36C24218U0075-005.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- SURVEILLANCE SYSTEM CAMERA PROJECT VIDEO MANAGEMENT SYSTEM VA MEDICAL CENTER - MONTROSE, NY
- Solicitation number
- 36C24218U0075
About this file
36C24218U0075 VMS Matrix.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218C0267-000.docx | DOCX document | |
| 36C24218U0075-008.docx | DOCX document | |
| 36C24218U0075-011.txt | TXT text file | |
| 36C24218U0075-010.pdf | ||
| 36C24218U0075-009.pdf | ||
| 36C24218U0075-007.pdf | ||
| 36C24218U0075-006.docx | DOCX document | |
| 36C24218U0075-004.docx | DOCX document | |
| 36C24218U0075-002.pdf | ||
| 36C24218U0075-000.docx | DOCX document | |
| 36C24218U0075-001.pdf | ||
| 36C24218U0075-003.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Building | Floor | Fixed Interior Camera | 360 Panoramic Interior Camera | Elevator Camera | Fixed Exterior Camera | 4K 360 Exterior Camera | Cisco Catalyst 3850 | Cisco Catalyst 3650 | 720TB Server | Workstation | Notes |
| 2131L | X4571L | PEHV1000SFN130 | S2550L | WV-X8570N | WS-C3850-48XS-S | WS-C3650-24PD-S | NVR-STG-720TB-4U90 | NVR-T-1-1-VW | |||
| Drop Ceiling | |||||||||||
| Building 1 | Ground | 21 | 1 | 2 | 1 | 1 | Drop Ceiling | ||||
| Building 1 | 1st | 20 | 3 | 1 | Drop Ceiling | ||||||
| Building 1 | 2nd | 24 | 1 | 1 | Drop Ceiling | ||||||
| Building 1 | 3rd | 8 | 1 | Drop Ceiling | |||||||
| Building 1 | Site | 4 | 1 | Drop Ceiling | |||||||
| Tunnel 1-2 | Ground | 1 | Drop Ceiling | ||||||||
| Tunnel 2-3-15 | Ground | 10 | 1 | Drop Ceiling | |||||||
| tunnel 2-7-8 | Ground | 8 | Drop Ceiling | ||||||||
| Building 2 | Site | 2 | 1 | 1 | Some conduit required | ||||||
| Carport | Site | 8 | Some conduit required | ||||||||
| Building 3 | Ground | 27 | 2 | 1 | Drop Ceiling | ||||||
| Building 3 | 1st | 24 | 1 | Drop Ceiling | |||||||
| Building 3 | 2nd | 24 | 1 | Drop Ceiling | |||||||
| Building 3 | Site | 4 | Some conduit required | ||||||||
| Building 4 | Ground | 21 | 1 | 2 | 1 | Drop Ceiling | |||||
| Building 4 | 1st | 2 | 1 | Drop Ceiling | |||||||
| Building 4 | 2nd | 21 | 2 | 1 | 1 | Drop Ceiling | |||||
| Building 4 | Site | 2 | Some conduit required | ||||||||
| Tunnel 4-12 | Ground | 8 | Drop Ceiling | ||||||||
| Tunnel 3-4 | Ground | 2 | Drop Ceiling | ||||||||
| Tunnel 4-5-6 | Ground | 8 | Drop Ceiling | ||||||||
| Building 5 | Ground | 36 | 2 | 2 | 2 | Conduit required, lift required | |||||
| Building 5 | 1st | 31 | 6 | 2 | Conduit required, lift required | ||||||
| Building 5 | Site | 2 | 6 | Some conduit required | |||||||
| Building 6 | Ground | 19 | 1 | 2 | 1 | Drop Ceiling | |||||
| Building 6 | 1st | 23 | 1 | 1 | Drop Ceiling | ||||||
| Building 6 | 2nd | 23 | 3 | 1 | 1 | Drop Ceiling | |||||
| Building 6 | Site | Some conduit required | |||||||||
| Building 7 | Ground | 22 | 1 | 2 | 1 | Drop Ceiling | |||||
| Building 7 | 1st | 1 | 5 | Drop Ceiling | |||||||
| Building 7 | 2nd | 2 | 4 | Drop Ceiling | |||||||
| Building 7 | Site | 3 | Some conduit required | ||||||||
| Building 12 | Ground | 19 | 3 | 2 | 1 | Conduit required in shops, Equipment Rm & Supply rm | |||||
| Building 12 | 1st Fl | 19 | 2 | Drop Ceiling | |||||||
| Building 12 | 2nd | 23 | 2 | Conduit required in Storage Closet | |||||||
| Building 12 | Site | 5 | Some conduit required | ||||||||
| Building 13 | Ground | 33 | 5 | 2 | 1 | Conduit required in Canteen Storage & Food Pantry | |||||
| Building 13 | Site | 1 | 4 | Some conduit required | |||||||
| Tunnel 12-13-16 | Ground | 9 | Drop Ceiling | ||||||||
| Tunnel 13-14 | Ground | 1 | Drop Ceiling | ||||||||
| Tunnel 14-15 | Ground | 6 | 1 | Drop Ceiling | |||||||
| Building 14 | Ground | 20 | 3 | 2 | 1 | Drop Ceiling | |||||
| Building 14 | 1st | 14 | 1 | 1 | Drop Ceiling | ||||||
| Building 14 | 2nd | 2 | Drop Ceiling | ||||||||
| Building 14 | Site | 1 | 4 | Some conduit required | |||||||
| Building 15 | Ground | 22 | 1 | 2 | 1 | 2 | Drop Ceiling | ||||
| Building 15 | 1st | 23 | 1 | 1 | Drop Ceiling | ||||||
| Building 15 | 2nd | 23 | 1 | 1 | Drop Ceiling | ||||||
| Building 15 | Site | 4 | Drop Ceiling | ||||||||
| Building 16 | North | 1 | 5 | 1 | 1 | 10 | 1 | Drop Ceiling | |||
| Building 16 | South | 3 | 1 | Drop Ceiling | |||||||
| Building 17 | 1st | 2 | 2 | 1 | 1 | 4 | 1 | Some conduit required | |||
| Building 17 | 2nd | 2 | Some conduit required | ||||||||
| Building 17 | 3rd | 2 | Some conduit required | ||||||||
| Building 17 | Site | 2 | 3 | Some conduit required | |||||||
| Building 18 | Basement | 2 | 1 | Conduit required, some existing | |||||||
| Building 18 | 1st | 4 | 1 | 1 | 2 | Conduit required, some existing | |||||
| Building 18 | Site | 2 | Conduit required, some existing | ||||||||
| Building 19 | Ground | No cameras | |||||||||
| Building 19 | 1st | No cameras | |||||||||
| Building 20 | Site | 1 | 1 | Some conduit required | |||||||
| Building 23 | Site | 1 | Conduit required and Aerial Cable | ||||||||
| Building 24 | Site | 1 | 1 | 1 | Some conduit required | ||||||
| Building 26 | 1st | 18 | 1 | Drop Ceiling | |||||||
| Building 26 | Site | 1 | 4 | Conduit required in pool/Gym areas-Lift required | |||||||
| Tunnel 25-26 | Ground | 6 | Drop Ceiling | ||||||||
| Tunnel 25-26 | Site | 1 | Drop Ceiling | ||||||||
| Building 27 | 1st | 10 | 1 | Chapel-Conduit required in basement, hard ceilings | |||||||
| Building 27 | Site | 4 | 1 | Some conduit required | |||||||
| Building 28 | Basement | 2 | 1 | Drop Ceiling | |||||||
| Building 28 | 1st | 11 | 1 | 1 | 4 | 1 | 1 | Drop Ceiling | |||
| Building 28 | 2nd | 11 | 1 | Drop Ceiling | |||||||
| Building 28 | 3rd | 8 | 1 | Drop Ceiling | |||||||
| Building 28 | Site | 3 | Some conduit required | ||||||||
| Building 29 | Basement | 2 | 1 | Hard ceilings | |||||||
| Building 29 | 1st | 31 | 2 | 1 | Hard ceilings, some existing conduit can be reused | ||||||
| Building 29 | 2nd | 13 | 1 | Hard ceilings, some existing conduit can be reused | |||||||
| Building 29 | 3rd | 13 | 1 | Hard ceilings, some existing conduit can be reused | |||||||
| Building 29 | Site | 2 | Hard ceilings, some existing conduit can be reused | ||||||||
| Building 30 | Basement | 14 | 1 | Some conduit required | |||||||
| Building 30 | 1st | 9 | 2 | 1 | Drop Ceiling | ||||||
| Building 30 | 2nd | 9 | 1 | Drop Ceiling | |||||||
| Building 30 | 3rd | 9 | 1 | Drop Ceiling | |||||||
| Building 30 | 4th | 8 | 1 | Drop Ceiling | |||||||
| Building 30 | Site | 4 | Some conduit required | ||||||||
| Building 33 | Site | 1 | Some conduit required | ||||||||
| Building 52 | Basement | 9 | 1 | Some conduit required | |||||||
| Building 52 | 1st | 8 | 1 | 1 | 1 | 1 | Drop Ceiling | ||||
| Building 52 | 2nd | 8 | 1 | 1 | Drop Ceiling | ||||||
| Building 52 | 3rd | 7 | 1 | 1 | Drop Ceiling | ||||||
| Building 52 | Site | 1 | 3 | Some conduit required | |||||||
| Main Gate | Site | 5 | 2 | 1 | Use existing pathway for camera on Pole, lift required | ||||||
| Smoke Shed 1 | Ground | 2 | 1 | Hard Ceiling | |||||||
| Smoke Shed 2 | Ground | 2 | 1 | Hard Ceiling | |||||||
| Smoke Shed 3 | Ground | 2 | Hard Ceiling | ||||||||
| Smoke Shed 4 | Ground | 2 | Hard Ceiling | ||||||||
| Location TBD | |||||||||||
| Totals | 822 | 52 | 28 | 32 | 89 | 1 | 56 | 10 | 11 | ||
| Total Cameras | 1023 | ||||||||||
| Notes | |||||||||||
| All Exterior 360 cameras have a corner mount (except for 8 at carport which should have pendant mount) | |||||||||||
| All Interior 360 cameras should have pendant mount (figure average 5' pipe to drop down) | |||||||||||
| All stairwell cameras require conduit | |||||||||||
| Building 23 will require Aerial Cable | |||||||||||
| Elevators will require Traveler Cable |