This document is a Statement of Work (SOW) for a project to replace the main electrical substation located on the Providence VA Medical Center (PVAMC) campus. The key objectives are to replace the existing substation with a new substation of adequate capacity to meet future needs, construct approximately 500 feet of underground duct bank, decommission and remove the existing substation, prepare the site for the new utility equipment, and coordinate the work with the local utility.
The major elements of work include general construction, site preparation, MEP installation, and demolition and removal of existing structures. The construction must conform to Department of Veterans Affairs design manuals and technical specifications, as well as all applicable codes, and be coordinated with other ongoing projects at the PVAMC. The estimated total duration of the work is 630 calendar days from the notice to proceed.
The related federal contract opportunity is a Pre-Solicitation for a Construction project to replace a substation at the Providence VAMC, with a Solicitation Number of 36C24124R0111. The full, completed Statement of Work, including Specifications and Drawings, will be provided with the actual solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P02_Sources Sought_36C24124AP4019.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE PRIMARY SUBSTATION
PROJECT 650-22-103
Statement of Work The objective of this project is to replace the existing main electrical substation located on the Providence VA Medical Center (PVAMC) campus with a new substation of adequate capacity to meet future needs. The major elements of work include general construction, site preparation, MEP installation, and demolition and removal of existing structures. The project includes the following:
· Development of a phasing plan to maintain power to the campus during installation and commissioning of the new substation.
· Construction of approximately 500 feet of underground duct bank originating at the new substation and terminating in a new manhole.
· All work required for the complete decommissioning, removal, and disposal of the existing substation.
· Site preparation for the new utility equipment including equipment pads, manholes, and conduits. Work must be coordinated with the local utility.
· Construction of a new electrical substation and tie-ins to the existing 11.2kV distribution system. Work must be coordinated with the local utility.
The construction will conform to Department of Veterans Affairs design manuals and technical specifications, as well as all applicable codes. Construction work will be coordinated with other ongoing projects at the PVAMC. It is expected that the following disciplines will be required for the construction of this project: civil, mechanical, electrical, architectural, fire protection, structural and plumbing. The estimated total duration of the work is 630 calendar days from the notice to proceed.