36C24126R0069 0001.pdf
PDF 194 KB Posted
- Attached to
- 608-20-101 Loop Road Phase One West
- Solicitation number
- 36C24126R0069
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs, Network Contracting Office 1, VA Central Western Massachusetts HCS. The amendment number is 0001, effective July 21, 2026, for solicitation 36C24126R0069. The amendment's purpose is to provide attachments to the original solicitation issued on July 21, 2026, that failed to transmit during the initial submission, along with a new attachment titled Environmental Assessment Loop Road Part Four.pdf. The proposal due date remains unchanged at August 28, 2026, at 3:00 PM EST.
The amendment lists 16 attached documents required for this infrastructure project, including environmental assessments (Parts Four, Five, and Six), a PCRA document, an itemized cost breakdown (608-20-101), wage determination information (NH20260021 05182026), loop road and utility infrastructure drawings (Parts One and Two), and comprehensive specifications covering quality control and general requirements, commissioning, HVAC systems, electrical systems, cement and concrete, and storm sewer utilities. The project number is 608-20-101. Offerors must acknowledge receipt of this amendment prior to the specified deadline using one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each offer copy, or submitting separate written or electronic communication with solicitation and amendment references.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0001 07-21-2026 608-20-101
36C241
Department of Veterans Affairs network Contracting Office 1
VA Central Western Massachusetts HCS
421 North Main St
Leeds MA 01053 MA 01053
36C241 same as Block 6
To all Offerors/Bidders 36C24126R0069
07-21-2026 X
X X x
The purpose of this amendment is to provide the attachments to the original Solicitation submitted on 07/21/2026, that failed to transmit and provide new attachment Environmental Assessment Loop Road Part Four.pdf
Proposal due date remains 08/28/2026 at 3PM EST.
Chelsea Rodrigue
Contracting Officer
See attached document: Environmental Assessment Loop Road Part Four 02.
See attached document: Environmental Assessment Loop Road Part Five.
See attached document: Environmental Assessment Loop Road Part Six.
See attached document: _PCRA.
See attached document: Itemized Cost Breakdown 608-20-101.
See attached document: Wage Determination NH20260021 05182026.
See attached document: Loop Road and Utility Infrastructure Drawings Part One 02.
See attached document: Loop Road and Utility Infrastructure Drawings Part Two.
See attached document: Specifications Part One Quality Control and General
Requirements.
See attached document: Specifications Part Two General Commissioning 1 of 3.
See attached document: Specifications Part Two general Commissiong 2 of 3.
See attached document: Specifications Part Two General Commissiong 3 of 3.
See attached document: Specifications Part Three HVAC.
See attached document: Specifications Part Four Electrical Systems.
See attached document: Specifications Part Five Cement and Concrete.
See attached document: Specifications Part Six Storm Sewer Utilities.
File details come from the government source that posted it. Updated .