Questions and Answers.docx
DOCX document 15 KB Posted
- Attached to
- J044--Boiler Plant Safety Devices
- Solicitation number
- 36C24125Q0127
About this file
This is a Questions and Answers document for solicitation 36C24125Q0127 regarding boiler plant safety devices at a Department of Veterans Affairs facility.
The document provides technical specifications about three Superior Boilers fire tube units (two 300 HP and one 150 HP) operating at 90 PSI. The boilers use Webster burners (HDSX for Boilers 1 & 3, JBSX for Boiler 2) with Fireye PPC 6000 and YB110 controls and flame safeguards. Rosemount meters require calibration. While the contractor must supply gaskets, several aspects including boiler opening/closing, cleanings, inspections, and plant-wide controller/SCADA systems are handled through separate contracts with Venergy Group. The boilers are integrated with a Building Management System (BMS).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24125Q0127_3.docx | DOCX document | |
| 36C24125Q0127_2.docx | DOCX document | |
| Combined Synopsis-Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24125Q0127 | Questions and Answers
1. Make / model and Horsepower of each boiler, water tube or fire tube style?
a. Superior Boilers Frie Tube. Boilers 1 & 3 are 300 HP, and Boiler 2 is 150 HP.
2. Steam pressure?
a. 90 PSI
3. Will the VA be supplying all the parts to be replaced?
a. No
4. Make / Model of each burner?
a. Webster, Boilers 1 & 3 are HDSX, and Boiler 2 is JBSX
5. Make / Model of burner controls and flame safeguards?
a. Fireye PPC 6000 and YB110
6. Make / Model of Plant Wide Controller?
a. Being replaced on separate contract through Venergy Group.
7. Make / Model of Steam, feed water, gas, oil, etc. meters that are required to be calibrated?
a. All are Rosemount.
8. Brand of SCADA?
a. Being replaced on separate contract through Venergy Group.
9. Are the boilers integrated with a BMS?
a. Yes
10. Will the VA be opening and closing the boilers annually?
a. Yes, this is done on another contract not part of this scope through Venergy Group.
11. Who will perform the cleanings and inspections?
a. Yes, this is done on another contract not part of this scope through Venergy Group.
12. Will the prime contractor be responsible for supplying any/all gaskets for the boilers?
a. Yes, this is done on another contract not part of this scope through Venergy Group.