About this file

36C24218B0086 00004 RFI with drawings_RESPONSE (2).pdf

View the file

Other files

File Type Posted
36C24218B0086-00004000.docx DOCX document
36C24218B0086-00004002.pdf PDF
36C24218B0086-00004003.pdf PDF
36C24218B0086-00003000.docx DOCX document
36C24218B0086-00003001.pdf PDF
36C24218B0086-00002001.pdf PDF
36C24218B0086-00002000.docx DOCX document
36C24218B0086-00001000.docx DOCX document
36C24218B0086-00001001.pdf PDF
36C24218B0086-002.pdf PDF
36C24218B0086-004.pdf PDF
36C24218B0086-003.pdf PDF
36C24218B0086-001.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

700 Nicholas Blvd. | Suite 300 | Elk Grove Village, Illinois 60007 California | Connecticut | Colorado | Florida | Louisiana | Pennsylvania | Virginia | Wisconsin

847.952.9362 | www.bancroft-ae.com

RESPONSE TO RFI

January 5, 2018

To: Eugene Seiter, General Engineer P&D/ Facility Management VA New Jersey Health Care System Office: (973) 676-1000 Ext. 3030 Fax: (973) 395-7028 Cell: (973) 580-0681 eugene.seiter@va.gov

Contract No.: VA243-16-C-0064

Station Project No.: 561-15-300

Bancroft Project No.: 16-105

Project Name: East Orange Improve Outpatient Environment 4D

RE:

1. From Robert Lurz, Seawolf Construction (January 4, 2018):

The finish schedule does not agree with a lot of what is shown on the finish floor plans.

Please advise which is correct.

a. In the Finish Plan Legend shown on floor finish plans it shows WSF-1 only but on the finish schedule it shows WSF-2 and WSF-3. What are the colors for WSF-2/3?

b. On the floor finish plans the transition tag TS-4 is a welded seam. This can only be accomplished with sheet vinyl to sheet vinyl. In many areas it shows TS-4 welded seams at LVT to LVT. According to flooring subcontractors this cannot be done. Please advise.

Summary

RFI RESPONSE:

1a. Refer to revised sheets I-101, I-102, I-103 and I-400 for revisions and clarifications to finish flooring.

1b. Refer to revised sheets I-101, I-102 and I-103 for revised transition details.

ATTACHMENTS:

1. Sheet I-101

2. Sheet I-102

3. Sheet I-103

4. Sheet I-400

700 Nicholas Blvd. | Suite 403 | Elk Grove Village, Illinois 60007 California | Connecticut | Colorado | Florida | Louisiana | Pennsylvania | Virginia | Wisconsin

847.952.9362 | www.bancroft-ae.com

Prepared By: Jennifer Villena-Johnson

Copies To: File, Pat Bailey