608-23-001 Renovate Second Floor East Wing Dwgs.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24124B0031
About this file
This solicitation is seeking bids for renovations to the second floor of the east wing at a Department of Veterans Affairs medical center. Key details include:
-
The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses and bids will only be accepted from verified SDVOSBs.
-
The scope of work involves renovations and finishes upgrades to the second floor as detailed in the drawings and specifications. Site visits are scheduled for February 16th and questions are due by February 21st with bids due on March 7th.
-
The selected contractor must pay prevailing Davis-Bacon wages and provide payment and performance bonds equal to 100% of the contract price. Insurance requirements include an Experience Modification Rating below 1.0.
-
Bids must include the completed SF-1442, acknowledgement of amendments, pricing, bid guarantee, representations and certifications, and safety/environmental violation information. Electronic submission is required by the due date and time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24124B0031 0005.docx | DOCX document | |
| 36C24124B0031 0004.docx | DOCX document | |
| RFI ANSWERS.docx | DOCX document | |
| Site visit Sign in sheet.pdf | ||
| 36C24124B0031 0003.docx | DOCX document | |
| 36C24124B0031 0002.docx | DOCX document | |
| 36C24124B0031 0001.docx | DOCX document | |
| Project Specifications 650-23-001 020124.pdf | ||
| 608-23-001 Renovations to Second Floor East Wing SOW R020124 (1).pdf | ||
| 36C24124B0031_1.docx | DOCX document | |
| SAM.gov NH WD 06302023.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10
LIST OF ABBREVIA llONS LIST OF DRAWINGS
Affv ABOVE GA GAGE, GAUGE SC SOLID CORE GENERALA/C AIR CONDITIONING GALV. GALVANIZED SCH SCHEDULE
A
AC.P. ACOUSTIC PANEL GB GRAB BAR SD SOAP DISPENSER
GO.O COVER ACT ACOUSTICAL TILE GC GEN. CONTRACTOR SHT SHEET
G0.1 GENERAL INFORMATION AT ACOUSTICAL TILE GFRC GLASS FIBER REINFORCED CONCRETE SIM SIMILAR A
ADJ ADJUSTABLE GL GLASS, GLAZING SKLT SKYLIGHT G2.0 SECOND FLOOR AREA OF WORK PLAN
AFF ABOVE FIN. FLOOR GWB GYPSUM WALL BOARD SND. SANITARY NAPKIN DISP.
AHU AIR HANDLING UNIT SNW SANITARY NAPKIN WASTE
AL ALUMINUM HC HOLLOW CORE SPEC SPECIFICATION(S)
ALT ALTERNATE HOW HARDWARE SQ SQUARE
ANOD ANODIZED HM HOLLOW METAL S/STL STAINLESS STEEL ARCHITECTURALAPPROX APPROXIMATE HORZ HORIZONTAL SSCG STAINLESS STEEL CORNER GUARD
ARCH ARCHITECT HP HIGHPOINT STL STEEL
ARCHL ARCHITECTURAL HT HEIGHT STD STORAGE AD1 .2 SECOND FLOOR DEMOLITION PLAN
HTG HEATING STRUCT STRUCTURAL A1.2 SECOND FLOOR PLAN
BO BOARD HVAC HEAT, VENT, A./C. SUSP SUSPENDED
A2.2 SECOND FLOOR REFLECTED CEILING PLAN BIT BITUMINOUS sv SHEET VINYL
BLDG BUILDING IC INSIDE CLEAR SYS SYSTEM AF1 .2 SECOND FLOOR FINISH PLAN
BLKG BLOCKING INCL INCLUDE(□) (ING) SGT STRUCTURAL GLAZED TILE
BOT BOTTOM INSUL INSULATE(□) (ION)
BRG BEARING INT INTERIOR T/ TOP OF
MECHANICALBRK BRICK TEL TELEPHONE
BRZ BRONZE JT JOINT TEMP.GL. TEMPERED GLASS
B
B/S BOTH SIDES TEX TEXTURE(□)
MHE1.2 SECOND FLOOR EXISTING CONDITIONS PLAN BUR BUILT-UP ROOFING L LENGTH T & G TONGUE AND GROOVE B
B/W BOTH WAYS LAM LAMINATE(□) THK THICK{NESS)
LAV LAVATORY THR THRESHOLD
C COURSE LCC LEAD COATED COPPER TKBD TACKBOARD
CAB CABINET LH LEFT HAND TRANS TRANSPARENT
CEM CEMENT LT LIGHT TPD TOILET PAPER DISP.
CG CORNER GUARD LTL LINTEL TYP TYPICAL
CFA CALL FOR AID LVR LOUVER TZ TERRAZZO
CG-F CORNER GUARD-FIRE RATED
CHBD CHALKBOARD MAS MASONRY UC UNDERCUT
Cl CAST IRON MAX MAXIMUM
CJT CONTROL JOINT MB MACHINE BOLT VB VINYL BASE
CLG CEILING MECH MECHANICAL V.C.T. VINYL COMP. TILE
CLL CONTRACT LIMIT LINE MED MEDIUM VERT VERTICAL
CLR CLEAR MTL METAL VG VERTICAL GRAIN
CMU CONCRETE MASONRY UNIT MFG MANUFACTURING VIF VERIFY IN FIELD
COL COLUMN MFR MANUFACTURE(R) vwc VINYL WALLCOVERING
CONC CONCRETE MH MECHANICAL HOOD
C
CONSTR CONSTRUCTION MIN MINIMUM w WIDTH, WIDE
CONT CONTINUOUS MIR MIRROR W/ WITH
CONTR CONTRACT(OR) MISC MISCELLANEOUS WO WOOD
C
CORR CORRUGATED MLDNG MOLDING, MOULDING W.G. WIRE GLASS
CPT CARPET(ED) MO MASONRY OPENING WIND WINDOW
CR CARD READER MULL MULLION W/0 WITHOUT
CT CERAMIC TILE WP WATERPROOFING
CTR COUNTER NAT NATURAL WWM WELDED WIRE MESH
CTSK COUNTERSUNK NIC NOT IN CONTRACT WR WATER RESISTANT
CYD CUBIC YARD NOM NOMINAL
NTS NOT TO SCALE
D DRAIN
DET DETAIL(ED) OA OVERALL
OF DRINKING FOUNTAIN OBS OBSCURE
DIAG DIAGONAL oc ON CENTER(S)
DIA DIAMETER OD OUTSIDE DIAMETER
DIM DIMENSION OPG OPENING
DISP DISPENSER OPP OPPOSITE
ON DOWN
DR DOOR PERF PERFORATE(□)
DWG DRAWING PLAM PLASTIC LAMINATE
D
DWR DRAWER PLAS PLASTER
PNL PANEL D
EA EACH pp PUSH PLATE
EF EXHAUST FAN PR PROXIMITY READER
EG EDGE GUARD PSI POUNDS PER SQUARE INCH
EL ELEVATION PT POINT
ELEC ELECTRICAL PNT PAINT(ED)
ELEV ELEVATOR PTO PAPER TOWEL DISPENSER
EMER EMERGENCY PTN PARTITION
ENG ENGINEER PTR PAPER TOWEL RECEPTACLE
EQ EQUAL PVC POLYVINYL CHLORIDE
EQUIP EQUIPMENT PVMT PAVEMENT
EWC ELEC. WATER COOLER
EXIST EXISTING QT QUARRY TILE
EXP EXPANSION
EXPO EXPOSED R RISER
EXT EXTERIOR RAD RADIUS(ED)
EIFS EXTERIOR INSULATION AND FINISH RBR RUBBER
SYSTEM RD ROOF DRAIN
E
FA FIRE ALARM
REF REFER(ENCE)
REFR REFRIGERATOR
FD FLOOR DRAIN
REINF REINFORCE(□) (ING) FE FIRE EXTINGUISHER
FEC IRE EXTINGUISHER CAB. REM REMOVE
REQ'D REQUIRED FIN FINISH(ED)
RET RETURN FLG FLASHING
REV REVISION(S), REVISED FLR FLOOR(ING)
RFG ROOFING FON FOUNDATION
RH RIGHT HAND
FP(G) FIREPROOF(ING) RM ROOM
FR FRAME RO ROUGH OPENING
F.S. FULL SIZE RWL RAIN WATER LEADER
FTG FOOTING
E
FUT FUTURE
PIIC FABRIC WALLCOVERING
FURR. FURRING
F F
Phase Project Tnle Project Number Drawing Title
CONSULTANT ARCHITECT/ENGINEER OF RECORD KEY PLAN (Al STAMP Office of GENERAL INFORMATION 100% CONSTRUCTION RENOVATIONS TO SECOND 608-23-001
Construction DOCUMENTS FLOOR EAST WING Building Number
BLDG 1, E-WINGand Facilities Management Approved: Project Director I Location I Drawing Number
• MANCHESTER, NH
FULLY SPRINKLERED Issue Date Checked
EJ
G0.1
VA
U.S. Department
11/15/2022 AO iii of Veterans Affairs 0 Revisions: Date: n.
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
PROJECT
NORTH
Dental Check-In
184 SF
DOR
SF
F
FEMALE
111 SF
heck-In Window
TEL CL
20 SF
MALE
98 SF
Rm#
212A
S.P.S.
365 SF
STERILIZER
Room Name
LAB
LAB
omcE omcE
LAB
STERILIZER RM
SPO CLOSET
UTILITY ROOM
OFFICE
OFFICE
OFFICE
OFFICE
omcE
STORAGE CLOSET
OFFICE
STORAGE ROOM
omcE
STORAGE CLOSET
LAB
LAB
CORRIDOR
L.JL'vVl'II
106 SF
FOYER
2 SF
Floor
ETR
ETR
VCT-1
VCT-1
PCT-1
PCT-1
VCT-1
PCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
ETR
ETR
VCT-1
CORRIDOR
908 SF rr---
1 39
SF
STORAGE
56 SF
STOR CL
12 SF
LOGISTIC
STORAGE
349 SF
CORRIDOR
120 SF
ELEC CL
20 SF
o□[g]�
ELEVATOR
NO 1
ELEC CL
24 SF
D
CORRIDOR
ELEVATOR 215 SF
NO 2
SERVICE
ELEVATOR
NO 3
CORRIDOR
410 SF
/ 1 SECOND FLOOR FINSIH PLAN
= ,AF1.2 SCALE 1/8" 1'-0"
Base
PT-5
PT-5
PT-5
PT-5
PT-5
PT-5
PT-5
PT-5
RB-1
RB-1
RB-I
RB-I
RB-I
PT-5
PT-5
PT-5
RB-I
PT-5
RB-I
RB-I
PT-5
OFFICE
185 SF
FEMALE
120 SF
MALE
120 SF
STAIR
NO. 2
196 SF
N
PT-1
PT-2
PT-1
PT-1
N/A
N/A
PT-1
N/A
PT-1
PT-1
PT-I
PT-1
PT-I
PT-I
PT-3
PT-I
PT-I
PT-I
PT-2
PT-2
PT-I
FIRE CL
3 SF
ELEC CL
13 SF
ROOM FINISH
Walls
E s
PT-3 PT-1
PT-1 PT-2
PT-1 PT-2
PT-1 PT-1
N/A N/A
N/A N/A
N/A PT-1
N/A N/A
PT-1 PT-3
PT-1 PT-4
PT-I PT-4
PT-1 PT-3
PT-3 PT-I
PT-I PT-I
PT-I PT-2
PT-1 PT-1
PT-1 PT-2
PT-I PT-2
PT-2 PT-2
PT-2 PT-2
PT-I PT-I
SCHEDULE
w
PT-1
PT-2
PT-1
PT-2
N/A
N/A
N/A
N/A
PT-1
PT-1
PT-I
PT-1
PT-I
PT-I
PT-I
PT-I
PT-I
PT-I
PT-2
PT-2
PT-I
Ceiling
AT-2 PATCH WALLS AS NEEDED FOR NEW FlNISHES
AT-2 PATCH WALLS AS NEEDED FOR NEW FINISHES
AT-2 PATCH WAllS AS NEEDED FOR NEW FINISHES
PT-6 PATCH WAllS AS NEEDED FOR NEW FINISHES
PT-6 PATCH WAllS AS NEEDED FOR NEW FINISHES
AT-2 PATCH WAllS AS NEEDED FOR NEW FINISHES
PT-6 PATCH WALLS AS NEEDED FOR NEW FlNISHES
PT-6 PATCH WAllS AS NEEDED FOR NEW FlNISHES
AT-1 PATCH WALLS AS NEEDED FOR NEW FlNISHES
AT-I PATCH WALLS AS NEEDED FOR NEW FlNISHES
AT-I PATCH WALLS AS NEEDED FOR NEW FINISHES
AT-1 PATCH WAllS AS NEEDED FOR NEW FINISHES
AT-2 PATCH WAllS AS NEEDED FOR NEW FlNISHES
PT-6 PATCH WALLS AS NEEDED FOR NEW FlNISHES
AT-1 PATCH WALLS AS NEEDED FOR NEW FlNISHES
AT-2 PATCH WAllS AS NEEDED FOR NEW FlNISHES
AT-I PATCH WALLS AS NEEDED FOR NEW FlNISHES
PT-6 PATCH WALLS AS NEEDED FOR NEW FINISHES
AT-2 PATCH WALLS AS NEEDED FOR NEW FINISHES
AT-2 PATCH WAllS AS NEEDED FOR NEW FINISHES
AT-I PATCH WALLS AS NEEDED FOR NEW FINISHES
cr2 R-+-H cr3 \-+-+-H
1t-+-t-t-tOFFICE-t-t-t-t1 OFFICE
J::JI:m+i::i=+:+:i=:1+:ii tt:��t1:::t:::t:::t:t1
STOR �
Notes
STERILIZER RM
ROOM E
217 2�0 21s>+-t-+
STAIR
NO 1
rH-H-Hr,o FFI C E-1-1--1-1--1-1-........, ,i;, I+-+-+-+-
OFFICE OFFICE
E
219 OFFICE OFFI C E±±±±:fttjj�J:j H-+-+-+-+-+-+-+-+-<f-+->-++ 1-+-+-0+- F
F
I C
E l-+-l-+-+-+-+-+-+-+-t-1-t-H II-+++++++++++-
□ □ ,t±±:±:t±:t:±:J:±:±J/t:l:==:t:::t,;□� t:1:±:t:±:J:±:±,;:□a;=== tt:=±:±:1:±:t:±:J:±:t,□
STOR CL
SECOND FLOOR
FLOOR FINISH KEY
EXISTING TO REMAIN
VINYL COMPOSITION TILE
VCT-1
PORCELAIN TILE
PCT-1
FINISH LEGEND
FLOORING FINISHES
VCT-1: �NYL COMPOSITE TILE
ARMSTRONG FLOORING - STANDARD EXCELEON
SANO-DRIFT WHITE
PCT-1: PORCELAIN TILE
CROSS\ILLE EMPIRE - GENERAL'S GREY VS85 UP
2X2 MOSAIC
WAUL FlNISHES
RB-1: 6" RUBBER BASE
JOHNSONITE - BLACK
PAINT (P)
PT-1: BENJAMIN MOORE WHITE DOWN OC-131
PT-2: BENJAMIN MOORE LILY PAD 480
PT-3: SHER\\IN \\ILUAMS BREEZY SW 7616
PT-4: BENJAMIN MOORE MANCHESTER TAN HC-81
PT-5: BENJAMIN MOORE BLACK 2132-10
PT-6: BENJAMIN MOORE CEILING WHITE
PT-1: BENJAMIN MOORE WHITE DOWN OC-131
LEGEND
@ EXISTING ROOM N A ME /NUMBER T AG
CONSULTANT ARCHITECT/ENGINEER OF RECORD KEY PLAN STAMP Office of Construction and Facilities Management
Drawing Title
SECOND FLOOR FINISH PLAN
P hase
100% CONSTRUCTION
DOCUMENTS
MECH/ ELEC / PLUMBING: ARCHITECTURAL:
Revisions: Date:
2 3 4 5
VA
U.S. Department of Veterans Affairs
Approved: Project Director
FULLY SPRINKLERED
7 8
9 10
FINISH NOTES=
I. ALL WALLS TO BE PAINTIEO WlTHIN AREA OF WORK. WAll PAINT TO BE EGGSHELL FINISH
UNLESS OTHER\\ISE NOTED ON FlNISH LEGEND OR SCHEDULE.
2. BRING ALL FLOOR FlNISHES WALL TO WAll AND UNDER CASEWORK.
3. ALL GWB CEILINGS SHAll BE PAINTIEO UNLESS NOTED OTHER\\ISE.
4. CEILING TILES AND GRID WHERE DEMOLITION HAS CAUSED OPENINGS IN C0UNG SHAll BE
INSTALLED AND REPLACED
CEILING FlNISHES
AT-1: ACOUSTICAL CEILING TILE
GRID- 15/16"
COLOR- WHITE
SIZE- 48" x 24" x 5/8"
ARMSTRONG CORTEGA FIREGUARD 823
AT-2: ACOUSTICAL CEILING TILE
GRID- 15/16"
COLOR- WHITE
SIZE- 24" x 24" x 5/8"
ARMSTRONG CORTEGA FIREGUARD 824
Project THle
RENOVATIONS TO SECOND
FLOOR EAST WING
Project Number
608-23-001
Building Number
BLDG 1, E-WING
llocation
I Drawing Number
�ANCHESTER, NH
�ls s ue�D�a::=te
====:::;-;::c;;:
A h=e c:;::ke d;:=
:c=
AF1.2
11/15/2023
9 10
A
B
C
D
E
F
| 1_G0.0_Cover G0 |
| 2_G0.1_Info G0.1 |
| 3_G2.0_Area Of Work Plan G2.0 |
| 4_AD1.2_Demolition Floor Plan AD1 |
| 5_A1.2_Second Floor Plan A1 |
| 6_A2.1_Second Floor Reflected Ceiling Plan A2 |
| 7_AF1.2_Second Floor Finish Plan AF1.2 |
| 8_MHE 1.2_Mechanical Exisiting Conditions Plan MHE1.2 |
File details come from the government source that posted it. Updated .