About this file

36C24218Q0214 36C24218Q0214_1.docx

View the file

Other files

File Type Posted
36C24218Q0214-001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FedBizOpps Combined Synopsis/Solicitation Notice

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

RESPONSE DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field FedBizOpps Combined Synopsis/Solicitation Notice Rev. March 2010 H Manhattan Campus Chemical Fume Hoods / Biosafety Cabinets Testing, Certification and Repair Services (VA-18-00013274) 10468-3904 36C24218Q0214 02-02-2018 N 541990 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904 New York Campus New York Harbor Healtcare System 423 East 23rd Street New York, NY 10010-5011

SITE-SPECIFIC PERFORMANCE WORK STATEMENT

DEPARTMENT OF VETERANS AFFAIRS

NY HARBOR HEALTHCARE SYSTEM Manhattan Campus

1. SCOPE OF WORK. The contractor shall provide all labor, personnel, supervision, equipment, tools, and all materials necessary to perform preventive maintenance, repair and certification on the chemical fume hoods / biological safety cabinets in Department of Veterans Affairs New York Harbor Healthcare System Manhattan Campus. The frequency of the PM is Semi-annual.

The service contract period to be partial base year + 4 (Four) Option years.

Preventive Maintenance Procedures:

The contractor will contact the POC at least two weeks prior to their arrival with a list of the fume hoods and/or biological safety cabinets that are to be tested and certified so the POC can make arrangements with the affected services. Contractor will report to the POC upon arrival at the facility and inform POC of the fume hoods and/or biological safety cabinets that are to be tested and certified for the day. In the event of a fume hood failure due to poor exhaust, the contractor will inform the POC who will then arrange for the repair of the exhaust system and the rescheduling of the fume hood testing and certification. Contractor will be responsible for fume hood filter replacement as needed. The contractor will be responsible for the proper operation and repairs of the sash, motor, belts, fan unit, electrical connections and VAV where applicable. The contractor will also insure proper calibration on existing self-monitoring devices.

Fume Hoods /Biological Safety Cabinets are to be tested in accordance with OSHA, AIHA/ANSI. Hoods are to be certified semiannually or annually as required. Primary test to be performed are inflow velocity profiling as per ANSI/AIHA Z9.5-2003 American National Standards for Laboratory Ventilation 6.3.3 Face Velocity Tests. The average face velocity shall be determined by the method described in the ANSI/ASHRAE 110-1995 Method of Testing Performance of Laboratory Fume Hoods. Face velocity measurements shall be made by dividing the hood opening into equal area grids with sides measuring no more than 12 in. (30.5 cm). The tip of the probe shall be positioned in the plane of the sash opening and fixed (not handheld) at the approximate center of each grid. Grid measurements around the perimeter of the hood opening shall be made at a distance of approximately 6 in. (15.2 cm) from the top, bottom, and sides of the opening enclosure. The average face velocity shall be the average of the grid velocity measurements. Each grid velocity shall be the average of at least 10 measurements made over at least 10 seconds. The plane of the sash shall be located at the midpoint of the sash frame depth.

ANSI/ASHRAE 110-1995 ASHRAE Guideline: Method of Testing Performance of Laboratory Fume Hoods. 6.2 Face Velocity Measurement. A 1.0 ft2 imaginary grid pattern shall be formed by equally dividing the design hood opening into vertical and horizontal openings. Velocity readings shall be taken with a calibrated anemometer. For VAV hoods, measurements should be made at 25, 50, and 100% sash openings. A hood is considered certified when the average face velocity at twelve inches working sash height is between 80 – 120 feet per minute. Testing for Pharmacy equipment shall be performed in accordance with USP Chapter 797; CETA CAG-002; and ISO14644-1:1999 standards and requirements for proper operation of this equipment with regard to minimizing potential contamination and exposure during sterile compounding and preparation of hazardous drugs.

Routine performance tests shall be conducted at least semi-annually or annually or whenever a significant change has been made to the operational characteristics or relocation of the equipment. A hood that is found to be operating with an average face velocity more than 10% below the designated average face velocity shall be labeled as OUT OF SERVICE and corrective actions shall be taken by VA staff to increase flow. Each hood shall be posted with a notice giving the date of the routine performance test, the measured average face velocity and initialed by the technician. If it is taken OUT OF SERVICE it shall be posted with an out-of-service notice.

Repair Procedures: The contractor must be able to respond to emergency repairs within one business day in order to restore equipment back to first-class operating condition. Contractor will make allowances for revisits for clean room and hood certification due to failure to certify. Contractor will schedule certification of the equipment once repairs have been completed.

1.2 PERSONNEL QUALIFICATIONS. Before allowing employees to start work under the terms of this contract, the Contractor shall ensure that employees have the required qualifications and, if applicable, have the required current and valid professional certifications and licenses in compliance with federal, state, and local environmental requirements or laws. Personnel operating motor vehicles will have a valid state driver’s license and abide by all NY Harbor Healthcare System traffic laws, i.e. hands-free cell phone use while driving, and parking requirements. When requested, the Contractor will provide the CO and on-site COR with information on the qualifications or certifications for employees and sub-Contractors. Licensed journeyman tradespersons shall be licensed for their respective trades in accordance with city, county, state or federal requirements. Contactor will ensure all certificates; licenses and bonds are kept current and valid. All licenses and certifications will be submitted to the on-site COR and QAE annually or as requested. Associated training, licensing and certifications’ expenses shall be borne by the Contractor.

1.6. DELIVERABLES: At the completion of each day’s testing, the contractor will give the POC written reports for the hoods that were inspected indicating whether the unit has been passed and certified or failed with description of the deficiencies noted. Service reports must be signed by both service provider and POC at completion of work. An electronic version of same shall be sent to the POC. In addition, stickers will be affixed to equipment indicating date certified and due date of next inspection.

1.7 EVALUATION FACTORS: The facility will evaluate all proposals and contractors based on the following factors:

1.7.1 Technical Proposal:

a) Demonstrate an understanding and acceptance of the scope of work and RFP requirements.

1. Demonstrate the ability to meet the requirements of the scope of work.

1.7.2 Team Arrangements & Subcontracting Plan:

a) Provide Resumes of Key Personnel

b) Provide Information Flow and Delegation of Authority and Responsibility to execute maintenance tasks

1.7.3 Past Performance:

a) The contractor perform work that is the same or similar in nature, size, and complexity to the services being procured under this Solicitation.

b) Recent Past Performance

1. Relevant Post Performance

d) Past Performance Confidence Rating

1.7.4 Sub- Contractors:

1. The sub-contractor will identify his Key Subcontractors

1.7.5 Price Proposal:

1. Price will be evaluated to determine whether it is reasonable and if it reflects the offeror understands of the work. This factor will be evaluated utilizing price analysis. Analysis will include review of price reasonableness and balanced pricing. Offeror’s are cautioned that "materially unbalanced" prices and/or unreasonably high or low prices may cause your proposal to be deemed unacceptable and rejected.

1.7.6 Quality Control Plan:

a) VA Engineering will evaluate the offeror’s ability to provide services that met the Hospital’s quality requirements. The Offeror’s performance will be examined to determine whether the quality of service necessary to provide conformance to contract requirements was met.

1.7.7 Contractor’s Capabilities:

Contractor will have resources (employees, supervisors, material and equipment) dedicated specifically to the performance of this contract.

1.8 VA Privacy Training:

Contractors coming on site must read and sign “VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or Use to VA Sensitive Information”. The contractor shall provide to the COR a copy of the signed training on an annual basis.

ATTACHMENT

“A” Equipment List

Campus

Floor/Room
Serial #
MFG
Model
Type
Class
Testing Frequency

NY

6078-S
6078-S-FH-1
Custom
Fume Hood
Fume Hood
NA
Annual

NY

6155
110542791
LABCONCO
3450001
A2
II
Annual

NY

18116B-DN
96546
Baker
SG 403a
A2
II
Annual

NY

18116B-DN
81332
Baker
SG 603
A2
II
Annual

NY

18th Floor P3 lab
sl46932v
Baker
SG 600
A2
II
Semi-annual

NY

18th Floor P3 lab
sl46935v
Baker
SG 600
A2
II
Semi-annual

NY

12th Floor South
104696
BAKER
SS-500/Isolator
Clean Bench
NA
Semi-annual

NY

Ground floor Pharmacy
86256
Baker
SS-500/Isolator
Clean Bench
NA
Semi-annual

NY

12TH FL PHARM
76405
Baker
SG- 303
A2
II
Semi-annual

NY

12102S
86392
Baker
CS-500
Single Pass
I
Semi-annual

NY

18147B-N
81337
Baker
SG 603
A2
II
Annual

NY

18108-N
10587
Fisher Hamilton
54L933
A
II
Annual

NY

18064
58516
Baker
SG 400 II
A2
II
Annual

NY

13026W
BM16135V
Baker
B-315
A2
II
Annual

NY

18147A-N
81578
Baker
SG 603
A2
II
Annual

NY

13023-W
13120-240
Forma
1126
A1
II
Annual

NY

18151-N
18151-N-FH-2
Duralab
FH-4Ft
Fume Hood
NA
Annual

NY

18064-S
21779
Hamilton
F.H.
Fume Hood
NA
Annual

NY

18147A-N
81589
Baker
SG 403a
A2
II
Annual

NY

18064-S
58419
BAKER
SG 400 II
A2
II
Annual

NY

18064-S
21780
Hamilton
F.H.
Fume Hood
NA
Annual

NY

18091B-S
61676
Nuaire
NU 425-600
A2
II
Annual

NY

13027W
L32
Duralab
FH
Fume Hood
NA
Annual

NY

13020W
L26
Duralab
FH
Fume Hood
NA
Annual

NY

18123-N
94844
Baker
SG- 303
A2
II
Annual

NY

18064-S
21781
Hamilton
F.H.
Fume Hood
NA
Annual

NY

18055A-S
62551
Baker
SG 400
A2
II
Annual

NY

18055A-S
18-18055A-S-FH-1
Duralab
Fume Hood
Fume Hood
NA
Annual

NY

18003-W
SL-32002V
Baker
SG 600
A2
II
Annual

NY

18-055c
041128669-AJ
LABCONCO
36213 04 DELTA
A2
II
Annual

NY

6W-026
68208
Baker
SG 403
A2
II
Annual

NY

16029-W
13200-488
Forma
1128
A1
II
Annual

NY

6W-026
E-38091V
Baker
EG 3252
Clean Bench
NA
Annual

NY

18-055c
59090200012
Labconco
3460009 LS
A2
II
Annual

NY

16036-W
SL34400V
Baker
SG 400
A2
II
Annual

NY

6026-W
SG-22308V
Baker
VBM 400
A2
II
Annual

NY

18111B-N
97566
Baker
SG- 603A-HE
A2
II
Annual

NY

6W-026
SL31410V
Baker
SG 400
A2
II
Annual

NY

16037W
16037WFH1
Duralab
Fume Hood
Fume Hood
NA
Annual

NY

16038W
16038WFH1
Duralab
FH
Fume Hood
NA
Annual

NY

6152N
6640-5226
Labconco
36213
A2
II
Annual

NY

16035-W
16035-W-FH-1
Duralab
FH-4Ft
Fume Hood
NA
Annual

NY

16021-W
L-37
Unknown
Fume Hood
Fume Hood
NA
Annual

NY

16047-W
L-46
Unknown
Fume Hood
Fume Hood
NA
Annual

NY

16013FW
L36
Duralab
FH
Fume Hood
NA
Annual

NY

18112-N
SL-46934V
Baker
SG 600
A2
II
Annual

NY

6074s
99709
Baker
SG- 303
A2
II
Annual

NY

13024-W
041229686aa
Labconco
36205-04DS
A2
II
Annual

NY

13024-W
L-29
Unknown
Fume Hood
Fume Hood
NA
Annual

NY

13024-W
L-28
Unknown
Fume Hood
Fume Hood
NA
Annual

NY

6026W
6026w-fh-1
Custom
Fume Hood
Fume Hood
NA
Annual

NY

West-18019B
010288
Lab Products
NA
Clean Bench
NA
Annual

NY

West-18019B
11141-47
Forma
1894
Clean Bench
NA
Annual

NY

6161N
L-16
LABNCONCO
UNKNOWN 2FTFH
Fume Hood
NA
Annual

NY

WEST WING AUTO CLAVE ROOM
136123030210
NUAIRE
607-400
Clean Bench
NA
Annual

NY

18019A-W
126121030210
NUAIRE
607-400
Clean Bench
NA
Annual

NY

18025-W
136122030210
NUAIRE
607-400
Clean Bench
NA
Annual

NY

2193C/Dental Lab
15912
Captair
5000C
Fume Hood
NA
Annual

NY

18030-W
80729
Baker
AG4 ATS
Clean Bench
NA
Annual

NY

18029-W
050739691C
ALLENTOWN
3820005
Clean Bench
NA
Annual

NY

18019-c
81384
Labproducts
NA
Clean Bench
NA
Annual

NY

18032-W
143090-9701
Labproducts
Dump Station
Clean Bench
NA
Annual

NY

6026W
6026W-FH-2
Duralab
Fume Hood
Fume Hood
NA
Annual

NY

14022-W
14022-W-FH-1
Labconco
F.H.
Fume Hood
NA
Annual

NY

6141-N
L-12
TSS
Fume Hood
Fume Hood
NA
Annual

NY

6141-N
236168/L11
Labconco
Fume Hood
NA
Annual

NY

6141-N
195739/L13
Labconco
Fume Hood
Fume Hood
NA
Annual

NY

2193-C/Dental Lab
L-10
TSS
Fume Hood
Fume Hood
NA
Annual

NY

6049S
980840069B
Labconco
69101-00
Fume Hood
NA
Annual

NY

Autopsy Room
L-81
Labconco
Fume Hood
Fume Hood
NA
Annual

See attached document: S02-SOLICITATION.

File details come from the government source that posted it.