This document is a comprehensive electrical inspection and testing services report for the Togus VA Maine Medical Center in Augusta, Maine. The report details a tri-annual electrical inspection conducted by AMP Quality Energy Services from January 6-27, 2023, under Contract #36C24122P0923, with the primary objective of performing visual mechanical inspections, labeling, photographing, infrared scanning, and testing of electrical equipment across multiple buildings.
The inspection covered electrical systems in 15 buildings, including transformers, switchgears, distribution panels, auto transfer switches, and generators. Key findings include numerous recommendations for equipment maintenance and upgrades, such as cleaning MV switchgear, installing surge arrestors, updating arc flash labels, addressing anchoring issues, and replacing equipment that has exceeded its useful life expectancy. Some critical observations include dirty and dusty conditions in medium voltage equipment, potential transformer cooling fin damage, and electrical panels with missing fasteners and outdated safety labels. The report notes that while the overall electrical system appears to be in good condition, there are inherent issues due to age and environmental conditions that require attention.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.docx | DOCX document | |
| 36C24125Q0364_3.docx | DOCX document | |
| Attachment 1 - Questions and Answers.pdf | ||
| Amendment 0001.docx | DOCX document | |
| 36C24125Q0364_2.docx | DOCX document | |
| Combined Synopsis-Solicitation.docx | DOCX document | |
| 36C24125Q0364_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tri-annual Electrical Inspections & Testing
Services
Togus VA Maine Medical Center
Augusta, ME 04330
Test Report February 9th, 2023
Job# 2498
Contract #: 36C24122P0923
CO: Issa Shawki
COR: Karen Ainsworth
Introduction Urgent Issues & Recommendations General Issues & Recommendations
Building 209 Test Sheets Building 210 Test Sheets Building 203 Test Sheets Building 248 Test Sheets Building 235 Test Sheets Building 240 Test Sheets Building 204 Test Sheets Building 232 Test Sheets Building 245 Test Sheets Building 244 Test Sheets Building 202 Test Sheets Building 212 Test Sheets Building 205 Test Sheets Building 207 Test Sheets Building 206 Test Sheets
Building Quarters Test Sheets Building 238 & 239 Test Sheets Building 249 Test Sheets Building 200 Test Sheets Building 200E Test Sheets
Table of Contents
Section 1
Introduction
February 9th, 2023
Job# 2498
Contract #: 36C24122P0923
CO: Issa Shawki
COR: Karen Ainsworth
Tri-annual Electrical Inspections & Testing Services at the Togus VA Maine Medical Center located at 1 VA Ctr, Augusta, ME 04330
Hello VA, AMP personnel, Ryan Echols, Rusty Bennett, Lex Wright, Caleb Hipp and Matt Prombo participated in this project and the onsite work occurred from 1/6/23 to 1/27/23. AMP performed visual mechanical inspections, labeling, photographing, IR scanning and testing required for all equipment listed on the proposed schedule/equipment list based off of one line diagrams provided. Additionally, new replacement or added equipment to the system in various buildings were added as time permitted. The only work that was not completed under this mobilization was the 4-hour test of the Essential Electrical System (EES) and all of the MV switchgear breakers and relays. The 4-hour test of the EES was requested by VA staff to be performed in April during better weather conditions and to eliminate any potential issues that could be encountered during inclement weather. Two team members will be back on site from
4/20/23 to 4/21/23 to complete the EES test and remaining MV switchgear work. The final report will be updated with these findings and provided at that time.
Overall, the electrical system appears to be good condition and being maintained. With all older compounds, inherent issues will be present, simply due to age and environmental conditions.
Below is a list of urgent issues and recommendations and general issues that the AMP team has identified. If any issues were found during the inspections and testing, the AMP and VA Team performed corrective actions if feasible to perform during the outages. It is important to note this section does not include all of the issues, only more urgent and general issues. For a detailed list of all the findings, please review each test sheet further in this report that was created for each piece of equipment inspected. IR scans and oil sampling reports have been added to their respective equipment test sheet. All IR scan photos, regular photos, credentials and report will be provided on a storage device and will be shipped with physical report copies to the VA once AMP is approved to do so.
Urgent Issues & Recommendations
Section 2
Urgent Issues & Recommendations:
1. Bldg. 209 - MV Switchgear - MVSWGR 209: Very dirty and dusty conditions present. Air insulated MV equipment should be cleaned, inspected and exercised on annual basis to prevent tracking and flashovers which are a common cause of medium voltage air insulated equipment failures.
2. Bldg. 210 - MV XFMR - T20: Mortar and construction debris has fallen on top of the transformer and minimal protective barriers were present. Transformer cooling fins that allow insulating oil to circulate and keep the transformer cooled down are very thin.
Falling bricks or mortar could cause damage to transformer and cooling fins. If the fins are damaged, oil will leak out and air will enter the transformer causing premature failure or catastrophic failure will occur. A simple barrier or wooden structure should be built over the top of the transformer to prevent damage.
3. Bldg. 210 - SWBD-Gen-11: Edge guard for load bank conductors penetrating top mounted enclosure was found to be partially installed leaving conductors exposed to sharp edges. Edge guard needs to be installed to prevent a potential flashover. A dead front panel screw was partially screwed into the outer jacket of insulation on a conductor. The team re-routed and terminated the conductor to avoid further damage and potential flashover. Metal shavings and spare hardware found attached to bus presumably from installation. Vacuuming performed and installation hardware removed from physical contact with the energized
4. Bldg. 248 – ATS248: Transfer switch did retransfer as designed but indicator lights were indicating the switch was still on EM power which was not correct. Further troubleshooting of false power source indication will be needed.
5. Building 204 – EMP: Mfr dead front was replaced by custom plate. Thus, mfr. identifying information is not present except as noted. Outer cover securing clamps are in varying states of deteriorated functionality. Removal of dead front was not performed due to condition of installation. AMP was not able to measure the load of conductors with elevated temperature since dead front can't be removed safely. Due to age, condition and safety hazards to personnel, AMP recommends replacement of this distribution panel.
6. Building 207 – Switchboards A,B&C: High levels of humidity in equipment room are causing rust to appear on equipment. VA informed several breakers are defective so that if opened, will not re-close. Recommend replacement due to condition and exceeded useful life expectancy. Recommend installing dehumidifier to reduce humidity in equipment room and prevent future corrosion.
7. Building 249 – Transformer T8: Water leakage, and subsequently corrosion are evident, but not significant. No visible signs of oil leaks. There are (2) minor dents on cooling fins.
West side of transformer pad has accumulated vegetation debris and may enhance corrosion. Bolted connection of neutral bonding strap to cabinet was found very loose.
There are no surge arrestors installed. Per C57.104-2019, Carbon Monoxide gas is in a status 2 condition and recommend investigating the source of activity. Per C57.104-
2019, the transformer is a status 2 state with greater than normal combustible gas level.
Recommend establishing a trend as faults may be present. Duval Pentagon indicates the transformer may have Thermal Faults (> 300 C). Per C57.104-2019, the combustible gas level warrants additional oil testing and analysis. Exercise caution and evaluate transformer load conditions.
8. Building 200 – Transformer T5: Space requirements for installation present challenges for code working space compliance and inspection. Recommend notation for consideration when engineering future upgrades. Additionally, climbing the hill in snowy conditions presented safe access challenges. Similarly, safe access for site personnel could be challenging under adverse weather conditions. It was not possible to determine if fluid accumulation under the unit was water, oil, or both. Low oil level, <25⁰ C, could be indicative of leakage. Per C57.104-2019, Carbon Monoxide gas is in a status 2 condition and recommend investigating the source of activity. Per C57.104-
2019, the transformer is a status 2 state with greater than normal combustible gas level.
Recommend establishing a trend as faults may be present. Duval Pentagon indicates the transformer may have Thermal Faults (> 300 C).Per C57.104-2019, the combustible gas level warrants additional oil testing and analysis. Exercise caution and evaluate transformer load conditions.
9. Building 200E – MSGA Spare Breaker: Spare breaker will not close and breaker should be repaired or refurbished.
General Issues & Recommendations
Section 3
General Issues & Recommendations:
1. AMP would recommend that the Togus facility consider adopting a yearly maintenance program that would test the equipment over the course of three years versus trying to perform all tri-annual testing in one trip. This would place less stress on facility staff and managers for planning all the outages out and also ease the onsite work efforts required by maintenance staff and contractor personnel. It would also allow the facility to add repairs to the following years trip without having to pay for an additional mobilization.
2. Per NFPA70E, arc flash hazard calculations need to be reviewed every 5 years or whenever there is a significant change in the electrical system. The team found that some equipment had updated labels from 2021, outdated labels from 2014 or no labels.
Overall, a short circuit, coordination study and arc flash study should be conducted for the whole compound. This process will end up generating a complete one-line diagram, verify if all equipment is properly rated for short circuits and also inform employees of appropriate incident energy so proper PPE can be utilized.
3. Install surge arrestors at all MV switches, transformers and LV switchgear and transfer switches. Surge arrestors are inexpensive and will help minimize equipment damage in the event of a lightning strike or voltage spike. The cost to repair or replace equipment typically exceeds the cost of surge arrestors.
4. A significant amount of equipment were found to not be anchored in place. Per NEC
110.13 (A) Mounting. “Electrical equipment shall be firmly secured to the surface on which it is mounted.” The VA Handbook 18-8 Seismic Design Requirements should be reviewed before addressing anchoring including factoring in seismic ratings for this specific location. Without anchoring, even modest activity could cause shifting of equipment. Some equipment could be damaged and not functional in emergency situations like generators. Other equipment that is top heavy could tip over on personnel creating safe hazards.
5. Some equipment has clear working space violations per NEC 110.26 and 110.34. Per
110.26(A)(2) Width of Working Space “In all cases, the workspace shall permit at least a
90 degree opening of equipment doors or hinged panels.” Per NEC 110.26(A)(1) and
110.34(A), there are minimum depth requirements of clear working space in order to allow personnel to have an adequate amount of space to provide servicing and testing of equipment. Several transformers have protective bollards or even landscaping in front of equipment doors that prevent doors from opening to 90 degrees or encroach on the clear working spaces. Relocating bollards, performing landscaping cleanup and trimming can be performed to feasibly eliminate some of the violations.
6. Several distribution panels, switchboards and transfer switches were found to have missing fasteners, hole plugs (KO Fillers) and bushings. Per NEC 110.12(A) Unused
Openings “Unused openings shall be closed to afford protection” Per 300.4(G) Fittings
“Where raceways contain 4 AWG or larger insulated circuit conductors, and these conductors enter a cabinet, box or raceway, the conductor shall be protected.” Missing fasteners, hole plugs and bushings should be installed in these areas which will eliminate the risk of debris or personnel from falling into equipment and prevent unintentional contact with energized parts.
7. Debris from initial and/or subsequent installation, including metal shavings, hole saw cores, stripped conductor insulation, was found in several enclosures and removed.
Recommend final inspection of installation and additional upgrade activities add focus on cleanliness, especially for removal hole saw cores and metal shavings.
8. Several locations had stored material and non-electrical equipment blocking access to installed electrical panels and equipment. This presents multiple fire and access code issues and emphasis should be provided to all staff to discontinue the practice.
9. In a few Distribution Panels conductors were sharply bent beyond allowable per NEC
300.34 Conductor Bending Radius. Though not presently observed, over time, natural hardening of the conductor insulation could cause cracking or splitting of the outer radius of the conductor. Hazards to personnel could then present. If pressed against an enclosure panel, short circuiting could occur. In each circumstance observed, the conductors were bent, arranged and restrained in a way to prevent enclosure contact, so no imminent issues were observed which would require immediate correction. We recommend future acceptance inspection ensure conductor minimum radius be maintained. We further recommend that maintenance personnel entering enclosures be informed and trained to look for these concerns to avoid potential contact with exposed conductor.
10. It was found that most of the transformers were under vacuum which could allow moisture and contamination to enter the transformer if a seal leak were to occur or while pulling oil samples. A fitting, pressure gauge and nitrogen blanket as applicable should be installed in the transformer which would place each transformer under positive pressure and for facility staff to monitor if any transformer seal leaks were to occur.
11. Develop a plan for replacing, retrofitting or refurbishing all equipment inspected and found to be past its useful life expectancy. Most notably, focus should be placed on equipment inspected and tested for all quarters equipment, building 204 EMP, building
207 switchboards A, B and C, building 248 EMDP, building 200 MV SWGR 200, MSGA &
MSGB. Equipment inspected in these locations have exceeded their useful life expectancy per IEEE 493 Gold book (shown below). These areas in particular, appear to be the most dilapidated and should have the highest priority for replacement, repair or retrofitting. It is important to note that age is a significant factor in determining useful life expectancy, but there are other factors that need to be considered when determining. For example: what site conditions is the equipment exposed to i.e. rain, snow, humidity, etc.; Has annual maintenance and inspections been performed; Is the equipment overloaded; Is the equipment load balanced; Has the equipment experienced any faults or short circuits.
IEEE 493 Gold Book
IEEE Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems
Equipment Expected Useful Life In Years
Capacitors 17
LV Molded Case Circuit Breakers 20
LV Power Circuit Breakers 15-20
MV Power Circuit Breakers 15-20
MV Vacuum Circuit Breakers 15-20
Dry Type Transformers & Reactors 20
Liquid Filled Transformers 30
MV & MV Cables 20
Protective Relays Not Stated
Motors & Motor Starters 20-30
VFD's & UPS's 20
AMP Quality Energy Services wants to thank the Augusta, Maine VA staff as all the staff were very professional and accommodating to work with. We enjoy the opportunity to display our core principles daily: Attentiveness, Commitment, Creativity, Dependability, Diligence and
Integrity. If we ever fall short of these values, we ask that you inform us, so we may do whatever it takes elicit forgiveness. Should you have any questions please contact the undersigned.
Thank You, Matt Prombo
Government Division Program Director
AMP LLC.
304 Turney Ridge Rd.
Somerville, AL 35670
PH: (815) 474-0119
Section 4
Building 209 Test Sheets
Customer
Address
User
Date 1/6/23 Temp. F 33 Humidity 86%
Identifier
Serial #
HV
Imp.
LV kV BIL
Taps
Gal.
Temp.
Max Temp. Winding Temp. Ambient
Inspected
Yes
Yes
Yes
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Insulation Resistance
.5 Min. 1.0 Min. 10 Min.
69.6G 80.1G 109.6G 1.16 1.36
414M 571M 879M 1.37 1.57
Oil Sample: 00201495 DGA:00201494. Ok.Oil Sampling
Grounding Ok
H to X & Ground
X to H & Ground
5000VDC
1000VDC
Recommended Min.
Resitance Ω
5,000M
100M
Electrical Tests
Windings Tested Test Voltage Resistance Ω PIDAR
Surge Arrestors
No anchors connecting frame to concrete base.
Ok
Pumps & Fans
Bolted Connection / IR Scan
Liquid Level Gauges
Temperature Gauge
Pressure Gauge
N/A
IR Pictures: 2412-2417 & 1-3. Ok
Ok
Ok
Ok
Ok
Ok
Anchoring & Alignment
Cleanliness
Alarms & Controls
Pressure Relief Device
Sample Valve Ok
N/A
Gauges Liquid Level 25°C 5°C
45°C N/A .6°C
Visual & Mechanical Inspections
Tank Pressure -1.5
Condition & Notes
Pad at grade and not elevated. Oil residue at F1.
Description
Condition
Type 4.2%IZ
112 12,470
Bldg. 209 - MV XFMR - T11
Cooper 950002447Manufacturer kVA
Delta/Wye
In Service
008H4P07K88ACAT #
208Y/120V
Transformer Nameplate Data
HV kV BIL 95 30 HV/LV Conductor AL
N/A
Outside Bldg. 209
Transformer
Date MAR09
Eqpt. Location
Position
Flir IR, AEMC TTR, MIT1025 & Fluke MM
Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
MP, RE, CH, LW & RB
Job#
LV
OA
Insulation Type Mineral Oil 213 Temp. Rise 65°C
Taps As Found/Left C / 12470 5 @ 2.5% Cooling
TTR
Expected A Phase Dev. % B Phase Dev. % B Phase Dev. %
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
103.836 103.84 Ok 103.83 Ok 103.83 Ok
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
Comments: No anchors connecting frame to concrete base. House keeping pad at grade and will not keep tank and enclosure out of standing water. Appears to have old oil seepage for fuse F1. Apply nitrogen blanket to creatre positive pressure.
RatioTap Voltage
E
D
C
B
A
N/A
N/A
12,470
N/A
AMP Quality Energy Services, LLC
4220 West Schrimsher SW Site W1
Huntsville, AL, 35804
Nameplate Data Serial Number 950002447 Unit ID BLDG. 209 - T11 Equipment Type Transformer Manufacturer Cooper Year Manufactured 2009 Primary KV 12.470 Gallons 213 KVA Rating 112 Phases 3 Fluid type Mineral Oil Substation Location Augusta, ME VA Breathing
Configuration Sealed
Equipment Information Top Valve (in) Bottom Valve (in) Hose Length (ft) Paint Condition Conservator Tank Bushings Enclosed Leaks Radiators Service Energized Compartments
Sample Date 01/06/2023 Barcode Sample Number 00201494 Job Number 2498 Sample Temp. ºC 5 DGA ppm Hydrogen 21 Methane 5 Ethane Trace Ethylene 2 Acetylene 0 Carbon Monoxide 317 Carbon Dioxide 1277 Oxygen 17178 Nitrogen 82604
TDCG 346
CO2 / CO 4.03
DGA Condition Status 1 DGA Analysis Per C57.104-2019, the combustible gases indicates the transformer is operating properly.
Duval Pentagon not applicable.
Operating Procedures
Per C57.104-2019, the combustible gas level allows for continued normal operation.
Sampling Interval Annually
Barcode Sample Number 00201495 Moisture (D1533) ppm 2 Acid (D974) mgKOH/g 0.006 IFT mM/m 31.8 Color (D1500) 0.50 Visual (1524) Clear and Sparkle - No Sediment Dielectric (D1816) kV 2 mm 70.1 Specific Gravity (D1298/D4052)
0.8824
PF 25C (D924) % 0.025
PF 100C (D924) % 0.506
Ox Inhib. (D2668) wt% 0.213 Furan Analysis (D5837) ppb 5H2F 0.0
2FOL 0.0
2FAL 8.2
2ACF 0.0
5M2F 0.0
PCB (D4059) ppm < 1 Dielectric (D877) kV 44.0 Oil Classification Class I Oil Quality All tests met C57.106-2015 minimum requirements and oil is considered a Class I for continued service.
The Degree of Polymerization is calculated to be greater than 800, indicating the cellulose insulation is in good condition.
Fluid test has No PCB.
°C %
Comments: Very dirty and dusty conditions present. Air insulated MV equipment should be cleaned on annual basis to prevent tracking. Ok.
Yes N/A
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load Open
Contact Resistance A Phase B Phase C Phase
IR Pictures: 0004-0007. Ok
N/A
Dirty and cleaned. Ok
Elecrical Tests
Test Voltage 2500V Equipment Temp. N/A
Insulation Resistance A Phase (A - B) B Phase (B-C) C Phase (C -A)
Readings in Ω
Pole to Pole Closed
Interlocking
Insulators & Barriers
Surge Arrestors
Pole to Frame
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Substation Bldg. 209 - MV Switchgear - MVSWGR 209 Position In Service
Outside Bldg. 209
Manufacturer
Serial #
0.6
53232R1-G1G7J
Nameplate Data
Yes
Yes
Yes
Voltage
Type Pad Mount Gear
15kV
S&C
930876
MV Switchgear
Test Eqpt. Used Flir IR
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/6/2023
Technicians MP, RE, CH LW & RB
Humidity Eqpt. Location
Job#
Heater N/A N/A
Yes
Condition & Notes
Ok
Ok
Ok
Dirty and cleaned. Ok
Ok
N/A
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Mechanical Operation
Condition
Description
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Yes
Heater N/A N/A
Yes
Condition & Notes
Arc flash study last updated in 2014
Ok
110.26(A)(3) requires 6 1/2' height of working space. Ceiling is approximately 4
1/2' Tall
Ok
Ok
Ok
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Mechanical Operation
Condition
Description
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Yes
Yes
Service Disconnect Switch
Test Eqpt. Used Flir IR, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/6/2023
Technicians MP, RE, CH, LW & RB
Humidity Eqpt. Location
Job#
Yes
Yes
Yes
Voltage
Type Safety Switch
Westinghouse
N/A
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Substation Bldg. 209 - Service Disconnect Switch Position In Service
Bldg. 209 Tunnel
Manufacturer
Serial #
0.6
HF-425N
Nameplate Data
Open
Contact Resistance A Phase B Phase C Phase
Pictures # 2455 to 2462. C Phase was 4 degrees warmer than A & B. C Phase was found to have 98A load and A and B had 12 and 28 respectively. Post could rebalance loads to reduce. Ok
Ok
Barriers brittle
Electrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance A Phase (A - B) B Phase (B-C) C Phase (C -A)
Readings in Ω
Pole to Pole Closed
Interlocking
Insulators & Barriers
Surge Arrestors
Pole to Frame
Comments: Arc flash label last updated in 2014. If no study has been completed within 5 years, a new study is recommended. 110.26(A)(3) requires 6 1/2' height of working space. Ceiling is approximately 4 1/2' Tall in tunnel where
SDS is located. C Phase was 4 degrees warmer than A & B. C Phase was found to have 98A load and A and B had 12 and
28 respectively. Post could rebalance loads to reduce.
Yes N/A
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load
Comments: Update arc flash study since last done in 2014. Missing 1 - 4" plastic bushing on conduit entry.
N/A N/A
Metering Yes N/A
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
IR Photos 2426-2429. Ok
N/A
Missing 1 - 4" plastic bushing on conduit entry
Elecrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Pole to Frame
Distribution Panel
Test Eqpt. Used Flir, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/6/2023
Technicians MP, RE, CH, LW & RB
Humidity Eqpt. Location
Job#
860.6
Substation Bldg. 209 - MDP-1
Insulators & Barriers
Eqpt. Room
Manufacturer
Serial #
Square D
N/A
12215442780010001
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type HCP
208Y/120V
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Update arc flash study since last done in 2014.
Ok
Description
Ok
Ok
Ok
N/A
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Mechanical Operation
Condition
Ok
Ok
Ok
N/A
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Mechanical Operation
Condition
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Ok
Ok
Description
Eqpt. Room
Manufacturer
Serial #
Square D
N/A
12304055520010001
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type HCP
240/120V
Catalog #
Pole to Frame
Distribution Panel
Test Eqpt. Used Flir, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/6/2023
Technicians All
Humidity Eqpt. Location
Job#
860.6
Substation Bldg. 209 - MDP-A
Insulators & Barriers
N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
Pictures 2418-2425. Heater breaker >15 degrees A Phase and B . 20A2P breaker. Load was 18A so ok.
Ok
Ok
Elecrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Comments: Heater breaker 20A2P breaker had 15 degrees c difference between other breakers. Amp clamp used and found load to be 18A. Ok.
N/A OK
Metering Yes N/A
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
Section 5
Building 210 Test Sheets
User
Date 1/6/23 Temp. F 33 Humidity 86%
Identifier
Serial #
HV
Imp.
LV kV BIL
Taps
Gal.
Temp.
Max Temp. Winding Temp. Ambient
Inspected
Yes
Yes
Yes
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Insulation Resistance
.5 Min. 1.0 Min. 10 Min.
20.73 25.1 101 1.22 3.198
8.47 8.68 14.19 1.02 1.72
OA
Insulation Type Mineral Oil 335 Temp. Rise 65°C
Taps As Found/Left C / 12470 5 @ 2.5% Cooling
N/A
Outside Bldg. 210
Transformer
Date 3/9
Eqpt. Location
Position
Fluke MM, Flir IR, AEMC TTR & MIT1025
Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
MP, RE, CH, LW & RB
Job#
LV
Condition & Notes
Working clearnce of 5' for MV cabinet not met per 110.34
Description
Condition
Type 5.3%IZ
500 12,470
Bldg. 210 - MV XFMR - T20
Cooper 950002603Manufacturer kVA
Delta/Wye
In Service
008H4P11K85ACAT #
208Y/120V
Transformer Nameplate Data
HV kV BIL 95 30 HV/LV Conductor AL
Gauges Liquid Level 25°C 15°C
41°C N/A .6°C
Visual & Mechanical Inspections
Tank Pressure N/A
Surge Arrestors
No anchoring Mortar and construction debris all over transformer from overhead tuckpointing work. Transformer should be better protected to prevent falling mortar and debris from covering or damaging transformer
Pumps & Fans
Bolted Connection / IR Scan
Liquid Level Gauges
Temperature Gauge
Pressure Gauge
N/A
IR Pics 2430-2435, Ok, Bus splices installed due to short cables for termination.
Ok
Ok
Ok
No PSI gauge. Gauge recommended.
Ok
Anchoring & Alignment
Cleanliness
Alarms & Controls
Pressure Relief Device
Sample Valve Ok
N/A
Grounding Ok
H to X & Ground
X to H & Ground
5000VDC
1000VDC
Recommended Min.
Resitance Ω
5,000M
100M
Electrical Tests
Windings Tested Test Voltage Resistance Ω PIDAR
Botte: 00201493 Syringe:00201492. OkOil Sampling
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
103.8 103.79 Ok 103.79 Ok 103.79 Ok
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
Comments: No anchors connecting frame to concrete base. Mortar and construction debris all over transformer from overhead tuckpointing work. Transformer should be better protected to prevent falling mortar and debris from covering or damaging transformer. Working clearnce of 5' not met per 110.34. Install PSI gauge to know if vacuum, positive presure or atmospheric pressure. Apply nitrogen blanket to creatre positive pressure.
RatioTap Voltage
E
D
C
B
A
N/A
N/A
12,470
4220 West Schrimsher SW Site W1
Huntsville, AL, 35804
Nameplate Data Serial Number 950002603 Unit ID BLDG. 210 T20 Equipment Type Transformer Manufacturer Cooper Year Manufactured 2009 Primary KV 12.470 Gallons 335 KVA Rating 500 Phases 3 Fluid type Mineral Oil Substation Location Augusta, ME VA Breathing
Configuration Sealed
Equipment Information Top Valve (in) Bottom Valve (in) Hose Length (ft) Paint Condition Conservator Tank Bushings Enclosed Leaks Radiators Service Energized Compartments
Sample Date 01/06/2023 Barcode Sample Number 00201492 Job Number 2498 Sample Temp. ºC 15 DGA ppm Hydrogen 43 Methane 6 Ethane Trace Ethylene 2 Acetylene 0 Carbon Monoxide 401 Carbon Dioxide 2088 Oxygen 11570 Nitrogen 73035
TDCG 453
CO2 / CO 5.21
DGA Condition Status 1 DGA Analysis Per C57.104-2019, the combustible gases indicates the transformer is operating properly.
Duval Pentagon not applicable.
Operating Procedures
Per C57.104-2019, the combustible gas level allows for continued normal operation.
Sampling Interval Annually
Barcode Sample Number 00201493 Moisture (D1533) ppm 3 Acid (D974) mgKOH/g 0.007 IFT mM/m 33.0 Color (D1500) 0.50 Visual (1524) Clear and Sparkle - No Sediment Dielectric (D1816) kV 2 mm 62.8 Specific Gravity (D1298/D4052)
0.8828
PF 25C (D924) % 0.017
PF 100C (D924) % 0.369
Ox Inhib. (D2668) wt% 0.215 Furan Analysis (D5837) ppb 5H2F 0.0
2FOL 0.0
2FAL 5.6
2ACF 0.0
5M2F 0.0
Dielectric (D877) kV 51.0 Oil Classification Class I Oil Quality All tests met C57.106-2015 minimum requirements and oil is considered a Class I for continued service.
The Degree of Polymerization is calculated to be greater than 800, indicating the cellulose insulation is in good
User
Date 1/6/23 Temp. F 33 Humidity 86%
Identifier
Model
Amps
Poles
Inspected
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Emergency Bypass N/A N/A N/A
Contact Resistance Phase A Phase B Phase C
Readings in µΩ Reading Reading Reading
Normal N/A N/A N/A
Emergency N/A N/A N/A
Normal Bypass N/A N/A N/A
95/90
Electrical Tests
Engine Start Time 1 Sec.
Voltage PU/DO 95/75
Cooldown Time 5 Min.
Retransfer Time to Normal 10 Min.
N/A
Rm. 107
ATS
Hz 60
Eqpt. Location
Position
Fluke MM, Megger, TTR, Flir IR
Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
MP & RB
Job#
Volts
Condition & Notes
1" ko filler missing.
Description
Condition
Phase 33
Visual & Mechanical Inspections
In Service
1190482-002RWSerial#
208V
Nameplate Data
E3ATSA3260CGX 260
Bldg. 210 - ATS210
ASCO 1049607Manufacturer
CAT#
Grounding Ok
Comments: Install missing 1" KO filler.
Ok
Ok
Exercise
Auto Transfer Test
Transfer Time to Emergency
Ok
Simulated outage by opening breaker feeding ATS normal source. Ok.
0 Sec.
Anchoring & Alignment
Cleanliness
IR Scan Picture #'s: 2448-2453. Ok.
Frequency PU/DO
Ok
Ok
N/A
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Mechanical Operation
Condition
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Update arc flash study since last done in 2014. 2" and 2 1/2" openings need KO fillers. Fan room panel conductor insulation is cracked and degraded.
No anchoring
Description
Eqpt. Room
Manufacturer
Serial #
GE
182-99102
N/A
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type AV Line SWBD
208Y/120V
Catalog #
Pole to Frame
Distribution Panel
Test Eqpt. Used FLIR IR, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/6/2023
Technicians All
Humidity Eqpt. Location
Job#
860.6
Substation Bldg. 210 - MDP
Insulators & Barriers
N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
Photo #'s 2436-2447. Ok
N/A
Ok
Elecrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Comments: Ampacity meter not showing load. Further investigation needed. Update arc flash study since last done in
2014. 2" and 2 1/2" openings need KO fillers. Fan room panel conductor insulation is cracked and degraded which should be repaired or replaced. Recommend adding surge arrestors.
N/A Recommend adding surge arrestors.
Metering Yes Ammeter not reading.
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Comments: Edge guard for load bank conductors penetrating top mounted enclosure was found to be partially installed leaving conductors exposed to sharp edges. Edge guard needs to be installed. A dead front panel screw was partially screwed into the outer jacket of insulation on a conductor. The team re-reouted and terminted the conductor to avoid further damage and potential flashover. Metal shavings and spare hardware found attached to bus presumably from
N/A Ok
Metering Yes Ok
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
Photo #'s: 2480-2497. Ok
Ok
Ok
Elecrical Tests Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Pole to Frame
Switchboard
Test Eqpt. Used Fluke MM, Flir IR
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/6/2023
Technicians All
Humidity Eqpt. Location
Job#
860.6
Substation Bldg. 210 - SWBD-Gen-11
Insulators & Barriers
Eqpt. Room
Manufacturer
Serial #
Eaton
LBS0020898
900P025H01 R15
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type Switchboard
480Y/277V
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Edge guard for load bank conductors penetrating top mounted enclosure was found to be partially installed leaving conductors exposed to sharp edges. Edge guard needs to be installed. A dead front panel screw was partially screwed into the outer jacket of insulation on a conductor. The team re-reouted and terminted the conductor to avoid further damage and potential flashover.
Ok
Description
OkMetal shavings and spare hardware found attached to bus presumably from installation. Vacuuming performed and installation hardware removed from bus.
Ok
N/A
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
User
Date 1/6/23 Temp. F 33 Humidity 86%
Identifier
Model
KW
Phase
PF
Inspected
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Comments: No anchors connecting frame to concrete base.
Manual Start Up Test Ok
Voltage
Load 7.2A
Oil Pressure
Cooldown Time
45 PSI
5 Min
Batteries & Charger
Liquid Levels
Transfer Time to Emergency
Ok
Ok
3 Seconds
CAT C13Manufacturer
Ok
Frequency 60
Re-transfer Time to Emergency 10 Min.
800AYear of Manuf. 08/19 0.8 OCPD Size
Condition & Notes
Ok
Description
Generator
Hz 2/29
Eqpt. Location
Position
Fluke MM, Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
MP, RE, CH, LW & RB
In Service
CAT00C13TT3200659Serial#
480Y/277V
Anchoring & Alignment
Cleanliness
Gauges
Grounding Ok
No anchoring
Ok
Job#
Volts
Auto Start Up Test Ok kVA
N/A
Outside Bldg. 210
Nameplate Data
FLA 30
500 400
Bldg. 210 - Gen-11
Visual & Mechanical Inspections
Section 6
Building 203 Test Sheets
User
Date 1/8/23 Temp. F 19 Humidity 68%
Identifier
Serial #
HV
Imp.
LV kV BIL
Taps
Gal.
Temp.
Max Temp. Winding Temp. Ambient
Inspected
Yes
Yes
Yes
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Insulation Resistance
.5 Min. 1.0 Min. 10 Min.
70.2 88 220 1.25 2.5
38 50.9 107.9 1.34 2.12
ONAN
Insulation Type Mineral Oil 234 Temp. Rise 65°C
Taps As Found/Left C / 12470 5 @ 2.5% Cooling
N/A
Outside Bldg. 203
Transformer
Date 3/9
Eqpt. Location
Position
Fluke MM, Flir IR, AEMC TTR & MIT1025
Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
RE/CH
Job#
LV
Condition & Notes
Working clearnce of 5' for MV cabinet not met per 110.34
Description
Condition
Type 5.4 %IZ
150 12,470
Bldg. 203 - MV XFMR - T10
Cooper 950002470Manufacturer kVA
Delta/Wye
In Service
008H4P08K89ACAT #
208Y/120V
Transformer Nameplate Data
HV kV BIL 95 30 HV/LV Conductor AL
Gauges Liquid Level 25°C 5°C
45°C N/A Neg 6°C
Visual & Mechanical Inspections
Tank Pressure NEG 3 PSI
Surge Arrestors
No anchoring
Ok
Pumps & Fans
Bolted Connection / IR Scan
Liquid Level Gauges
Temperature Gauge
Pressure Gauge
N/A
IR Pics 2508-2513, Ok
Ok
Ok
Ok
Ok
Ok
Anchoring & Alignment
Cleanliness
Alarms & Controls
Pressure Relief Device
Sample Valve Ok
N/A
Grounding Ok
H to X & Ground
X to H & Ground
5000VDC
1000VDC
Recommended Min.
Resitance Ω
5,000M
100M
Electrical Tests
Botte: 00207969 Syringe:00207968Oil Sampling
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
103.8 103.79 Ok 103.78 Ok 103.77 Ok
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
Comments: No anchors connecting frame to concrete base. Apply nitrogen blanket to create positive pressure.
RatioTap Voltage
E
D
C
B
A
N/A
N/A
12,470
4220 West Schrimsher SW Site W1
Huntsville, AL, 35804
Nameplate Data Serial Number 950002470 Unit ID BLDG. 203 T10 Equipment Type Transformer Manufacturer Cooper Year Manufactured 2009 Primary KV 12.470 Gallons 234 KVA Rating 150 Phases 3 Fluid type Mineral Oil Substation Location Augusta, ME VA Breathing
Configuration Sealed
Equipment Information Top Valve (in) Bottom Valve (in) Hose Length (ft) Paint Condition Conservator Tank Bushings Enclosed Leaks Radiators Service Energized Compartments
Sample Date 01/08/2023 Barcode Sample Number 00207968 Job Number 2498 Sample Temp. ºC 5 DGA ppm Hydrogen 17 Methane 4 Ethane Trace Ethylene 1 Acetylene 0 Carbon Monoxide 211 Carbon Dioxide 1066 Oxygen 13834 Nitrogen 67456
TDCG 234
CO2 / CO 5.05
DGA Condition Status 1 DGA Analysis Per C57.104-2019, the combustible gases indicates the transformer is operating properly.
Duval Pentagon not applicable.
Operating Procedures
Per C57.104-2019, the combustible gas level allows for continued normal operation.
Sampling Interval Annually
Barcode Sample Number 00207969 Moisture (D1533) ppm 3 Acid (D974) mgKOH/g 0.007 IFT mM/m 35.5 Color (D1500) 0.50 Visual (1524) Clear and Sparkle - Trace Sediment Dielectric (D1816) kV 2 mm 58.5 Specific Gravity (D1298/D4052)
0.8824
PF 25C (D924) % 0.034
PF 100C (D924) % 0.569
Ox Inhib. (D2668) wt% 0.185 Furan Analysis (D5837) ppb 5H2F 0.0
2FOL 0.0
2FAL 9.8
2ACF 0.0
5M2F 0.0
Dielectric (D877) kV 44.4 Oil Classification Class I Oil Quality All tests met C57.106-2015 minimum requirements and oil is considered a Class I for continued service.
The Degree of Polymerization is calculated to be greater than 800, indicating the cellulose insulation is in good
Comments: Arc flash label last updated in 2014.
Yes N/A
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load Open
Contact Resistance A Phase B Phase C Phase
Pictures # 2504 to 2507. Ok
Ok
Ok
Electrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance A Phase (A - B) B Phase (B-C) C Phase (C -A)
Readings in Ω
Pole to Pole Closed
Interlocking
Insulators & Barriers
Surge Arrestors
Pole to Frame
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Substation Bldg. 203 - Service Disconnect Switch - E03BA Position In Service
Eqpt. Room
Manufacturer
Serial #
-18
DG325UGKN
Nameplate Data
Yes
Yes
Yes
Voltage
Type Safety Switch
Eaton
56519
Service Disconnect Switch
Test Eqpt. Used Flir IR, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/8/2023
Technicians RE & CH
Humidity Eqpt. Location
Job#
Heater N/A N/A
Yes
Condition & Notes
Arc flash study last updated in 2014
Ok
Ok
Ok
Ok
Ok
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Mechanical Operation
Condition
Description
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Ok
Amp breaker for metering failed to reset after being exercised. Metering circuit was moved to spare breaker.
N/A
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Mechanical Operation
Condition
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Update arc flash study since last done in 2014. Conduit is missing bushing.
Ok
Description
SP001-203
Manufacturer
Serial #
GE
D0062996T
N/A
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type SPECTRA SERIES
208Y/120V
Catalog #
Pole to Frame
Distribution Panel
Test Eqpt. Used FLIR IR
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/8/2023
Technicians RE/CH
Humidity Eqpt. Location
Job#
68-6
Substation Bldg. 203 - MDP
Insulators & Barriers
N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
Photo #'s 2514-2521. Ok
N/A
Ok
Elecrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Comments: Recommend adding surge arrestors. Update arc flash study since last done in 2014. Conduit needs bushing.
20 Amp breaker for metering failed to reset after being exercised and tested. A spare breaker was moved and used for the Metering circuit.
N/A Recommend adding surge arrestors.
Metering Yes N/A
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
User
Date 1/8/23 Temp. F 21 Humidity 68%
Identifier
Model
Amps
Poles
Inspected
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Emergency Bypass N/A N/A N/A
Contact Resistance Phase A Phase B Phase C
Readings in µΩ Reading Reading Reading
Normal N/A N/A N/A
Emergency N/A N/A N/A
Normal Bypass N/A N/A N/A
95/90
Electrical Tests
Engine Start Time 1 Sec.
Voltage PU/DO 90/85
Cooldown Time 15 Min
Retransfer Time to Normal 15 Min
N/A
Eqpt. Room
ATS
Hz 60
Eqpt. Location
Position
Fluke MM, Megger, TTR, Flir IR
Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
RE& CH
Job#
Volts
Condition & Notes
1" ko filler missing. Arc Flash study last updated in 2014.
Description
Condition
Phase 33
Visual & Mechanical Inspections
In Service
1819494 RESerial#
208V
Nameplate Data
J7ATSB3260C5XC 260
Bldg. 203 - ATS203
ASCO 7000Manufacturer
CAT#
Grounding Ok
Comments: 1" ko filler missing. Arc Flash study last updated in 2014.
Ok
Ok
Exercise
Auto Transfer Test
Transfer Time to Emergency
OK
Ok.
0 Sec.
Anchoring & Alignment
Cleanliness
IR Scan Picture #'s: 2498-2503. Ok.
Section 7
Building 248 Test Sheets
User
Date 1/8/23 Temp. F 19 Humidity 46%
Identifier
Serial #
HV
Imp.
LV kV BIL
Taps
Gal.
Temp.
Max Temp. Winding Temp. Ambient
Inspected
Yes
Yes
Yes
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Insulation Resistance
.5 Min. 1.0 Min. 10 Min.
64.6 81.5 141.8 1.27 1.74
8.12 9.68 18.22 1.19 1.88
TTR
Expected A Phase Dev. % B Phase Dev. % B Phase Dev. %
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
103.83 103.68 Ok 103.62 Ok 103.57 Ok
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
Botte: 00201489 Syringe:00201488. Ok.Oil Sampling
RatioTap Voltage
E
D
C
B
A
N/A
N/A
12,470
N/A
N/A
Grounding Ok
H to X & Ground
X to H & Ground
5000VDC
1000VDC
Recommended Min.
Resitance Ω
5,000M
100M
Electrical Tests
Windings Tested Test Voltage Resistance Ω PIDAR
Surge Arrestors
No anchoring
Ok
Pumps & Fans
Bolted Connection / IR Scan
Liquid Level Gauges
Temperature Gauge
Pressure Gauge
N/A
IR Pics 0008-0023. Ok
Ok
Ok
Ok
Ok
Ok
Anchoring & Alignment
Cleanliness
Alarms & Controls
Pressure Relief Device
Sample Valve Ok
N/A
Gauges Liquid Level 25°C 5°C
48°C N/A -7.2°C
Visual & Mechanical Inspections
Tank Pressure -2
Condition & Notes
Ok
Description
Condition
Type 5.3%IZ
500 12,470
Bldg. 248 - MV XFMR - T12
Cooper 950002604Manufacturer kVA
Delta/Wye
In Service
008H4P11K85ACAT #
208Y/120V
Transformer Nameplate Data
HV kV BIL 95 30 HV/LV Conductor AL
N/A
Outside Bldg. 248
Transformer
Date 3/9
Eqpt. Location
Position
Fluke MM, Flir IR, AEMC TTR & MIT1025
Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
MP, RB & LW
Job#
LV
OA
Insulation Type Mineral Oil 335 Temp. Rise 65°C
Comments: No anchors connecting frame to concrete base. Apply nitrogen blanket to creatre positive pressure.
4220 West Schrimsher SW Site W1
Huntsville, AL, 35804
Location Augusta, ME VA Breathing Configuration Sealed
Equipment Information Top Valve (in) Bottom Valve (in) Hose Length (ft) Paint Condition Conservator Tank Bushings Enclosed Leaks Radiators Service Energized Compartments
Sample Date 01/08/2023 Barcode Sample Number 00201488 Job Number 2498 Sample Temp. ºC 5 DGA ppm Hydrogen 46 Methane 10 Ethane 1 Ethylene 3 Acetylene 0 Carbon Monoxide 538 Carbon Dioxide 3245 Oxygen 8531 Nitrogen 69009
TDCG 598
CO2 / CO 6.03
DGA Condition Status 1 DGA Analysis Per C57.104-2019, the combustible gases indicates the transformer is operating properly.
Duval Pentagon not applicable.
Operating Procedures
Per C57.104-2019, the combustible gas level allows for continued normal operation.
Sampling Interval Annually
Barcode Sample Number 00201489 Moisture (D1533) ppm 4 Acid (D974) mgKOH/g 0.008 IFT mM/m 30.7 Color (D1500) 0.50 Visual (1524) Clear and Sparkle - No Sediment Dielectric (D1816) kV 2 mm 66.7 Specific Gravity (D1298/D4052)
0.8826
PF 25C (D924) % 0.015
PF 100C (D924) % 0.409
Ox Inhib. (D2668) wt% 0.215 Furan Analysis (D5837) ppb 5H2F 0.0
2FOL 0.0
2FAL 6.1
2ACF 0.0
5M2F 0.0
Dielectric (D877) kV 48.5 Oil Classification Class I Oil Quality All tests met C57.106-2015 minimum requirements and oil is considered a Class I for continued service.
The Degree of Polymerization is calculated to be greater than 800, indicating the cellulose insulation is in good condition.
Nameplate Data Serial Number 950002604 Unit ID BLDG.248T12 Equipment Type Transformer Manufacturer Cooper Year Manufactured 2009 Primary KV 12.470 Gallons 335 KVA Rating 500 Phases 3 Fluid type Mineral Oil Substation
Comments: Update arc flash study since last done in 2014.
N/A Ok
Metering Yes Ok
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
Photo #'s 0024-0049. Ok
N/A
Ok
Elecrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Pole to Frame
Distribution Panel
Test Eqpt. Used FLIR IR, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/8/2023
Technicians MP, RB & LW
Humidity Eqpt. Location
Job#
46-7.2
Substation Bldg. 248 - New MDP
Insulators & Barriers
Eqpt. Room
Manufacturer
Serial #
Square D
N/A
30020744-00
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type QED SWBD
208Y/120V
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Update arc flash study since last done in 2014.
Ok
Description
Ok
Ok
Ok
Ok
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Comments: Update arc flash study since last done in 2014. 4" bushing needed for Panel MP Mechannical RM feeder.
Various conductors are pressed up against sharp frame rails. Insulation was insalled behind conductors to prevent contact with sharp edges.
N/A N/A
Metering Yes Ok
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
Photo #'s 0050 - 0063 . Ok
N/A
Ok
Elecrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Pole to Frame
Distribution Panel
Test Eqpt. Used FLIR IR, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/8/2023
Technicians MP, RB & LW
Humidity Eqpt. Location
Job#
46-7.2
Substation Bldg. 248 - MDP
Insulators & Barriers
Eqpt. Room
Manufacturer
Serial #
Square D
C44-82709-1
N/A
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type Power Style 3 SWBD
208Y/120V
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Update arc flash study since last done in 2014. 4" bushing needed for Panel MP
Mechannical RM feeder. Various conductors are pressed up against sharp frame rails. Insulation was insalled behind conductors to prevent contact with sharp edges.
No anchoring
Description
Ok
Ok
Ok
Ok
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Surge supressor needs to be removed and/or replaced as indicator lights indicate c phase not functioning or bulb is burnt out. Surge arrestor is double tapping on existing breaker 9 and needs a seperate breaker.
Metering Yes N/A
Reading Reading Reading
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Readings in Ω
Pole to Pole
Reading Reading Reading
N/A N/A N/A
Line to Load Open
Contact Resistance Pole 1 Pole 2 Pole 3
Photo #'s 0066 - 0077. All temperature vairations in conductors were found to be acceptable due to loads. Ok.
N/A
Ok
Elecrical Tests
Test Voltage N/A Equipment Temp. N/A
Insulation Resistance Pole 1 (P1-P2) Pole 2 (P2-P3) Pole 3 (P3-P1)
Readings in Ω
Pole to Pole Closed
Interlocking
Pole to Frame
Distribution Panel
Test Eqpt. Used FLIR IR, Fluke MM
Customer
Address
User
Date Temp.
2498Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
N/A
1/8/2023
Technicians MP, RB & LW
Humidity Eqpt. Location
Job#
46-7.2
Substation Bldg. 248 - EMDP
Insulators & Barriers
Eqpt. Room
Manufacturer
Serial #
Square D
N/A
44-82709-4
Nameplate Data
Surge Arrestors
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Fusing
Bolted Connection / IR Scan
Voltage
Type I-Line
208Y/120V
Catalog #
Amperage
Visual & Mechanical Inspections Inspected
Position In Service
Yes
Condition & Notes
Update arc flash study since last done in 2014. Old Spare wires left in panel need to be removed and whole plugged with 1 1/2" KO Filler.
Ok
Description
Neutrals and ground are tied together which creates objectionable current due to ground and neutral put in parallel.
Ok
Ok
N/A
Anchoring & Alignment
Grouding & Clearances
Cleaniness & Lubrication
Comments: Update arc flash study since last done in 2014. Old Spare wires left in panel need to be removed. AMP removed old wire and connector. VA will need to install 1 1/2" KO. Neutrals and ground are tied together which creates objectionable current due to ground and neutral put in parallel. Surge suppressor needs to be removed and/or replaced as indicator lights indicate c phase not functioning or bulb is burnt out. Surge arrestor is double tapping on existing breaker 9 and needs a separate breaker. Equipment should be replaced due to condition and past its useful life expectancy.
User
Date 1/8/23 Temp. F 19 Humidity 46%
Identifier
Model
Amps
Poles
Inspected
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Emergency Bypass N/A N/A N/A
Contact Resistance Phase A Phase B Phase C
Readings in µΩ Reading Reading Reading
Normal N/A N/A N/A
Emergency N/A N/A N/A
Normal Bypass N/A N/A N/A
N/A
Electrical Tests
Engine Start Time 1 Sec.
Voltage PU/DO N/A
Cooldown Time 5 Min.
Retransfer Time to Normal 10 Min.
N/A
Eqpt. Rm.
ATS
Hz 60
Eqpt. Location
Position
Fluke MM, Flir IR
Technicians
Test Eqpt. Used
Togus VA Medical Center
1 VA Ctr, Augusta, ME 04330
MP, RB & LW
Job#
Volts
Condition & Notes
2" KO filler needed. Arc Flash study needs to be updated. Transfer switch did restransfer as designed but indicator lights were indicating the switch was still on EM power which was not correct. Further troubleshooting of false power source indication will be needed.
Description
Condition
Phase 43
Visual & Mechanical Inspections
In Service
919139Serial#
208Y/120V
Nameplate Data
Bldg. 248 - ATS248
Square D
9001AG400-31-208
Manufacturer
CAT#
4 Pole ATS
Grounding Multiple wires landed under single lugs
Comments: 2" KO filler needed. Arc Flash study needs to be updated. Transfer switch did restransfer as designed but indicator lights were indicating the switch was still on EM power which was not correct. Further troubleshooting of false power source indication will be needed.
Ok
Ok
Exercise
Auto Transfer Test
Transfer Time to Emergency
Ok
Simulated outage by de-energizing xfmr. Ok.
0 Sec.
Anchoring & Alignment
Cleanliness
IR Scan Picture #'s: 0078-0087. Ok.
Section 8
Building 235 Test…