S06 SOW 523-17-008 Boiler Plant AST Containment.docx

DOCX document 1 MB Posted

Attached to
Z2DA--523-17-008 Boiler Plant AST Containment
Solicitation number
36C24124B0015
Issued by

About this file

This statement of work outlines repairs needed for aboveground storage tanks and containment systems at the Jamaica Plain VA Medical Center. The Department of Veterans Affairs is seeking a contractor to address concrete foundation and coating cracks, separation of a dike wall, tank labeling, and corrosion on steel components. The contractor must complete the repairs within 180 calendar days of receiving a notice to proceed. The related solicitation was issued by the VA Veterans Health Administration VISN1 for boiler plant AST containment work identified in the statement of work.

View the file

Other files

File Type Posted
S06 Bid Opening Conference Line 36C24124B0015.docx DOCX document
36C24124B0015 0005.docx DOCX document
S06 WD MA20230001 12.08.2023.pdf PDF
S06 RFI Question and Answers - Boiler Plant AST Containment.docx DOCX document
36C24124B0015 0004.docx DOCX document
S06 Site Visit Sign In Sheet 11.28.2023.pdf PDF
36C24124B0015 0003.docx DOCX document
36C24124B0015 0002.docx DOCX document
S06 523-17-008 BID SPECIFICATIONS.pdf PDF
S06 523-17-008 SOW Boiler Plant AST Containment.docx DOCX document
S06 523-17-008 BID DRAWINGS.pdf PDF
36C24124B0015 0001.docx DOCX document
S02 Drawings 523-24-005.pdf PDF
S02 SOW 523-24-005.docx DOCX document
S02 Specifications 523-24-005.pdf PDF
S02 WD MA20230001 10.20.2023.pdf PDF
36C24124B0015_1.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

523-17-008 Boiler Plant AST

Statement of Work

VA Boston Healthcare System – Jamaica Plain

Repair of secondary containment for the Aboveground Storage Tanks (ASTs)

1.0. VA Boston Healthcare System – Jamaica Plain (VA)

The Jamaica Plain VAMC has completed an inspection of two (2) 40,000-gallon diesel ASTs and containment systems, and one (1) 11,410-gallon liquid nitrogen AST. The inspection identified several conditions of concern for the diesel ASTs and recommended that associated repairs be completed.

2.1 Boiler Plant Building #5 Scope

The VA had a third party conduct an inspection of our ASTs that revealed the following issues:

Conditions Identified/Recommendations:

· Concrete Foundation/Floor Issues/Dike –Containment- Overall structural foundation is in good condition per visual inspection, however, top coating at various areas is cracked, thus, recommend these areas be recoated to avoid water penetration, accordingly.

· Upper Left Rear Dike-Wall Issue- There is a visible separation of upper corner section of wall system, thus, recommends it be repaired and sealed.

· Tank Labeling Issues- Recommend additional labeling for tank is put on tank to properly and clearly identify product in tank and also reflect tank numbers as noted above.

· Corrosion/Painting Issues- Recommend that for various smaller sections/areas of steel components (for tank and piping) that are starting to show signs of corrosion are repainted. However, it should be noted that there were no visible signs of structural damage to these components as of time of this inspection.

Contractor to refer to attached drawings and general requirements specifications for repair plan.

The Period of Performance is 180 calendar days from the issuance of the Notice to Proceed (NTP).

Records Management:

1. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.

2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

6. The Government Agency owns the rights to all data/records produced as part of this contract.

7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].

9. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

10. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.