36C24125R0098 0002.docx

DOCX document 19 KB Posted

Attached to
Y1DA--402-24-007 B200E Lobby Flooring
Solicitation number
36C24125R0098
Issued by

About this file

This document is an amendment to a solicitation for a construction project at the VA Maine Health Care System in Togus, Maine. The procurement (Solicitation Number 36C24125R0098) involves removing and replacing lobby flooring in building 200E, with specific requirements including phased work in occupied areas and potential off-hours demolition. Key clarifications in the amendment address project details such as staffing (Project Superintendent can potentially cover Safety and Health Officer roles but cannot simultaneously serve as QA/QC), work environment conditions, and past performance submission guidelines.

The amendment includes responses to 17 contractor questions covering critical aspects like asbestos concerns (VA confirms no anticipated asbestos abatement), construction barriers (hard barriers required, STARC panels acceptable), and past performance submissions. The project scope involves approximately 4,650 square feet of flooring replacement, with work to be conducted while surrounding rooms remain occupied. Contractors are advised that past performance documentation should be recent (within 5 years), relevant, and can include ongoing projects that are substantially complete.

View the file

Other files

File Type Posted
Site Visit Sign in 06232025.pdf PDF
36C24125R0098 0001.docx DOCX document
402-24-007 BLD 200E Lobby Flooring ICRA.pdf PDF
402-24-007 B200E Lobby Flooring PCRA.pdf PDF
36C24125R0098_1.docx DOCX document
WD ME20250009 01032025.pdf PDF
RM Verbiage for 65006 SOW.docx DOCX document
Specifications .pdf PDF
SOW Attachment 2- Togus Campus Map.pdf PDF
SOW Attachment 1 Seasonal Influenza with Vaccines .pdf PDF
SOW - B200E Lobby Flooring.docx DOCX document
Highlighted Floor Plan.pdf PDF
SOW Attachment 3- PIV Badge Template .pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

OF PAGES

NOTICE: Offerors must acknowledge receipt of this amendment in writing, by the date and time specified for proposal submissions or the date and time specified in Block 6, whichever is later. IF YOUR ACKNOWLEDGE IS NOT RECEIVED AT THE DESIGNATED LOCATION BY THE SPECIFIED DATE AND TIME, YOUR OFFER MAY BE REJECTED. If, by virtue of this amendment, you wish to change your offer, such change must make reference to the solicitation and this amendment and be received prior to the date and time specified in Block 6.

1. SOLICITATION NUMBER

2. SOLICITATION DATE

3. AMENDMENT NUMBER

4. AMENDMENT DATE

5. ISSUED BY

6. DUE DATE

THIS AMENDMENT DOES NOT CHANGE THE DATE BY WHICH OFFERS ARE DUE UNLESS A DATE AND

TIME IS INSERTED BELOW.

A. DATE

B. TIME

7. FOR INFORMATION CALL

A. NAME

C. E-MAIL ADDRESS

B. TELEPHONE

AREA CODE

PHONE NUMBER

8. DESCRIPTION OF AMENDMENT

Except as provided herein, all terms and conditions of the solicitation remain unchanged and in full force and effect.

In lieu of other written methods of acknowlegdment, the offeror may complete Blocks 9 and 10 and return this amendment to the address in Block 5.

9. NAME AND ADDRESS OF OFFEROR

10A. OFFEROR

10B. NAME OF SIGNER

10C. TITLE OF SIGNER

UEI:

EFT:

10D. DATE

AUTHORIZED FOR LOCAL REPRODUCTION

OPTIONAL FORM 309 (9-97)

Prescribed by GSA - FAR (48 CFR) 53.215-1(g) (No collect calls) (Signature of person authorized to sign)

I. AMENDMENT

II. ACKNOWLEDGMENT OF AMENDMENT

AMENDMENT OF SOLICITATION

(Negotiated Procurements) 36C24125R0098 06-13-2025 Department of Veterans Affairs Network Contracting Office 1 VAMC Togus 1 VA Center Augusta

ME

04330 Diane C. Davis 207-623-8411 x3357 diane.davis2@va.gov The purpose of this amendment is to:

a. Include RFI questions and answers.

b. All other terms and conditions remain unchanged.

To all Offerors/Bidders

RFI Questions and Answers 402-24-07 Lobby Floors

Q1. The Specification 02 82 13.19 Asbestos Floor Tile and Mastic Abatement, page 02 82 11 – 1, B. Extent of Work: 2., states there is 4650sf of ACM flooring & mastic to be abated, the Statement of Work does not mention any ACBM abatement. Please clarify if there are any hazardous materials present which will require abatement.

A1. The VA expects no asbestos abatement as part of this project.

Q2. Will this project require a separate Project Superintendent and SSHO, or will a competent Project Superintendent be allowed to assume the duties of both positions?

A2. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties.

Q3. Will the rooms surrounding the proposed work areas be occupied during removal and replacement of the floors?

A3. Rooms surrounding the proposed work areas will be occupied during removal and replacement of floors. Phasing will be required.

Q4. Should the contractor factor in off hours work for the demolition phases of the contract?

A4. Yes. See noise and vibration language within specifications.

Q5. On page 8 of the solicitation, under Past Performance, it reads: 1. Offeror shall use the attached form titled “Past Performance Questionnaire” (see RFP Attachment 9) to obtain past performance information from at least two prior contracts…” However, Attachment 9 is missing from the original bid documents. We understand from previous solicitations that this is just a template, but we’d like to confirm if there’s a specific form the Government would like us to use.

A5. There is no specific form, the attachment is just a template to use if you need to.

Q6. Is it acceptable to submit previously completed PPQs from past projects, or do new PPQs need to be submitted?

A6. Past performance should relevant and recent. Per the solicitation completed within 5 years and similar in scope and magnitude.

Q7. Do projects presented for Past Performance and/or Experience need to be complete, or can they be ongoing and substantially complete (at least 50%)?

A7. See above A6.

Q8. If projects need to be complete, would an active multi-year contract—such as a regional preventative maintenance and service contract or BPA with discrete, completed task orders—be considered compliant and relevant, provided it includes scopes of work that are directly applicable to the solicitation?

A8. Completed task orders are acceptable.

Q9. Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? If no to the question, will the SSHO need to be full-time for this project?

A9. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties.

Q10. Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? If no to the question, will the QA/QC need to be full time for this project?

A10. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties.

Q11. Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC?

A11. No.

Q12. The header dates of this SOW are dated 11/18/2022. Please confirm this is a 2025 SOW requirement.

A12. The SOW attached to the RFP is the most recent.

Q13. Please verify the GOV anticipates asbestos in this project, the SOW does not speak to asbestos however the specs do at Section 02 82 11.

A13. The VA expects no asbestos abatement as part of this project.

Q14. In the SOW page 1 of Section 6 2.1 indicates approximately 4,650 sqft of space, would you consider adding 52.211-18 Variation of quantity to this solicitation?

A14. 52.211-18 only applies to IDIQ contracts.

Q15. Page 6 of 6 #18 Attachments: Attachment #1 SOW Seasonal influenza with vaccines : VHA Directive 1192.01 speaks to Health Care Personnel, Page 8(p) VA Contracting Officers: This section implies, “VA contracting officers responsible for on-site HCP contract will inform the contractors about this directive and its requirements.” However, this project is not an on-site contract for HCP. Section C page 3, indicated that flu season is between Dec 1 through March 31, please validate that is not a mandatory requirement.

A15. VA confirms this is not an on-site HCP contract.

Q16. Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements?

A16. Construction barriers shall be hard barriers and must be completed in a manner that prevents dust release. Barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage. The VA accepts STARC panels.

Q17. Was an asbestos test done of the floor? Do you know when the flooring was installed?

A17. The VA does not anticipate any asbestos containing materials, testing was conducted in April 2024. We do not know when the flooring was installed.