36C24218Q9452-002.pdf
PDF 2 MB Posted
- Attached to
- 620-19-1-555-0004 (VA-18-00084936) VA HUDSON VALLEY HCS HOSPITAL WATER TREATMENT & WASTE WATER TREATMENT
- Solicitation number
- 36C24218Q9452
About this file
36C24218Q9452 WTP - WWTP Attachments.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218Q9452-0002000.docx | DOCX document | |
| 36C24218Q9452-0001000.docx | DOCX document | |
| 36C24218Q9452-001.docx | DOCX document | |
| 36C24218Q9452-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUP FREQUENCY DUE DATE
Lead & Copper 10/ every 12 months (Distribution)
Asbestos 9 Years (per entry source) * 1/31/2024
IOCG1 Prim. & Sec.Table 8B) Yearly per entry point By 12/31/2018
Nitrate Yearly ( if ,5mg/l) * 3/5/2019
TTHM & HAA5 1/plant/quarter (distribution)
DBP Precursors Monthly
POCs (Table 9D) + MTBE Yearly per source *
SOCs (Table 9C) Combined 18 Months per entry source* 12/31/2018
Filter Effluent Turbidity Every 4 hours or continuously
Distribution Turbidity 5 sites per week
Distribution Total Coliform Bacteria 2 per month (Distribution)
Radiological 9 years per entry point *
DBPMax Disinfection Byproducts 1 Sample Yearly 9/30/19
ATTACHMENT – MONITORING REQUIREMENTS WATER PLANT CASTLE POINT
Vendor shall not rely solely on below table, and shall verify with NYSDOH and the federal government in regards to testing frequency and the period in which test must be conducted in order to comply with NYSDOH regulations
ATTACHMENT – SCHEDULE OF CAMPUS LABORATORY WATER ANALYSIS
CASTLE POINT
PARAMETER FREQUENCY
Iron Twice per month Escherichia Coli Twice per month Total Coliform Twice per month Alkalinity- CaCO3 Twice per month pH Twice per month Sediment Twice per month Silicate Twice per month Total Metal Digestion Twice per month
ATTACHMENT – SCHEDULE OF CAMPUS LABORATORY WATER ANALYSIS -
MONTROSE
PARAMETER FREQUENCY
Iron Twice per month Escherichia Coli Twice per month Total Coliform Twice per month Alkalinity- CaCO3 Twice per month pH Twice per month Sediment Twice per month Silicate Twice per month Total Metal Digestion Twice per month
MONTHLY BUILDINGS
January B-20 and B-16
February B-9 and B-35 March B-20 and B-16 April B-9 and B-35 May B-20 and B-16 June B-9 and B-35 July B-20 and B-16
August B-9 and B-35 September B-20 and B-16
October B-9 and B-35 November B-20 and B-16 December B-9 and B-35
ATTACHMENT - SCHEDULE OF BUILDINGS FOR COLIFORM ANALYSIS - CASTLE
POINT
ATTACHMENT – SCHEDULE OF BUILDINGS FOR COLIFORM ANALYSIS - MONTROSE
MONTH BUILDING / LOCATION
October B- 7, 13, 28, 29, MAIN AT BOUNDARY November B- 4, 5, 30 December B- 1, 12, 27, 36 January B- 3, 6, 26, 1ST WATER TOWER # 34 February B- 2, 14, 31 March B- 15, 36, 52 April B- 7, 13, 17, 29, 2nd WATER TOWER # 54 May B- 4, 16, 30 June B- 1, 12, 19 July B- 3, 6, 18, 20, 31 August B- 14, 24, 31 September B- 15, 23, 52
BUILDINGS FREQUENCY
B- 9 WEEKLY
B-20 WEEKLY
B-35 WEEKLY
B-16 WEEKLY
STP WEEKLY
ATTACHMENT - SCHEDULE OF BUILDINGS FOR RESIDUAL CHLORINE
ANALYSIS - CASTLE POINT
ATTACHMENT – PERMIT REQUIREMENTS CASTLE POINT
Meet Current Castle Point WWTP NYS DEC SPDES Permit NY0020087 requirements including but not limited to:
Coliform P/A 44 annually. They are scheduled periodically throughout the year.
Heterotrophic plate count 44 annually. Sites same as above coliform test
In accordance with page 6 of SPDES permit NY0020087 attached. Use the list from the attachment for this section. There are more tests required then outlined below.
BOD5 Influent and Effluent monthly
TSS Influent and Effluent monthly
Nitrogen/Ammonia N monthly
ATTACHMENT – PERMIT LIMITS, LEVEL AND MONITORING CASTLE POINT
SPDES PERMIT NUMBER NY0020087 (PAGE 6)
OUTFALL No. LIMITATIONS APPLY: RECEIVING WATER EFFECTIVE EXPIRING 001 All year unless otherwise noted Hudson River EDPM ExDP
PARAMETER EFFLUENT LIMIT MONITORING REQUIREMENTS FN
TYPE LIMIT UNITS LIMIT UNITS SAMPLE
FREQUENCY
SAMPLE
TYPE
LOCATION
INF. EFF.
Flow Monthly Average
0.40 MGD Continuous Recorder X
BOD 30-Day Arithmetic
Mean
30 mg/l 100 lbs/day 1/month 6 hr Composite
X X 1
BOD 7-Day Arithmetic
Mean
45 mg/l 150 lbs/day 1/month 6 hr Composite
Solids, Suspended
30-Day Arithmetic
Mean
30 mg/l 100 lbs/day 1/month 6 hr Composite
X X 1
Solids, Suspended
7-Day Arithmetic
Mean
45 mg/l 150 lbs/day 1/month 6 hr Composite
X
Solids, Settleable
Daily Maximum
0.3 ml/l Daily Grab X pH Range 6.0-9.0 SU Daily Grab X Nitrogen, Daily Monitor mg/l 1/month Grab X
Ammonia (as N)
Maximum
Temperature Daily Maximum
Monitor Deg C Daily Grab X X
Effluent Disinfection Required:[ ] All Year [X] Seasonal from May 1st to October 1st Coliform, Fecal 30-Day
Geometric Mean
200 No./ 100 ml
1/month Grab X
Coliform 7-Day Geometric
Mean
400 No./ 100 ml
1/month Grab X
Coliform 6 Hr Geometric
Mean
800 No./ 100 ml
See Footnote See Footnote
X 2
Coliform Individual Sample
2400 No./ 100 ml
See Footnote See Footnote
X 2
Coliform Daily Maximum
.375 Mg/l Daily Grab X 3,4
CASTLE POINT FOOTNOTES:
(1) AND EFFLUENT SHALL NOT EXCEED 15% AND 15% OF INFLUENT CONCENTRATION VALUES FOR
BOD & TSS RESPECTIVELY.
(2) THIS IS AN INTERSTATE ENVIRONMENT COMMISSION (IEC) REQUIREMENT. THE PERMITTEE IS
NOT REQUIRED TO PERFORM THIS SAMPLING BUT SHALL BE REQUIRED TO MEET THE PERMIT
LIMIT AT ALL TIMES. EPA, DEC OR IEC MAY PERFORM SAMPLING.
ATTACHMENT – PERMIT REQUIREMENTS MONTROSE
Meet Current Montrose WWTP NYS DEC SPDES Permit NY0021326 requirements including but not limited to:
Coliform P/A 44 annually. They are scheduled periodically throughout the year.
Heterotrophic plate count 44 annually. Sites same as above coliform test
In accordance with page 3 of SPDES permit NY002136 attached. Use the list from the attachment for this section. There are more tests required then outlined below.
BOD5 Influent and Effluent monthly
TSS Influent and Effluent monthly
Nitrogen/Ammonia N monthly
Total Coliform monthly May 1st -Oct 31st (during chlorination period)
Fecal Coliform monthly May-Oct (during chlorination period)
ATTACHMENT 3 – PERMIT LIMITS, LEVEL AND MONITORING MONTROSE
SPDES PERMIT NUMBER NY0021326 (PAGE 3)
OUTFALL No. LIMITATIONS APPLY: RECEIVING WATER EFFECTIVE EXPIRING 001 All year unless otherwise noted Hudson River EDPM ExDP
PARAMETER EFFLUENT LIMIT MONITORING REQUIREMENTS FN
TYPE LIMIT UNITS LIMIT UNITS SAMPLE
FREQUENCY
SAMPLE
TYPE
LOCATION
INF. EFF.
Flow Monthly Average
0.40 MGD Continuous Recorder X
BOD 30-Day Arithmetic
Mean
30 mg/l 100 lbs/day 1/month 6 hr Composite
X X 1
BOD 7-Day Arithmetic
Mean
45 mg/l 150 lbs/day 1/month 6 hr Composite
Solids, Suspended
30-Day Arithmetic
Mean
30 mg/l 100 lbs/day 1/month 6 hr Composite
X X 1
Solids, Suspended
7-Day Arithmetic
Mean
45 mg/l 150 lbs/day 1/month 6 hr Composite
X
Solids, Settleable
Daily Maximum
0.3 ml/l Daily Grab X pH Range 6.0-9.0 SU Daily Grab X Nitrogen, Daily Monitor mg/l 1/month Grab X
Ammonia (as N)
Maximum
Temperature Daily Maximum
Monitor Deg C Daily Grab X X
Effluent Disinfection Required:[ ] All Year [X] Seasonal from May 1st to October 1st Coliform, Fecal 30-Day
Geometric Mean
200 No./ 100 ml
1/month Grab X
Coliform 7-Day Geometric
Mean
400 No./ 100 ml
1/month Grab X
Coliform 6 Hr Geometric
Mean
800 No./ 100 ml
See Footnote See Footnote
X 2
Coliform Individual Sample
2400 No./ 100 ml
See Footnote See Footnote
X 2
Coliform Daily Maximum
.375 Mg/l Daily Grab X 3,4
MONTROSE FOOTNOTES:
(1) AND EFFLUENT SHALL NOT EXCEED 15% AND 15% OF INFLUENT CONCENTRATION VALUES FOR
BOD & TSS RESPECTIVELY.
(2) THIS IS AN INTERSTATE ENVIRONMENT COMMISSION (IEC) REQUIREMENT. THE PERMITTEE IS
NOT REQUIRED TO PERFORM THIS SAMPLING BUT SHALL BE REQUIRED TO MEET THE PERMIT
LIMIT AT ALL TIMES. EPA, DEC OR IEC MAY PERFORM SAMPLING.
(3) AN INTERIM TOTAL RESIDUAL CHLORINE LIMIT OF 0.5-2.0 MG/L IS IN EFFECT UNTIL THE DISINFECTION SYSTEM IS UPGRADED TO MEET THE FINAL EFFLUENT LIMIT OF 0.375 MG/L IN
ACCORDANCE WITH THE SCHEDULE OF COMPLIANCE ON PAGE 4 OF THIS PERMIT
(4) FINAL EFFLUENT LIMIT
| WTP - WWTP Attachments |
| WTP - WWTP Attachments |
| Attachments |
| Water Testing Attachments |
| Attachments |
| ATTACHMENT - SCHEDULE OF BUILDINGS FOR COLIFORM ANALYSIS - CASTLE POINT |
| Sheet1 |
Attachments
| WTP - WWTP Attachments |
| WTP - WWTP Attachments |
| RESIDUAL CHLORINE ANALYSIS |
| Sheet1 |
| WWTP |
| WTP - WWTP Attachments |
| WTP - WWTP Attachments |
| Attachments |
| Permit to Operate a Public Water Supply 2017 |
| Attachment C SPDES |
| WTP - WWTP Attachments |
| CP SPDES Permit |
File details come from the government source that posted it.