36C24219B0056-0003000.docx

DOCX document 18 KB Posted

Attached to
528A7-15-703 MEDICAL CENTER EXTERIOR WAYFINDING SIGNAGE AND GRAPHICS UPGRADE
Solicitation number
36C24219B0056
Issued by

About this file

36C24219B0056 0003 36C24219B0056 0003.docx

View the file

Other files

File Type Posted
36C24220C0013-000.docx DOCX document
36C24219B0056-0004000.docx DOCX document
36C24219B0056-0004000.docx DOCX document
36C24219B0056-0003000.docx DOCX document
36C24219B0056-0002001.pdf PDF
36C24219B0056-0002000.docx DOCX document
36C24219B0056-0002000.docx DOCX document
36C24219B0056-0002001.pdf PDF
36C24219B0056-0001000.docx DOCX document
36C24219B0056-0001000.docx DOCX document
36C24219B0056-026.pdf PDF
36C24219B0056-020.pdf PDF
36C24219B0056-018.pdf PDF
36C24219B0056-023.pdf PDF
36C24219B0056-016.pdf PDF
36C24219B0056-022.pdf PDF
36C24219B0056-024.pdf PDF
36C24219B0056-021.pdf PDF
36C24219B0056-015.docx DOCX document
36C24219B0056-027.pdf PDF
36C24219B0056-025.pdf PDF
36C24219B0056-028.pdf PDF
36C24219B0056-019.pdf PDF
36C24219B0056-017.pdf PDF
36C24219B0056-021.pdf PDF
36C24219B0056-028.pdf PDF
36C24219B0056-016.pdf PDF
36C24219B0056-027.pdf PDF
36C24219B0056-015.docx DOCX document
36C24219B0056-024.pdf PDF
36C24219B0056-019.pdf PDF
36C24219B0056-022.pdf PDF
36C24219B0056-025.pdf PDF
36C24219B0056-026.pdf PDF
36C24219B0056-023.pdf PDF
36C24219B0056-018.pdf PDF
36C24219B0056-020.pdf PDF
36C24219B0056-017.pdf PDF
36C24219B0056-000.docx DOCX document
36C24219B0056-000.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-29-2019 528A7-15-703 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227 To all Offerors/Bidders

36C24219B0056 08-29-2019

X X X

THIS AMENDMENT IS RESPONSES TO AN RFI

RFI QUESTIONS AND ANSWERS

1. There are exterior pylon signs that require foundations, please provide foundation and masonry pier details.

Designated design of exterior sign foundations, steel frame and masonry is by the contractor. Provide sealed shop drawings for approval by the architect. Masonry requires horizontal reinforcing and steel shelf support. See specification sections for signs, masonry and steel. Check with your exterior signage subcontractor for their preferred design. Design is usually specific to sign systems contractors.

1. There are exterior signs that require electrical work for illumination. Please provide locations for the source of power.

Power locations are given in the specifications for electrical work, part 3, power location schedule. In this case too, connection to power source is usually specific to the sign system company and the electrician who does this work for that subcontractor. Needs to be done by master electrician and in compliance with the current NEC.

1. On page 1 of the solicitation, the bid due date is September 30, 2019 @ 1:30. Page 10 of 48 has the due date as September 23, 2019. Please confirm the due date.

The Bid opening is on 1:30pm on September 30, 2019