36C24218Q9459-0005000.docx
DOCX document 22 KB Posted
- Solicitation number
- 36C24218Q9459
About this file
36C24218Q9459 0005 36C24218Q9459 0005.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218Q9459-0003000.docx | DOCX document | |
| 36C24218Q9459-0002000.docx | DOCX document | |
| 36C24218Q9459-0002001.docx | DOCX document | |
| 36C24218Q9459-0001000.docx | DOCX document | |
| 36C24218Q9459-001.docx | DOCX document | |
| 36C24218Q9459-002.pdf | ||
| 36C24218Q9459-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) none 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx
NY
10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx
NY
10468-3904 To all Offerors/Bidders
36C24218Q9459
X x The purpose of this amendment is to answer additional vendor questions. This amendment also updates the CLIN structure to account for unscheduled maintenance that was added via Amendment 4 to this solicitation.
The due date for quotes is hereby extended. The new due date for quotes is Wednesday, August 15, 2018, at 10 AM EST.
Marshand Boone Contracting Officer
1. The initial solicitation states that a Licensed 2A operator must be onsite 8 hours a day
“The contractor shall operate the wastewater treatment plant and system to ensure the system is continuously operational 24 hours per day, 365 days per year. A minimum of one operator, licensed by the State of New York, shall be on duty a minimum of 8 hours per day Monday through Friday and 4 hours during weekends and holidays, 2 hours per day on Saturday and Sunday. License /certification must be equal to or greater than Grade 2A.”
Yet in Amendment 2 Question 12-
“12. Please confirm that weekends hours are four hours on Saturday and four hours on Sunday. page 6, 1.7
Answer: Confirmed. The plant shall be manned from 8 am- 4:30 pm on normal weekdays and 8 am- 12 pm on weekends and holidays. The licensed operator shall be on site no less than 30 days per quarter. “
Which directive holds?
Answer: The plant shall be manned from 8 am- 4:30 pm on normal weekdays and 8 am- 12 pm on weekends and holidays. The licensed operator shall be on site no less than 30 days per quarter. In order to satisfy attendance for a given day, the operator shall be on duty for a full shift. Personnel shall sign in and sign out each day at the Fire Department (Building 15).
1. In Amendment 2 , Question # 1:
“We would like to confirm that we are to bid operating the plant equipment as it is operating now and that any new units operations or equipment will be an addition to the contract. Please provide a list of equipment that is out of service and whether the contractor will be required to restore service under our costs or as a separate repair proposal.
Answer: The contractor should assume that the plant is fully in service. If repairs become necessary, the contractor will be asked to submit a proposal. Resulting work will be implemented under the line item “Unscheduled Maintenance”.”
There is not a line item for Unscheduled Maintenance on the Bid sheet, can you please clarify – Is this a Number we need to generate? This Line Item is again mentioned in Question 3 Please provide a Bid sheet with this line item.
Answer: Please see revised price schedule attached.
1. Addendum 2 Question 17, please clarify;
“17. Please provide historical sludge disposal quantity.
Answer: A line item will be established to pay for sludge removal based on a 6,000 gallon load.”
Does this mean that the bidder is supposed to provide a cost for the sludge hauling? And each load is to be billed against that line item? Please provide a bid sheet with that line item - for each year of the contract.
Answer: Please see revised price scheduled attached.
PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to provide Operation, Maintenance, Preparation of Discharge Monitoring Report (DMR) and Monthly Operating Report (MOP), and Technical Assistance to Manage the Sewage Treatment at the Northport
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to supply Field Inspections, completing Forms and Preparation of Reports in Accordance with SPCC Plan for Storage Tanks and Air Permit Regulations for the Period 10/1/2018 through 9/30/19.
| 0003 |
| 12.00 MO __________________ |
Unscheduled Emergency Maintenance (Base Period)
| 0004 |
| 8.00 QT ___________________ |
Sludge removal of 6,000 gallon load (Base Period)
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to provide Operation, Maintenance, Preparation of Discharge Monitoring Report (DMR) and Monthly Operating Report (MOP), and Technical Assistance to Manage the Sewage Treatment at the Northport Contract Period: Option 1 POP Begin: 10-01-2019 POP End: 09-30-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to supply Field Inspections, completing Forms and Preparation of Reports in Accordance with SPCC Plan for Storage Tanks and Air Permit Regulations for the Period 10/1/2019 through 9/30/20.
Contract Period: Option 1 POP Begin: 10-01-2019 POP End: 09-30-2020
| 1003 |
| 12.00 MO __________________ |
Unscheduled Emergency Maintenance (Option Period One)
| 1004 |
| 8.00 QT __________________ |
Sludge Removal of 6,000 gallon load (Option Period One)
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to provide Operation, Maintenance, Preparation of Discharge Monitoring Report (DMR) and Monthly Operating Report (MOP), and Technical Assistance to Manage the Sewage Treatment at the Northport
Contract Period: Option 2 POP Begin: 10-01-2020 POP End: 09-30-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to supply Field Inspections, completing Forms and Preparation of Reports in Accordance with SPCC Plan for Storage Tanks and Air Permit Regulations for the Period 10/1/2020 through 9/30/2021.
Contract Period: Option 2 POP Begin: 10-01-2020 POP End: 09-30-2021
| 2003 |
| 12.00 MO ________________ |
Unscheduled Emergency Maintenance (Option Period 2)
8.00 QT _________________
Sludge Removal of 6,000 gallon load (Option Period 2)
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to provide Operation, Maintenance, Preparation of Discharge Monitoring Report (DMR) and Monthly Operating Report (MOP), and Technical Assistance to Manage the Sewage Treatment at the Northport Contract Period: Option 3 POP Begin: 10-01-2021 POP End: 09-30-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to supply Field Inspections, completing Forms and Preparation of Reports in Accordance with SPCC Plan for Storage Tanks and Air Permit Regulations for the Period 10/1/2021 through 9/30/2022.
Contract Period: Option 3 POP Begin: 10-01-2021 POP End: 09-30-2022
12.00 MO __________________
Unscheduled Emergency Maintenance (Option Period 3)
8.00 QT ___________________
Sludge Removal of 6,000 gallon load (Option Period 3)
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to provide Operation, Maintenance, Preparation of Discharge Monitoring Report (DMR) and Monthly Operating Report (MOP), and Technical Assistance to Manage the Sewage Treatment at the Northport Contract Period: Option 4 POP Begin: 10-01-2022 POP End: 09-30-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
Vendor to supply Field Inspections, completing Forms and Preparation of Reports in Accordance with SPCC Plan for Storage Tanks and Air Permit Regulations for the Period 10/1/2022 through 9/30/2023.
Contract Period: Option 4 POP Begin: 10-01-2022 POP End: 09-30-2023
| 4003 |
| 12.00 MO ___________________ |
Unscheduled Emergency Maintenance (Option Period 4)
| 4004 |
| 8.00 QT ___________________ |
Sludge Removal of 6,000 gallon load (Option Period 4)
| GRAND TOTAL |