | SF |
| Carpet | |
| Remove Asbestos-Contaminated Carpet from Floor | SF |
| Duct Insulation | |
| Remove Boiler Breeching, Duct or AHU Insulation (to 1" thick) | SF |
| Remove Boiler Breeching, Duct or AHU Insulation (to 2" thick) | SF |
| Pipe Insulation (Full Containment) | |
| to 4" Insulation Size (Outside Dia.) | LF |
| to 8" Insulation Size (Outside Dia.) | LF |
| to 12" Insulation Size (Outside Dia.) | LF |
| Pipe Insulation (GloveBag Method) | |
| to 4" Insulation Size (Outside Dia.) | LF |
| to 8" Insulation Size (Outside Dia.) | LF |
| to 12" Insulation Size (Outside Dia.) | LF |
| Spray-on Fireproofing | |
| Remove asbestos insulation or fire proofing from decking, beams, columns, joists or other flat structural surfaces plus any overspray | SF |
| Remove asbestos insulation or fire proofing from irregular surfaces plus any overspray | SF |
| REINSTALL ITEMS (INCLUDES CLEANING) | |
| Reinstallation | |
| Re-install existing 2 x 4 fluorescent light fixture | EA |
| Re-install existing suspended acoustical ceiling tiles in existing grid | SF |
| Reinstall all movable furniture, equipment, etc. after work is complete (excluding office partition units) | Day |
| WASTE DISPOSAL | |
| Disposal | |
| Asbestos waste disposal charges, including haul | C.Y. |
| Disposal of Non-ACM Construction and Demolition Material | C.Y. |
&"-,Bold"&14HAZARDOUS MATERIALS ABATEMENT
UNIT PRICING TABLE
LEAD
ITEM UNIT OF MEASURE UNIT PRICE
| REMOVAL OF LEAD BASED PAINT (LBP) | |
| Pre-Work | |
| Attend on-site pre-start meeting, prepare and submit brief lead abatement work plan, project schedule, decontamination unit sketches and worker qualifications | EA |
| Mobilize All Personnel and Equipment To Site (Within 72 Hour Notice) | |
| Mobilize All Personnel and Equipment To Site (> 72 Hour Notice) | EA |
| Containment | |
| Preparation of lead containment area in accordance with all applicable regulations and contract requirements and post-abatement cleaning (including but not limited to pre-cleaning, HEPA vacuum and wet wipe floor and wall surfaces, cover non-work surfaces with polyethylene sheeting) | SF of Floor Area |
| Encapsulation | |
| Encapsulation of lead-based paint, interior, brushwork, trim, under 6" | LF |
| Encapsulation of lead-based paint, interior, brushwork, trim, 6" to 12" wide | LF |
| Encapsulation of lead-based paint, interior, brushwork, balustrades | LF |
| Encapsulation of lead-based paint, interior, brushwork, pipe, to 4" diameter | LF |
| Encapsulation of lead-based paint, interior, brushwork, pipe, to 8" diameter | LF |
| Encapsulation of lead-based paint, miscellaneous, steel, flat surfaces | SF |
| Encapsulation of lead-based paint, miscellaneous, steel, beams, brushwork | SF |
| Encapsulation of lead-based paint, miscellaneous, steel, trusses | SF |
| Removal | |
| Removal of lead-based paint, baseboard, to 8" wide | LF |
| Removal of lead-based paint, balustrades, one side | SF |
| Removal of lead-based paint from doors | SF |
| Removal of lead-based paint, from door frames, trim to 6" | LF |
| Removal of lead-based paint, handrails | LF |
| Removal of lead-based paint, frame and trim | LF |
| WASTE PACKAGING, HANDLING AND DISPOSAL | |
| Disposal of Lead-containing Hazardous Waste (> 5 parts per million of leachable lead by Toxicity Characteriustic Leaching Procedure) | 55-gallon Drum |
| Disposal of Lead-containing Non-Hazardous Waste (< 5 parts per million of leachable lead by Toxicity Characteriustic Leaching Procedure) | 55-gallon Drum |
MOLD
ITEM UNIT OF MEASURE UNIT PRICE
| PRE-WORK REQUIREMENTS | |
| Submittals | |
| Attend on-site pre-start meeting, prepare and submit brief mold abatement work plan, project schedule and worker qualifications | EA |
| Mobilize All Personnel and Equipment To Site (Within 72 Hour Notice) | EA |
| Mobilize All Personnel and Equipment To Site (> 72 Hour Notice) | EA |
| CONTAINMENT & PREPARATION IN MOLD-IMPACTED AREA | |
| Remove and relocate within facility all movable furniture, etc. | HR |
| Hard Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 8' height | SF |
| Hard Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 12' height | SF |
| for heights above 12' add | |
| Remove Mold-Impacted Material. Establish HEPA-filtered negative pressure containment as stipulated in the project documents. | |
| Carpet (remove and dispose) | SF |
| Vinyl Cove Base Molding (remove and dispose) | SF |
| Vinyl Floor Tile and Mastic (remove and dispose) | SF |
| Wall Plaster and Lath (remove and dispose) | SF |
| Ceiling Plaster and Lath (remove and dispose) | SF |
| Sheetrock Wall (remove and dispose, leave studs in place) | SF |
| Sheetrock Wall (remove and dispose of entire wall system including studs) | SF |
| Sheetrock Ceiling (remove and dispose, leave studs in place) | SF |
| Sheetrock Ceiling (remove and dispose of entire wall system including studs) | SF |
| Suspended Acoustical Tile Ceiling (clean grid and leave in place) | SF |
| Suspended Acoustical Tile Ceiling (remove and dispose of entire ceiling syetm including grid and ceiling tile) | SF |
| Concealed spline ceiling system (remove and dispose) | SF |
| Fiberglass Pipe Insulation (remove and dispose) | LF |
| Remove, clean and store on-site non-impacted suspended acoustical ceiling tile system complete with metal T-grid and tile | SF |
| Remove and clean 2 x 4 fluorescent light fixtures, store on site | EA |
| Apply Mold-Inhibitor to Surface Following Abatement (e.g. wall cavity, chase) | SF |